| issue date = 05/31/2013
| issue date = 05/31/2013
| title = Termination of Reactor Oversight Process for Kewaunee Power Station and Commencement of Decommissioning Inspection Program
| title = Termination of Reactor Oversight Process for Kewaunee Power Station and Commencement of Decommissioning Inspection Program
| author name = Casto C A
| author name = Casto C
| author affiliation = NRC/RGN-III/ORA
| author affiliation = NRC/RGN-III/ORA
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Dominion Energy Kewaunee, Inc
| addressee affiliation = Dominion Energy Kewaunee, Inc
| docket = 05000305
| docket = 05000305
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 31, 2013  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 31, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
 
Inssbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc. Inssbrook Technical Center 5000 Dominion Boulevard  
 
Glen Allen, VA 23060-6711  


==SUBJECT:==
==SUBJECT:==
TERMINATION OF REACTOR OVERSIGHT PROCESS FOR KEWAUNEE POWER STATION AND COMMENCEMENT OF DECOMMISSIONING INSPECTION PROGRAM
TERMINATION OF REACTOR OVERSIGHT PROCESS FOR KEWAUNEE POWER STATION AND COMMENCEMENT OF DECOMMISSIONING INSPECTION PROGRAM


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==
The purpose of this letter is to inform you of our decision to cease implementation of NRC Inspection Manual Chapter (IMC) 0305, "Operating Reactor Assessment Program," dated June 13, 2012, and IMC 2515, "Light Water Reactor Inspection Program - Operations Phase," for the Kewaunee Power Station as of May 31, 2013.
On February 25, 2013, you notified the NRC of your intent to permanently shut down and decommission the Kewaunee Power Station. On May 14, 2013, you notified us that the Kewaunee Power Station was permanently shut down and that all nuclear fuel was removed from the reactor vessel. Therefore, the Kewaunee Power Station will no longer be assessed under IMC 0305, "Operating Reactor Assessment Program," and IMC 2515, "Light-Water Reactor inspection Program - Operations P hase."  Beginning June 1, 2013, the NRC's oversight of your licensed activities will be conducted under the provisions in IMC 2561, "Decommissioning Power Reactor Inspection Program," dated April 14, 2003. The objectives of IMC 2561 are to verify that decommissioning activities are being conducted safely, that spent fuel is safely stored onsite or transferred to another licensed location, and that site operations and licensee termination activities are in conformance with applicable regulatory requirements, licensee commitments, and management controls.
With the transition to IMC 2561, it is no longer necessary for you to report Reactor Oversight Process performance indicator data associated with the Kewaunee Power Station, as described in IMC 0608, "Performance Indicator Program."  Although the inspection program for NRC oversight at your facility will change, all license commitments remain in effect until altered by formal action from the NRC.


By letters dated April 4 and 30, 2013, the NRC notified you of two inspection findings involving the Emergency Preparedness and Mitigating Systems Cornerstones, each having low to moderate safety significance (White). In the letters, we stated that we would conduct supplemental inspections to review the actions taken to address the performance issues using Inspection Procedure (IP) 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area."  Since IMC 0305 and IMC 2515 are no longer applicable to Kewaunee Power Station, we will conduct these inspections using IP 92702, "Follow-Up on Corrective Actions for Violations and Deviations," dated January 10, 2008, to verify appropriate corrective actions are being implemented.  
The purpose of this letter is to inform you of our decision to cease implementation of NRC Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program, dated June 13, 2012, and IMC 2515, Light Water Reactor Inspection Program - Operations Phase, for the Kewaunee Power Station as of May 31, 2013.
On February 25, 2013, you notified the NRC of your intent to permanently shut down and decommission the Kewaunee Power Station. On May 14, 2013, you notified us that the Kewaunee Power Station was permanently shut down and that all nuclear fuel was removed from the reactor vessel. Therefore, the Kewaunee Power Station will no longer be assessed under IMC 0305, Operating Reactor Assessment Program, and IMC 2515, Light-Water Reactor inspection Program - Operations Phase. Beginning June 1, 2013, the NRCs oversight of your licensed activities will be conducted under the provisions in IMC 2561, Decommissioning Power Reactor Inspection Program, dated April 14, 2003. The objectives of IMC 2561 are to verify that decommissioning activities are being conducted safely, that spent fuel is safely stored onsite or transferred to another licensed location, and that site operations and licensee termination activities are in conformance with applicable regulatory requirements, licensee commitments, and management controls.
With the transition to IMC 2561, it is no longer necessary for you to report Reactor Oversight Process performance indicator data associated with the Kewaunee Power Station, as described in IMC 0608, Performance Indicator Program. Although the inspection program for NRC oversight at your facility will change, all license commitments remain in effect until altered by formal action from the NRC.


The enclosed inspection plan lists the inspection procedures scheduled through December 31, 2013, as part of our IMC 2561 inspection program. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you to discuss the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections. Information regarding security-related inspections will be sent via separate, non-publicly available correspondence.  
D. Heacock                                      By letters dated April 4 and 30, 2013, the NRC notified you of two inspection findings involving the Emergency Preparedness and Mitigating Systems Cornerstones, each having low to moderate safety significance (White). In the letters, we stated that we would conduct supplemental inspections to review the actions taken to address the performance issues using Inspection Procedure (IP) 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. Since IMC 0305 and IMC 2515 are no longer applicable to Kewaunee Power Station, we will conduct these inspections using IP 92702, Follow-Up on Corrective Actions for Violations and Deviations, dated January 10, 2008, to verify appropriate corrective actions are being implemented.
 
The enclosed inspection plan lists the inspection procedures scheduled through December 31, 2013, as part of our IMC 2561 inspection program. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you to discuss the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections. Information regarding security-related inspections will be sent via separate, non-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the component of NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the component of NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Kenneth Riemer at 630-829-9628 with any questions you have regarding this letter. If you have any questions regarding the fee billing with the transition to IMC 2561, please contact Christine Galster at 301-415-0662.
Please contact Kenneth Riemer at 630-829-9628 with any questions you have regarding this letter. If you have any questions regarding the fee billing with the transition to IMC 2561, please contact Christine Galster at 301-415-0662.
 
Sincerely,
Sincerely, /RA by K. O'Brien, Acting for/
                                                /RA by K. OBrien, Acting for/
Charles A. Casto  
Charles A. Casto Regional Administrator Docket No. 50-305 License No. DPR-43
 
Regional Administrator  
 
Docket No. 50-305 License No. DPR-43  


==Enclosure:==
==Enclosure:==
Kewaunee Master Inspection Plan  
Kewaunee Master Inspection Plan cc w/encl: ListServTM
 
cc w/encl: ListServ TM   


By letters dated April 4 and 30, 2013, the NRC notified you of two inspection findings involving the Emergency Preparedness and Mitigating Systems Cornerstones, each having low to moderate safety significance (White). In the letters, we stated that we would conduct supplemental inspections to review the actions taken to address the performance issues using Inspection Procedure (IP) 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area.Since IMC 0305 and IMC 2515 are no longer applicable to Kewaunee Power Station, we will conduct these inspections using IP 92702, "Follow-Up on Corrective Actions for Violations and Deviations," dated January 10, 2008, to verify appropriate corrective actions are being implemented.
D. Heacock                                              By letters dated April 4 and 30, 2013, the NRC notified you of two inspection findings involving the Emergency Preparedness and Mitigating Systems Cornerstones, each having low to moderate safety significance (White). In the letters, we stated that we would conduct supplemental inspections to review the actions taken to address the performance issues using Inspection Procedure (IP) 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. Since IMC 0305 and IMC 2515 are no longer applicable to Kewaunee Power Station, we will conduct these inspections using IP 92702, Follow-Up on Corrective Actions for Violations and Deviations, dated January 10, 2008, to verify appropriate corrective actions are being implemented.
The enclosed inspection plan lists the inspection procedures scheduled through December 31, 2013, as part of our IMC 2561 inspection program. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you to discuss the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections. Information regarding security-related inspections will be sent via separate, non-publicly available correspondence.
The enclosed inspection plan lists the inspection procedures scheduled through December 31, 2013, as part of our IMC 2561 inspection program. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you to discuss the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections. Information regarding security-related inspections will be sent via separate, non-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the component of NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
available electronically for public inspection in the component of NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Kenneth Riemer at 630-829-9628 with any questions you have regarding this letter. If you have any questions regarding the fee billing with the transition to IMC 2561, please contact Christine Galster at 301-415-0662.
Please contact Kenneth Riemer at 630-829-9628 with any questions you have regarding this letter. If you have any questions regarding the fee billing with the transition to IMC 2561, please contact Christine Galster at 301-415-0662.
Sincerely, /RA by K. O'Brien, Acting for/
Sincerely,
Charles A. Casto  
                                                        /RA by K. OBrien, Acting for/
 
Charles A. Casto Regional Administrator Docket No. 50-305 License No. DPR-43
Regional Administrator Docket No. 50-305 License No. DPR-43  


==Enclosure:==
==Enclosure:==
Kewaunee Master Inspection Plan cc w/encl: ListServ TM DISTRIBUTION
Kewaunee Master Inspection Plan cc w/encl: ListServTM DISTRIBUTION:
: See next page DOCUMENT NAME: Termination of ROP Kewaunee Letter    
See next page DOCUMENT NAME: Termination of ROP Kewaunee Letter                                             *via e-mail Publicly Available           Non-Publicly Available             Sensitive           Non-Sensitive OFFICE             RIII                       RIII                   RIII               NRR:DIRS WCartwright for NAME               NShah for RKrsek           ROrlikowski             NShah for KRiemer TKobetz*
*via e-mail Publicly Available Non-Publicly Available   Sensitive Non-Sensitive OFFICE RIII RIII RIII NRR:DIRS NAME NShah for RKrsek ROrlikowski NShah for KRiemer WCartwright for TKobetz* DATE 05/30/13 05/31/13 05/30/13 05/30/13 OFFICE FSME RIII:DNMS RIII RIII NAME BWatson* KO'Brien for ABoland KO'Brien for SReynolds KO'Brien for GShear DATE 05/30/13 05/31/13 05/31/13 05/31/13 OFFICE NSIR:DSO NSIR:DPR NRR:DIRS RIII NAME KO'Brien for PHolahan* MThaggard* HNieh* KO'Brien, Acting RA for CCasto DATE 05/31/13 05/30/13 05/30/13 05/31/13 OFFICIAL RECORD COPY Enclosure Kewaunee Master Inspection Plan In accordance with the U.S. Nuclear Regulatory Commission (NRC) Inspection Manual
DATE               05/30/13                   05/31/13               05/30/13           05/30/13 OFFICE             FSME                       RIII:DNMS               RIII               RIII NAME               BWatson*                   KOBrien for ABoland   KOBrien for       KOBrien for GShear SReynolds DATE               05/30/13                   05/31/13               05/31/13           05/31/13 OFFICE             NSIR:DSO                   NSIR:DPR               NRR:DIRS           RIII KOBrien, Acting RA NAME               KOBrien for PHolahan*     MThaggard*             HNieh*             for CCasto DATE               05/31/13                   05/30/13               05/30/13           05/31/13 OFFICIAL RECORD COPY


Chapter 2561, "Decommissioning Power Reactor Inspection Program," the NRC Region III staff developed a Master Inspection Plan (MIP) for the Kewaunee Power Station for the remainder of calendar year 2013. The inspection plan is based on your current performance in executing the site decommissioning project and the schedule of activities planned for the period June through December 2013.  
Kewaunee Master Inspection Plan In accordance with the U.S. Nuclear Regulatory Commission (NRC) Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff developed a Master Inspection Plan (MIP) for the Kewaunee Power Station for the remainder of calendar year 2013. The inspection plan is based on your current performance in executing the site decommissioning project and the schedule of activities planned for the period June through December 2013.
The following is a list of the routine and discretionary inspection procedures (IPs) we expect to use during our inspections. The procedures used during each inspection will depend on the specific activities being conducted at the site. Additional discretionary inspection procedures may be used if decommissioning activities warrant.
The ROP baseline emergency preparedness inspection procedure IP 71114 (including attachments with the exception of IP 71114.06) will be completed for 2013 and 2014, to assure the licensee maintains the required emergency preparedness program. The schedule and scope of the emergency preparedness inspection activities will be adjusted based on the licensees schedule of decommissioning activities and current licensing basis. Inspection procedures 82301, 82302, and 82701 may be used as additional guidance for these inspections during this period.
Inspection Procedure            Title IP 36801                        Organization, Management and Cost Controls IP 37801                        Safety Reviews, Design Changes, and Modifications IP 40801                        Self-Assessment, Auditing, and Corrective Action IP 60801                        Spent Fuel Pool Safety IP 62801                        Maintenance and Surveillance IP 71714                        Cold Weather Preparations IP 71801                        Decommissioning Performance and Status Review IP 81311                        Physical Security Requirements for ISFSI IP 83750                        Occupational Radiation Exposure IP 84750                        Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750                        Solid Radioactive Waste Management and Transportation of Radioactive Materials IP 42700                        Plant Procedures IP 61726                        Surveillance Observation IP 62706                        Maintenance Rule IP 64704                        Fire Protection Program IP 92702                        Follow-Up on Corrective Actions for Violations and Deviations IP 71114                        Emergency Preparedness (applicable portions)
IP 71003                        Post-Approval Site Inspection for License Renewal (applicable portions)
TI 186                          Inspection of Procedures and Processes for Responding to Potential Aircraft Threats (applicable portions)
Enclosure


The following is a list of the routine and discretionary inspection procedures (IPs) we expect to use during our inspections. The procedures used during each inspection will depend on the specific activities being conducted at the site. Additional discretionary inspection procedures may be used if decommissioning activities warrant. 
Letter to D. Heacock from C. Casto dated May 31, 2013
 
The ROP baseline emergency preparedness inspection procedure IP 71114 (including attachments with the exception of IP 71114.06) will be completed for 2013 and 2014, to assure the licensee maintains the required emergency preparedness program. The schedule and scope of the emergency preparedness inspection activities will be adjusted based on the licensee's schedule of decommissioning activities and current licensing basis. Inspection procedures 82301, 82302, and 82701 may be used as additional guidance for these inspections during this period.
Inspection Procedure  Title  IP 36801  Organization, Management and Cost Controls IP 37801  Safety Reviews, Design Changes, and Modifications IP 40801  Self-Assessment, Auditing, and Corrective Action  IP 60801  Spent Fuel Pool Safety  IP 62801  Maintenance and Surveillance IP 71714  Cold Weather Preparations  IP 71801    Decommissioning Performance and Status Review IP 81311  Physical Security Requirements for ISFSI  IP 83750    Occupational Radiation Exposure IP 84750  Radioactive Waste Treatment, and Effluent and      Environmental Monitoring IP 86750  Solid Radioactive Waste Management and Transportation of Radioactive Materials  IP 42700  Plant Procedures  IP 61726  Surveillance Observation IP 62706  Maintenance Rule IP 64704  Fire Protection Program IP 92702 Follow-Up on Corrective Actions for Violations and Deviations IP 71114 Emergency Preparedness  (applicable portions)
IP 71003 Post-Approval Site Inspection for License Renewal (applicable portions) TI 186 Inspection of Procedures and Processes for Responding to Potential Aircraft Threats (applicable portions)
Letter to D. Heacock from C. Casto dated May 31, 2013  


==SUBJECT:==
==SUBJECT:==
TERMINATION OF REACTOR OVERSIGHT PROCESS FOR KEWAUNEE POWER STATION AND COMMENCEMENT OF DECOMMISSIONING INSPECTION PROGRAM  
TERMINATION OF REACTOR OVERSIGHT PROCESS FOR KEWAUNEE POWER STATION AND COMMENCEMENT OF DECOMMISSIONING INSPECTION PROGRAM DISTRIBUTION:
 
Doug Huyck RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Bruce Watson, FSME Theodore Smith, FSME Timothy Kobetz, NRR Karl Feintuch, NRR Robert Orlikowski, DNMS Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov}}
DISTRIBUTION
: Doug Huyck RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee  
 
RidsNrrDirsIrib Resource  
 
Chuck Casto Cynthia Pederson Bruce Watson, FSME Theodore Smith, FSME Timothy Kobetz, NRR  
 
Karl Feintuch, NRR  
 
Robert Orlikowski, DNMS Steven Orth Allan Barker  
 
Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov}}

Latest revision as of 18:27, 4 November 2019

Termination of Reactor Oversight Process for Kewaunee Power Station and Commencement of Decommissioning Inspection Program
ML13151A375
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/31/2013
From: Casto C
Region 3 Administrator
To: Heacock D
Dominion Energy Kewaunee
References
Download: ML13151A375 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 31, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Inssbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

TERMINATION OF REACTOR OVERSIGHT PROCESS FOR KEWAUNEE POWER STATION AND COMMENCEMENT OF DECOMMISSIONING INSPECTION PROGRAM

Dear Mr. Heacock:

The purpose of this letter is to inform you of our decision to cease implementation of NRC Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program, dated June 13, 2012, and IMC 2515, Light Water Reactor Inspection Program - Operations Phase, for the Kewaunee Power Station as of May 31, 2013.

On February 25, 2013, you notified the NRC of your intent to permanently shut down and decommission the Kewaunee Power Station. On May 14, 2013, you notified us that the Kewaunee Power Station was permanently shut down and that all nuclear fuel was removed from the reactor vessel. Therefore, the Kewaunee Power Station will no longer be assessed under IMC 0305, Operating Reactor Assessment Program, and IMC 2515, Light-Water Reactor inspection Program - Operations Phase. Beginning June 1, 2013, the NRCs oversight of your licensed activities will be conducted under the provisions in IMC 2561, Decommissioning Power Reactor Inspection Program, dated April 14, 2003. The objectives of IMC 2561 are to verify that decommissioning activities are being conducted safely, that spent fuel is safely stored onsite or transferred to another licensed location, and that site operations and licensee termination activities are in conformance with applicable regulatory requirements, licensee commitments, and management controls.

With the transition to IMC 2561, it is no longer necessary for you to report Reactor Oversight Process performance indicator data associated with the Kewaunee Power Station, as described in IMC 0608, Performance Indicator Program. Although the inspection program for NRC oversight at your facility will change, all license commitments remain in effect until altered by formal action from the NRC.

D. Heacock By letters dated April 4 and 30, 2013, the NRC notified you of two inspection findings involving the Emergency Preparedness and Mitigating Systems Cornerstones, each having low to moderate safety significance (White). In the letters, we stated that we would conduct supplemental inspections to review the actions taken to address the performance issues using Inspection Procedure (IP) 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. Since IMC 0305 and IMC 2515 are no longer applicable to Kewaunee Power Station, we will conduct these inspections using IP 92702, Follow-Up on Corrective Actions for Violations and Deviations, dated January 10, 2008, to verify appropriate corrective actions are being implemented.

The enclosed inspection plan lists the inspection procedures scheduled through December 31, 2013, as part of our IMC 2561 inspection program. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you to discuss the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections. Information regarding security-related inspections will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the component of NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Kenneth Riemer at 630-829-9628 with any questions you have regarding this letter. If you have any questions regarding the fee billing with the transition to IMC 2561, please contact Christine Galster at 301-415-0662.

Sincerely,

/RA by K. OBrien, Acting for/

Charles A. Casto Regional Administrator Docket No. 50-305 License No. DPR-43

Enclosure:

Kewaunee Master Inspection Plan cc w/encl: ListServTM

D. Heacock By letters dated April 4 and 30, 2013, the NRC notified you of two inspection findings involving the Emergency Preparedness and Mitigating Systems Cornerstones, each having low to moderate safety significance (White). In the letters, we stated that we would conduct supplemental inspections to review the actions taken to address the performance issues using Inspection Procedure (IP) 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. Since IMC 0305 and IMC 2515 are no longer applicable to Kewaunee Power Station, we will conduct these inspections using IP 92702, Follow-Up on Corrective Actions for Violations and Deviations, dated January 10, 2008, to verify appropriate corrective actions are being implemented.

The enclosed inspection plan lists the inspection procedures scheduled through December 31, 2013, as part of our IMC 2561 inspection program. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you to discuss the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections. Information regarding security-related inspections will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the component of NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Kenneth Riemer at 630-829-9628 with any questions you have regarding this letter. If you have any questions regarding the fee billing with the transition to IMC 2561, please contact Christine Galster at 301-415-0662.

Sincerely,

/RA by K. OBrien, Acting for/

Charles A. Casto Regional Administrator Docket No. 50-305 License No. DPR-43

Enclosure:

Kewaunee Master Inspection Plan cc w/encl: ListServTM DISTRIBUTION:

See next page DOCUMENT NAME: Termination of ROP Kewaunee Letter *via e-mail Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII RIII NRR:DIRS WCartwright for NAME NShah for RKrsek ROrlikowski NShah for KRiemer TKobetz*

DATE 05/30/13 05/31/13 05/30/13 05/30/13 OFFICE FSME RIII:DNMS RIII RIII NAME BWatson* KOBrien for ABoland KOBrien for KOBrien for GShear SReynolds DATE 05/30/13 05/31/13 05/31/13 05/31/13 OFFICE NSIR:DSO NSIR:DPR NRR:DIRS RIII KOBrien, Acting RA NAME KOBrien for PHolahan* MThaggard* HNieh* for CCasto DATE 05/31/13 05/30/13 05/30/13 05/31/13 OFFICIAL RECORD COPY

Kewaunee Master Inspection Plan In accordance with the U.S. Nuclear Regulatory Commission (NRC) Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff developed a Master Inspection Plan (MIP) for the Kewaunee Power Station for the remainder of calendar year 2013. The inspection plan is based on your current performance in executing the site decommissioning project and the schedule of activities planned for the period June through December 2013.

The following is a list of the routine and discretionary inspection procedures (IPs) we expect to use during our inspections. The procedures used during each inspection will depend on the specific activities being conducted at the site. Additional discretionary inspection procedures may be used if decommissioning activities warrant.

The ROP baseline emergency preparedness inspection procedure IP 71114 (including attachments with the exception of IP 71114.06) will be completed for 2013 and 2014, to assure the licensee maintains the required emergency preparedness program. The schedule and scope of the emergency preparedness inspection activities will be adjusted based on the licensees schedule of decommissioning activities and current licensing basis. Inspection procedures 82301, 82302, and 82701 may be used as additional guidance for these inspections during this period.

Inspection Procedure Title IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 71714 Cold Weather Preparations IP 71801 Decommissioning Performance and Status Review IP 81311 Physical Security Requirements for ISFSI IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials IP 42700 Plant Procedures IP 61726 Surveillance Observation IP 62706 Maintenance Rule IP 64704 Fire Protection Program IP 92702 Follow-Up on Corrective Actions for Violations and Deviations IP 71114 Emergency Preparedness (applicable portions)

IP 71003 Post-Approval Site Inspection for License Renewal (applicable portions)

TI 186 Inspection of Procedures and Processes for Responding to Potential Aircraft Threats (applicable portions)

Enclosure

Letter to D. Heacock from C. Casto dated May 31, 2013

SUBJECT:

TERMINATION OF REACTOR OVERSIGHT PROCESS FOR KEWAUNEE POWER STATION AND COMMENCEMENT OF DECOMMISSIONING INSPECTION PROGRAM DISTRIBUTION:

Doug Huyck RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Bruce Watson, FSME Theodore Smith, FSME Timothy Kobetz, NRR Karl Feintuch, NRR Robert Orlikowski, DNMS Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov