Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: PERFORM SHUTDOWN MARGIN CALCULATION FOR AN OPERATING REACTOR JPM NUMBER: PBN JPM P000.002D.COT REV. 1 RELATED PRA NONE INFORMATION:

TASK NUMBERS / P000.002.COT TASK TITLE(S): PERFORM SHUTDOWN MARGIN CALCULATION FOR AN OPERATING REACTOR K/A NUMBERS: 003 AK1.07 (3.1/3.9) 003 AK3.04 (3.6/4.1) 2.1.25 (2.8/3.1)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other: X Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path: N/A TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Joey Trudeau 7/27/12 Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Andrew Zommers Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002D.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev. 1 JPM Number: PBN JPM P000.002D.COT JPM

Title:

PERFORM SHUTDOWN MARGIN CALCULATION FOR AN OPERATING REACTOR Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002D.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev. 1 JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 had been operating at 100% power.
  • Rod H-2 in Shutdown Bank "A" has dropped to the bottom of the core.
  • The crew is responding in accordance with AOP-6A, "Dropped Rod".
  • Assume todays date and time are current.

INITIATING CUES:

OS1 has directed you to calculate the required shutdown margin in accordance with PBF-2513, "Shutdown Margin for an Operating Reactor", per Step 9 of AOP-6A.

The following Unit 1 conditions currently exist:

  • Boron Concentration - 1125 ppm
  • Rx Power - 90%
  • Tave - 572 °F
  • Tref - 573 °F
  • Control Bank D @ 185 steps
  • All other banks @ 225 steps Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002D.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev. 1 JPM PERFORMANCE INFORMATION Required Materials: PBF-2513, Shutdown Margin for an Operating Reactor Calculator General

References:

Technical Requirements Manual (TRM)

Unit 1 ROD Book Task Standards: Required Shutdown Margin calculated within the specified tolerance

(+/- 56 pcm).

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

NOTE: Provide examinee with a copy of the Unit 1 ROD book with ROD 1.1 filled out for 1782 MWD/MTU three days ago. Also provide examinee with a copy of the TRM.

Performance Step: 1 Verify TAVG within 1.5°F of TREF.

Critical N Standard: Verify TAVG within 1.5°F of TREF based on initial conditions given and circle YES on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002D.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev. 1 Performance Step: 2 Obtain Core burn-up from ROD 1.1.

Critical Y Standard: Core burn-up determined to be 1896 +/- 38 MWD/MTU.

Evaluator Note: Core burn-up determined to be 1896 MWD/MTU and recorded on PBF-2513. From ROD 1.1, examinee will have 1782 MWD/MTU three days ago and will need to add 114 MWD/MTU (3 Days

  • 38 MWD/MTU/Day)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Obtain EOL burn-up from Rod 1.1.

Critical N Standard: EOL burn-up determined to be 17220 MWD/MTU and recorded on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Calculate % burn-up.

Critical N Standard: Calculate % burn-up to be 11.0% + 0.25% and record on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002D.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev. 1 Performance Step: 5 Obtain reactor power level.

Critical N Standard: Record 90% on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 6 Obtain control rod position for Bank C and D.

Critical N Standard: Bank C and D control rod position determined to be 225 and 185 steps and recorded on PBF-2513.

Evaluator Cue: If asked Bank C is at 225 steps per initial conditions.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 7 Obtain power defect from Rod 7.

Critical Y Standard: Determine power defect to be 1600 to 1650 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002D.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev. 1 Performance Step: 8 Obtain control rod worth (Bank D, C, B, A, S in, HZP) from Rod 5.

Critical Y Standard: Determine control rod worth (Bank D, C, B, A, S in, HZP) to be 5860 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 9 Obtain stuck rod worth from Rod 5.

Critical Y Standard: Determine stuck rod worth to be 617 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 10 Calculate stuck rod worth minus control rod worth.

Critical N Standard: Calculate stuck rod worth minus control rod worth to be -5243 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002D.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev. 1 Performance Step: 11 Obtain bank worth to ARO from Rod 3.1, using Step 2 and Step 6 Critical Y data.

Standard: Determine bank worth to ARO to be 111 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 12 Obtain correct value for dropped rod, stuck rod or no abnormal Critical Y condition.

Standard: Determine dropped rod and enter stuck rod worth from ROD 5 and record 617 pcm on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 13 Calculate total available control rod negative reactivity by adding Critical Y Step 10, 11, 12 and 250 pcm.

Standard: Determine Total available control rod negative reactivity to be

-4265 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002D.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev. 1 Performance Step: 14 Calculates shutdown margin by adding Steps 13 and 7.

Critical Y Standard: Determine calculated SDM to be 2615 to 2665 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 15 Determine the required shutdown margin using TRM 2.1 Figure 2 Critical Y using Step 4 data.

Standard: Determines required SDM to be 2000 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 16 Determines if calculated shutdown margin is more negative than Critical Y required shutdown margin.

Standard: Determines Calculated SDM is greater than Required SDM and circles YES on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002D.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev. 1 Performance Step: 17 Inform OS1 you calculated the shutdown margin in accordance with Critical N PBF-2513, "Shutdown Margin for an Operating Reactor" and shutdown margin is satisfactory.

Standard: Inform OS1 that SDM calculation is complete.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Terminating Cues: This completes the JPM Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002D.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev. 1 Historical Record:

Rev. 0: Developed JPM for ILT 2011 admin re-exam.

Rev. 1: Revised JPM with EPU values for the 2012 ILT NRC exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002D.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev. 1 DO NOT HAND OUT THIS IS A KEY SHUTDOWN MARGIN FOR AN OPERATING REACTOR UNIT ___1_____ TIME _________ DATE ___Today__

ROD BOOK STEP CORE PARAMETER OR VARIABLE DATA SECTION TAVG within 1.5°F of TREF (circle one) 1 (Consult with Reactor Engineering if greater than 1.5°F) YES/NO Core Burn-Up 1896 +/- 38 2 ROD 1.1 (MWD/MTU from ROD 1.1) MWD/MTU Nominal EOL Burn-Up 3 ROD 1.1 17220 MWD/MTU (MWD/MTU from ROD 1.1)

% Burn-Up 4 11.0 + 0.25 %

(Step 2 ÷ Step 3) 5 Reactor Power Level (%) 90 %

Bank C 225 steps 6 Control Rod Position Bank D 185 steps Power Defect 7 ROD 7 (+)1600 to 1650pcm (for power recorded in Step 5)

Control Rod Worth 8 ROD 5 (+) 5860 pcm (Bank D, C, B, A, S in; at HZP) 9 Stuck Rod Worth ROD 5 (+) 617 pcm 10 Stuck Rod Worth minus Control Rod Worth (Step 9 Step 8) (-) 5243 pcm Bank Worth to ARO 11 ROD 3.1 (+) 111 pcm (Use Step 2 and Step 6 data)

For a dropped rod, enter the Stuck Rod Worth from ROD 5. ROD 5 For a stuck rod, multiple misaligned rods, or a rod misaligned low, 12 contact Reactor Engineering. (+) 617 pcm Enter 0 if no rod abnormalities exist.

Total Available Control Rod Negative Reactivity (Step 10 + Step 11 + Step 12 + 250 pcm*)

13 (-) 4265 pcm

  • 250 pcm added to account for redistribution effects from Xenon and voiding Calculated Shut Down Margin 14 (-)2615 to 2665pcm (Step 13 + Step 7)

Required Shut Down Margin 15 (-) 2000 pcm (From TRM 2.1, [COLR], Figure 2, using Step 4 data)

(circle one)

Calculated Shut Down Margin is more negative than Required 16 Shut Down Margin (Step 14 more negative than Step 15)

YES/NO Completed By: ________________________ Independent Verification By: _____________________

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 12 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 had been operating at 100% power.
  • Rod H-2 in Shutdown Bank "A" has dropped to the bottom of the core.
  • The crew is responding in accordance with AOP-6A, "Dropped Rod".
  • Assume todays date and time are current.

INITIATING CUES:

OS1 has directed you to calculate the required shutdown margin in accordance with PBF-2513, "Shutdown Margin for an Operating Reactor", per Step 9 of AOP-6A.

The following Unit 1 conditions currently exist:

  • Boron Concentration - 1125 ppm
  • Rx Power - 90%
  • Tave - 572 °F
  • Tref - 573 °F
  • Control Bank D @ 185 steps
  • All other banks @ 225 steps Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 13 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002D.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev. 1 ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required?

Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 14 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: PERFORM CONTROL ROOM SHIFT TURNOVER CHECKLIST JPM NUMBER: PBN JPM P119.001.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / P119.001.COT Conduct Shift Turnover TASK TITLE(S):

K/A NUMBERS: Generic 2.1.3 (3.0/3.4)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room: X LOCATION:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path: YES TASK APPLICABILITY: SRO: RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers 7/27/12 Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Joey Trudeau Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P119.001.COT JPM

Title:

PERFORM CONTROL ROOM SHIFT TURNOVER CHECKLISTPERFORM CONTROL ROOM SHIFT TURNOVER CHECKLIST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 Control Operator.
  • Unit 1 is at 100% power with no testing or other evolutions in progress.
  • It is nearing the end of the mid-shift.

INITIATING CUES:

  • You are to complete the Control Room Shift Turnover Checklist for Unit 1.
  • You are not to re-align any equipment.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: PBF 2061, Control Room Shift Turnover Checklist Unit 1 General

References:

None Task Standards: All 4 control board misalignments identified and impact on plant identified.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Identify loss of control power to 1SI-878B, 1P-15A SI Pump Loop B Injection Critical Y (SEQ-1) MOV with valve being SHUT.

Standard: Identify 1SI-878B being SHUT and loss of control power on 1SI-878B identified by lack of indicating lights (green light and red light off) and note time. (Page 5)

Identify the Unit 1 SI-SPRAY READY Status Board UNSAT.

Examinee identifies this affects LCO 3.5.2 ECCS - Operating Evaluator Cue: Examinee may attempt to remove green indicating bulb to see if it is burnt out. Inform examinee that the bulb has been checked and the bulb is good.

Acknowledge report by the RO as OS1 for 1SI-878B being shut and have the RO continue on with logs.

As needed for a follow up question, request the examinee identify any TS impact as appropriate for the RO license level.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Identify misalignment of 1YIC-926A, 1SI-836 Spray Eductor Controller.

Critical Y (SEQ-1)

Standard: Misalignment of 1YIC-926A identified by controller in MANUAL and SHUT, then note time. (page 7)

Examinee identifies this item affects LCO 3.6.7 Spray Add System Evaluator Cue: Acknowledge report by the RO as OS1 for 1YIC-926A being manual and shut and have the RO continue on with logs.

As needed for a follow up question, request the examinee identify any TS impact as appropriate for the RO license level.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Identify misalignment of 1FIC-4074A, 1P-53 MDAFP Controller to 1HX-1A.

Critical Y (SEQ-1)

Standard: Identify Controller is set for 100 GPM vice 145 GPM and note time. (page 11)

Examinee identifies this item affects LCO 3.7.5. Auxiliary Feedwater Evaluator Cue: Acknowledge report by the RO as OS1 for 1SI-878B being shut and have the RO continue on with logs.

As needed for a follow up question, request the examinee identify any TS impact as appropriate for the RO license level.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 4 Identify misalignment of 1CV-111 RMW to 1Z-1 Blender Flow Control Valve as Critical Y (SEQ-1) OPEN.

Standard: Examinee identifies 1CV-111 as OPEN. (page 13)

Examinee identifies this item as out of position but not affecting any LCO.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Identify misalignment of 1CV-111 RMW to 1Z-1 Blender Flow Control Valve as Critical N OPEN.

Standard: Examinee identifies that the RO is not allowed to go behind the control boards without a relief.

Evaluator Cue: Inform the RO that the Third License has checked P-23A Reactor Make Up Water Pump aligned for Blender Services and in AUTO.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Ensure any follow up questions are completed prior to ending the JPM.

Terminating Cues: This completes the JPM Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Historical Record:

Rev 0: Modified JPM P119.001a.COT for ILT 2012 ILT NRC exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

Snap into any Mode 1-4 IC where turnover logs are applicable.

Place 1YIC-926A in MANUAL Set 1FIC-4074A to 100 GPM Close 1RC-515 Shut 1SI-878B and then insert malfunction below Snap IC for multiple uses Simulator Setup:

SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION TITLE DELAY SERV RAMP Preload VLV1SIS042 1SI-878 Loop B N/A 1-Fail Cntl N/A Injection Valve Fuse Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 Control Operator.
  • Unit 1 is at 100% power with no testing or other evolutions in progress.
  • It is nearing the end of the mid-shift.

INITIATING CUES:

  • You are to complete the Control Room Shift Turnover Checklist for Unit 1.
  • You are not to re-align any equipment.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: PERFORM CONTAINMENT ISOLATION VALVE TEST JPM NUMBER: PBN JPM P103.002.COT REV. 1 RELATED PRA None INFORMATION:

TASK NUMBERS / P103.002.COT TASK TITLE(S): PERFORM CONTAINMENT ISOLATION VALVE TEST K/A NUMBERS: 103 A3.01 (3.9/4.2)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Joey Trudeau 7/27/12 Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Andrew Zommers Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P103.002.COT JPM

Title:

PERFORM CONTAINMENT ISOLATION VALVE TESTPERFORM CONTAINMENT ISOLATION VALVE TEST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Performance of IT 60, Containment Isolation Valves (Quarterly) Unit 1 was started last shift and is completed through Section 5.3.
  • A Unit 1 forced vent is NOT in progress.
  • The PAB Auxiliary Operator is standing by for assistance during the IT.
  • The stopwatch has been appropriately logged out in MTE log.
  • Unit 1 is in Mode 1 INITIATING CUES:
  • OS1 directs you to continue with section 5.4 of IT 60, Containment Isolation Valves (Quarterly) Unit 1.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: IT 60, Containment Isolation Valves (Quarterly) Unit 1.

General

References:

IT 60, Containment Isolation Valves (Quarterly) Unit 1.

Task Standards: Complete section 5.4 and Attachment D of IT 60.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 IF a forced vent is in progress, THEN ENSURE requirements of OP 9C, Critical N Containment Venting and Purging for interrupting forced vent are met PRIOR to interrupting it.

Standard: Examinee determines no forced vent is in progress, step is N/A.

Evaluator Cue: No forced vent is in progress as stated in initial conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 IF U1 in Mode 1, 2, 3 OR 4, Critical N THEN Enter TS 3.4.15 Action Condition B.

Standard: Examinee determines Unit 1 should enter TSAC 3.4.15.B.

Evaluator Cue: Acknowledge the TSAC entry and inform Examinee the 4th License will make the required log entries.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Record the "As Found" position of the following:

Critical N

  • 1P-707A 1RE-211/212 Rad Monitoring Sample Pump
  • 1P-707B RE-211/212 Rad Monitoring Forced Vent Pump Standard: Examinee records as-found positions of 1P-707A (running) and 1P-707B (off).

Evaluator Cue: If asked, the AO reports P-707A Sample Pump running.

If examinee checks the RMS Server or RMS on PPCS, the indication is as expected.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 4 IF running, Critical N THEN, SECURE the following:

  • 1P-707A 1RE-211/212 Rad Monitoring Sample Pump
  • 1P-707B RE-211/212 Rad Monitoring Forced Vent Pump Standard: Examinee secures 1P-707A.

Evaluator Note: If an error occurs, like finger slipping off stop watch, additional stroke timing is allowed to be documented on Attachment J. For example, if a valve was timed in error going shut, the valve must be timed open per the IT and then could be re-timed shut and documented in Attachment J. This applies to all valve timing in this JPM.

Evaluator Cue: If asked, AO reports P-707A Sample Pump secured.

If examinee checks the RMS Server or RMS on PPCS, the indication is as expected.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 SHUT and TIME 1RM-3200A, RE-211/212 Return Cont Isol Critical Y Valve.

Standard: Examinee records required Data on Attachment D within acceptance criteria.

Evaluator Cue: PAB Auxiliary operator reports that 1RM-3200A indicates shut locally.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 6 OPEN and TIME 1RM-3200A, RE-211/212 Return Cont Isol Critical Y Valve. (For Information Only)

Standard: Examinee records required Data on Attachment D.

Evaluator Note: Opening of valve is critical, not recording data.

Evaluator Cue: PAB Auxiliary Operator reports that 1RM-3200A indicates open locally.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 SHUT and TIME 1RM-3200B, RE-211/212 Supply Cont Isol Critical Y Valve.

Standard: Examinee records required Data on Attachment D. All are within acceptance criteria (except for the malfunctioning Isolation Panel status light).

Identify LCO 3.3.3 Post Accident Monitoring is NOT MET.

Evaluator Note: Ensure examinee continues with the procedure to completion to restore the RE-211/212 flowpath.

Identifying LCO 3.3.3 PAM NOT MET is not critical.

Evaluator Cue: Acknowledge report from RO that Isolation Panel status light is malfunctioning for 1RM-3200B. OS1 wants you to continue with the IT.

PAB Auxiliary operator reports 1RM-3200B indicates shut locally.

If examinee tests the containment isolation panel status lights for 1RM-3200 B, cue that the light is illuminated during the panel alarm test.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 8 OPEN and TIME 1RM-3200B, RE-211/212 Supply Cont Isol Critical Y Valve. (For Information Only)

Standard: Examinee records required Data on Attachment D.

Evaluator Note: Opening of valve is critical, not recording data.

Evaluator Cue: PAB Auxiliary operator reports 1RM-3200B indicates open locally.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 SHUT and TIME 1RM-3200C.

Critical Y Standard: Examinee records required Data on Attachment D within acceptance criteria.

Evaluator Note: Valve is inaccessible, located in containment.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 OPEN and TIME 1RM-3200C. (For Information Only)

Critical Y Standard: Examinee records required Data on Attachment D.

Evaluator Note: Opening of valve is critical, not recording data.

Valve is inaccessible, located in containment.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 11 IF a forced vent was interrupted in Step 5.4.1, THEN ENSURE Critical N requirements of OP 9C, Containment Venting and Purging are met PRIOR to restarting forced vent.

Standard: Examinee determines step is N/A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Restore 1P-707A AND 1P-707B, to "As Found" condition of Step 5.4.3.

Critical Y Standard: Examinee re-starts 1P-707A.

Evaluator Cue: If requested, PAB Auxiliary Operators check of 1P-707A is satisfactory prior to pump start.

If examinee checks the RMS Server or RMS on PPCS, the indication is as expected.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Check RMS Valve Data with Acceptance Criteria of Attachment D.

Critical Y Standard: Examinee determines all data is within acceptance criteria with the exception of 1RM-3200B position indication on C01. Examinee circles UNSAT on Attachment D and signs.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 14 IF TS 3.4.15 Action Condition B was entered in Step 5.4.2, THEN EXIT the Critical N Action Condition.

Standard: Examinee determines we can exit TSAC 3.4.15.B.

Evaluator Note: Cannot exit TSAC if P-707A is not started.

Evaluator Cue: Acknowledge the report to exit TSAC and the 4th License will make the log entry.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Examinee reports to OS1 that IT 60 Containment Isolation Valves Critical N (Quarterly) Unit 1 section 5.4 is completed.

Standard: Examinee makes report of IT 60 completion with noted discrepancy.

Evaluator Cue: Acknowledge the report.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Historical Record:

Rev. 1: Revised JPM for 2012 ILT NRC exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

Any at power IC can be used to perform this JPM.

Snap IC with preloaded override.

Stopwatch will be needed.

Simulator Setup: (Modify tables as necessary)

SIMULATOR OVERRIDES; TIME OVERRIDE ID. OVERRIDE DELAY VALUE RAMP DESCRIPTION PRELOAD STA-1C01B-A04 1RM3200B OFF RE-211/212 SUP SHUT Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 12 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • Performance of IT 60, Containment Isolation Valves (Quarterly) Unit 1 was started last shift and is completed through Section 5.3.
  • A Unit 1 forced vent is NOT in progress.
  • The PAB Auxiliary Operator is standing by for assistance during the IT.
  • The stopwatch has been appropriately logged out in MTE log.
  • Unit 1 is in Mode 1 INITIATING CUES:
  • OS1 directs you to continue with section 5.4 of IT 60, Containment Isolation Valves (Quarterly) Unit 1.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 13 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 14 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: OPERATE TSC VENTILATION SYSTEM JPM NUMBER: JPM P088.008AOT REV. 7 RELATED PRA None INFORMATION:

TASK NUMBERS / P088.008.AOT/OPERATE TSC VENTILATION SYSTEM TASK TITLE(S):

K/A NUMBERS: 2.3.1 (2.6/3.0)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION In-Plant: X Control Room:

LOCATION:

Simulator: Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO X Additional signatures may be added as desired.

Developed by: Joey Trudeau 7/27/12 Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Andrew Zommers Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM P088.008AOT JPM Number:

OPERATE TSC VENTILATION SYSTEM JPM

Title:

Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • A Site Area Emergency has been declared at PBNP.
  • You are on the relief crew and have reported to the Operations Support Center (OSC) for further instructions.
  • A radiation release at PBNP is imminent.
  • Wind speed is 10 mph from the north (towards Two Rivers).

INITIATING CUES:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: EPIP 4.1, "Technical Support Center (TSC) Activation and Evacuation",

Attachment B General

References:

EPIP 4.1, "Technical Support Center (TSC) Activation and Evacuation",

Attachment A Task Standards: Shift TSC heating, ventilation and air conditioning from normal to emergency mode.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Ensure that air flow is from the TSC to the turbine building.

Critical N Check DPI-4713A on the annunciator panel (El. 18.5') to verify that the TSC is pressurized relative to the turbine building.

Standard: The examinee ensures that air flow is from the TSC to the turbine building.

DPI-4713A on the annunciator panel (El. 18.5') is checked to verify that the TSC is pressurized relative to the turbine building.

Evaluator Note: DPI-4713A point to the area with the higher pressure.

Evaluator Cue: DPI-4713A indicates 0.1 inches of water on the turbine building side.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 IF the air flow is NOT from the TSC to the Turbine Building, THEN coordinate Critical Y manipulation of the turbine building supply fans, dampers, and exhaust fans with the Operations Coordinator to achieve air flow from the TSC at Door 116.

Standard: The examinee requests the Operations Coordinator to adjust air flow from the TSC at Door 116 per Step 2.2 of EPIP 4.1, "Technical Support Center (TSC) Activation and Evacuation", Attachment B.

Evaluator Cue: The Operations Coordinator acknowledges your request.

DPI-4713A now indicates 0.1 inches of water on the TSC side.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 To shift the heating, ventilating, and air conditioning system from the normal to Critical N emergency mode, locate panel M-1.

Standard: The examinee locates panel M-1 per Figure 4 of EPIP 4.1, "Technical Support Center (TSC) Activation and Evacuation", Attachment B.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Turn the "auto/unocc/occupied" switch on panel M-1 to the "occupied" position.

Critical Y Standard: The examinee positions the "auto/unocc/occupied" switch on panel M-1 to the "occupied" position.

Evaluator Cue: The "auto/unocc/occupied" switch on panel M-1 is in the "occupied" position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 5 Turn the "normal/emergency" switch on panel M-1 to the "emergency" position.

Critical Y Standard: The examinee positions the "normal/emergency" switch on panel M-1 to the "emergency" (#2) position.

Evaluator Cue: The "normal/emergency" switch on panel M-1 is in the "emergency" (#2) position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Select the north or south (east) emergency intake depending on meteorological Critical Y conditions. Select the upwind intake duct.

Standard: The examinee selects the upwind (North) intake duct, the toggle switch is positioned to the (North) right position.

Evaluator Note: Initial Conditions - Wind speed is 10 mph from the North (towards Two Rivers).

Evaluator Cue: The South/North emergency intake toggle switch is in the (North) right position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 7 Select "hand" on compressor K22 located on the west wall of El. 18.5' of the TSC Critical Y building (see Figure 4).

Standard: The examinee positions the compressor K22 switch to the "hand" position.

Evaluator Cue: The switch for compressor K22 is in the "hand" position.

If asked, examinee hears compressor running.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Turn the air handling unit (W89) disconnect to the "on" position in the TSC room Critical Y north wall (see Attachment A).

Standard: The examinee positions the air handling unit (W89) disconnect to the "on" position.

Evaluator Cue: The air handling unit (W89) disconnect is in the "on" position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Push "start" pushbutton.

Critical Y Standard: The examinee depresses the "start" pushbutton.

Evaluator Cue: The "start" pushbutton is depressed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 10 Inform the Rad/Chem Coordinator that the TSC emergency ventilation system has Critical N been activated in accordance with EPIP 4.1, "Technical Support Center (TSC)

Activation and Evacuation", Attachment B.

Standard: The examinee informs the Rad/Chem Coordinator that the TSC emergency ventilation system has been activated in accordance with EPIP 4.1, "Technical Support Center (TSC) Activation and Evacuation", Attachment B.

Evaluator Cue: The Rad/Chem Coordinator acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This completes this JPM.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Historical Record:

Rev. 0-6: See microfilm.

Rev. 7: Updated JPM to new form. Revised for use on the 2012 ILT NRC Exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • A Site Area Emergency has been declared at PBNP.
  • You are on the relief crew and have reported to the Operations Support Center (OSC) for further instructions.
  • A radiation release at PBNP is imminent.
  • Wind speed is 10 mph from the north (towards Two Rivers).

INITIATING CUES:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: REVIEW SHUTDOWN MARGIN CALCULATION FOR AN OPERATING REACTOR JPM NUMBER: PBN JPM P000.002c.COT REV. 2 RELATED PRA NONE INFORMATION:

TASK NUMBERS / P000.002.COT / PERFORM SHUTDOWN MARGIN CALCULATION TASK TITLE(S): FOR AN OPERATING REACTOR K/A NUMBERS: 003 AK1.07 (3.1/3.9) 003 AK3.04 (3.8/4.1) 2.1.25 (2.8/3.1)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other: X Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path: YES TASK APPLICABILITY: SRO: X RO: NLO Additional signatures may be added as desired.

Developed by: Joey Trudeau 7/27/12 Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Andrew Zommers Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002c.COT, Verify Shutdown Margin Calculation for an Operating Reactor, Rev. 2 JPM Number: JPM P000.002cCOT JPM

Title:

VERIFY SHUTDOWN MARGIN CALCULATION FOR AN OPERATING REACTOR Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002c.COT, Verify Shutdown Margin Calculation for an Operating Reactor, Rev. 2 JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 had been operating at 100% power.
  • Rod H-2 in Shutdown Bank "A" has dropped to the bottom of the core.
  • The crew is responding in accordance with AOP-6A, "Dropped Rod".
  • PBF-2513, "Shutdown Margin for an Operating Reactor", was completed and independently verified per Step 9 of AOP-6A 20 minutes ago.

INITIATING CUES:

The Shift Manager has directed you to review the shutdown margin calculation.

The following Unit 1 conditions currently exist:

  • Boron Concentration - 1275 ppm
  • Rx Power - 90%
  • Tave - 572 °F
  • Tref - 573 °F
  • Control Bank D @ 180 steps
  • All other banks @ 225 steps Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002c.COT, Verify Shutdown Margin Calculation for an Operating Reactor, Rev. 2 JPM PERFORMANCE INFORMATION Required Materials: PBF-2513, Shutdown Margin for an Operating Reactor Calculator Filled out Rod 1.1 with required core Burnup per JPM.

General

References:

Technical Requirements manual (TRM)

Unit 1 ROD Book Task Standards: Verify Shutdown Margin calculated within the specified tolerance (+/- 50 pcm).

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

NOTE: If the candidate attempts to stop evaluating the SDM after finding the first mistake, direct them to complete evaluating the entire SDM.

NOTE: Provide examinee with a copy of the Unit 1 ROD book with ROD 1.1 filled out for 2850 MWD/MTU five days ago. Also provide examinee with a copy of the TRM.

Performance Step: 1 Verify TAVG within 1.5°F of TREF.

Critical N Standard: Verify TAVG within 1.5°F of TREF based on initial conditions given and YES circled on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002c.COT, Verify Shutdown Margin Calculation for an Operating Reactor, Rev. 2 Performance Step: 2 Verify Core burn-up from ROD 1.1.

Critical N Standard: Core burn-up determined to be 3040 +/- 38 MWD/MTU.

Evaluator Note: Core burn-up determined to be 3040 MWD/MTU and recorded on PBF-2513. From ROD 1.1, examinee will have 2850 MWD/MTU five days ago and will need to add 190 MWD/MTU (5 Days

  • 38 MWD/MTU/Day)

Evaluator Cue: Provide examinee with copy of Unit 1 ROD book.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Verify EOL burn-up from Rod 1.1.

Critical N Standard: EOL burn-up determined to be 17220 MWD/MTU as recorded on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Verify % burn-up.

Critical N Standard: Verify 17.7% + 0.3 as recorded on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002c.COT, Verify Shutdown Margin Calculation for an Operating Reactor, Rev. 2 Performance Step: 5 Verify reactor power level.

Critical N Standard: Verify 90% recorded on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Verify control rod position for Bank C and D.

Critical N Standard: Bank C and D control rod position determined to be 225 and 180 steps as recorded on PBF-2513.

Evaluator Cue: If asked Bank C is at 225 steps per initial conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Verify power defect from Rod 7.

Critical Y Standard: Determine that the power defect of 1480 pcm recorded on PBF-2513 is in error and it should be 1650 + 25 pcm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002c.COT, Verify Shutdown Margin Calculation for an Operating Reactor, Rev. 2 Performance Step: 8 Verify control rod worth (Bank D, C, B, A, S in, HZP) from Rod 5.

Critical N Standard: Verify control rod worth (Bank D, C, B, A, S in, HZP) to be 6095 pcm as recorded on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Verify stuck rod worth from Rod 5.

Critical N Standard: Verify stuck rod worth to be 653 pcm as recorded on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Verify stuck rod worth minus control rod worth.

Critical N Standard: Verify stuck rod worth minus control rod worth to be - 5442 pcm as recorded on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002c.COT, Verify Shutdown Margin Calculation for an Operating Reactor, Rev. 2 Performance Step: 11 Verify bank worth to ARO from Rod 3.1, using Step 2 and Step 6 Critical Y data.

Standard: Determine bank worth to ARO of 105 pcm recorded on PBF-2513 to be in error and it should be 166 pcm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Verify correct value for dropped rod, stuck rod or no abnormal Critical N condition.

Standard: Verify dropped rod and stuck rod worth from ROD 5 is 653 pcm as recorded on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Verify calculated total available control rod negative reactivity by Critical Y adding Step 10, 11, 12 and 250 pcm.

Standard: Verify Total available control rod negative reactivity of 4434 pcm recorded on PBF-2513 to be in error and -4373 pcm should be the correct number.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002c.COT, Verify Shutdown Margin Calculation for an Operating Reactor, Rev. 2 Performance Step: 14 Verify calculated shutdown margin by adding Steps 13 and 7.

Critical Y Standard: Determine calculated SDM of 2954 pcm as recorded on PBF-2513 to be in error and it should be -2723 pcm + 25.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Verify the required shutdown margin using TRM 2.1 Figure 2 using Critical N Step 4 data.

Standard: Verify required SDM to be 2000 pcm as recorded on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 16 Verify if calculated shutdown margin is more negative than required Critical N shutdown margin.

Standard: Verify Calculated SDM is greater than Required SDM as circled on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Evolution complete Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002c.COT, Verify Shutdown Margin Calculation for an Operating Reactor, Rev. 2 Historical Record:

Rev. 0: Developed JPM for ILT 2007 NRC exam Rev. 1: Revised JPM for ILT 2011 Audit exam Rev. 2: Revised JPM with EPU values for the 2012 ILT NRC Exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Point Beach Nuclear Plant SHUTDOWN MARGIN FOR AN OPERATING REACTOR UNIT ____1____ TIME ___20 minutes ago___ DATE ____Today_____

ROD BOOK STEP CORE PARAMETER OR VARIABLE DATA SECTION 1 TAVG within 1.5°F of TREF (circle one)

(Consult with Reactor Engineering if greater than 1.5°F) YES/NO 2 Core Burn-Up ROD 1.1 3040 MWD/MTU (MWD/MTU from ROD 1.1) 3 Nominal EOL Burn-Up ROD 1.1 17220 MWD/MTU (MWD/MTU from ROD 1.1) 4  % Burn-Up 17.7 %

(Step 2 ÷ Step 3) 5 Reactor Power Level (%) 90 %

6 Bank C 225 steps Control Rod Position Bank D 180 steps 7 Power Defect ROD 7 (+) 1480 pcm (for power recorded in Step 5) 8 Control Rod Worth ROD 5 (+) 6095 pcm (Bank D, C, B, A, S in; at HZP) 9 Stuck Rod Worth ROD 5 (+) 653 pcm 10 Stuck Rod Worth minus Control Rod Worth

(-) 5442 pcm (Step 9 Step 8) 11 Bank Worth to ARO ROD 3.1 (+) 105 pcm (Use Step 2 and Step 6 data) 12 For a dropped rod, enter the Stuck Rod Worth from ROD 5. ROD 5 For a stuck rod, multiple misaligned rods, or a rod misaligned low, contact Reactor Engineering. (+) 653 pcm Enter 0 if no rod abnormalities exist.

13 Total Available Control Rod Negative Reactivity (Step 10 + Step 11 + Step 12 + 250 pcm*)

(-) 4434 pcm

  • 250 pcm added to account for redistribution effects from X enon and voiding 14 Calculated Shut Down Margin

(-) 2954 pcm (Step 13 + Step 7) 15 Required Shut Down Margin

(-) 2000 pcm (From TRM 2.1, [COLR], Figure 2, using Step 4 data) 16 Calculated Shut Down Margin is more negative than (circle one)

Required Shut Down Margin (Step 14 more negative than Step 15) YES/NO Completed By: _ ___4th RO_________

Independent Verification By: 3rd RO__________

DOS/SM Review: ____________________________

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 had been operating at 100% power.
  • Rod H-2 in Shutdown Bank "A" has dropped to the bottom of the core.
  • The crew is responding in accordance with AOP-6A, "Dropped Rod".
  • PBF-2513, "Shutdown Margin for an Operating Reactor", was completed and independently verified per Step 9 of AOP-6A 20 minutes ago.

INITIATING CUES:

The Shift Manager has directed you to review the shutdown margin calculation.

The following Unit 1 conditions currently exist:

  • Boron Concentration - 1275 ppm
  • Rx Power - 90%
  • Tave - 572 °F
  • Tref - 573 °F
  • Control Bank D @ 180 steps
  • All other banks @ 225 steps Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 12 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.002c.COT, Verify Shutdown Margin Calculation for an Operating Reactor, Rev. 2 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 13 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Review Quadrant Power Tilt Manual Calculation JPM NUMBER: PBN JPM P015.008B.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P015.008.COT / Respond to Quadrant Power Tilt in excess of Technical TASK TITLE(S): Specifications K/A NUMBERS: 2.1.37 (4.3/4.6)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other: X Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path: YES TASK APPLICABILITY: SRO: X RO: NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers 7/27/12 Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Joey Trudeau Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: JPM PBN P015.008.COT JPM

Title:

Review Manual Quadrant Power Tilt Calculation Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is operating at 92% and stable following a dropped rod.
  • Annunciator POWER RANGE CHANNEL DEVIATION (1C04 1A 3-3) is LIT.
  • The crew has completed the first four steps of AOP 6H, Quadrant Power Tilt.
  • The 3rd and 4th Licenses have completed PBF-2512, Quadrant Power Tilt Manual Calculation, in accordance with AOP-6H, Quadrant Power Tilt, Step 5.

INITIATING CUES:

  • The Shift Manager directs you, OS2, to perform the Shift Management review of the completed PBF-2512, Quadrant Power Tilt Manual Calculation.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: 1. AOP-6H, Quadrant Power Tilt

2. PBF 2512, Quadrant Power Tilt Manual Calculation (attached)
3. Reactor Operating Data (ROD) Book, ROD 14, Power Range Detector Calibration Currents at 100% power (attached)
4. Calculator General

References:

1. AOP-6H, Quadrant Power Tilt
2. CP 312, PPCS Operability Determination
3. PBF 2512, Quadrant Power Tilt Manual Calculation
4. Reactor Operating Data (ROD) Book, ROD 14, Power Range Detector Calibration Currents at 100% power Task Standards: The Examinee determines there are errors with PBF-2512, Quadrant Power Tilt Manual Calculation.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Verify column 1 Record Power Range meter readings from the 0-500 microamp Critical N scale.

Standard: Examinee verifies recorded power range meter readings from the 0-500 microamp scale (Channels 41A, 42A, 43A, 41B, 42B, 43B, and 44B) into the DATA blocks for Column 1.

Evaluator Note: This JPM will not require the simulator.

Evaluator Cue: If asked, inform the examinee the ROs correctly filled in data for Column 1.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Verify column 2 channel calibration current data transferred from ROD 14.

Critical N Standard: The Examinee verifies transferred channel calibration current from ROD 14 (Channels 41A, 42A, 43A, 41B, 42B, 43B, and 44B) into the DATA blocks for Column 2.

Evaluator Note: Data was transferred incorrectly for 44B. It should be 296.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Verify column 3 calculate power for each channel (Column 1 ÷ Column 2).

Critical N Standard:

  • The Examinee calculates power for each channel (Channels 41A, 42A, 43A, 41B, 42B, 43B, and 44B) by dividing the Power Range meter reading values recorded in Column 1 by the channel calibration currents from ROD 14 recorded in Column 2 and
  • Verifies the calculated power for each channel for Column 3.

Evaluator Note: Calculation for channel 44B incorrect from wrong data recorded in column 2.

It should be 0.916.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 4 Verify column 4 calculate average power [(sum of Column 3) ÷ 4]

Critical N Standard:

  • The Examinee calculates average power (Upper and Lower) by totaling the values recorded in Column 3 and then dividing by the number 4 and
  • Verifies the calculated average power values in column 4.

Evaluator Note: Lower average power incorrect due to previous incorrect data being recorded. It should be 0.905.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Verify QPTR Calculate upper and lower tilt ratio (Column 3 ÷ Column 4)

Critical Y Standard:

  • The Examinee calculates upper and lower tilt ratio by dividing the calculated power for each channel value recorded in Column 3 by the calculated average power recorded in Column 4 and
  • Verifies the calculated upper and lower tilt ratio values for QPTR.

Evaluator Note: All lower QPTR values incorrect and 41A upper recorded incorrectly.

Correct values are:

Upper 41A 1.111 Lower 41B 1.070 42B 0.910 43B 1.009 44B 1.012 Evaluator Cue: If examinee reports there are errors associated with the completed QPTR calculation acknowledge the report. Inform the SRO to make the corrections on the form.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 6 PPCS NTILTxU for N41A through N44A, NTILTxL for N41B through N44B.

Critical N Standard: The Examinee may:

  • Leave the PPCS Column blank, or
  • N/A the PPCS Column and add remarks annotating that PPCS excore tilt calculations were declared inoperable.

Evaluator Note: PPCS Excore Tilt calculations were declared inoperable per initial conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Verify the Date/Time and Performed By/IV and sign for Shift Management Critical N Review Standard: The Examinee signifies completion of the Quadrant Power Tilt Manual Calculation By:

  • Verifying the Unit designator is filled in,
  • Verifying the Date/Time and Performed By/IV blocks and
  • Returning the completed form to the Evaluator Evaluator Cue: Upon completion of PBF-2512 review the examinee may report errors associated with the calculations and not sign the PBF.

Acknowledge the report and inform the examinee the errors have been corrected on the form and the SM directs you to continue with AOP 6H, Quadrant Power Tilt, Step 5 using the corrected calculations.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 8 Check Quadrant Power Tilt - Greater than 1.02 Critical Y Standard: The Examinee determines that Quadrant Power Tilt is greater than 1.02 (12%) and proceeds to Step 6 of AOP-6H to reduce thermal power.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Reduce Thermal Power at least 3% from Rated Thermal Power for every 1%

Critical Y Indicated Power Tilt.

Standard: The Examinee determines that Reactor Thermal Power needs to be reduces 36%

from RTP which means an additional 28% minimum load reduction is needed based on initial conditions.

Evaluator Cue: Ask examinee the minimum power reduction required.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This completes the JPM.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Historical Record:

Rev 0: JPM originally developed by the NRC for the ILT 2011 Licensing Examination under different ID number. Revised for 2012 ILT NRC exam due to several form revisions and new ID.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 14

Reference:

FP-T-SAT-75

TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 is operating at 92% and stable following a dropped rod.
  • Annunciator POWER RANGE CHANNEL DEVIATION (1C04 1A 3-3) is LIT.
  • The crew has completed the first four steps of AOP 6H, Quadrant Power Tilt.
  • The 3rd and 4th Licenses have completed PBF-2512, Quadrant Power Tilt Manual Calculation, in accordance with AOP-6H, Quadrant Power Tilt, Step 5.

INITIATING CUES:

  • The Shift Manager directs you, OS2, to perform the Shift Management review of the completed PBF-2512, Quadrant Power Tilt Manual Calculation.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 14

Reference:

FP-T-SAT-75

ANSWER KEY DO NOT HAND OUT Detector Channel 1 2 3 4 QPTR PPCS 41A 237 226 1.049 1.111+/- .001 /

42A 226 282 0.801 0.849+/- .001 Date / Time Upper 0.944 43A 270 281 0.961 1.018+/- .001 44A 285 296 0.963 1.020+/- .001 41B 242 250 0.968 1.070+/- .001 Performed By 42B 230 279 0.824 0.910+/- .001 Lower 0.905 43B 264 289 0.913 1.009+/- .001 44B 271 296 0.916 1.012+/- .001 IV HIGHLITED AREAS ARE WHERE ERRORS WERE INSERTED Detector Channel 1 2 3 4 QPTR PPCS 41A 237 226 1.049 1.049 Today/20 min ago 42A 226 282 0.801 0.849 Date / Time Upper 0.944 43A 270 281 0.961 1.018 44A 285 296 0.963 1.020 41B 242 250 0.968 1.054 Performed By 42B 230 279 0.824 0.898 Lower 0.918 43B 264 289 0.913 0.995 44B 271 280 0.968 1.054 IV Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 14

Reference:

FP-T-SAT-75

QUADRANT POWER TILT MANUAL CALCULATION Unit 1 Shift Management Review NOTE: If available, then PPCS data should be recorded.

The calculation should be carried out to the nearest 1000th and should be independently checked.

Care should be used to accurately transfer meter readings and data from ROD 14.

Detector Channel 1 2 3 4 QPTR PPCS 41A 237 226 1.049 1.049 OOS Today/20 min ago 42A 226 282 0.801 0.849 OOS Date / Time Upper 0.944 43A 270 281 0.961 1.018 OOS 44A 285 296 0.963 1.020 OOS AKZ 41B 242 250 0.968 1.054 OOS Performed By 42B 230 279 0.824 0.898 OOS Lower 0.918 43B 264 289 0.913 0.995 OOS DVD 44B 271 280 0.968 1.054 OOS IV Detector Channel 1 2 3 4 QPTR PPCS 41A /

42A Date / Time Upper 43A 44A 41B Performed By 42B Lower 43B 44B IV Detector Channel 1 2 3 4 QPTR PPCS 41A /

42A Date / Time Upper 43A 44A 41B Performed By 42B Lower 43B 44B IV Note: This is a SOMS form and SOMS must also be revised when this form is revised.

Column Instruction/Source Record Power Range meter readings from the 0-500 microamp scale (check range set at 0.5 milliamps),

1. OR obtain readings from NI drawer test points. MTE#_______________ Cal due date______________
2. Transfer channel calibration current from ROD 14.
3. Calculate power for each channel (column 1 ÷ column 2)

Note: With input from one Power Range channel inoperable AND Thermal Power 75% RTP, the remaining three channels can be used for calculating QPTR in column 4 as [(sum of column 3) ÷ 3]

4. Calculate average power [(sum of column 3) ÷ 4]

QPTR Calculate upper and lower tilt ratio (column 3 ÷ column 4)

PPCS NTILTxU for N41A through N44A, NTILTxL for N41B through N44B PBF-2512 Revision 6 09/02/11

Reference:

AOP-6H Page 12 of 14

POINT BEACH NUCLEAR PLANT ROD 14 REACTOR OPERATING DATA Rev 16 October 28, 2011 POWER RANGE DETECTORS UNIT 1 CYCLE 34 POINT BEACH NUCLEAR PLANT POWER RANGE DETECTOR CALIBRATION CURRENTS AT 100% POWER UNIT 1 100% CALIBRATION CURRENTS (µA)

NE-41 NE-42 NE-43 NE-44 DATE INITIALS A B A B A B A B 2 weeks 223 245 281 277 280 288 290 283 ago DDD 1 week 222 242 282 278 281 290 295 280 ago AKZ 226 250 282 279 281 289 296 296 yesterday RCB Page 13 of 14

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Page 14 of 14

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Review Completed Surveillance JPM NUMBER: PBN JPM 119.223a.SRO REV. 1 RELATED PRA NONE INFORMATION:

TASK NUMBERS / PBN 119.223.SRO Review Completed Procedures TASK TITLE(S):

K/A NUMBERS: 2.2.12 (3.7/4.1) 005.A1.07 (2.5/3.1)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: Other: X Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers 8/6/12 Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Joey Trudeau Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM 119.223a.SRO JPM

Title:

Review Completed Procedures Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Work was done on the A Train of RHR and post maintenance testing, IT-03 Train A, Low Head Safety Injection Pumps and Valves Train A Unit 1 has been completed through step 5.7.7.

INITIATING CUES:

  • You are OS1 and the Third License has asked you to perform the SRO review of IT 03 Train A prior to completion of step 5.7.8.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: IT-03 Train A, Low Head Safety Injection Pumps and Valves Train A Unit 1 with errors as stated in the JPM.

General

References:

IT-03 Train A, Low Head Safety Injection Pumps and Valves Train A Unit 1.

Task Standards: Complete review of IT-03 and find the listed errors.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Attachment B for 1RH-626 stroke verification Unsat reading of 24.5 seconds.

Critical Y Standard: Determine 24.5 sec for SHUT stroke of 1RH-626 is outside acceptance criteria.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 2 Attachment D for 1P-10A LHSI Pump Data Sheet has incorrect pump differential Critical Y pressure of 142.4 due to math error.

Standard: Determine recorded pump differential pressure of 142.4 is outside acceptance criteria. Correct the calculation to determine the actual DP is within specification.

Evaluator Note: Actual DP is 122.4 which is in specification.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 3 Attachment D for 1P-10A LHSI Pump Data Sheet has UNSAT reading for P1V Critical Y for step 5.6.16.b of 0.729.

Standard: Determine UNSAT vibration reading for point P1V greater than acceptance criteria.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 4 Step 6.1.2 IF acceptance criteria is not met, THEN ensure the following:

Critical Y a. Affected equipment declared inoperable.

Standard: Determine TSAC 3.5.2.A remains in effect.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 5 Step 6.1.2 IF acceptance criteria is not met, THEN ensure the following:

Critical N b. Applicable TSACs entered.

Standard: Determine this step was previously completed at step 5.1.9.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 6 Step 6.1.2 IF acceptance criteria is not met, THEN ensure the following:

Critical N c. Action request submitted for affected equipment.

Standard: Ensure a condition report(s) is generated for the affected equipment (1P-10A RHR Pump and 1RH-626 or similar wording).

Evaluator Cue: When the condition report is addressed, state that it will be submitted by the 4th license.

Ask a follow up question about what equipment will be in the AR(s) if not stated by the candidate.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Terminating Cues: This completes the JPM.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Historical Record:

Rev 0: Developed for the ILT 2009 Audit Exam.

Rev 1: Revised for ILT 2012 NRC exam due to procedure revisions.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM SETUP INFORMATION Obtain a completed record copy of IT 03 Train A for current values on RHR.

Fill out an IT-03 Train A with a PBF-0026i.

Include the 3 errors in the completed IT-03 Train A as stated in the JPM.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • Work was done on the A Train of RHR and post maintenance testing, IT-03 Train A, Low Head Safety Injection Pumps and Valves Train A Unit 1 has been completed through step 5.7.7.

INITIATING CUES:

  • You are OS1 and the Third License has asked you to perform the SRO review of IT 03 Train A prior to completion of step 5.7.8.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: REMOVE AN RMS CHANNEL FROM SERVICE JPM NUMBER: PBN JPM P119.903a.SRO REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / P119.903.SRO Evaluate RMS abnormalities TASK TITLE(S):

K/A NUMBERS: 2.3.13 (3.4/3.8)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other: X Lab:

Time for Completion: 30 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers 7/27/12 Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Joey Trudeau Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P119.903a.SRO JPM

Title:

REMOVE AN RMS CHANNEL FROM SERVICE Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 OS with both plants operating in Mode 1.
  • A Discharge of the Wastewell is in progress through F-235 and F-236 Waste Water Effluent Filters.
  • The 3rd RO just reported that RE-230 Waste Water Effluent Liquid Monitor/Background indicates FAIL LOW.

INITIATING CUES:

  • The Shift Manager has directed you to remove RE-230/230B from service per PBF-2068g RE-230/230B.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: PBF-2068g RE-230/230B Waste Water Effluent Liquid/Background Monitor Radiological Effluent Control Manual (RECM)

EPMP 9.0 Equipment Important to Emergency Preparedness General

References:

PBF-2068g RE-230/230B Waste Water Effluent Liquid/Background Monitor RMSASRB 1.0 RMSASRB CI RE-230 Radiological Effluent Control Manual (RECM)

EPMP 9.0 Equipment Important to Emergency Preparedness Task Standards: Remove RE-230 Waste Water Effluent Liquid/Background Monitor from service per PBF-2068g RE-230/230B.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Determine Channel Number.

Critical N Standard: Verify correct channel number on PBF-2068g. [RE-230/230B (8-2/8-3)]

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Determine Channel Name/Location.

Critical N Standard: Verify correct Channel Name/Location on PBF-2068g. (Unit 2 TB/ 8 El. West)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 3 Determine if TS, RECM, or E-Plan applicable.

Critical N Standard: Verify RECM and E-Plan applicable for RE-230.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Determine applicable sections of TS, RECM or E-Plan.

Critical N Standard: Verify listed references on PBF-2068g RE-230/230B.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Determine redundant channel or compensatory action required. If required, then Critical Y list below (otherwise mark N/A)

Standard: Determine compensatory measures are required per EPMP 9.0, 1-hour grab samples and document on the form.

Evaluator Note: EPMP 9.0 Attachment C page 10 of 23 requires 1-hour grab samples due to E-Plan classification impacts (no redundant channels). This is the critical determination.

RECM Note 3 table 3-1 requires 12-hour grab samples, if the discharge is to continue (not critical for this JPM).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 6 Determine time channel may be out of service.

Critical N Standard: Verify 30 days is the most time limiting requirement for taking RE-230 OOS per the RECM step 3.2.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Name(s) of Chem and/or RP supervision contacted.

Critical Y Standard: Notified personnel from RP and Chemistry to initiate grab samples.

Evaluator Note: The critical portion of this step is to contact Chemistry if not already done previously.

Evaluator Cue: Shift Chemistry Technician has been notified.

Shift RP Technician has been notified.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 If required, notify Regulatory Affairs of potential Reportability requirements.

Critical N Standard: List name of Regulatory Affairs person notified.

Evaluator Note: Regulatory Affairs is not required until the 30 day notification is sent out.

Evaluator Cue: If asked, the on call Regulatory Affairs person has been contacted.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 9 Name(s) of Emergency Plan staff contacted (at earliest convenience):

Critical N Standard: List names of contacted personnel from E-Plan.

Evaluator Cue: The on call Emergency Plan staff person has been notified.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 SM authorization to remove the channel from service or acknowledgment that the Critical N channel has failed:

Standard: Have Shift Manager acknowledge that RE-230 has failed.

Evaluator Note: The examinee may request the SM initials to be filled out. Initial the block as the SM in order to complete the JPM.

Evaluator Cue: Shift Manager acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Channel placed into Maintenance or other mode:

Critical N Standard: RE-230 may or may not be placed in maintenance.

Evaluator Cue: If asked to, the RO will place RE-230 in maintenance.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 12 Reason the channel was removed from service (circle one):

Critical N Standard: RE-230 failure circled.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This concludes the JPM Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Historical Record:

Rev 0: JPM developed for the ILT 2012 NRC exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 OS with both plants operating in Mode 1.
  • A Discharge of the Wastewell is in progress through F-235 and F-236 Waste Water Effluent Filters.
  • The 3rd RO just reported that RE-230 Waste Water Effluent Liquid Monitor/Background indicates FAIL LOW.

INITIATING CUES:

  • The Shift Manager has directed you to remove RE-230/230B from service per PBF-2068g RE-230/230B.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: LOCALLY OPERATE THE ATMOSPHERIC STEAM DUMP CONTROL VALVES JPM NUMBER: PBN JPM P065.001A.AOT REV. 1 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P000.044.AOT Locally Operate the Atmospheric Steam Dump Valves TASK TITLE(S):

K/A NUMBERS: 035 K6.02 (3.1/3.5) 035 A3.02 (3.7/3.5)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform: X EVALUATION In-Plant: X Control Room:

LOCATION:

Simulator: Other:

Lab:

Time for Completion: 10 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO X Additional signatures may be added as desired.

Developed by: Joey Trudeau 8/5/12 Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Andy Zommers Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P065.001A.AOT JPM

Title:

LOCALLY OPERTE THE ATMOSPHERIC STEAM DUMP CONTROL VALVES Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 2 has tripped due to a fire in the Unit 2 Façade.
  • 2MS-2015 B S/G Atmospheric Steam Dump Valve is operating sporadically and currently partially open.
  • The fire is out and the brigade leader has determined it is safe for personnel to access the façade area to perform any needed actions.

INITIATING CUE:

  • OS2 directs you to fail shut 2MS-2015 B S/G Atmospheric Steam Dump Valve per FOP 1.2, Potential Fire Affected Safe Shutdown Components (Fire Area A01H-Unit 2 Façade) and notify the Control Room as soon as it is shut.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: FOP 1.2, Potential Fire Affected Safe Shutdown Components (Fire Area A01H-Unit 2 Façade) page 108 Unit 2 Secondary System Isolation General

References:

FOP 1.2, Potential Fire Affected Safe Shutdown Components (Fire Area A01H-Unit 2 Façade)

Task Standards: Locally operate 2MS-2015 per FOP 1.2 using the gagging device.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Fail 2MS-2015, B S/G Atmospheric Dump Valve shut by:

Critical Y

  • Shut IA-872, SG B Atmospheric Steam Dump Operating Air Inlet Standard: Shut IA-872, SG B Atmospheric Steam Dump Operating Air Inlet Evaluator Cue: If asked, control air is reading approximately half scale.

IA-872 valve handwheel is fully inserted.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Fail 2MS-2015, B S/G Atmospheric Dump Valve shut by:

Critical Y

  • Open moisture trap filter plug for 2MS-2015 to vent air Standard: Vent air for 2MS-2015 Evaluator Cue: Moisture trap filter plug is open. Initially there was a sound of air venting, after several seconds it has stopped.

If asked, control air is reading zero.

If asked, 1MS-2015 indicates shut locally.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Report status to Control Room.

Critical N Standard: Control notified.

Evaluator Cue: Control Room acknowledges your report and OS2 directs you to locally throttle 2MS-2015 five turns open using the gagging handwheel.

If asked, there are no further actions required by AOP-10C Attachment A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 4 Using the gagging handwheel, open 2MS-2015, B S/G Atmospheric Dump Critical Y Valve five turns.

Standard: Gag 2MS-2015 5 turns open.

Evaluator Note: If handwheel is turned counter-clockwise, cue the handwheel did not move.

Handwheel is turned clockwise to gag valve open.

Evaluator Cue: 2MS-2015 gagging handwheel was turned five turns open and the sound of steam flow started.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Inform Control of the status of 2MS-2015.

Critical N Standard: Control notified.

Evaluator Cue: Control Room acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This completes the JPM.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Historical Record:

Rev. 1 Revised cue for the 2012 NRC ILT Exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 2 has tripped due to a fire in the Unit 2 Façade.
  • 2MS-2015 B S/G Atmospheric Steam Dump Valve is operating sporadically and currently partially open.
  • The fire is out and the brigade leader has determined it is safe for personnel to access the façade area to perform any needed actions.

INITIATING CUE:

  • OS2 directs you to fail shut 2MS-2015 B S/G Atmospheric Steam Dump Valve per FOP 1.2, Potential Fire Affected Safe Shutdown Components (Fire Area A01H-Unit 2 Façade) and notify the Control Room as soon as it is shut.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: START AN AIR COMPRESSOR TO A DEPRESSURIZED RECEIVER JPM NUMBER: PBN JPM P000.008a.AOT REV. 9 RELATED PRA None INFORMATION:

TASK NUMBERS / P000.008.AOT / START AIR COMPRESSOR(S) TO TASK TITLE(S): DEPRESSURIZED RECEIVERS K/A NUMBERS: 078.A3.01 (3.1/3.2)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path: YES TASK APPLICABILITY: SRO: X RO: X NLO X Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Approved by:

Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.008a.AOT, Start an Air Compressor to a Depressurized Receiver, Rev. 9 JPM Number: PBN JPM P000.008a.AOT JPM

Title:

START AN AIR COMPRESSOR TO A DEPRESSURIZED RECEIVER Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.008a.AOT, Start an Air Compressor to a Depressurized Receiver, Rev. 9 JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Instrument air compressor K2A is not running.
  • Air receiver T-33B is depressurized following leak repair.

INITIATING CUES:

  • The OS1 directs you to start instrument air compressor K2A in accordance with AOP-5B, Loss of Instrument Air, Attachment BB, Air Compressor Startup to Supply Depressurized Receiver.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.008a.AOT, Start an Air Compressor to a Depressurized Receiver, Rev. 9 JPM PERFORMANCE INFORMATION Required Materials: AOP 5B, Loss of Instrument Air General

References:

AOP 5B, Loss of Instrument Air Task Standards: Compressor K2A started and aligned to T-33B.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 BB1. Place K2A In Operation:

Critical Y a. Check K2A total closure valve shut

  • IA-226 Standard: Examinee recognizes IA-226 open and proceeds to RNO column Evaluator Cue: IA-226 position indicator points to OPEN (it is preferable to physically indicate position using an object such as a pen or laser pointer, rather than a verbal indication.)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.008a.AOT, Start an Air Compressor to a Depressurized Receiver, Rev. 9 Performance Step: 2 RNO a. Perform the following:

Critical Y 1) Shut total closure valve operating air at receiver T33B

  • IA-205 Standard: IA-205 Shut Evaluator Cue: Stem is inserted, valve stops turning.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 2) Uncap and open K2A total closure air line vents.

Critical Y

  • IA-218
  • IA-219 Standard: IA-218 and 219 Uncapped and Open Evaluator Note: Combination wrench hangs on south wall of air compressor room.

Evaluator Cue: Caps Removed, valve stems extended, stems stop moving.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.008a.AOT, Start an Air Compressor to a Depressurized Receiver, Rev. 9 Performance Step: 4 3) Using a red combination wrench, shut K2A total closure Critical Y valve.

  • IA-226 Standard: IA-226 manually turned counterclockwise to the CLOSED position with red wrench.

Evaluator Note: Wrench hangs on south wall of air compressor room.

Evaluator Cue: IA-226 local indicator indicates CLOSED.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 4) Shut and cap K2A total closure air line vents.

Critical Y

  • IA-218
  • IA-219 Standard: IA-218 and 219 shut and capped Evaluator Note: Cap installation is not a critical element of this step.

Evaluator Cue: Caps reinstalled, valve stems inserted, valves stop turning.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 b. Start K2A Critical Y Standard: Examinee contacts Control Room to start K2A Evaluator Cue: Acknowledge request, CR has started K2A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.008a.AOT, Start an Air Compressor to a Depressurized Receiver, Rev. 9 Performance Step: 7 c. Using a red combination wrench, open K2A total closure Critical Y valve

  • IA-226 Standard: IA-226 Open Evaluator Cue: IA-226 local indicator indicates OPEN.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 d. Check air receiver pressure greater than 30 psig Critical N Standard: Examinee checks air receiver pressure locally.

Evaluator Cue: Receiver pressure indicates 12 psig and rising.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.008a.AOT, Start an Air Compressor to a Depressurized Receiver, Rev. 9 Performance Step: 9 RNO d. WHEN pressure greater than 30 psig, THEN perform Step Critical Y BB1.e.

e. (AER) Ensure total closure operating air open at receiver T33B.
  • IA-205 Standard: IA-205 Open Evaluator Cue: Time has passed and pressure indicates 31 psig and slowly rising. Valve stem extended, valve stops turning.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This completes the JPM.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.008a.AOT, Start an Air Compressor to a Depressurized Receiver, Rev. 9 Historical Record:

Rev 8: Reformatted to current revision of QF-1075-01. Updated steps to refer to correct tools.

Rev 9: Made step 8 of JPM not critical, no actions are taken. Also made the terminating cue the same as other JPMs.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • Instrument air compressor K2A is not running.
  • Air receiver T-33B is depressurized following leak repair.

INITIATING CUES:

  • The OS1 directs you to start instrument air compressor K2A in accordance with AOP-5B, Loss of Instrument Air, Attachment BB, Air Compressor Startup to Supply Depressurized Receiver.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.008a.AOT, Start an Air Compressor to a Depressurized Receiver, Rev. 9 ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date For items 2-8, 10-13. For items 1 and 9 Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: LOCALLY START G-05 JPM NUMBER: PBN JPM P065.001A.AOT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P065.001.AOT Operate Gas Turbine TASK TITLE(S):

K/A NUMBERS: EPE 055.EA2.03 (3.9/4.7)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform: X EVALUATION In-Plant: X Control Room:

LOCATION:

Simulator: Other:

Lab:

Time for Completion: 30 Minutes Time Critical: No Alternate Path: Yes TASK APPLICABILITY: SRO: X RO: X NLO X Additional signatures may be added as desired.

Developed by: Joey Trudeau Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Andy Zommers Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P065.001A.AOT JPM

Title:

LOCALLY START G-05 Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The Gas Turbine needs to be started for Technical Specification compliance.
  • Attempts to start G-05, Gas Turbine, remotely have been unsuccessful.
  • Shift management has determined that G-05 Pre-Startup Checklist Attachment A of OI-110, Gas Turbine Operation, will NOT be performed.
  • Capacitor Bank Z-952 is NOT ON-LINE.
  • Required communications and notifications have been completed.
  • PBF-2014, Generator Starts and Load Reliability Information Sheet, will be completed by the 4th License.

INITIATING CUE:

  • SM/OS1 has directed you to locally start G-05 at Minimum Load per OI-110, Attachment C.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: OI-110, Gas Turbine Operation ARP C500 Trip 025, High Lube Oil Temperature Key to unlock G05 Building General

References:

OI-110, Gas Turbine Operation ARP C500 Trip 025, High Lube Oil Temperature Task Standards: Locally Start G-05 and trip per ARP actions.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

ENSURE KC-09590-HMI Overview Graphic is displayed.

ENSURE ARB is visible on desk.

Performance Step: 1 Critical N Standard: Capacitor Bank is not On-Line Evaluator Cue: If asked, Capacitor Bank, Z-952, is not On-Line per turnover.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Critical Y Standard: 43 LOCAL-REMOTE switch is placed in LOCAL Evaluator Cue: 43 LOCAL-REMOTE switch is in LOCAL Performance: SATISFACTORY UNSATISFACTORY Comments:

CAUTION: DO NOT REMOVE KEYBOARD AND MOUSE TO PREVENT INADVERTANT ACTIONS ASSOCIATED WITH THE GAS TURBINE. USE GIVEN PICTURE.

Performance Step: 3 Critical N Standard: READY TO START, light is ILLUMINATED Evaluator Note: The HMI screen graphics are NOT touch screen capable. If examinee tries to touch the screen to take action, nothing will occur. The keyboard and mouse are located inside the C500 panel below the screen.

Evaluator Cue: READY TO START, light is ILLUMINATED Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 4 Critical N Standard: Check of HX-504 is not warranted.

Evaluator Cue: It is summertime and the check of HX-504 is not warranted at this time.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical N Standard: Minimum Load is selected on the OVERVIEW graphics with the mouse.

Evaluator Cue: Shift Management has determined Minimum Load to be placed on G-05.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 6 Critical N Standard: Attachment A, G-05 Pre-Start Checklist is NOT being performed.

Evaluator Cue: Attachment A, G-05 Pre-Start Checklist is NOT being performed as previously briefed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical N Standard: Ready To Start light is LIT.

Evaluator Cue: Ready To Start light is LIT.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 8 Critical Y Standard: START is selected and clicked on with mouse left side lower part of screen.

Evaluator Note: The HMI screen graphics are NOT touch screen capable. If examinee tries to touch the screen to take action, nothing will occur. The keyboard and mouse are located inside the C500 panel below the screen.

Evaluator Cue: START has been selected and clicked on the OVERVIEW Graphic.

G-05 is STARTING.

If asked, you hear G05 starting and RPM is increasing.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 9 Critical N Standard: Min Load is selected on the graphics with the mouse in the upper right hand corner.

Evaluator Note: The HMI screen graphics are NOT touch screen capable. If examinee tries to touch the screen to take action, nothing will occur. The keyboard and mouse are located inside the C500 panel below the screen.

Evaluator Cue: Min Load is selected on the OVERVIEW Graphic (where is currently shows MANUAL.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Critical N Standard: Start time is communicated to the 4th License.

Evaluator Cue: If examinee asks for PBF-2014 inform them the 4th License is recording the start time for them.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 11 Critical N Standard: Start time (T1) RECORDED.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Critical N Standard: Step 1.7 N/Ad.

Evaluator Cue: Shift Manager determined manual closure is not required.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Critical N Standard: Examinee stops performing OI-110 and addresses alarm.

Evaluator Cue: Inform examinee the C500 Trip 025 High Lube Oil Temperature Alarm just came in.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 14 Critical N Standard: Lube Oil Temperature is observed >140 °F.

Evaluator Note: The following actions are taken from the ARP for High Lube Oil Temp.

Evaluator Cue: Lube Oil Cooler Outlet Temperature as indicated on the HMI interface is 145 °F and slowly rising.

If checked, Lube Oil temperature as indicated locally at TI-9556 G05 GT Gen Oil Temperature Indicator is reading 146 °F and slowly rising.

If checked, TI-9555 HX-503B GT Gen LO Cooler Discharge Temperature Indicator is reading 146 °F and slowly rising.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Critical N Standard: G05 is at or below MINIMUM load so no action is required.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 16 Critical Y Standard: G-05 Turbine is TRIPPED locally.

Evaluator Note: G-05 Local Emergency Shutdown can be accomplished by performing any of the following in the Gas Turbine Building (GTB):

  • Pressing the Emergency Stop Button on RK-95, Instrument Rack (GTB central west side).
  • Actuating the Push/Pull EMERGENCY STOP on the front of C-500, Panel 2F.
  • Pressing the EMERG STOP on the Emergency Stop Faceplate on KC-09590-HMI.
  • Selecting OFF on the Operation Selector Faceplate on the START PERMS graphic on KC-09590-HMI.

Evaluator Cue: G-05 Turbine is TRIPPED and coasting down.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This JPM is COMPLETE.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 12 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Historical Record:

Rev. 0 Developed for the 2012 NRC ILT Exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 13 of 16

Reference:

FP-T-SAT-75

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 14 of 16

Reference:

FP-T-SAT-75

TURNOVER SHEET INITIAL CONDITIONS:

  • The Gas Turbine needs to be started for Technical Specification compliance.
  • Attempts to start G-05, Gas Turbine, remotely have been unsuccessful.
  • Shift management has determined that G-05 Pre-Startup Checklist Attachment A of OI-110, Gas Turbine Operation, will NOT be performed.
  • Capacitor Bank Z-952 is NOT ON-LINE.
  • Required communications and notifications have been completed.
  • PBF-2014, Generator Starts and Load Reliability Information Sheet, will be completed by the 4th License.

INITIATING CUE:

  • SM/OS1 has directed you to locally start G-05 at Minimum Load per OI-110, Attachment C.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 15 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 16 of 16

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Perform a Dropped Rod Recovery JPM NUMBER: PBN JPM P000.049a.COT REV. 1 RELATED PRA None INFORMATION:

TASK NUMBERS / P000.049.COT Respond to Dropped Rod TASK TITLE(S):

K/A NUMBERS: APE 003 AA1.02 (3.6/3.4)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 30 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Approved by:

Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.049a.COT, Perform a Dropped Rod Recovery, Rev. 1 JPM Number: PBN P000.049aCOT JPM

Title:

Perform a Dropped Rod Recovery Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.049a.COT, Perform a Dropped Rod Recovery, Rev. 1 JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are 4th RO.
  • The plant is at < 50% power following a dropped rod (G7 Control Bank C) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ago.
  • The cause has been identified as a blown fuse on the stationary gripper.
  • Fuses have been replaced by I&C.
  • The crew is at step 19 of AOP-6A Dropped Rod Unit 1.
  • Reactor Engineering determined that power has been stabilized for a sufficient period of time to allow for recovery of the dropped rod.
  • The Unit 1 Turbine Hall Auxiliary Operator is standing by in the Unit 1 Rod Drive Room for assistance.

INITIATING CUES:

  • The Shift Manager directs you to recover rod G7 per AOP-6A which has been completed through step 18.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.049a.COT, Perform a Dropped Rod Recovery, Rev. 1 JPM PERFORMANCE INFORMATION Required Materials: AOP-6A, Dropped Rod Unit 1 marked up through step 18.

General

References:

AOP-6A Dropped Rod Unit 1 Task Standards: Recover rod G7 per AOP-6A observing procedure limitations.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Position Control Rod Bank Selector Switch to Affected Bank Critical Y Standard: Examinee positions switch to Control Bank C Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Check Control Rods not fully withdrawn.

Critical N Standard: Examinee verifies Control Bank D less than 230 steps Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.049a.COT, Perform a Dropped Rod Recovery, Rev. 1 Performance Step: 3 Record the following information on Attachment A, Data Sheet:

Critical Y Dropped rod identification (G7)

Bank overlap counter reading (506)

P/A converter for affected bank (225)

Step counter for affected group (225)

Standard: Examinee records data on Attachment A of AOP-6A Evaluator Note: Examinee may utilize PPCS or labeling at the lift coil disconnect to determine that G-7 is in Group 2.

Evaluator Cue: When asked, the Turbine Hall AO reports Bank Overlap Counter reads 506.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Set Group Step Counter for affected group to - ZERO Critical N Standard: Examinee zeros Control Bank C Group 2 step counter to ZERO Evaluator Note: To reset step counters depress small button on bottom right of counter.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.049a.COT, Perform a Dropped Rod Recovery, Rev. 1 Performance Step: 5 Align Lift Coil Disconnect Switches:

Critical Y Place lift coil disconnect switches for all rods in affected bank to - DISCONNECT Place lift coil disconnect switch for the dropped rod in -

CONNECT Standard: Examinee places unaffected rods in CB C to DISCONNECT and Rod G7 to CONNECT Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Record Manual Rod Speed Potentiometer settings on Attachment A, Critical Y DATA SHEET, Step A2 Standard: Examinee should locate potentiometer.

Evaluator Note: Examinee should locate the potentiometer. There is a picture of the controller in the RSC rack.

Evaluator Cue: Cue examinee the setting is 36 SPM for Control Banks and 64 SPM for Shutdown Banks.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.049a.COT, Perform a Dropped Rod Recovery, Rev. 1 Performance Step: 7 Adjust Rod Speed as follows:

Critical N Check dropped rod in control bank Adjust manual control potentiometer to 7 steps per minute or as directed by Reactor Engineering Standard: Examinee determines control rod is in a control bank and obtains guidance from Reactor Engineering for rod speed.

Evaluator Note: Rod speed can be set by the instructor using LOA, controller is not physically modeled in the simulator.

Evaluator Cue: Reactor Engineering recommends 36 SPM for Control Banks to recover the rod.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Check Dropped Rod Out of Alignment LESS THAN 24 HOURS Critical N Standard: Examinee determines rod was dropped less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ago.

Evaluator Note: Retrieving a rod in Control Bank C will cause an urgent failure alarm.

This alarm will not stop rod motion.

Evaluator Cue: Control Rod G7 was dropped 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ago.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.049a.COT, Perform a Dropped Rod Recovery, Rev. 1 Performance Step: 9 Withdraw Dropped Rod to Bank Demand Position.

Critical Y

  • Limit total withdrawal to 90 steps in any one hour or as specified by Reactor Engineering.
  • Adjust turbine load or borate as necessary to keep Tavg within 4ºF of Tref.
  • Record rod position hourly in Attachment A, DATA SHEET, until it is realigned with its bank.
  • Limit reactor power to - LESS THAN OR EQUAL TO 50%.
  • DO NOT continue until rod is aligned with its bank.

Standard: Examinee withdraws rod G7 per AOP 6A guidance.

Evaluator Note: The intent of this step will be to allow the examinee to withdraw rod G7 to adequately evaluate staying within limits.

Evaluator Cue: Reactor Engineering guidance is to withdraw rod G7 in 15 step increments every 15 minutes.

After examinee monitors the plant post rod pull, inform the examinee that 15 minutes has elapsed since last rod pull.

After examinee reaches a minimum of 45 steps then cue that rod G7 is at 225 steps and aligned with the rest of Bank C. (insert trigger and if desired adjust step counter to 225)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Go To Step 30.

Critical N Standard: Examinee goes to Step 30.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.049a.COT, Perform a Dropped Rod Recovery, Rev. 1 Performance Step: 11 Check that Rod Motion Has Occurred.

Critical N

  • IRPI indicates rod alignment
  • Tavg change due to rod withdrawal
  • Flux map indicates rod alignment Standard: Examinee determines rod motion occurred.

Evaluator Cue: If asked, rod G7 IRPI indicates 225 steps.

If asked, flux mapping by Reactor Engineering was completed and verified rod G7 is at 225 steps.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Determine if P/A Converter Needs to be Reset as Follows:

Critical Y

  • Check dropped rod located in a control bank.
  • Reset the P/A Converter:

o Place display selector switch in affected bank position o Place and hold automatic manual switch to - MANUAL o Depress down pushbutton to return display to position recorded in Attachment A, DATA SHEET, Step A1 o Return automatic manual switch to - AUTOMATIC o Place display selector switch in - OFF Standard: Examinee resets P/A Converter for Control Bank C Evaluator Note: May have them stop after they can show how it is done.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.049a.COT, Perform a Dropped Rod Recovery, Rev. 1 Performance Step: 13 Ensure Bank Overlap Counter Reading Matches Reading Recorded Critical N In Attachment A , DATA SHEET, Step A1 Standard: Examinee records Bank Overlap Counter reading of 506.

Evaluator Cue: When asked, the Turbine Hall Auxiliary Operator reports Bank Overlap Counter reads 506.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 14 Update PPCS Bank Rod Position For All Banks Critical N Standard: Examinee updates PPCS.

Evaluator Cue: Inform examinee that the 3rd License will update PPCS.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Place Lift Coil Disconnect Switches For Unaffected Rods In -

Critical Y CONNECT Standard: Examinee places lift coil disconnect switches for Control Bank C to CONNECT.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.049a.COT, Perform a Dropped Rod Recovery, Rev. 1 Performance Step: 16 Return Manual Shutdown Or Control Potentiometer To Position Critical N Recorded In Attachment A , DATA SHEET, Step A2 Standard: Examinee verifies rod speed potentiometer settings.

Evaluator Cue: Cue examinee the setting is 36 SPM for Control Banks and 64 SPM for Shutdown Banks.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 Reset Urgent Failure Alarm Critical N

  • Depress rod alarm reset pushbutton.
  • Check 1C04 1A 1 CLEAR Standard: Examinee resets Urgent Failure Alarm Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 Place Control Rod Bank Selector Switch In Automatic Or Manual Critical N Standard: Examinee places Control Rod Bank Selector Switch to Automatic.

Evaluator Cue: If asked, OS1 directs Control Rods to be placed in AUTO.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This completes the JPM.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.049a.COT, Perform a Dropped Rod Recovery, Rev. 1 Historical Record:

Rev 0: JPM developed by the NRC for ILT 2011 License Examination.

Rev 1: Updated JPM for changes to procedure due to EPU. Revised JPM to be used during 2012 ILT NRC Exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 12 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.049a.COT, Perform a Dropped Rod Recovery, Rev. 1 JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

Go into 50% power IC and drop rod G7.

Stabilize power per AOP 6A Dropped Rod to at or below 50% power.

Delete Malfunction.

Snap IC for multiple uses.

Simulator Setup:

SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY f. SERV RAMP I. SEV.

No. TITLE MAL1CRF002-G7 Drop Rod G7 Trigger 1 OVR-CRF-0051 G7 IRPI Meter 225 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 13 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are 4th RO.
  • The plant is at < 50% power following a dropped rod (G7 Control Bank C) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ago.
  • The cause has been identified as a blown fuse on the stationary gripper.
  • Fuses have been replaced by I&C.
  • The crew is at step 19 of AOP-6A Dropped Rod Unit 1.
  • Reactor Engineering determined that power has been stabilized for a sufficient period of time to allow for recovery of the dropped rod.
  • The Unit 1 Turbine Hall Auxiliary Operator is standing by in the Unit 1 Rod Drive Room for assistance.

INITIATING CUES:

  • The Shift Manager directs you to recover rod G7 per AOP-6A which has been completed through step 18.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 14 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.049a.COT, Perform a Dropped Rod Recovery, Rev. 1 ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 15 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: MANUALLY MAKEUP TO THE VCT JPM NUMBER: PBN JPM P004.027b.COT REV. 4 RELATED PRA NONE INFORMATION:

TASK NUMBERS / P004.027.COT MANUALLY BLEND TO THE VCT/RWST TASK TITLE(S):

K/A NUMBERS: 004.A4.12 (3.8/3.3)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: No Alternate Path: Yes TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Joey Trudeau 7/27/12 Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Andy Zommers Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P004.027b.COT, Manually Makeup to the VCT, Rev. 4 JPM Number: PBN JPM P004.027b.COT JPM

Title:

MANUALLY MAKEUP TO THE VCT Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P004.027b.COT, Manually Makeup to the VCT, Rev. 4 JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 Operator at the Controls.
  • Leakage at the Charging Pump seals has resulted in the need to manually blend to the VCT to maintain normal VCT level.
  • The Chemical and Volume Control System is in its normal at-power alignment with a single letdown orifice in service.
  • Unit 1 RCS boron concentration is 947 ppm.
  • The on-service A boric acid storage tank concentration is 3.75%.
  • Unit 1 Letdown Gas Stripper is on-line.

INITIATING CUES:

  • OS1 directs you to:
  • Raise VCT level by approximately 15% at the current boron concentration in the RCS by use of manual blend per OP-5B, Blender Operation/Dilution/Boration, and Attachment G Manual Blend to RCS.

NOTE: The blend may be left in the CVCS piping since frequent blends are currently required.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P004.027b.COT, Manually Makeup to the VCT, Rev. 4 JPM PERFORMANCE INFORMATION Required Materials: OP 5B, Blender Operation / Dilution / Boration General

References:

Blender Data Manual Task Standards: The Examinee starts to raise VCT level, determines improper operation of the Reactor Makeup Water flow controller and secures the blend to the VCT or takes manual control of 1HC-111 adjusting RMW flow to 40 gpm prior to VCT level rise of >15%.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 DETERMINE the desired blender output concentration.

Critical N Standard: The Examinee determines the existing acid and water flow setpoints for the present boron concentration by referencing:

o Operating experience, or o Using the Blender Data Manual.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P004.027b.COT, Manually Makeup to the VCT, Rev. 4 Performance Step: 2 SET HC-111, RMUW Flow Controller, to desired FLOWRATE.

Critical Y Standard: The Examinee determines that controller HC-111 is set at 50 gpm and resets to 40 gpm.

Evaluator Note: If examinee desires to leave this controller set at 50 gpm, then this step becomes not critical and step 3 becomes critical.

Evaluator Cue: Acknowledge report the RMUW Controller is set incorrectly. Direct examinee to set to 40 gpm and continue with making up to the VCT.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 SET HC-110, Boric Acid Flow Hand Controller, to desired FLOWRATE.

Critical N Standard: The Examinee determines that no adjustment of controller HC-110 is necessary.

Evaluator Note: This dial should remain unchanged if RMUW is set to 40 gpm in previous step and not critical. This step becomes critical if RMUW is left at 50 gpm, then boric acid should be set at approximately 8.5 gpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 ENSURE CV-111, Z-1 BA Blender Flow Control, is in AUTO.

Critical N Standard: The Examinee determines CV-111B control switch is already in AUTO.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P004.027b.COT, Manually Makeup to the VCT, Rev. 4 Performance Step: 5 ENSURE CV-110A, Z-1 Blender Inlet FCV, in AUTO.

Critical N Standard: The Examinee determines CV-110A control switch is already in AUTO.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 ENSURE CV-110B, Z-1 Blender Outlet FCV, is in AUTO OR IF VCT Critical N BYPASSED, THEN OPEN (circle one).

Standard: The Examinee determines CV-110B control switch is already in AUTO and circles appropriately.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 ENSURE CV-110C, T-4 VCT Boric Acid Inlet Flow Control in AUTO OR Critical N IF VCT BYPASSED, THEN OPEN (circle one).

Standard: The Examinee determines CV-110B control switch is already in AUTO and circles appropriately.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P004.027b.COT, Manually Makeup to the VCT, Rev. 4 Performance Step: 8 PLACE the Reactor Makeup Mode Selector Switch in BLEND.

Critical Y Standard: The Examinee places the Reactor Makeup Mode Selector Switch to the BLEND position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 PLACE the Reactor Makeup Control Switch in START.

Critical Y Standard:

  • The Examinee places the Reactor Makeup Control Switch to the Start position and
  • Ensures that the red light is lit.

Evaluator Note: Verification of red light is NOT critical.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 WHEN required to maintain VCT pressure and level, THEN PERFORM Critical N one of the following:

Standard: Examinee leaves divert step blank in case it is needed and N/As Excess Letdown steps.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P004.027b.COT, Manually Makeup to the VCT, Rev. 4 Performance Step: 11 Monitor the following as applicable:

Critical N

  • VCT level and pressure
  • Dilution Flow Totalizer YIC-111A
  • RCP Seal Inlet Temperature
  • RCP Seal Leakoff Flow
  • RCS temperature
  • Reactor power/Count Rate Standard: The Examinee monitors all of the following parameters:
  • VCT level and pressure
  • Dilution Flow Totalizer YIC-111A
  • RCP Seal Inlet Temperature
  • RCP Seal Leakoff Flow
  • RCS temperature
  • Reactor power/Count Rate Performance: SATISFACTORY UNSATISFACTORY Comments:

NOTE: ONCE BLEND IS STARTED AND STABLE, INSERT TRIGGER 1 TO CAUSE the RMUW CONTROLLER TO FAIL. DO NOT INSERT MALFUNCTION UNTIL BLEND IS STARTED AND STABLE.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P004.027b.COT, Manually Makeup to the VCT, Rev. 4 Performance Step: 12 Examinee responds to RMUW deviation alarm or increased dilution rate Critical Y and takes action to secure make up to the VCT or takes manual control of 1HC-111 adjusting RMW flow to 40 gpm Standard: The examinee takes action to secure make up to the VCT or takes manual control of 1HC-111 adjusting RMW flow to 40 gpm prior to VCT level rise of >15%

Evaluator Note: Alarm Response Book (ARB) for RMW flow deviation step allows either option.

Alarm may not annunciate if makeup is promptly secured.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This completes the JPM Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P004.027b.COT, Manually Makeup to the VCT, Rev. 4 JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

Load any stable IC where make up can be made to the VCT.

Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.

Ensure Boric Acid Flow controller is set per Blender Data Manual.

Ensure RMUW Flow controller is set at 50 gpm.

Place 1CV-112A to divert leaving VCT level at 30% - THEN return 1CV-112A to AUTO Make any necessary adjustments or corrections.

Save to an IC for multiple uses if necessary.

Supply a copy of Attachment G with Initial Conditions signed off Ensure initial conditions on turnover sheet reflects current boron concentration.

ONCE BLEND IS STARTED AND STABLE, INSERT TRIGGER 1 TO CAUSE the RMUW CONTROLLER TO FAIL. DO NOT INSERT MALFUNCTION UNTIL BLEND IS STARTED AND STABLE SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION No. MALFUNCTION TITLE ET DELAY RAMP Trigger 1 1-FIC-111 (Fixed Output) CNH1CVC009B 50% - 10 Sec Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P004.027b.COT, Manually Makeup to the VCT, Rev. 4 Historical Record:

Rev. 3: Updated to current revision of QF-1075-01. Updated RCS boron concentration to match current IC-2 concentration.

Rev. 4: Updated RCS boron concentration to match current IC-2 concentration. Revised JPM for use during the 2012 ILT NRC Exam to match changes in OP-5B. Added additional malfunction to set RMUW controller to 50 gpm.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 Operator at the Controls.
  • Leakage at the Charging Pump seals has resulted in the need to manually blend to the VCT to maintain normal VCT level.
  • The Chemical and Volume Control System is in its normal at-power alignment with a single letdown orifice in service.
  • Unit 1 RCS boron concentration is 947 ppm.
  • The on-service A boric acid storage tank concentration is 3.75%.
  • Unit 1 Letdown Gas Stripper is on-line.

INITIATING CUES:

  • OS1 directs you to:
  • Raise VCT level by approximately 15% at the current boron concentration in the RCS by use of manual blend per OP-5B, Blender Operation/Dilution/Boration, and Attachment G Manual Blend to RCS.

NOTE: The blend may be left in the CVCS piping since frequent blends are currently required.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 12 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P004.027b.COT, Manually Makeup to the VCT, Rev. 3 ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 13 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: RESPOND TO LOSS OF SECONDARY HEAT SINK JPM NUMBER: JPM P000.028a.COT REV. 1 RELATED PRA None INFORMATION:

TASK NUMBERS / P000.028.COT / Respond to Loss of Secondary Heat Sink TASK TITLE(S):

K/A NUMBERS: E05.EA2.2 (3.7/4.3)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other:

Lab:

Time for Completion: 30 Minutes Time Critical: NO Alternate Path: YES TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Joey Trudeau 7/27/12 Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Andy Zommers Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 JPM Number: JPM P000.028a.COT JPM

Title:

RESPOND TO LOSS OF SECONDARY HEAT SINK Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 CO
  • Unit 1 was at 100% power.
  • 1P-53 MDAFW Pump is OOS after it failed IT-400, Test of 1P-53 Motor-Driven Auxiliary Feed Pump and Valves.
  • The associated PORV block valve 1RC-516 was shut, but a small RCS leak subsequently developed.
  • The crew transitioned to CSP-H.1 Unit 1, Response to Loss of Secondary Heat Sink.
  • CSP-H.1 Unit 1 has been completed through Step 12.b.
  • SI has been reset.

INITIATING CUES:

  • The SRO directs you to continue with CSP-H.1 Unit 1, Loss of Secondary Heat Sink, beginning at Step 12.c.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 JPM PERFORMANCE INFORMATION Required Materials: CSP-H.1 Unit 1, Loss of Secondary Heat Sink General

References:

CSP-H.1 Unit 1, Loss of Secondary Heat Sink Task Standards: The Examinee establishes condensate flow to a depressurized steam generator in accordance with CSP-H.1 Unit 1, Loss of Secondary Heat Sink.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Ensure feedwater regulating valve bypass controllers in manual and shut Critical N -1HC-480 for S/G A

-1HC-481 for S/G B Standard: The Examinee ensures controllers for A and B FRV bypass valves are selected to manual with potentiometer setting at 0 to shut bypass valves.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 Performance Step: 2 Reset feedwater regulating valve bypasses.

Critical *Y Standard: The Examinee depresses the Reset pushbuttons on 1C03 apron to reset the FRV bypasses.

Evaluator Note: Bypass valve resets are near the front of the apron section of 1C03, 78%

level/SI lockout red lights above Bypass valve controllers will go out when reset buttons are depressed.

  • Critical step that must be completed at either JPM step 2 or 17.

Evaluator Cue: If asked, I&C will be notified to perform ICP 3.11.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Open feedwater isolation valve(s):

Critical *Y - 1CS-3124

- 1CS-3125 Standard: The Examinee opens both feedwater isolation valves.

Evaluator Note: Procedure use and adherence with open bullets does not require both FIVs to be open. Critical part of this step is to have the FIV open for the S/G that will be fed with Condensate.

  • Critical step that must be completed at either JPM step 3 or 16.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 Performance Step: 4 Check Main Feedwater Pumps - at least one running.

Critical N -1P-28A

-1P-28B Standard: The Examinee checks the MFP control switches and finds that neither are running.

The Examinee enters the RNO column for step 13.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 -Locally Start main feed seal water pumps Critical N -1P-99A

-1P-99B Standard: The Examinee does the following:

a. Checks the indicating lights for the main feed seal water pumps or calls the AO to start the pumps (1P-99 A and B)

Evaluator Cue: If Examinee contacts AO to start 1P-99A and B, insert Trigger 5 and report back.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 Performance Step: 6 -Ensure main feed AC lube oil pumps running Critical N -1P-73B

-1P-73A Standard: The Examinee does the following:

b. Ensures that 1P-73 B and A are running.

Evaluator Cue: If Examinee contacts AO to start 1P-73A and B, insert Trigger 2 and report back.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 -Start one main feed pump Critical N -If no main Feedwater pumps can be started, then go to step 17.

Standard: The Examinee does the following:

c. Attempts to start a main Feedwater pump.
d. Realizes that none will start and goes to step 17.

Evaluator Cue: If asked, the AO reports back everything looks normal locally for a main Feedwater pump start.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 Performance Step: 8 Check SI - HAS NOT BEEN ACTUATED.

Critical N Standard: The Examinee checks SI annunciators or plant conditions are notes that an active SI signal is present Evaluator Note: The decision point in this step determines whether the plant must be depressurized and the SI signal blocked prior to depressurizing a SG. In this case, there is an active SI signal present from Low Pressurizer Pressure, even though the signal has been reset. If examinee mistakenly assumes that there is no active signal, since SI has been reset, the examinee will perform steps 18 and 19 prior to continuing with step 20. This will not affect the success path for the JPM.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Maintain Stable RCS Conditions:

Critical N Establish desired charging flow:

-Fully open charging flow control valve 1HC-142

-Start additional charging pumps

-1P-2A, train A

-1P-2B, train A

-1P-2C, train B

-Adjust charging pump speed as necessary to maintain charging flow less than 140 gpm Standard: The Examinee:

  • Fully opens charging flow control valve, 1HC-142,
  • Adjusts charging pump speed as necessary to maintain charging flow less than 140 gpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 Performance Step: 10 Control charging flow to maintain PZR level greater than [34%] 10%

Critical N Standard: The Examinee adjusts running charging pump(s) speed to control charging flow to maintain PZR level greater than [34%] 10%.

Evaluator Note: Pressurizer level will likely be off-scale low. If so, the examinee will check SI pump(s) operating per the RNO column.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Check RCS subcooling based on core exit thermocouples greater than [80°F] 35°F Critical N Standard: The Examinee checks RCS subcooling based on core exit thermocouples on 1C20 greater than [80°F] 35°F.

Evaluator Note: Subcooling may not be net. If so, the examinee will check SI pump(s) operating per the RNO column.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 Performance Step: 12 Depressurize One S/G To Less Than 280 PSIG:

Critical Y Dump steam to condenser at maximum rate from selected S/G:

Dump steam to condenser at maximum rate from selected S/G:

1) Place Steam Dump Mode Selector switch in Manual
2) Shift Condenser Steam Dump Controller to manual
3) Throttle open two condenser steam dump control valves o 1MS-2054 o 1MS-2055 o 1MS-2056 o 1MS-2057 o 1MS-2050 o 1MS-2051 o 1MS-2052 o 1MS-2053 Standard: The Examinee determines that the condenser steam dumps are available and places the condenser steam dump controller in Manual to throttle open two condenser steam dumps (enough to ensure depressurization).

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Shut MSIV on S/G not being depressurized.

Critical N Standard: The Examinee verifies shut the MSIV on the S/G not being depressurized.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 Performance Step: 14 Check core exit thermocouples stable or trending lower Critical N Standard: The Examinee checks core exit thermocouples stable or trending lower.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Ensure S/Gs - at least one being depressurized Critical N Standard: The Examinee ensures at least one steam generator is depressurizing by checking both steam generator pressures on 1C03.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 16 Establish Feedwater Flow Path:

Critical N Reset SI Standard: The Examinee resets SI.

Evaluator Note: Examinee may use annunciator C01 A 3-6, Unit 1 or 2 SI Train Reset Bypass Activated alarm to determine if SI is reset.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 12 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 Performance Step: 17 Ensure feedwater isolation valves - OPEN:

Critical *N - 1CS-3124

- 1CS-3125 Standard: The Examinee ensures feedwater isolation valves OPEN Evaluator Note: Procedure use and adherence with open bullets does not require both FIVs to be open. Critical part of this step is to have the FIV open for the S/G that will be fed with Condensate.

  • The valve(s) should have been opened at JPM step 3. If not, then this step is critical.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 -Reset feedwater regulating valve bypasses.

Critical *N Standard: The Examinee resets the feedwater regulating valve bypasses by depressing both feedwater regulating valve bypass pushbuttons on 1C03.

Evaluator Note: Bypass valve resets are near the front of the apron section of 1C03, 78%

level/SI lockout red lights above Bypass valve controllers will go out when reset buttons are depressed.

Only the FRV Bypass for the depressurized S/G needs to be reset.

  • The reset should have been completed at JPM step 2. If not, then this step is critical.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 13 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 Performance Step: 19 Fully open feedwater regulating valve bypass on S/G being depressurized Critical Y -1CS-480 for S/G A

-1CS-481 for S/G B Standard: The examinee fully opens the feedwater regulating valve bypass 1CS-480 or 1CS-481 for the steam generator being depressurized.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 20 Prepare For Condensate Flow While Depressurizing One S/G:

Critical N Ensure main feed AC lube oil pumps running

-1P-73B, train A

-1P-73A, train B Standard: The Examinee checks running main feed AC lube oil pumps, 1P-73B and 1P-73A on 1C03. If they are off the Examinee dispatches an Auxiliary Operator to locally start main feed AC lube oil pumps, 1P-73B and 1P-73A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 21 Place MFP control switch to pull-out:

Critical N -1P-28A

-1P-28B Standard: The Examinee places BOTH MFP control switch to pull-out.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 14 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 Performance Step: 22 Check SGFP Mini Recirc Flow Control Valves - CLOSED Critical N -1CS-2180

-1CS-2188 Standard: The Examinee checks that both SGFP Mini Recirc Flow Control Valves are CLOSED.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 23 Open main feed pump discharge MOVs:

Critical *Y Open main feed pump discharge MOV and hold switch in open position.

-1CS-2190, train A

-1CS-2189, train B Open breaker for open MOVs

-1B52-417M for 1CS-2190

-1B52-417J for 1CS-2189 Standard: The Examinee:

  • Opens and holds open the main feed pump discharge MOV control switch for 1CS-2190 as an Auxiliary Operator opens breaker 1B52-417M and then,
  • Opens and holds open the main feed pump discharge MOV control switch for 1CS-2189 as an Auxiliary Operator open breaker 1B52-417J.

Evaluator Note: *Although CSP-H.1 calls for both main feed pump discharge valves to be opened, only one open valve is required for satisfactory performance of this step.

Evaluator Cue: Evaluator to inform booth operator to open breaker for SGFP discharge valves when valves fully open.

  • Trigger 3 for CS-2190
  • Trigger 4 for CS-2189 Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 15 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 Performance Step: 24 Verify Condensate Flow Path To Depressurized S/G:

Critical N Check condensate pumps - at least one running Standard: The Examinee checks at least one condensate pump running at 1C03.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 25 Check flow path from running condensate pump to depressurizing S/G available Critical N Standard: The Examinee checks available the flow paths from the running condensate pumps to the depressurizing steam generator on 1C03.

Evaluator Cue: If the Examinee request an Auxiliary Operator walk-down of the feed and condensate system, the Auxiliary Operator reports that the feed and condensate system is intact and in a normal alignment.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 16 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 Performance Step: 26 Control Condensate Addition To Depressurized S/G(s):

Critical N Check wide range level in depressurized S/G(s) stable or trending higher Check cooldown rate <100ºF Standard: The Examinee checks wide range level in the depressurized S/G(s) stable or trending higher on either 1C20 or 1C03.

Examinee verifies cooldown rate and takes required actions.

Evaluator Note: Examinee may see Feedwater flow if using PPCS indications. Control board Feedwater flow meter scaling may not indicate such small flows.

Examinee may adjust steam flow to reduce cooldown rate. Until steam flow is reduced, steam flow will be greater than feed flow and S/G levels will not be rising.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 27 Establish S/G Levels Critical N

  • Verify CET's are stable or trending lower.
  • Verify level in at least one S/G is rising.

Standard: Examinee may transition back to step one if there is no rising S/G level noted.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This completes the JPM Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 17 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 Historical Record:

Rev 1: Updated for the 2012 ILT NRC Exam to match current plant equipment and procedures.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 18 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 JPM SETUP INFORMATION Simulator Setup Instructions:

Initial Setup:

  • Load an IC where conditions support 100% steady state conditions.
  • Load the preloads.
  • Start the simulation.
  • Complete EOP-0 Unit 1, Reactor Trip or Safety Injection to the point of transition to CSP-H.1 Unit 1, Response to Loss of Secondary Heat Sink.
  • Complete CSP-H.1 Unit 1, Steps 1 through 12 and then freeze the simulator.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Save to an IC for multiple uses.

Multiple Uses:

  • Load the saved IC for this JPM.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Resave if required.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 19 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant JPM P000.028a.COT, Respond to Loss of Secondary Heat Sink, Rev. 0 SIMULATOR INFORMATION:

Initiation Component Action Tag Malf. Ramp Delay Cue Description Name Value Time Time Preload 0-P38A Auxiliary PMP1AFW001 2-shaft - - -

Feed Water Pump seizure Preload 0-P38B Auxiliary PMP1AFW002 2-shaft - - -

Feed Water Pump seizure Preload 1P-29 Steam PMP1AFW003 2-shaft - - -

Driven Feed seizure Pump Preload 1-A5205 P-28A BKR1CFW001 1-trip - - 1(JCRFTR)

SF Feed Pump CKTBKR Preload 1-A5213 P-28B BKR1CFW004 1-trip - - 1(JCRFTR)

SG Feed Pump CKTBKR Preload 1B52-83 1P-53 BKR1AFW003 6 AFW Pump Breaker Preload 1RC-430 PRZR VLV1RCS001 1-open - -

Rel Vlv No 1-430 15 sec.

PLE 1-P73A 1P-28B LOA1CFW079 ON - 2 SGFP AC Lube 60 sec Oil Pump CS PLE 1-P73B 1P-28A LOA1CFW080 ON - 2 SGFP AC Lube 75 sec Oil Pump CS PLE 1CS-2190 FWP VLV1CFW015 1- Fail - - 3 No 1P-28A Disch CNTRL Stop Vlv Fuse PLE 1CS-2189 FWP VLV1CFW013 1- Fail 4 No 1P-28B Disch CNTRL Stop Vlv Fuse PLE P99A SGFP Seal LOA1CFW83 ON - - 5 Inj. Pump PLE P99B SGFP Seal LOA1CFW84 ON - 30 sec 5 Inj. Pump Preload RCS Leak Loop MAL1RCS002E 5 B Cold Leg Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 20 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 CO
  • Unit 1 was at 100% power.
  • 1P-53 MDAFW Pump is OOS after it failed IT-400, Test of 1P-53 Motor-Driven Auxiliary Feed Pump and Valves.
  • The associated PORV block valve 1RC-516 was shut, but a small RCS leak subsequently developed.
  • The crew transitioned to CSP-H.1 Unit 1, Response to Loss of Secondary Heat Sink.
  • CSP-H.1 Unit 1 has been completed through Step 12.b.
  • SI has been reset.

INITIATING CUES:

  • The SRO directs you to continue with CSP-H.1 Unit 1, Loss of Secondary Heat Sink, beginning at Step 12.c.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 21 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 22 of 22

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Respond to a RCP Malfunction JPM NUMBER: PBN JPM P000.031b.COT REV. 4 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P000.031.COT / Respond to RCP Malfunctions TASK TITLE(S):

K/A NUMBERS: 015/017 AK3.03 (3.7/4.0)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical: NO Alternate Path: YES TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Bob Peterson Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.031b.COT, Respond to a RCP Malfunction, Rev. 3 JPM Number: PBN JPM P000.031b.COT JPM

Title:

Respond to a RCP Malfunction Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.031b.COT, Respond to a RCP Malfunction, Rev. 3 JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are C04 Operator
  • AOP-1B is in progress, currently performing step 18. Step 18 a. and b. have been completed. Unit 1 is tripped and immediate actions of EOP-0 have been completed.

INITIATING CUES:

  • OS1 has directed you to perform the remainder of AOP-1B, Step 18, beginning with sub step c.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.031b.COT, Respond to a RCP Malfunction, Rev. 3 JPM PERFORMANCE INFORMATION Required Materials: AOP-1B, Reactor Coolant Pump Malfunction, Unit 1 General

References:

AOP-1B, Reactor Coolant Pump Malfunction, Unit 1 Task Standards: The Examinee takes appropriate action to secure A RCP IAW AOP-1B, Reactor Coolant Pump Malfunction Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 18. Secure Affected RCP:

Critical: Y c. Trip affected RCP Standard: Examinee Trips A RCP Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 2 d. Check at least one RCP running Critical: N Standard: Examinee checks B RCP running.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.031b.COT, Respond to a RCP Malfunction, Rev. 3 Performance Step: 3 e. Shut associated PZR normal spray valve Critical: N 1RC-431A for RCP A Standard: Examinee recognizes A spray valve is not shut and attempts to manually close the valve. Examinee enters RNO column for sub step e due to spray valve stuck open.

Evaluator Note: A Spray Valve controller is failed and spray valve is stuck open.

Examinee will need to shut A Spray valve using override switch.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 4 e. RNO IF spray valve can NOT be shut, THEN place manual Critical: Y override switch for affected spray valve to close.

o 1RC-431A-S for 1RC-431A Standard: Examinee places 1RC-431A-S to close Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.031b.COT, Respond to a RCP Malfunction, Rev. 3 Performance Step: 5 f. Check Affected RCP has been tripped for 3 minutes.

Critical: N RNO WHEN affected RCP has been tripped for 3 minutes, THEN do Steps 18.g through 18.h.

Standard: Examinee ensures 3 minutes has elapsed and continues to Step 18.g.

Evaluator Note: Examinee should note time and navigate through the procedure.

Evaluator Cue: (Evaluator may cue that 3 minutes have elapsed once examinee has demonstrated intention and ability to perform the step correctly.)

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 6 g. Shut affected RCP No. 1 seal water return MOV Critical: Y o 1CV-270A for A RCP Standard: Examinee shuts 1CV-270A Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 7 h. Check RCP seal water bypass control valve shut Critical: N

  • 1CV-386 Standard: Examinee checks 1CV-386 shut Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Terminating Cues: JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.031b.COT, Respond to a RCP Malfunction, Rev. 3 Historical Record:

Rev. 1: Reformatted to current revision of QF-1075-01. Revised to Rev. 20 of AOP 1B Unit 1, Reactor Coolant Pump Malfunction.

Rev. 2: Reformatted to current revision of QF-1075-01.

Rev. 4: Removed cues from steps that mimic simulator. This is a simulator JPM and the simulator will provide the cues, this minimizes confusion with actual given cues.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.031b.COT, Respond to a RCP Malfunction, Rev. 3 JPM SETUP INFORMATION Simulator Setup Instructions:

  • Load IC-2 or other full power IC
  • Insert RCP malfunctions as listed
  • Trip Reactor
  • Verify immediate actions of EOP-0 are met and insert 1HC-431A malfunction.
  • Freeze simulator and snap for reuse Simulator Malfunctions Severity/ Event Order Type Code Timing Description Value trigger 1YVPNAFH RCP A Frame Horiz A RCP Frame Preload XMT1RCP011A 4 NA Vibration Fixed Horiz Vibes Output 1YVPNAFV RCP A Frame Vert A RCP Frame Preload XMT1RCP012A 3 NA Vibration Fixed Vert Vibes Output 1YVPNASH RCP A Shaft Horiz A RCP Shaft Preload XMT1RCP013A 17 NA Vibration Fixed Horiz Vibes Output 1YVPNASV RCP A Shaft Vert A RCP Shaft Preload XMT1RCP014A 20 NA Vibration Fixed Vert Vibes Output Simulator Overrides Order Type Code Value Trigger Timing Description 1PCV-431A Spray A Spray Valve Hand controller fails to Preload CNH1PCS007B 10 1 NA Controller Fixed 10% open, Output Insert post trip NOTE: During Administration of JPM, delete Vibration Malfunctions shortly after RCP is tripped.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are C04 Operator
  • AOP-1B is in progress, currently performing step 18. Step 18 a. and b. have been completed. Unit 1 is tripped and immediate actions of EOP-0 have been completed.

INITIATING CUES:

  • OS1 has directed you to perform the remainder of AOP-1B, Step 18, beginning with substep c.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P000.031b.COT, Respond to a RCP Malfunction, Rev. 3 ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 10

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Adjust Containment Sump pH JPM NUMBER: PBN JPM P026.002a.COT REV. 5 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P026.002.COT / Manually Initiate Containment Spray TASK TITLE(S):

K/A NUMBERS: 026.A4.01 (4.5/4.3)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Joey Trudeau 7/27/12 Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Andy Zommers Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P026.002a.COT, Adjust Containment Sump pH, Rev. 5 JPM Number: PBN JPM P026.002a.COT JPM

Title:

Adjust Containment Sump pH Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P026.002a.COT, Adjust Containment Sump pH, Rev. 5 JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the third license on shift (C03).
  • Unit 1 has experienced a large break LOCA. The crew has entered EOP-1.3 Transfer to Containment Sump Recirculation - Low Head Injection.
  • Containment pressure has remained less than Spray Actuation Setpoint throughout the accident.

INITIATING CUES:

  • The SRO has directed you to perform step 5 of EOP-1.3.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P026.002a.COT, Adjust Containment Sump pH, Rev. 5 JPM PERFORMANCE INFORMATION Required Materials: EOP-1.3, Transfer to Containment Sump Recirculation - Low Head Injection General

References:

EOP-1.3, Transfer to Containment Sump Recirculation - Low Head Injection Task Standards: The Examinee establishes Containment Spray flow to containment using one containment spray pump and a spray eductor.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 5. Check if Containment Sump pH must be adjusted:

Critical N a. Check Containment Spray Pumps - BOTH STOPPED.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P026.002a.COT, Adjust Containment Sump pH, Rev. 5 Performance Step: 2 b. Check spray addition tank - NO NaOH ADDED TO Critical N CONTAINMENT Standard: The Examinee checks Spray Addition Tank level and recognizes no NaOH has been injected into containment.

Evaluator Note: Spray Addition Tank level indicator will read approximately 64%,

which is normal tank level indication.

Evaluator Cue: If asked, have examinee tell where they would find the last Spray Addition Tank level.

As required, Spray Add Tank level was as indicated (64%)

during performance of the last Unit 1 CO rounds.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 3 c. Ensure containment spray pump RWST suction MOVs -

Critical N BOTH OPEN

  • 1SI-870B for 1P-14B Standard: The Examinee ensures 1SI-870 A & B are open, red lights on, green lights off.

Evaluator Note: Spray Pump suction valves are normally open.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P026.002a.COT, Adjust Containment Sump pH, Rev. 5 Performance Step: 4 d. Ensure containment spray pump discharge MOVs - ALL Critical Y OPEN

The Critical Task is to open both valves in the flowpath of the pump to be started.

Evaluator Note: Spray Pump Discharge valves are normally shut. The discharge valves are in parallel for each pump.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 5 e. Start one containment spray pump Critical Y o 1P-14A, train A o 1P-14B, train B Standard: The Examinee starts one containment spray pump.

Evaluator Note: The Examinee may select either pump to start.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P026.002a.COT, Adjust Containment Sump pH, Rev. 5 Performance Step: 6 f. Open associated spray additive eductor suction valve for Critical Y running containment spray pump.

o 1SI-836A for 1P-14A o 1SI-836B for 1P-14B Standard: The Examinee places the controller for the selected train SI-836 valve in MANUAL and then manipulates control joystick to OPEN the valve or turns off control power to the selected controller.

The Critical Task is to ensure that at least one valve is open.

Evaluator Note: Examinee should select same train valve, however, the valves are in parallel so only one is needed to provide NaOH to the pump suction. Valves fail open, thus a 0 signal on the controller will fully open the valve. Failing power to the controller does the same function as taking it to manual and open.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 7 Inform the SRO of present plant conditions.

Critical N Standard: The Examinee informs the SRO that EOP-1.3 Step 5 is complete.

Evaluator Cue: The SRO acknowledges your report.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Terminating Cues: The evolution is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P026.002a.COT, Adjust Containment Sump pH, Rev. 5 Historical Record:

Rev. 2: Reformatted to the current revision of QF-1075-01. Revised to Re. 40 of EOP 1.3, Transfer to Containment Sump Recirculation - Low Head Injection.

Rev. 3: Reformatted to the current revision of QF-1075-01.

Rev. 4: Revised to match Rev. 46 of EOP 1.3.

Rev. 5: Revised simulator coding to be used for 2012 ILT NRC Exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P026.002a.COT, Adjust Containment Sump pH, Rev. 5 JPM SETUP INFORMATION Simulator Set Up:

Initial Setup Severity/ Event Order Type Code Timing Description Value trigger Ramp RCS Leak, Loop Preload MAL1RCS002D 47 1 10 B Hot Leg minutes

  • Load or Create IC set for post-LOCA conditions using above table. Run Simulation from Full Power IC and insert Trigger 1.
  • Verify that containment pressure remains below Spray Actuation Setpoint throughout the initial setup.
  • If Spray setpoint is reached, try code again with a longer ramp.
  • Make any necessary adjustments or corrections.
  • Save to an IC for multiple uses.

Multiple Use

  • Load the saved IC for this JPM
  • Walkdown control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Re-snap if required.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the third license on shift (C03).
  • Unit 1 has experienced a large break LOCA. The crew has entered EOP-1.3 Transfer to Containment Sump Recirculation - Low Head Injection.
  • Containment pressure has remained less than Spray Actuation Setpoint throughout the accident.

INITIATING CUES:

  • The SRO has directed you to perform step 5 of EOP-1.3.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P026.002a.COT, Adjust Containment Sump pH, Rev. 4 ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: ISLAND EDG PER 1-SOP-4KV-001 JPM NUMBER: PBN JPM P064.010.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / P064.010.COT / Control an EDG feeding an isolated bus.

TASK TITLE(S):

K/A NUMBERS: 064.A4.01 (4.0/4.3)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION In-Plant: Control Room: X LOCATION:

Simulator: X Other:

Lab:

Time for Completion: 25 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Joey Trudeau 7/27/12 Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by: Andy Zommers Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Approved by: Tom Larson Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Island EDG per 1-SOP-4KV-001, Rev. 0 JPM Number: PBN JPM P064.010.COT JPM

Title:

ISLAND EDG PER 1-SOP-4KV-001 Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Island EDG per 1-SOP-4KV-001, Rev. 0 JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The crew is performing actions in 1-SOP-4KV-001, 4KV System Operation Unit 1, to island G-01 on 1A-05.
  • G-01 EDG has been started and all required checks have been performed.
  • Electrical Maintenance has enabled the loss of voltage protection for 1A52-60, G-01 Diesel Generator To Bus 1A-05 Breaker per step 5.1.36.

INITIATING CUES:

  • OS1 has directed you to Island G-01 to 1A-05 IAW 1-SOP-4KV-001, starting with step 5.1.37.

NOTE: Initial conditions in 1-SOP-4KV-001 are not met in the simulator for battery charger line up and either Mode 5 or 6. Cue examinee all initial conditions are met.

These conditions were evaluated by the exam team and verified to not affect the way the EDG will operate in the simulator and JPM can be performed with the current conditions.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Island EDG per 1-SOP-4KV-001, Rev. 0 JPM PERFORMANCE INFORMATION Required Materials: 1-SOP-4KV-001, 4KV System Operation Unit 1 Calculator PBF-026i coversheet General

References:

1-SOP-4KV-001, 4KV System Operation Unit 1 Task Standards: Island G-01 EDG to 1A-05 Safeguards Bus Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Adjust generator voltage (incoming) to equal, or slightly exceed bus 1A05 Critical N voltage (running) with G-01 Diesel Generator Voltage Regulator control switch.

Standard: G-01 Diesel Generator voltage (incoming) is equal, or slightly exceeds bus 1A05 voltage (running).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Island EDG per 1-SOP-4KV-001, Rev. 0 Performance Step: 2 Place G-01 Diesel Generator to bus 1A05 Synchroscope switch to ON for Critical Y breaker 1A52-60 AND check incoming voltage is comparable to running voltage.

Standard: G-01 Diesel Generator to bus 1A05 Synchroscope switch to ON for breaker 1A52-60 AND incoming voltage is comparable to running voltage.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Adjust frequency to cause synchroscope to rotate slowly in fast direction (2 to 5 Critical N rpm).

Standard: Frequency adjusted to cause synchroscope to rotate slowly in fast direction.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 WHEN the synchroscope is just before 12:00, AND within the green band, THEN Critical Y close 1A52-60, G-01 Diesel Generator To Bus 1A-05 Breaker, AND pick up load immediately. (Target 100-500 KW).

Standard: 1A52-60, G-01 Diesel Generator To Bus 1A-05 Breaker is SHUT, AND load is picked up.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Island EDG per 1-SOP-4KV-001, Rev. 0 Performance Step: 5 Adjust KVARS in OUT direction with G-01 Diesel Generator Voltage Regulator Critical N control switch.

Standard: KVARS in OUT direction.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Place G-01 Diesel Generator to Bus 1A-05 Synchroscope switch to OFF for Critical N breaker 1A52-60.

Standard: G-01 Diesel Generator to Bus 1A-05 Synchroscope switch to OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Check running service water pumps include all operable A Train pumps.

Critical N Standard: Running service water pumps are checked.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Island EDG per 1-SOP-4KV-001, Rev. 0 Performance Step: 8 Secure B Train Service Water pumps as necessary to maintain service water Critical N header pressure less than 90 psig.

Standard: Maintain service water header pressure less than 90 psig.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Determine 1B03 load as follows:

Critical N

a. Record 1X13 amps on C02.
b. Record 1A05 bus voltage on C02.

Standard: 1X13 amps AND 1A05 bus voltage on C02 recorded.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Determine KW load on 1B03 in accordance with the following formula (assume a Critical Y 0.8 pf):

(1.386) x (1A05 volts) x (1X13 amps) = load in watts Standard: KW load on 1B03 is calculated at approximately 530 KW Evaluator Note: 1.386 x 4250 x 90 = 530,000 watts 530,000 watts (from above) divided by 1000 = ~ 530 KW Evaluator Cue: If asked, provide INDEPENDENT VERIFICATION and cue procedure step initialed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Island EDG per 1-SOP-4KV-001, Rev. 0 Performance Step: 10 Adjust G-01 KW load to match results of calculated 1B03 load by adjusting G-01 Critical Y Diesel Generator Governor control switch.

Standard: G-01 KW load to match results of calculated 1B03 load + 50 KW.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Adjust G-01 KVARs to 100 KVAR's out by adjusting the G-01 Diesel Generator Critical N Voltage Regulator control switch.

Standard: G-01 KVARs is adjusted to 100 KVAR's out.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Declare Offsite Power to 1A05 inoperable AND enter Critical N TSAC 3.8.1.D for unit 2 and TSAC 3.8.2.A for unit 1.

Standard: OS1 is informed of 1A-05 is inoperable and TSAC entry.

Evaluator Cue: Acknowledge 1A-05 is inoperable and that the TSAC entries will be logged by another crew member.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Island EDG per 1-SOP-4KV-001, Rev. 0 Performance Step: 13 Record current G-01 Diesel Generator output voltage on C02.

Critical N Standard: Current G-01 Diesel Generator output voltage on C02 is recorded.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 14 Open 1A52-57, 1A-03 To 1A-05 Bus Tie Breaker.

Critical Y Standard: 1A52-57, 1A-03 To 1A-05 Bus Tie Breaker is OPEN.

Evaluator Note: When 1A52-57, 1A-03 To 1A-05 Bus Tie Breaker, is open, G-01 operates in isochronous mode. When 1A52-57 is closed, G-01 operates in parallel mode with speed and voltage droop active.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Adjust G-01 Emergency Diesel Generator Frequency to 60 Hz using the G-01 Critical Y Diesel Generator Governor control switch.

Standard: G-01 Emergency Diesel Generator Frequency to 60 Hz.

Evaluator Note: If 1A05 bus voltage can not be maintained between 4050 and 4300 volts or frequency between 59.7 and 60.3 Hz, then declare busses 1A05, 1B03, 1B32, and 1B30 inoperable and enter TSAC 3.8.10.A for unit 1 and TSAC 3.8.9.A for Unit 2. Voltage and/or Frequency may be momentarily outside the band provided it is immediately returned to within the band.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Island EDG per 1-SOP-4KV-001, Rev. 0 Performance Step: 16 Adjust G-01 output voltage to match the voltage that was recorded in step 5.1.47.a Critical Y using the G-01 Diesel Generator Voltage Regulator control switch.

Standard: G-01 output voltage to matched the voltage that was recorded in step 5.1.47.a.

Evaluator Note: If 1A05 bus voltage can not be maintained between 4050 and 4300 volts or frequency between 59.7 and 60.3 Hz, then declare busses 1A05, 1B03, 1B32, and 1B30 inoperable and enter TSAC 3.8.10.A for unit 1 and TSAC 3.8.9.A for unit 2. Voltage and/or Frequency may be momentarily outside the band provided it is immediately returned to within the band.

Voltage may be adjusted to <4300 to comply with note.

Evaluator Cue: If informed that 1A52-57, 1A-03 To 1A-05 Bus Tie Breaker may be released for maintenance at this time; acknowledge report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This completes the JPM.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Island EDG per 1-SOP-4KV-001, Rev. 0 Historical Record:

Rev. 0: Developed for the 2012 ILT NRC Exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Island EDG per 1-SOP-4KV-001, Rev. 0 JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

Can use any simulator IC. Procedure initial conditions require Mode 6 or Defueled plus a certain battery charger alignment. These initial conditions can be signed off and simulated for the student to facilitate JPM performance in any IC.

Simulator Setup: Perform 1-SOP-4KV-001 up to the step where EDG G01 is ready to sync to 1A05.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 12 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • The crew is performing actions in 1-SOP-4KV-001, 4KV System Operation Unit 1, to island G-01 on 1A-05.
  • G-01 EDG has been started and all required checks have been performed.
  • Electrical Maintenance has enabled the loss of voltage protection for 1A52-60, G-01 Diesel Generator To Bus 1A-05 Breaker per step 5.1.36.

INITIATING CUES:

  • OS1 has directed you to Island G-01 to 1A-05 IAW 1-SOP-4KV-001, starting with step 5.1.37.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 13 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 14 of 14

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Return Excore Nuclear Instrument to Service JPM NUMBER: PBN JPM P015.003a.COT REV. 1 RELATED PRA None INFORMATION:

TASK NUMBERS / Place Excore Nuclear Instrumentation Channels In and Out of Service TASK TITLE(S):

K/A NUMBERS: 015.A4.03 (3.8/3.9)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical:

Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by:

Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Approved by:

Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P015.003a.COT, Return Excore Nuclear Instrument to Service, Rev. 1 JPM Number: PBN P015.003a COT JPM

Title:

Return Excore Nuclear Instrument to Service Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P015.003a.COT, Return Excore Nuclear Instrument to Service, Rev. 1 JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the fourth license.
  • Unit 1 is operating at 100% steady-state conditions.
  • Power Range Nuclear Instrument, 1N-41, has been out of service for the last eight hours to support troubleshooting and repair of a suspected summing and level amp failure.
  • I&C has completed repairs, re-installed the Instrument Power fuses, and requested Operations to return Power Range Nuclear Instrument, 1N-41, back to service.
  • Steps 5.2.1, 5.2.2 and 5.2.3 of 0-SOP-IC-001 RED, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor from Service - Red Channels, have been completed.
  • Step 5.2.4 of 0-SOP-IC-001 RED has just been reached.

INITIATING CUES:

  • OS1 directs you to complete Attachment A of 0-SOP-IC-001 RED for returning Power Range Nuclear Instrument, 1N-41, to service.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P015.003a.COT, Return Excore Nuclear Instrument to Service, Rev. 1 JPM PERFORMANCE INFORMATION Required Materials: 0-SOP-IC-001 RED, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor From Service - RED Channels prepared for return to service.

Red plaque installed on Unit 1 EHC Panel per 0-SOP-IC-001 RED.

General

References:

0-SOP-IC-001 RED, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor From Service - RED Channels Task Standards: The Examinee returns Power Range Nuclear Instrument, N-41 to an operable status.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Evaluator Note: Prior to each implementation of this JPM ensure the red magnetic placard for 0-SOP-IC-001 is placed on the Unit 1 EH panel, and PPCS points N41, N41A, and N41B are removed from scan. Refer to JPM Setup Information sheet.

Performance Step: 1 On 1C-133 ensure instrument power fuses are installed for N-41.

Critical N Standard: The Examinee verifies the Instrument Power fuses installed for N-41.

Evaluator Note: Fuses installed by I&C per turnover note.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P015.003a.COT, Return Excore Nuclear Instrument to Service, Rev. 1 Performance Step: 2 Check the following Annunciators CLEAR:

Critical N

  • 1C04 1A 3-2 N-41, 42, 43, or 44 POWER RANE LOSS OF DET VOLTAGE
  • 1C04 1A 3-3 POWER RANGE CHANNEL DEVIATION
  • 1C04 1A 4-2 POWER RANGE HIGH SETPOINT CHANNEL ALERT
  • 1C04 1A 4-3 POWER RANGE LOW SETPOINT CHANNEL ALERT Standard: The Examinee visually observes that the listed alarms are CLEAR.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 On C-133 check the following status lights for N-41:

Critical N

  • LOSS OF DETECTOR VOLTAGE - OFF
  • OVER POWER TRIP HIGH RANGE - OFF
  • OVER POWER ROD STOP - OFF
  • OVER POWER TRIP LOW RANGE - As expected for Unit conditions
  • POWER ABOVE PERMISSIVE P As expected for Unit conditions
  • POWER ABOVE PERMISSIVE P As expected for Unit conditions
  • POWER ABOVE PERMISSIVE P As expected for Unit conditions
  • INSTRUMENT POWER ON - LIT Standard: The Examinee visually observes the listed status lights.

Evaluator Note: The expected status is LIT for all status lights above marked as, As expected for Unit conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P015.003a.COT, Return Excore Nuclear Instrument to Service, Rev. 1 Performance Step: 4 In cabinet C-111, place the following bistable trip switches to Critical Y NORMAL AND check the expected response:

  • Overtemperature Trip
  • Overtemperature Rod Stop Standard: The Examinee places the bistable trip switches for Overtemperature Trip and Overtemperature Rod Stop to the NORMAL position in C-111.

Evaluator Note: The intent of the cue is to mimic the plant where the operator positioning the bistables is in contact with the board operator to confirm plant response.

Evaluator Cue: The unit operator informs you the expected plant response was obtained.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Perform Section 3.0 of Attachment B to remove the operator aid Critical N placed on 1C03.

Standard: Verifies this step is already signed off as complete with no action required.

Evaluator Cue: If needed cue examinee Attachment B is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P015.003a.COT, Return Excore Nuclear Instrument to Service, Rev. 1 Performance Step: 6 On 1C-130 place the following switches in OPERATE:

Critical Y

  • Power Mismatch Bypass
  • Rod Stop Bypass Standard: The Examinee places the Power Mismatch Bypass and Rod Stop Bypass switches to the OPERATE position on panel C-130.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 On 1C-130 place the Comparator Channel Defeat Switch to Critical Y NORMAL.

Standard: The Examinee places the Comparator Channel Defeat Switch to the NORMAL position on panel C-130.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 On 1C-130 check the COMPARATOR DEFEAT status light is OFF Critical N Standard: The Examinee checks the COMPARATOR DEFEAT status light OFF on panel C-130.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P015.003a.COT, Return Excore Nuclear Instrument to Service, Rev. 1 Performance Step: 9 On C-133 return the Dropped Rod Mode switch to NORMAL by Critical Y placing the switch momentarily to RESET, THEN to NORMAL.

Standard: The Examinee takes the Dropped Rod Mode switch to RESET and back to NORMAL.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 On C-133 Check Dropped Rod Alarm test status light is OFF.

Critical N Standard: The Examinee checks the Dropped Rod Alarm test light OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 On 1C04 check POWER RANGE 1N-41 ROD DROP TEST status Critical N light is OFF.

Standard: The Examinee checks POWER RANGE 1N-41 ROD DROP TEST status light OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P015.003a.COT, Return Excore Nuclear Instrument to Service, Rev. 1 Performance Step: 12 Check annunciator 1C04 1A 1-1 NIS TRIP BYPASS is CLEAR.

Critical N Standard: The Examinee checks annunciator 1C04 1A 1-1 CLEAR.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Ensure Tave-Tref Error meter nulled (+/- 0.5 degF), THEN place the Critical N Rod Control Selector Switch in AUTO unless directed by the SM.

Standard: Examinee places Rod Control Selector Switch to AUTO.

Evaluator Cue: Inform Examinee that the Shift Manager directs that rod control be returned to AUTO.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM may be terminated when the Rod Control Selector Switch is returned to AUTO.

Stop Time:

Evaluator Note: Following the final implementation of this JPM ensure the red magnetic placard for 0-SOP-IC-001 is removed from the Unit 1 EH panel, and PPCS points N41, N41A, and N41B are returned to scan. Refer to JPM Setup Information sheet.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P015.003a.COT, Return Excore Nuclear Instrument to Service, Rev. 1 Historical Record:

Rev 0: Developed for ILT 2011 Audit exam. This JPM was originally developed for the ILT 2005 NRC exam and never issued.

Rev 1: Added unit designator to some equipment IDs. Added simulator setup notes. Updated some component conditions to match procedure wording.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P015.003a.COT, Return Excore Nuclear Instrument to Service, Rev. 1 JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

Initial Setup:

  • Load an IC where conditions support Unit 1 at 100% steady-state conditions (IC-165)
  • Start the simulation.
  • Remove power range nuclear instrument, N-41 from service in accordance with 0-SOP-IC-001 RED, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor from Service with the exception of removing the instrument power fuses.
  • Place appropriate Operator Aid on C-03.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Save to an IC for multiple uses.

Multiple Use:

Load the saved IC for this JPM.

Place appropriate Operator Aid on C-03. (0-SOP-IC-001, Attachment B, Step 1.1.1)

Following each simulator reset into the saved IC, ensure PPCS points N41, N41A, and N41B are still removed from scan. (0-SOP-IC-001, Attachment A, Step 17)

Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.

Make any necessary adjustments or corrections.

Update documentation if required.

Resave if required.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the fourth license.
  • Unit 1 is operating at 100% steady-state conditions.
  • Power Range Nuclear Instrument, 1N-41, has been out of service for the last eight hours to support troubleshooting and repair of a suspected summing and level amp failure.
  • I&C has completed repairs, re-installed the Instrument Power fuses, and requested Operations to return Power Range Nuclear Instrument, 1N-41, back to service.
  • Steps 5.2.1, 5.2.2 and 5.2.3 of 0-SOP-IC-001 RED, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor from Service - Red Channels, have been completed.
  • Step 5.2.4 of 0-SOP-IC-001 RED has just been reached.

INITIATING CUES:

  • OS1 directs you to complete Attachment A of 0-SOP-IC-001 RED for returning Power Range Nuclear Instrument, 1N-41, to service.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 12 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P015.003a.COT, Return Excore Nuclear Instrument to Service, Rev. 1 ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 13 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Shift Component Cooling Water Pumps JPM NUMBER: PBN JPM P008.003a.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P008.003.COT Operate the CCW System TASK TITLE(S):

K/A NUMBERS: 008.A4.04 (2.6*/2.6)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date (Ensure validator is briefed on exam security per FP-T-SAT-31)

Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Approved by:

Training Program Owner Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 1 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P008.003a.COT, Shift Component Cooling Water Pumps, Rev. 0 JPM Number: PBN P008.003a.COT JPM

Title:

Shift Component Cooling Water Pumps Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 2 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P008.003a.COT, Shift Component Cooling Water Pumps, Rev. 0 JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • 1P-11B Component Cooling Water (CCW) Pump has been aligned for use after being drained for Maintenance.
  • 1P-11B Component Cooling Water Pump is filled and vented.
  • An AO is standing by at the Unit 1 CCW Pumps for assistance.
  • Expected alarms have been briefed.

INITIATING CUES:

  • OS1 directs you to start 1P-11B CCW Pump and secure 1P-11A CCW Pump per 1-SOP-CC-001 Component Cooling System Step 5.4.2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 3 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P008.003a.COT, Shift Component Cooling Water Pumps, Rev. 0 JPM PERFORMANCE INFORMATION Required Materials: 1-SOP-CC-001, Component Cooling System Section 5.4 General

References:

1-SOP-CC-001, Component Cooling System Task Standards: Shift from 1P-11A CCW Pump operating to 1P-11B CCW Pump operating per 0-SOP-CC-001, Component Cooling System.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 a. Ensure 1P-11B is filled and vented.

Critical N Standard: Examinee sign off 1-SOP-CC-001 per turnover.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 4 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P008.003a.COT, Shift Component Cooling Water Pumps, Rev. 0 Performance Step: 2 b. Ensure 1P-11B has proper valve alignment per 1-CL-CC-001 Critical N Component Cooling valve Lineup:

  • 1CC-V-23, 1P-11B CC Pump Casing Vent - SHUT & CAPPED Standard: Examinee signs off valves in correct position.

Evaluator Cue: The AO reports valves are in correct position per Step 5.4.2.b and have been IVd.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 c. Ensure 1T-12 CC Surge Tank is greater than 45% on 1LI-618B Critical N Standard: Examinee verifies CC Surge Tank >45% level.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 5 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P008.003a.COT, Shift Component Cooling Water Pumps, Rev. 0 Performance Step: 4 d. Open 1CC-738A OR 1CC-738B, (circle one) RHR HX Shell Side Critical Y Inlet.

Standard: Examinee opens 1CC-738A or 1CC-738B and circles.

Evaluator Note: Critical part of step is opening of one valve only.

Alarms 1C03 1D 1-4 and 1-5 RCP Low Cooling Water Flow come in and are expected.

Evaluator Cue: If examinee asks or wants to address the alarms, inform them they were briefed as expected alarms during the pre-job brief.

If asked, the AO reports the RCP CCW flows are slightly low at 205 gpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 e. IF total flow remains less than 2000 gpm on 1FI-619, THEN Critical N perform the following:

Standard: Examinee should determine flow is >2000 gpm and sub-steps under 5.4.2.e are NOT to be performed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 6 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P008.003a.COT, Shift Component Cooling Water Pumps, Rev. 0 Performance Step: 6 f. Start 1P-11B CCW Pump and run in parallel with 1P-11A.

Critical Y Standard: Examinee starts 1P-11B and runs for 1 minute while verifying system response.

Evaluator Note: Evaluator can cue examinee that 1 minute has expired if desired.

Evaluator Cue: If asked, the AO can report personnel are clear of the area and all conditions are normal for starting 1P-11B CCW Pump.

If asked, the AO can report the start of 1P-11B is normal.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 g. Place and hold in STOP 1P-11A CCW Pump control switch for Critical Y approximately 3 seconds.

Standard: Examinee stops 1P-11A CCW Pump.

Evaluator Cue: If asked, the AO can report normal coastdown of 1P-11A CCW Pump and check valve seating was heard for 1P-11A when pump was secured.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 7 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P008.003a.COT, Shift Component Cooling Water Pumps, Rev. 0 Performance Step: 8 h. Release 1P-11A CCW Pump control switch and allow it to return to Critical N AUTO.

Standard: Examinee places 1P-11A CCW Pump to AUTO.

Evaluator Cue: If examinee asks or wants to address the alarms, inform them they were briefed as expected alarms during the pre-job brief.

If asked, the AO reports the RCP CCW flows are slightly low at 205 gpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 i. SHUT 1CC-738A OR 1CC-738B RHR HX Shell Inlet Critical Y Standard: Examinee SHUTS 1CC-738A or 1CC-738B, whichever was opened previously.

Evaluator Cue: Concur with the requested IV.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 If step 5.4.2.e was NOT performed then Steps 5.4.2.j through 5.4.2.l Critical N are N/A.

Standard: Examinee N/As Steps 5.4.2.j through 5.4.2.l.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 8 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P008.003a.COT, Shift Component Cooling Water Pumps, Rev. 0 Performance Step: 11 Examinee informs OS1 shifting of CCW Pumps is complete per Critical N 1-SOP-CC-001.

Standard: Report completion of 1-SOP-CC-001 to shift CCW Pumps.

Evaluator Cue: Acknowledge completion of 1-SOP-CC-001 Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This completes the JPM.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 9 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P008.003a.COT, Shift Component Cooling Water Pumps, Rev. 0 Historical Record:

Rev 0: JPM developed by the NRC for ILT 2011 License Examination.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 10 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P008.003a.COT, Shift Component Cooling Water Pumps, Rev. 0 JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

  • Any IC that has 1P-11A CCW Pump operating with 1P-11B CCW Pump in standby not required to be operating will work. (IC 165)
  • There are no malfunctions or LOAs that are required to be used.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 11 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • 1P-11B Component Cooling Water (CCW) Pump has been aligned for use after being drained for Maintenance.
  • 1P-11B Component Cooling Water Pump is filled and vented.
  • An AO is standing by at the Unit 1 CCW Pumps for assistance.
  • Expected alarms have been briefed.

INITIATING CUES:

  • OS1 directs you to start 1P-11B CCW Pump and secure 1P-11A CCW Pump per 1-SOP-CC-001 Component Cooling System Step 5.4.2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 12 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBN JPM P008.003a.COT, Shift Component Cooling Water Pumps, Rev. 0 ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 4 12/04/09 Page 13 of 13

Reference:

FP-T-SAT-75