ML13196A525: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/15/2013
| issue date = 07/15/2013
| title = NRC Staff Transmittal of Watts Bar Operating License Application Hearing File and Mandatory Disclosures, Hearing File Index, Supplemental Disclosures - July 15, 2013
| title = NRC Staff Transmittal of Watts Bar Operating License Application Hearing File and Mandatory Disclosures, Hearing File Index, Supplemental Disclosures - July 15, 2013
| author name = Roth D E
| author name = Roth D
| author affiliation = NRC/OGC
| author affiliation = NRC/OGC
| addressee name = Abramson P B, Arnold G S, Ryerson P S
| addressee name = Abramson P, Arnold G, Ryerson P
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05000391
| docket = 05000391
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, DC 20555 - 0001 July 15, 2013  
{{#Wiki_filter:UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON WASHINGTON, DC 20555 - 0001 July 15, 2013 Administrative Judge                                  Administrative Judge Paul S. Ryerson, Chair                               Paul B. Abramson Atomic Safety and Licensing Board Panel               Atomic Safety and Licensing Board Panel Mail Stop T-3 F23                                    Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission                   U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                             Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of TENNESSEE VALLEY AUTHORITY (Watts Bar Nuclear Plant Unit 2)
 
Docket No. 50-391-OL; ASLBP No. 09-893-01-OL-BD01
Administrative Judge Paul S. Ryerson, Chair Atomic Safety and Licensing Board Panel  
 
Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
Administrative Judge Gary S. Arnold  Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
 
Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel  
 
Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
 
In the Matter of TENNESSEE VALLEY AUTHORITY (Watts Bar Nuclear Plant Unit 2) Docket No. 50-391-OL; ASLBP No. 09-893-01-OL-BD01  


==Dear Administrative Judges:==
==Dear Administrative Judges:==


The NRC Staff hereby submits Supplement 42 to the hearing file for the Watts Bar Nuclear Plant (Unit 2) OL proceeding, Docket No. 50-391-OL.
The NRC Staff hereby submits Supplement 42 to the hearing file for the Watts Bar Nuclear Plant (Unit 2) OL proceeding, Docket No. 50-391-OL.
Pursuant to the agreement of the parties, disclosures and the hearing file may be limited to final non-privileged documents relevant to the admitted contentions.
Pursuant to the agreement of the parties, disclosures and the hearing file may be limited to final non-privileged documents relevant to the admitted contentions. 1 Further, historical versions of the application need not be listed and privilege logs are waived.
1 Further, historical versions of the application need not be listed and privilege logs are waived.  
This supplement to the hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staffs mandatory disclosures produced pursuant to 10 C.F.R. § 2.336, as modified by the agreement. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of public each item in the hearing file is appended hereto as Attachment 1.
 
1 On July 15, 2013, Southern Alliance for Clean Energy filed an unopposed motion to withdraw its remaining admitted contention. Southern Alliance for Clean Energy's Unopposed Motion to Withdraw Contention 7 (July 15, 2013).
This supplement to the hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staff's mandatory disclosures produced pursuant to 10 C.F.R. § 2.336, as modified by the agreement. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System ("ADAMS"). An index containing the ADAMS accession number, date, and title or description of public each item in the hearing file is appended hereto as Attachment 1.  
 
1 On July 15, 2013, Southern Alliance for Clean Energy filed an unopposed motion to withdraw its remaining admitted contention. Southern Alliance for Clean Energy's Unopposed  
 
Motion to Withdraw Contention 7 (July 15, 2013).
Judge Ryerson
 
Judge Abramson Judge Arnold The Staff has taken a broad approach in identifying potentially-relevant documents for inclusion in the disclosures and hearing file. Additional public documents associated with the application, but not relevant to the admitted contention, are readily accessible in ADAMS. In addition, pursuant to the agreement of the parties, the Staff will continue to work with both parties to provide access to documents.   


On or around July 15, 2013, the supplement to the hearing file will be made available via the Electronic Hearing Docket ("EHD"), which may be accessed at the following URL:
Judge Ryerson Judge Abramson Judge Arnold The Staff has taken a broad approach in identifying potentially-relevant documents for inclusion in the disclosures and hearing file. Additional public documents associated with the application, but not relevant to the admitted contention, are readily accessible in ADAMS. In addition, pursuant to the agreement of the parties, the Staff will continue to work with both parties to provide access to documents.
 
On or around July 15, 2013, the supplement to the hearing file will be made available via the Electronic Hearing Docket (EHD), which may be accessed at the following URL:
http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub-folder entitled, "Watts Bar Hearing File" of the "Watts_Bar_50-391-OL" folder of the EHD.  
http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub-folder entitled, Watts Bar Hearing File" of the Watts_Bar_50-391-OL" folder of the EHD.
 
Further, attached is the affidavit of Justin C. Poole certifying that all relevant materials required under the agreement of the parties by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of July 11, 2013.
Further, attached is the affidavit of Justin C. Poole certifying that all relevant materials required under the agreement of the parties by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of July 11, 2013.  
Sincerely,
 
                                                    /Signed (electronically) by/
Sincerely,  
David Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: July 15, 2013
 
            /
Signed (electronically) by/
David Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov               Signed: July 15, 2013  


==Enclosures:==
==Enclosures:==
Attachment 1 - Public Hearing File Index  
Attachment 1 - Public Hearing File Index Affidavit of Justin C. Poole
 
Affidavit of Justin C. Poole  
 
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - July 15, 2013 1  ID# Accession Number Document Date Title 42-001 ML13175A086 06/28/201306/11/2013 Summary of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Status of Construction. 42-002 ML13164A121 05/02/20132013/05/02 Watts Bar 2 OL - 2012-05-02  -  WBN Project Plan  -  Unit 2.pdf 42-003 ML13164A127 05/02/20132013/05/02 Watts Bar 2 OL - TVA letter to NRC_05-02-13_2-PTI-070-02A, 2-PTI-070-02B transmittal to NRC (Component Cooling System Unit 2 Trains A and B Flow Balance) 42-004 ML13164A133 05/13/20132013/05/13 Watts Bar 2 OL - 2012-05-13  -  WBN Project Plan  -  Unit 2.pdf 42-005 ML13164A135 05/16/20132013/05/16 Watts Bar 2 OL - 2012-05-16  -  WBN Project Plan  -  Unit 2.pdf 42-006 ML13164A139 05/20/20132013/05/20 Watts Bar 2 OL - 2012-05-20  -  WBN Project Plan  -  Unit 2.pdf 42-007 ML13164A142 05/29/20132013/05/29 Watts Bar 2 OL - TVA letter to NRC_05-29-13_2-PTI-002-01, 2-PTI-003A-03, 2-PTI-026-01 transmittal to NRC  (Condensate System, Main Feedwater System Functional Test, High Pressure Fire Protection) 42-008 ML13164A192 05/30/20132013/05/30 Watts Bar 2 OL - 2012-05-30  -  WBN Project Plan  -  Unit 2.pdf 42-009 ML13164A195 06/03/20132013/06/03 Watts Bar 2 OL - 2012-06-03  -  WBN Project Plan  -  Unit 2.pdf 42-010 ML13162A310 04/03/20132-PTI-002-01, Rev 000, "Condensate System." 42-011 ML13162A312 11/16/20122-PTI-003A-03, Rev 000, "Main Feedwater System Functional Test." 42-012 ML13162A311 02/25/20132-PTI-026-01, Rev 000, "High Pressure Fire Protection." 42-013 ML13163A296 07/01/2013Sequoyah Nuclear Plant,Units 1 & 2,and Watts Bar Nuclear Plant, Units 1 and 2-Relaxation of Response Due Dates Regarding Flooding Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Dai-Ichi. 42-014 ML13182A615 07/01/2013Tennessee Valley Authority Commitment to Install Improved Flood Mitigation Systems at Sequoyah Nuclaer, Units 1 & 2, and Watts Bar Nuclear Plant, Units 1 &
: 2. 42-015 ML13162A309 05/29/2013Watts Bar Nuclear Plant (WBN) Unit 2 - Submittal of Pre-op Test Instructions. 42-016 ML13175A311 06/11/2013Watts Bar Nuclear Plant, Unit 2 - Slide - June 11, 2013 Public Meeting. 42-017 ML13171A100 06/13/2013Watts Bar Nuclear Plant, Unit 2, Submittal of Three Revised Specifications from Developmental Revision G of Technical Specification. 42-018 ML13175A131 06/18/2013Watts Bar, Unit 2, Submittal of Pre-op Test Instructions.
 
July 15, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of    )
      )
TENNESSEE VALLEY AUTHORITY  ) Docket No. 50-391-OL ) (Watts Bar Nuclear Plant, Unit 2)  )
 
AFFIDAVIT OF JUSTIN C. POOLE CONCERNING  MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Justin C. Poole, do hereby state as follows:
: 1. I am employed as Senior Project Manager, Plant Licensing Branch LPL II-2, in the Division of Operator Reactor Licensing in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. My responsibilities include oversight of the NRC Staff's review and evaluation of the Watts Bar Nuclear Plant, Unit 2 operating license application ("OLA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the OLA at issue in this proceeding. 2. I hereby certify that all relevant materials required to be disclosed pursuant  to 10 C.F.R. §§ 2.336 and 2.1203, as modified by the parties' agreement of December 1, 2009, have been disclosed, and that the disclosures are accurate and complete for documents identified as of July 11, 2013. 
: 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.       
 
                /Executed in Accord with 10 CFR 2.304(d)
/        Justin C. Poole        Senior Project Manager, NRR/DORL/LPL II-2 U.S. Nuclear Regulatory Commission Washington, DC 20555        Telephone:  (301)415-2048        E-mail:
Justin.Poole@nrc.gov Date Signed:  July 15, 2013
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
 
In the Matter of    )
      ) TENNESSEE VALLEY AUTHORITY  )  Docket No. 50-391-OL ) (Watts Bar Nuclear Plant, Unit 2)  )
 
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised), I hereby certify that copies of the foregoing "NRC STAFF'S SUPPLEMENTAL DISCLOSURE 42, INCLUDING PUBLIC HEARING FILE INDEX, AND AFFIDAVIT OF JUSTIN C. POOLE" dated July 15, 2013, have been served upon the
 
Electronic Information Exchange, the NRC's E-Filing System, in the above captioned proceeding, this 15th day of July, 2013:


  /Signed (electronically) by/
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - July 15, 2013 Accession  Document ID#                                                                    Title Number      Date 06/11/2013 Summary of Meeting with Tennessee Valley Authority to Discuss Watts 42-001 ML13175A086    06/28/2013 Bar Nuclear Plant, Unit 2, Status of Construction.
David E. Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel
42-002  ML13164A121    05/02/2013 2013/05/02 Watts Bar 2 OL - 2012-05 WBN Project Plan - Unit 2.pdf 2013/05/02 Watts Bar 2 OL - TVA letter to NRC_05-02-13_2-PTI-070-02A, 2-PTI-42-003                            070-02B transmittal to NRC (Component Cooling System Unit 2 Trains A and B ML13164A127    05/02/2013 Flow Balance) 42-004  ML13164A133    05/13/2013 2013/05/13 Watts Bar 2 OL - 2012-05 WBN Project Plan - Unit 2.pdf 42-005 ML13164A135    05/16/2013 2013/05/16 Watts Bar 2 OL - 2012-05 WBN Project Plan - Unit 2.pdf 42-006  ML13164A139    05/20/2013 2013/05/20 Watts Bar 2 OL - 2012-05 WBN Project Plan - Unit 2.pdf 2013/05/29 Watts Bar 2 OL - TVA letter to NRC_05-29-13_2-PTI-002-01, 2-PTI-42-007                            003A-03, 2-PTI-026-01 transmittal to NRC (Condensate System, Main Feedwater ML13164A142    05/29/2013 System Functional Test, High Pressure Fire Protection) 42-008  ML13164A192    05/30/2013 2013/05/30 Watts Bar 2 OL - 2012-05 WBN Project Plan - Unit 2.pdf 42-009  ML13164A195    06/03/2013 2013/06/03 Watts Bar 2 OL - 2012-06 WBN Project Plan - Unit 2.pdf 42-010  ML13162A310    04/03/2013 2-PTI-002-01, Rev 000, "Condensate System."
42-011  ML13162A312    11/16/2012 2-PTI-003A-03, Rev 000, "Main Feedwater System Functional Test."
42-012  ML13162A311    02/25/2013 2-PTI-026-01, Rev 000, "High Pressure Fire Protection."
Sequoyah Nuclear Plant,Units 1 & 2,and Watts Bar Nuclear Plant, Units 1 and 2-Relaxation of Response Due Dates Regarding Flooding Hazard Reevaluations for 42-013 Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the ML13163A296    07/01/2013 Fukushima Dai-Ichi.
Tennessee Valley Authority Commitment to Install Improved Flood Mitigation 42-014                            Systems at Sequoyah Nuclaer, Units 1 & 2, and Watts Bar Nuclear Plant, Units 1 &
ML13182A615    07/01/2013 2.
42-015  ML13162A309    05/29/2013 Watts Bar Nuclear Plant (WBN) Unit 2 - Submittal of Pre-op Test Instructions.
42-016  ML13175A311    06/11/2013 Watts Bar Nuclear Plant, Unit 2 - Slide - June 11, 2013 Public Meeting.
Watts Bar Nuclear Plant, Unit 2, Submittal of Three Revised Specifications from 42-017 ML13171A100    06/13/2013 Developmental Revision G of Technical Specification.
42-018  ML13175A131    06/18/2013 Watts Bar, Unit 2, Submittal of Pre-op Test Instructions.
1


Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov  
July 15, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                )
                                                )
TENNESSEE VALLEY AUTHORITY                      )      Docket No. 50-391-OL
                                                )
(Watts Bar Nuclear Plant, Unit 2)                )
AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Justin C. Poole, do hereby state as follows:
: 1.      I am employed as Senior Project Manager, Plant Licensing Branch LPL II-2, in the Division of Operator Reactor Licensing in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. My responsibilities include oversight of the NRC Staffs review and evaluation of the Watts Bar Nuclear Plant, Unit 2 operating license application (OLA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the OLA at issue in this proceeding.
: 2.      I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 and 2.1203, as modified by the parties agreement of December 1, 2009, have been disclosed, and that the disclosures are accurate and complete for documents identified as of July 11, 2013.
: 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
                                                  /Executed in Accord with 10 CFR 2.304(d)/
Justin C. Poole Senior Project Manager, NRR/DORL/LPL II-2 U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301)415-2048 E-mail: Justin.Poole@nrc.gov Date Signed: July 15, 2013


Signed: July 15, 2013}}
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                            )
                                            )
TENNESSEE VALLEY AUTHORITY                  )      Docket No. 50-391-OL
                                            )
(Watts Bar Nuclear Plant, Unit 2)            )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised), I hereby certify that copies of the foregoing NRC STAFF'S SUPPLEMENTAL DISCLOSURE 42, INCLUDING PUBLIC HEARING FILE INDEX, AND AFFIDAVIT OF JUSTIN C. POOLE dated July 15, 2013, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 15th day of July, 2013:
                                                  /Signed (electronically) by/
David E. Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: July 15, 2013}}

Latest revision as of 16:58, 4 November 2019

NRC Staff Transmittal of Watts Bar Operating License Application Hearing File and Mandatory Disclosures, Hearing File Index, Supplemental Disclosures - July 15, 2013
ML13196A525
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 07/15/2013
From: Roth D
NRC/OGC
To: Abramson P, Gary Arnold, Paul Ryerson
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-391-OL, ASLBP 09-893-01-OL-BD01, RAS 24826
Download: ML13196A525 (6)


Text

UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON WASHINGTON, DC 20555 - 0001 July 15, 2013 Administrative Judge Administrative Judge Paul S. Ryerson, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of TENNESSEE VALLEY AUTHORITY (Watts Bar Nuclear Plant Unit 2)

Docket No. 50-391-OL; ASLBP No. 09-893-01-OL-BD01

Dear Administrative Judges:

The NRC Staff hereby submits Supplement 42 to the hearing file for the Watts Bar Nuclear Plant (Unit 2) OL proceeding, Docket No. 50-391-OL.

Pursuant to the agreement of the parties, disclosures and the hearing file may be limited to final non-privileged documents relevant to the admitted contentions. 1 Further, historical versions of the application need not be listed and privilege logs are waived.

This supplement to the hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staffs mandatory disclosures produced pursuant to 10 C.F.R. § 2.336, as modified by the agreement. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of public each item in the hearing file is appended hereto as Attachment 1.

1 On July 15, 2013, Southern Alliance for Clean Energy filed an unopposed motion to withdraw its remaining admitted contention. Southern Alliance for Clean Energy's Unopposed Motion to Withdraw Contention 7 (July 15, 2013).

Judge Ryerson Judge Abramson Judge Arnold The Staff has taken a broad approach in identifying potentially-relevant documents for inclusion in the disclosures and hearing file. Additional public documents associated with the application, but not relevant to the admitted contention, are readily accessible in ADAMS. In addition, pursuant to the agreement of the parties, the Staff will continue to work with both parties to provide access to documents.

On or around July 15, 2013, the supplement to the hearing file will be made available via the Electronic Hearing Docket (EHD), which may be accessed at the following URL:

http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub-folder entitled, Watts Bar Hearing File" of the Watts_Bar_50-391-OL" folder of the EHD.

Further, attached is the affidavit of Justin C. Poole certifying that all relevant materials required under the agreement of the parties by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of July 11, 2013.

Sincerely,

/Signed (electronically) by/

David Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: July 15, 2013

Enclosures:

Attachment 1 - Public Hearing File Index Affidavit of Justin C. Poole

ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - July 15, 2013 Accession Document ID# Title Number Date 06/11/2013 Summary of Meeting with Tennessee Valley Authority to Discuss Watts42-001 ML13175A086 06/28/2013 Bar Nuclear Plant, Unit 2, Status of Construction.42-002 ML13164A121 05/02/2013 2013/05/02 Watts Bar 2 OL - 2012-05 WBN Project Plan - Unit 2.pdf 2013/05/02 Watts Bar 2 OL - TVA letter to NRC_05-02-13_2-PTI-070-02A, 2-PTI-42-003 070-02B transmittal to NRC (Component Cooling System Unit 2 Trains A and B ML13164A127 05/02/2013 Flow Balance)42-004 ML13164A133 05/13/2013 2013/05/13 Watts Bar 2 OL - 2012-05 WBN Project Plan - Unit 2.pdf 42-005 ML13164A135 05/16/2013 2013/05/16 Watts Bar 2 OL - 2012-05 WBN Project Plan - Unit 2.pdf 42-006 ML13164A139 05/20/2013 2013/05/20 Watts Bar 2 OL - 2012-05 WBN Project Plan - Unit 2.pdf 2013/05/29 Watts Bar 2 OL - TVA letter to NRC_05-29-13_2-PTI-002-01, 2-PTI-42-007 003A-03, 2-PTI-026-01 transmittal to NRC (Condensate System, Main Feedwater ML13164A142 05/29/2013 System Functional Test, High Pressure Fire Protection)42-008 ML13164A192 05/30/2013 2013/05/30 Watts Bar 2 OL - 2012-05 WBN Project Plan - Unit 2.pdf 42-009 ML13164A195 06/03/2013 2013/06/03 Watts Bar 2 OL - 2012-06 WBN Project Plan - Unit 2.pdf 42-010 ML13162A310 04/03/2013 2-PTI-002-01, Rev 000, "Condensate System."42-011 ML13162A312 11/16/2012 2-PTI-003A-03, Rev 000, "Main Feedwater System Functional Test."42-012 ML13162A311 02/25/2013 2-PTI-026-01, Rev 000, "High Pressure Fire Protection."

Sequoyah Nuclear Plant,Units 1 & 2,and Watts Bar Nuclear Plant, Units 1 and 2-Relaxation of Response Due Dates Regarding Flooding Hazard Reevaluations for 42-013 Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the ML13163A296 07/01/2013 Fukushima Dai-Ichi.

Tennessee Valley Authority Commitment to Install Improved Flood Mitigation 42-014 Systems at Sequoyah Nuclaer, Units 1 & 2, and Watts Bar Nuclear Plant, Units 1 &

ML13182A615 07/01/2013 2.42-015 ML13162A309 05/29/2013 Watts Bar Nuclear Plant (WBN) Unit 2 - Submittal of Pre-op Test Instructions.42-016 ML13175A311 06/11/2013 Watts Bar Nuclear Plant, Unit 2 - Slide - June 11, 2013 Public Meeting.

Watts Bar Nuclear Plant, Unit 2, Submittal of Three Revised Specifications from 42-017 ML13171A100 06/13/2013 Developmental Revision G of Technical Specification.42-018 ML13175A131 06/18/2013 Watts Bar, Unit 2, Submittal of Pre-op Test Instructions.

1

July 15, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL

)

(Watts Bar Nuclear Plant, Unit 2) )

AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Justin C. Poole, do hereby state as follows:

1. I am employed as Senior Project Manager, Plant Licensing Branch LPL II-2, in the Division of Operator Reactor Licensing in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. My responsibilities include oversight of the NRC Staffs review and evaluation of the Watts Bar Nuclear Plant, Unit 2 operating license application (OLA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the OLA at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 and 2.1203, as modified by the parties agreement of December 1, 2009, have been disclosed, and that the disclosures are accurate and complete for documents identified as of July 11, 2013.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Executed in Accord with 10 CFR 2.304(d)/

Justin C. Poole Senior Project Manager, NRR/DORL/LPL II-2 U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301)415-2048 E-mail: Justin.Poole@nrc.gov Date Signed: July 15, 2013

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL

)

(Watts Bar Nuclear Plant, Unit 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised), I hereby certify that copies of the foregoing NRC STAFF'S SUPPLEMENTAL DISCLOSURE 42, INCLUDING PUBLIC HEARING FILE INDEX, AND AFFIDAVIT OF JUSTIN C. POOLE dated July 15, 2013, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 15th day of July, 2013:

/Signed (electronically) by/

David E. Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: July 15, 2013