| number = ML13196A258
| number = ML13196A258
| issue date = 07/01/2013
| issue date = 07/01/2013
| title = Oconee, Units 1, 2, and 3, Independent Spent Fuel Storage Installation, Updated Final Safety Analysis Report (UFSAR) 2012 Revision
| title = Independent Spent Fuel Storage Installation, Updated Final Safety Analysis Report (UFSAR) 2012 Revision
| author name = Batson S L
| author name = Batson S
| author affiliation = Duke Energy Carolinas, LLC
| author affiliation = Duke Energy Carolinas, LLC
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:4 DUKE Scott L. BatsonENERGY. Vice President Oconee Nuclear StationDuke EnergyONOIVP 17800 Rochester HwySeneca, SC 2967210 CFR 72.70(b) o: 864.873.3274 f 864.873.
{{#Wiki_filter:4 DUKE                                                                                                   Scott L. Batson ENERGY.                                                                                         Oconee Vice President Nuclear Station Duke Energy ONOIVP 17800 RochesterHwy Seneca, SC 29672 10 CFR 72.70(b)                                             o: 864.873.3274 f 864.873. 4208 Scott.Batson@duke-energy.com July 1, 2013 Director, Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
4208Scott.Batson@duke-energy.com July 1, 2013Director, Office of Nuclear MaterialSafety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Subject:==
==Subject:==
 
Duke Energy Carolinas, LLC (Duke Energy)
Duke Energy Carolinas, LLC (Duke Energy)Oconee Nuclear Station, Units 1, 2, and 3Docket Nos. 72-4, 50-269, 50-270, 50-287Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report (UFSAR)2012 RevisionPursuant to 10 CFR 72.70(b),
Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 72-4, 50-269, 50-270, 50-287 Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report (UFSAR) 2012 Revision Pursuant to 10 CFR 72.70(b), enclosed is a copy of the 2012 revision to the Oconee Independent Spent Fuel Storage Installation UFSAR. The effective date of the revision is December 31, 2012.
enclosed is a copy of the 2012 revision to the OconeeIndependent Spent Fuel Storage Installation UFSAR. The effective date of the revision isDecember 31, 2012.The first part of the enclosure provides instructions for inserting this revision into existingmanuals including a list of effective pages required by 10 CFR 72.70(b).
The first part of the enclosure provides instructions for inserting this revision into existing manuals including a list of effective pages required by 10 CFR 72.70(b).
This submittal document contains no regulatory commitments.
This submittal document contains no regulatory commitments.
If there are any questions, please contact Susan Perry at (864) 873-4370.
If there are any questions, please contact Susan Perry at (864) 873-4370.
I declare under penalty of perjury that the foregoing is true and correct.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1st day of July, 2013.
Executed on the 1st dayof July, 2013.Sincerely, Scott L. BatsonEnclosure.
Sincerely, Scott L. Batson Enclosure.
www.duke-energy.com U. S. Nuclear Regulatory Commission July 1, 2013Page 2xc:Mr. Victor McCreeAdministrator, Region IIU.S. Nuclear Regulatory Commission Marquis One Tower245 Peachtree Center Ave., NE, Suite 1200Atlanta, GA 30303-1257 Mr. John BoskaProject ManagerU.S. Nuclear Regulatory Commission 11555 Rockville PikeMail Stop O-8G9ARockville, MD 20852-2746 Mr. Ed CroweSenior Resident Inspector Oconee Nuclear Station ONS ISFSI UFSAR UPDATEINSERTION INSTRUCTIONS Submittal Due Date: 6/30/13Effective Date: 12/31/121. Replace List of Effective Pages (LOEP) for Tables and Figures with the 2012 LOEP Update.2. Replace entire text portions (including the Table of Contents, List of Tables, List of Figures and Listof Abbreviations) with the updated text portion.3. Update Tables and Figures according to the following instructions NOTE: No Tables or Figures were updated on this revision.
www.duke-energy.com
OCONEE ISFSI UFSAR -2012 UPDATEList of Effective Pages (LOEP) for Table and FiguresThe purpose of this list is to assure that the pages in the Tables and Figures section of your manual matchthe most recent issue, as well as to show a full accounting of all tables and figures, including those thathave been deleted.
 
The earliest effective date, 12/31/07, was used when all tables and figures were re-issued.Effective Table Table TitleDate No.12/31/07 A-i Design Parameters for the Oconee ISFSI12/31/07 A-2 Summary of ISFSI Fuel Handling Operations 12/31/07 A-3 Primary Design Parameters for the ISFSI Transport System12/31/07 A-4 Major Systems, Subsystems, and Components of the Oconee ISFSI12/31/07 A-5 Population Growth in Oconee, Pickens, and Anderson  
U. S. Nuclear Regulatory Commission July 1, 2013 Page 2 xc:
: Counties, South Carolina (1980-2005)12/31/07 A-6 Population Projections for Oconee, Pickens, and Anderson  
Mr. Victor McCree Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. John Boska Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852-2746 Mr. Ed Crowe Senior Resident Inspector Oconee Nuclear Station
: Counties, South Carolina(2010-2050) 12/31/07 A-7 Joint Frequencies of Wind Distribution and Speed by Stability Class (Pages 1-6)12/31/07 A-8 Soil Permeability Test Results12/31/07 A-9 Significant Earthquakes in the Southeast United States (Intensity V or Greater)  
 
(Pages1-5)12/31/07 A-10 Physical Characteristics of PWR Fuel Assemblies Based on Nominal Design12/31/07 A- 1I Transfer Cask Stress Analysis for Tornado Effects12/31/07 A-12 Oconee ISFSI Major Components and Functions 12/31/07 A- 13 Oconee ISFSI Radioactive Material Confinement Barriers12/31/07 A-14 Oconee ISFSI Major Components and Design Requirements 12/31/07 A-15 ONS ISFSI Project Transfer Trailer Design Parameters 12/31/07 A-16 Oconee ISFSI Major Components and Classification 12/31/07 A-17 Gamma Energy Spectrum12/31/07 A-18 Shielding Analysis Results (Pages 1-2)12/31/07 A-19 Summary of Estimated On-site Doses Resulting from ISFSI Operation (Per DSCTransfer to HSM) (Pages 1-2)12/31/07 A-20 Dose Estimate for Construction of Additional Horizontal Storage Modules Based onLabor Estimates for 2 X 10 Array12/31/07 A-21 Neutron and Gamma Energy Spectrum12/31/07 A-22 Comparison of Total Dose Rates for HSM With and Without Air Outlet Shielding Blocks12/31/07 A-23 Cask Drop Target Parameters Effective Date: 12/31/12 Page 2 of 3Effective Figure Figure TitleDate No.12/31/07 B-1 Location of ISFSI12/31/07 B-2 General Location12/31/07 B-3 Site Plan12/31/07 B-4 ISFSI Layout12/31/07 B-5 Topography Within 5. Miles12/31/07 B-6 Relative Positions of Meteorological Instruments 12/31/07 B-7 Relative Elevation of Meteorological Instruments 12/31/07 B-8 Areal Groundwater Survey12/31/07 B-9 Groundwater Survey at Station Site12/31/07 B- 10 Well Permeameter Test Apparatus 12/31/07 B-11 Formulae for Determining Permeability 12/31/07 B-12 General Site Area12/31/07 B-13 Site Boring Plan12/31/07 B-14 Core Boring Record (Pages 1-2)12/31/07 B-15 Core Boring Record (Pages 1-2)12/31/07 B-16 Core Boring Record12/31/07 B-17 Core Boring Record12/31/07 B-18 Core Boring Record (Pages 1-2)12/31/07 B-19 Core Boring Record (Pages 1-2)12/31/07 B-20 Core Boring Record (Pages 1-2)12/31/07 B-21 Core Boring Record (Pages 1-2)12/31/07 B-22 Core Boring Record (Pages 1-2)12/31/07 B-23 Core Boring Record12/31/07 B-24 Core Boring Record (Pages 1-2)12/31/07 B-25 Core Boring Record (Pages 1-2)12/31/07 B-26 Core Boring Record (Pages 1-2)12/31/07 B-27 Core Boring Record12/31/07 B-28 ISFSI Foundation Profile12/31/07 B-29 Site Layout and Route12/31/07 B-30 Site Plan12/31/07 B-31 Transfer Cask Lifting Yoke12/31/07 B-32 Transfer Cask Lift Extension 12/31/07 B-33 Spent Fuel Pool AreaEffective Date: 12/31/12 Page 3 of 3Effective Figure Figure TitleDate No.12/31/07 B-3412/31/07 B-3512/31/07 B-3612/31/07 B-3712/31/07 B-3812/31/07 B-3912/31/07 B-4012/31/07 B-4112/31/07 B-4212/31/07 B-4312/31/07 B-4412/31/07 B-4512/31/07 B-46B-4712/31/07 B-48Spent Fuel Pool AreaSpent Fuel Pool AreaNUHOMSO System Loading Operations Flowchart NUHOMSb System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart Location of Dose RatesDose Rate Versus Distance from Surface of HSMDose from Filled HSM ArrayDose from Filled HSM ArrayRadiation Zone Map of Modules Surface Dose RatesDeleted Per 1991 UpdateFuel Assembly Burnup Requirements Effective Date: 12/31/12 ONS ISFSI UFSAR UPDATEINSERTION INSTRUCTIONS Submittal Due Date: 6/30/13Effective Date: 12/31/121. Replace List of Effective Pages (LOEP) for Tables and Figures with the 2012 LOEP Update.2. Replace entire text portions (including the Table of Contents, List of Tables, List of Figures and Listof Abbreviations) with the updated text portion.3. Update Tables and Figures according to the following instructions NOTE: No Tables or Figures were updated on this revision.
ONS ISFSI UFSAR UPDATE INSERTION INSTRUCTIONS Submittal Due Date: 6/30/13 Effective Date: 12/31/12
OCONEE ISFSI UFSAR -2012 UPDATEList of Effective Pages (LOEP) for Table and FiguresThe purpose of this list is to assure that the pages in the Tables and Figures section of your manual matchthe most recent issue, as well as to show a full accounting of all tables and figures, including those thathave been deleted.
: 1. Replace List of Effective Pages (LOEP) for Tables and Figures with the 2012 LOEP Update.
The earliest effective date, 12/31/07, was used when all tables and figures were re-issued.Effective Table Table TitleDate No.12/31/07 A-I Design Parameters for the Oconee ISFSI12/31/07 A-2 Summary of lSFSI Fuel Handling Operations 12/31/07 A-3 Primary Design Parameters for the ISFSI Transport System12/31/07 A-4 Major Systems, Subsystems, and Components of the Oconee ISFSI12/31/07 A-5 Population Growth in Oconee, Pickens, and Anderson  
: 2. Replace entire text portions (including the Table of Contents, List of Tables, List of Figures and List of Abbreviations) with the updated text portion.
: Counties, South Carolina (1980-2005)12/31/07 A-6 Population Projections for Oconee, Pickens, and Anderson  
: 3. Update Tables and Figures according to the following instructions NOTE: No Tables or Figures were updated on this revision.
: Counties, South Carolina(2010-2050) 12/31/07 A-7 Joint Frequencies of Wind Distribution and Speed by Stability Class (Pages 1-6)12/31/07 A-8 Soil Permeability Test Results12/31/07 A-9 Significant Earthquakes in the Southeast United States (Intensity V or Greater)  
 
(Pages1-5)12/31/07 A-10 Physical Characteristics of PWR Fuel Assemblies Based on Nominal Design12/31/07 A-] I Transfer Cask Stress Analysis for Tornado Effects12/31/07 A-12 Oconee ISFSI Major Components and Functions 12/31/07 A-13 Oconee ISFSI Radioactive Material Confinement Barriers12/31/07 A-14 Oconee ISFSI Major Components and Design Requirements 12/31/07 A-15 ONS ISFSI Project Transfer Trailer Design Parameters 12/31/07 A-16 Oconee ISFSI Major Components and Classification 12/31/07 A- 17 Gamma Energy Spectrum12/31/07 A-18 Shielding Analysis Results (Pages 1-2)12/31/07 A-19 Sunmmary of Estimated On-site Doses Resulting from ISFSI Operation (Per DSCTransfer to HSM) (Pages 1-2)12/31/07 A-20 Dose Estimate for Construction of Additional Horizontal Storage Modules Based onLabor Estimates for 2 X 10 Array12/3 1/07 A-21 Neutron and Gamma Energy Spectrum12/31/07 A-22 Comparison of Total Dose Rates for HSM With and Without Air Outlet Shielding Blocks12/31/07 A-23 Cask Drop Target Parameters Effective Date: 12/31/12 Page 2 of 3Effective Figure Figure TitleDate No.12/31/07 B-1 Location of ISFSI12/31/07 B-2 General Location12/31/07 B-3 Site Plan12/31/07 B-4 ISFSI Layout12/31/07 B-5 Topography Within 5 Miles12/31/07 B-6 Relative Positions of Meteorological Instruments 12/31/07 B-7 Relative Elevation of Meteorological Instruments 12/31/07 B-8 Areal Groundwater Survey12/31/07 B-9 Groundwater Survey at Station Site12/31/07 B-10 Well Penneameter Test Apparatus 12/31/07 B-I l Formulae for Determining Permeability 12/31/07 B-12 General Site Area12/31/07 B-13 Site Boring Plan12/31/07 B-14 Core Boring Record (Pages 1-2)12/31/07 B-15 Core Boring Record (Pages 1-2)12/31/07 B- 16 Core Boring Record12/31/07 B- 17 Core Boring Record12/31/07 B-18 Core Boring Record (Pages 1-2)12/31/07 B-19 Core Boring Record (Pages 1-2)12/31/07 B-20 Core Boring Record (Pages 1-2)12/31/07 B-21 Core Boring Record (Pages 1-2)12/31/07 B-22 Core Boring Record (Pages 1-2)12/31/07 B-23 Core Boring Record12/31/07 B-24 Core Boring Record (Pages 1-2)12/31/07 B-25 Core Boring Record (Pages 1-2)12/31/07 B-26 Core Boring Record (Pages 1-2)12/31/07 B-27 Core Boring Record12/31/07 B-28 ISFSI Foundation Profile12/31/07 B-29 Site Layout and Route12/31/07 B-30 Site Plan12/31/07 B-31 Transfer Cask Lifting Yoke12/31/07 B-32 Transfer Cask Lift Extension 12/31/07 B-33 Spent Fuel Pool AreaEffective Date: 12/31/12 Page 3 of 3Effective Figure Figure TitleDate No.12/31/07 B-3412/31/07 B-3512/31/07 B-3612/31/07 B-3712/31/07 B-3812/31/07 B-3912/31/07 B-4012/31/07 B-4112/31/07 B-4212/31/07 B-4312/31/07 B-4412/31/07 B-4512/31/07 B-46B-4712/31/07 B-48Spent Fuel Pool AreaSpent Fuel Pool AreaNUHOMS System Loading Operations Flowchart System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart Location of Dose RatesDose Rate Versus Distance from Surface of HSMDose from Filled HSM ArrayDose from Filled HSM ArrayRadiation Zone Map of Modules Surface Dose RatesDeleted Per 1991 UpdateFuel Assembly Burnup Requirements Effective Date: 12/31/12}}
OCONEE ISFSI UFSAR - 2012 UPDATE List of Effective Pages (LOEP) for Table and Figures The purpose of this list is to assure that the pages in the Tables and Figures section of your manual match the most recent issue, as well as to show a full accounting of all tables and figures, including those that have been deleted. The earliest effective date, 12/31/07, was used when all tables and figures were re-issued.
Effective     Table   Table Title Date          No.
12/31/07       A-i       Design Parameters for the Oconee ISFSI 12/31/07     A-2       Summary of ISFSI Fuel Handling Operations 12/31/07     A-3       Primary Design Parameters for the ISFSI Transport System 12/31/07       A-4       Major Systems, Subsystems, and Components of the Oconee ISFSI 12/31/07     A-5       Population Growth in Oconee, Pickens, and Anderson Counties, South Carolina (1980-2005) 12/31/07     A-6       Population Projections for Oconee, Pickens, and Anderson Counties, South Carolina (2010-2050) 12/31/07     A-7       Joint Frequencies of Wind Distribution and Speed by Stability Class (Pages 1-6) 12/31/07     A-8       Soil Permeability Test Results 12/31/07     A-9       Significant Earthquakes in the Southeast United States (Intensity V or Greater) (Pages 1-5) 12/31/07     A-10     Physical Characteristics of PWR Fuel Assemblies Based on Nominal Design 12/31/07     A- 1I     Transfer Cask Stress Analysis for Tornado Effects 12/31/07     A-12     Oconee ISFSI Major Components and Functions 12/31/07     A- 13     Oconee ISFSI Radioactive Material Confinement Barriers 12/31/07     A-14     Oconee ISFSI Major Components and Design Requirements 12/31/07     A-15     ONS ISFSI Project Transfer Trailer Design Parameters 12/31/07     A-16     Oconee ISFSI Major Components and Classification 12/31/07     A-17     Gamma Energy Spectrum 12/31/07     A-18     Shielding Analysis Results (Pages 1-2) 12/31/07     A-19     Summary of Estimated On-site Doses Resulting from ISFSI Operation (Per DSC Transfer to HSM) (Pages 1-2) 12/31/07     A-20     Dose Estimate for Construction of Additional Horizontal Storage Modules Based on Labor Estimates for 2 X 10 Array 12/31/07     A-21       Neutron and Gamma Energy Spectrum 12/31/07     A-22     Comparison of Total Dose Rates for HSM With and Without Air Outlet Shielding Blocks 12/31/07     A-23     Cask Drop Target Parameters Effective Date: 12/31/12
 
Page 2 of 3 Effective    Figure     Figure Title Date          No.
12/31/07     B-1       Location of ISFSI 12/31/07     B-2       General Location 12/31/07     B-3       Site Plan 12/31/07     B-4       ISFSI Layout 12/31/07     B-5       Topography Within 5.Miles 12/31/07     B-6       Relative Positions of Meteorological Instruments 12/31/07     B-7       Relative Elevation of Meteorological Instruments 12/31/07     B-8       Areal Groundwater Survey 12/31/07     B-9       Groundwater Survey at Station Site 12/31/07     B- 10     Well Permeameter Test Apparatus 12/31/07     B-11       Formulae for Determining Permeability 12/31/07     B-12       General Site Area 12/31/07     B-13       Site Boring Plan 12/31/07     B-14       Core Boring Record (Pages 1-2) 12/31/07     B-15       Core Boring Record (Pages 1-2) 12/31/07     B-16       Core Boring Record 12/31/07     B-17       Core Boring Record 12/31/07     B-18       Core Boring Record (Pages 1-2) 12/31/07     B-19       Core Boring Record (Pages 1-2) 12/31/07     B-20       Core Boring Record (Pages 1-2) 12/31/07     B-21       Core Boring Record (Pages 1-2) 12/31/07     B-22       Core Boring Record (Pages 1-2) 12/31/07     B-23       Core Boring Record 12/31/07     B-24       Core Boring Record (Pages 1-2) 12/31/07     B-25       Core Boring Record (Pages 1-2) 12/31/07     B-26       Core Boring Record (Pages 1-2) 12/31/07     B-27       Core Boring Record 12/31/07     B-28       ISFSI Foundation Profile 12/31/07     B-29       Site Layout and Route 12/31/07     B-30       Site Plan 12/31/07     B-31       Transfer Cask Lifting Yoke 12/31/07     B-32       Transfer Cask Lift Extension 12/31/07     B-33       Spent Fuel Pool Area Effective Date: 12/31/12
 
Page 3 of 3 Effective    Figure     Figure Title Date          No.
12/31/07     B-34      Spent Fuel Pool Area 12/31/07     B-35      Spent Fuel Pool Area 12/31/07     B-36      NUHOMSO System Loading Operations Flowchart 12/31/07     B-37      NUHOMSb System Loading Operations Flowchart 12/31/07     B-38      NUHOMS System Loading Operations Flowchart 12/31/07     B-39      NUHOMS System Loading Operations Flowchart 12/31/07     B-40      NUHOMS System Loading Operations Flowchart 12/31/07     B-41      NUHOMS System Loading Operations Flowchart 12/31/07     B-42      Location of Dose Rates 12/31/07     B-43      Dose Rate Versus Distance from Surface of HSM 12/31/07     B-44      Dose from Filled HSM Array 12/31/07     B-45      Dose from Filled HSM Array 12/31/07     B-46      Radiation Zone Map of Modules Surface Dose Rates B-47      Deleted Per 1991 Update 12/31/07     B-48      Fuel Assembly Burnup Requirements Effective Date: 12/31/12
 
ONS ISFSI UFSAR UPDATE INSERTION INSTRUCTIONS Submittal Due Date: 6/30/13 Effective Date: 12/31/12
: 1. Replace List of Effective Pages (LOEP) for Tables and Figures with the 2012 LOEP Update.
: 2. Replace entire text portions (including the Table of Contents, List of Tables, List of Figures and List of Abbreviations) with the updated text portion.
: 3. Update Tables and Figures according to the following instructions NOTE: No Tables or Figures were updated on this revision.
 
OCONEE ISFSI UFSAR - 2012 UPDATE List of Effective Pages (LOEP) for Table and Figures The purpose of this list is to assure that the pages in the Tables and Figures section of your manual match the most recent issue, as well as to show a full accounting of all tables and figures, including those that have been deleted. The earliest effective date, 12/31/07, was used when all tables and figures were re-issued.
Effective     Table    Table Title Date          No.
12/31/07    A-I      Design Parameters for the Oconee ISFSI 12/31/07      A-2      Summary of lSFSI Fuel Handling Operations 12/31/07     A-3      Primary Design Parameters for the ISFSI Transport System 12/31/07     A-4      Major Systems, Subsystems, and Components of the Oconee ISFSI 12/31/07     A-5       Population Growth in Oconee, Pickens, and Anderson Counties, South Carolina (1980-2005) 12/31/07     A-6       Population Projections for Oconee, Pickens, and Anderson Counties, South Carolina (2010-2050) 12/31/07     A-7       Joint Frequencies of Wind Distribution and Speed by Stability Class (Pages 1-6) 12/31/07     A-8       Soil Permeability Test Results 12/31/07     A-9       Significant Earthquakes in the Southeast United States (Intensity V or Greater) (Pages 1-5) 12/31/07     A-10     Physical Characteristics of PWR Fuel Assemblies Based on Nominal Design 12/31/07     A-] I     Transfer Cask Stress Analysis for Tornado Effects 12/31/07     A-12     Oconee ISFSI Major Components and Functions 12/31/07     A-13     Oconee ISFSI Radioactive Material Confinement Barriers 12/31/07     A-14     Oconee ISFSI Major Components and Design Requirements 12/31/07     A-15     ONS ISFSI Project Transfer Trailer Design Parameters 12/31/07     A-16     Oconee ISFSI Major Components and Classification 12/31/07     A- 17     Gamma Energy Spectrum 12/31/07     A-18     Shielding Analysis Results (Pages 1-2) 12/31/07     A-19     Sunmmary of Estimated On-site Doses Resulting from ISFSI Operation (Per DSC Transfer to HSM) (Pages 1-2) 12/31/07     A-20     Dose Estimate for Construction of Additional Horizontal Storage Modules Based on Labor Estimates for 2 X 10 Array 12/3 1/07   A-21       Neutron and Gamma Energy Spectrum 12/31/07     A-22     Comparison of Total Dose Rates for HSM With and Without Air Outlet Shielding Blocks 12/31/07     A-23     Cask Drop Target Parameters Effective Date: 12/31/12
 
Page 2 of 3 Effective    Figure     Figure Title Date        No.
12/31/07     B-1       Location of ISFSI 12/31/07     B-2       General Location 12/31/07     B-3       Site Plan 12/31/07     B-4       ISFSI Layout 12/31/07     B-5       Topography Within 5 Miles 12/31/07     B-6       Relative Positions of Meteorological Instruments 12/31/07     B-7       Relative Elevation of Meteorological Instruments 12/31/07     B-8       Areal Groundwater Survey 12/31/07     B-9       Groundwater Survey at Station Site 12/31/07     B-10       Well Penneameter Test Apparatus 12/31/07     B-I l     Formulae for Determining Permeability 12/31/07     B-12       General Site Area 12/31/07     B-13       Site Boring Plan 12/31/07     B-14       Core Boring Record (Pages 1-2) 12/31/07     B-15       Core Boring Record (Pages 1-2) 12/31/07     B- 16     Core Boring Record 12/31/07     B- 17     Core Boring Record 12/31/07     B-18       Core Boring Record (Pages 1-2) 12/31/07     B-19       Core Boring Record (Pages 1-2) 12/31/07     B-20       Core Boring Record (Pages 1-2) 12/31/07     B-21       Core Boring Record (Pages 1-2) 12/31/07     B-22       Core Boring Record (Pages 1-2) 12/31/07     B-23       Core Boring Record 12/31/07     B-24       Core Boring Record (Pages 1-2) 12/31/07     B-25       Core Boring Record (Pages 1-2) 12/31/07     B-26       Core Boring Record (Pages 1-2) 12/31/07     B-27       Core Boring Record 12/31/07     B-28       ISFSI Foundation Profile 12/31/07     B-29       Site Layout and Route 12/31/07     B-30       Site Plan 12/31/07     B-31       Transfer Cask Lifting Yoke 12/31/07     B-32       Transfer Cask Lift Extension 12/31/07     B-33       Spent Fuel Pool Area Effective Date: 12/31/12
 
Page 3 of 3 Effective    Figure     Figure Title Date        No.
12/31/07     B-34      Spent Fuel Pool Area 12/31/07     B-35      Spent Fuel Pool Area 12/31/07     B-36      NUHOMS System Loading Operations Flowchart 12/31/07     B-37      NUHOMS*' System Loading Operations Flowchart 12/31/07     B-38      NUHOMS System Loading Operations Flowchart 12/31/07     B-39      NUHOMS System Loading Operations Flowchart 12/31/07     B-40      NUHOMS System Loading Operations Flowchart 12/31/07     B-41      NUHOMS System Loading Operations Flowchart 12/31/07     B-42      Location of Dose Rates 12/31/07     B-43      Dose Rate Versus Distance from Surface of HSM 12/31/07     B-44      Dose from Filled HSM Array 12/31/07     B-45      Dose from Filled HSM Array 12/31/07     B-46      Radiation Zone Map of Modules Surface Dose Rates B-47      Deleted Per 1991 Update 12/31/07    B-48      Fuel Assembly Burnup Requirements Effective Date: 12/31/12}}

Latest revision as of 16:00, 4 November 2019

Independent Spent Fuel Storage Installation, Updated Final Safety Analysis Report (UFSAR) 2012 Revision
ML13196A258
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/01/2013
From: Batson S
Duke Energy Carolinas
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML13196A258 (10)


Text

4 DUKE Scott L. Batson ENERGY. Oconee Vice President Nuclear Station Duke Energy ONOIVP 17800 RochesterHwy Seneca, SC 29672 10 CFR 72.70(b) o: 864.873.3274 f 864.873. 4208 Scott.Batson@duke-energy.com July 1, 2013 Director, Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC (Duke Energy)

Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 72-4, 50-269, 50-270, 50-287 Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report (UFSAR) 2012 Revision Pursuant to 10 CFR 72.70(b), enclosed is a copy of the 2012 revision to the Oconee Independent Spent Fuel Storage Installation UFSAR. The effective date of the revision is December 31, 2012.

The first part of the enclosure provides instructions for inserting this revision into existing manuals including a list of effective pages required by 10 CFR 72.70(b).

This submittal document contains no regulatory commitments.

If there are any questions, please contact Susan Perry at (864) 873-4370.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1st day of July, 2013.

Sincerely, Scott L. Batson Enclosure.

www.duke-energy.com

U. S. Nuclear Regulatory Commission July 1, 2013 Page 2 xc:

Mr. Victor McCree Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. John Boska Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852-2746 Mr. Ed Crowe Senior Resident Inspector Oconee Nuclear Station

ONS ISFSI UFSAR UPDATE INSERTION INSTRUCTIONS Submittal Due Date: 6/30/13 Effective Date: 12/31/12

1. Replace List of Effective Pages (LOEP) for Tables and Figures with the 2012 LOEP Update.
2. Replace entire text portions (including the Table of Contents, List of Tables, List of Figures and List of Abbreviations) with the updated text portion.
3. Update Tables and Figures according to the following instructions NOTE: No Tables or Figures were updated on this revision.

OCONEE ISFSI UFSAR - 2012 UPDATE List of Effective Pages (LOEP) for Table and Figures The purpose of this list is to assure that the pages in the Tables and Figures section of your manual match the most recent issue, as well as to show a full accounting of all tables and figures, including those that have been deleted. The earliest effective date, 12/31/07, was used when all tables and figures were re-issued.

Effective Table Table Title Date No.

12/31/07 A-i Design Parameters for the Oconee ISFSI 12/31/07 A-2 Summary of ISFSI Fuel Handling Operations 12/31/07 A-3 Primary Design Parameters for the ISFSI Transport System 12/31/07 A-4 Major Systems, Subsystems, and Components of the Oconee ISFSI 12/31/07 A-5 Population Growth in Oconee, Pickens, and Anderson Counties, South Carolina (1980-2005) 12/31/07 A-6 Population Projections for Oconee, Pickens, and Anderson Counties, South Carolina (2010-2050) 12/31/07 A-7 Joint Frequencies of Wind Distribution and Speed by Stability Class (Pages 1-6) 12/31/07 A-8 Soil Permeability Test Results 12/31/07 A-9 Significant Earthquakes in the Southeast United States (Intensity V or Greater) (Pages 1-5) 12/31/07 A-10 Physical Characteristics of PWR Fuel Assemblies Based on Nominal Design 12/31/07 A- 1I Transfer Cask Stress Analysis for Tornado Effects 12/31/07 A-12 Oconee ISFSI Major Components and Functions 12/31/07 A- 13 Oconee ISFSI Radioactive Material Confinement Barriers 12/31/07 A-14 Oconee ISFSI Major Components and Design Requirements 12/31/07 A-15 ONS ISFSI Project Transfer Trailer Design Parameters 12/31/07 A-16 Oconee ISFSI Major Components and Classification 12/31/07 A-17 Gamma Energy Spectrum 12/31/07 A-18 Shielding Analysis Results (Pages 1-2) 12/31/07 A-19 Summary of Estimated On-site Doses Resulting from ISFSI Operation (Per DSC Transfer to HSM) (Pages 1-2) 12/31/07 A-20 Dose Estimate for Construction of Additional Horizontal Storage Modules Based on Labor Estimates for 2 X 10 Array 12/31/07 A-21 Neutron and Gamma Energy Spectrum 12/31/07 A-22 Comparison of Total Dose Rates for HSM With and Without Air Outlet Shielding Blocks 12/31/07 A-23 Cask Drop Target Parameters Effective Date: 12/31/12

Page 2 of 3 Effective Figure Figure Title Date No.

12/31/07 B-1 Location of ISFSI 12/31/07 B-2 General Location 12/31/07 B-3 Site Plan 12/31/07 B-4 ISFSI Layout 12/31/07 B-5 Topography Within 5.Miles 12/31/07 B-6 Relative Positions of Meteorological Instruments 12/31/07 B-7 Relative Elevation of Meteorological Instruments 12/31/07 B-8 Areal Groundwater Survey 12/31/07 B-9 Groundwater Survey at Station Site 12/31/07 B- 10 Well Permeameter Test Apparatus 12/31/07 B-11 Formulae for Determining Permeability 12/31/07 B-12 General Site Area 12/31/07 B-13 Site Boring Plan 12/31/07 B-14 Core Boring Record (Pages 1-2) 12/31/07 B-15 Core Boring Record (Pages 1-2) 12/31/07 B-16 Core Boring Record 12/31/07 B-17 Core Boring Record 12/31/07 B-18 Core Boring Record (Pages 1-2) 12/31/07 B-19 Core Boring Record (Pages 1-2) 12/31/07 B-20 Core Boring Record (Pages 1-2) 12/31/07 B-21 Core Boring Record (Pages 1-2) 12/31/07 B-22 Core Boring Record (Pages 1-2) 12/31/07 B-23 Core Boring Record 12/31/07 B-24 Core Boring Record (Pages 1-2) 12/31/07 B-25 Core Boring Record (Pages 1-2) 12/31/07 B-26 Core Boring Record (Pages 1-2) 12/31/07 B-27 Core Boring Record 12/31/07 B-28 ISFSI Foundation Profile 12/31/07 B-29 Site Layout and Route 12/31/07 B-30 Site Plan 12/31/07 B-31 Transfer Cask Lifting Yoke 12/31/07 B-32 Transfer Cask Lift Extension 12/31/07 B-33 Spent Fuel Pool Area Effective Date: 12/31/12

Page 3 of 3 Effective Figure Figure Title Date No.

12/31/07 B-34 Spent Fuel Pool Area 12/31/07 B-35 Spent Fuel Pool Area 12/31/07 B-36 NUHOMSO System Loading Operations Flowchart 12/31/07 B-37 NUHOMSb System Loading Operations Flowchart 12/31/07 B-38 NUHOMS System Loading Operations Flowchart 12/31/07 B-39 NUHOMS System Loading Operations Flowchart 12/31/07 B-40 NUHOMS System Loading Operations Flowchart 12/31/07 B-41 NUHOMS System Loading Operations Flowchart 12/31/07 B-42 Location of Dose Rates 12/31/07 B-43 Dose Rate Versus Distance from Surface of HSM 12/31/07 B-44 Dose from Filled HSM Array 12/31/07 B-45 Dose from Filled HSM Array 12/31/07 B-46 Radiation Zone Map of Modules Surface Dose Rates B-47 Deleted Per 1991 Update 12/31/07 B-48 Fuel Assembly Burnup Requirements Effective Date: 12/31/12

ONS ISFSI UFSAR UPDATE INSERTION INSTRUCTIONS Submittal Due Date: 6/30/13 Effective Date: 12/31/12

1. Replace List of Effective Pages (LOEP) for Tables and Figures with the 2012 LOEP Update.
2. Replace entire text portions (including the Table of Contents, List of Tables, List of Figures and List of Abbreviations) with the updated text portion.
3. Update Tables and Figures according to the following instructions NOTE: No Tables or Figures were updated on this revision.

OCONEE ISFSI UFSAR - 2012 UPDATE List of Effective Pages (LOEP) for Table and Figures The purpose of this list is to assure that the pages in the Tables and Figures section of your manual match the most recent issue, as well as to show a full accounting of all tables and figures, including those that have been deleted. The earliest effective date, 12/31/07, was used when all tables and figures were re-issued.

Effective Table Table Title Date No.

12/31/07 A-I Design Parameters for the Oconee ISFSI 12/31/07 A-2 Summary of lSFSI Fuel Handling Operations 12/31/07 A-3 Primary Design Parameters for the ISFSI Transport System 12/31/07 A-4 Major Systems, Subsystems, and Components of the Oconee ISFSI 12/31/07 A-5 Population Growth in Oconee, Pickens, and Anderson Counties, South Carolina (1980-2005) 12/31/07 A-6 Population Projections for Oconee, Pickens, and Anderson Counties, South Carolina (2010-2050) 12/31/07 A-7 Joint Frequencies of Wind Distribution and Speed by Stability Class (Pages 1-6) 12/31/07 A-8 Soil Permeability Test Results 12/31/07 A-9 Significant Earthquakes in the Southeast United States (Intensity V or Greater) (Pages 1-5) 12/31/07 A-10 Physical Characteristics of PWR Fuel Assemblies Based on Nominal Design 12/31/07 A-] I Transfer Cask Stress Analysis for Tornado Effects 12/31/07 A-12 Oconee ISFSI Major Components and Functions 12/31/07 A-13 Oconee ISFSI Radioactive Material Confinement Barriers 12/31/07 A-14 Oconee ISFSI Major Components and Design Requirements 12/31/07 A-15 ONS ISFSI Project Transfer Trailer Design Parameters 12/31/07 A-16 Oconee ISFSI Major Components and Classification 12/31/07 A- 17 Gamma Energy Spectrum 12/31/07 A-18 Shielding Analysis Results (Pages 1-2) 12/31/07 A-19 Sunmmary of Estimated On-site Doses Resulting from ISFSI Operation (Per DSC Transfer to HSM) (Pages 1-2) 12/31/07 A-20 Dose Estimate for Construction of Additional Horizontal Storage Modules Based on Labor Estimates for 2 X 10 Array 12/3 1/07 A-21 Neutron and Gamma Energy Spectrum 12/31/07 A-22 Comparison of Total Dose Rates for HSM With and Without Air Outlet Shielding Blocks 12/31/07 A-23 Cask Drop Target Parameters Effective Date: 12/31/12

Page 2 of 3 Effective Figure Figure Title Date No.

12/31/07 B-1 Location of ISFSI 12/31/07 B-2 General Location 12/31/07 B-3 Site Plan 12/31/07 B-4 ISFSI Layout 12/31/07 B-5 Topography Within 5 Miles 12/31/07 B-6 Relative Positions of Meteorological Instruments 12/31/07 B-7 Relative Elevation of Meteorological Instruments 12/31/07 B-8 Areal Groundwater Survey 12/31/07 B-9 Groundwater Survey at Station Site 12/31/07 B-10 Well Penneameter Test Apparatus 12/31/07 B-I l Formulae for Determining Permeability 12/31/07 B-12 General Site Area 12/31/07 B-13 Site Boring Plan 12/31/07 B-14 Core Boring Record (Pages 1-2) 12/31/07 B-15 Core Boring Record (Pages 1-2) 12/31/07 B- 16 Core Boring Record 12/31/07 B- 17 Core Boring Record 12/31/07 B-18 Core Boring Record (Pages 1-2) 12/31/07 B-19 Core Boring Record (Pages 1-2) 12/31/07 B-20 Core Boring Record (Pages 1-2) 12/31/07 B-21 Core Boring Record (Pages 1-2) 12/31/07 B-22 Core Boring Record (Pages 1-2) 12/31/07 B-23 Core Boring Record 12/31/07 B-24 Core Boring Record (Pages 1-2) 12/31/07 B-25 Core Boring Record (Pages 1-2) 12/31/07 B-26 Core Boring Record (Pages 1-2) 12/31/07 B-27 Core Boring Record 12/31/07 B-28 ISFSI Foundation Profile 12/31/07 B-29 Site Layout and Route 12/31/07 B-30 Site Plan 12/31/07 B-31 Transfer Cask Lifting Yoke 12/31/07 B-32 Transfer Cask Lift Extension 12/31/07 B-33 Spent Fuel Pool Area Effective Date: 12/31/12

Page 3 of 3 Effective Figure Figure Title Date No.

12/31/07 B-34 Spent Fuel Pool Area 12/31/07 B-35 Spent Fuel Pool Area 12/31/07 B-36 NUHOMS System Loading Operations Flowchart 12/31/07 B-37 NUHOMS*' System Loading Operations Flowchart 12/31/07 B-38 NUHOMS System Loading Operations Flowchart 12/31/07 B-39 NUHOMS System Loading Operations Flowchart 12/31/07 B-40 NUHOMS System Loading Operations Flowchart 12/31/07 B-41 NUHOMS System Loading Operations Flowchart 12/31/07 B-42 Location of Dose Rates 12/31/07 B-43 Dose Rate Versus Distance from Surface of HSM 12/31/07 B-44 Dose from Filled HSM Array 12/31/07 B-45 Dose from Filled HSM Array 12/31/07 B-46 Radiation Zone Map of Modules Surface Dose Rates B-47 Deleted Per 1991 Update 12/31/07 B-48 Fuel Assembly Burnup Requirements Effective Date: 12/31/12