UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 1, 2013 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
SUBJECT:
TENNESSEE VALLEY AUTHORITY COMMITMENT TO INSTALL IMPROVED FLOOD MITIGATION SYSTEMS AT SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2, AND WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2
Dear Mr. Shea:
By letter dated April 16, 2013, (Agencywide Documents Access and Management System Accession No. ML13108A107), the Tennessee Valley Authority (TVA) made commitments to improve the mitigation strategy for potential external flooding hazards at the Sequoyah Nuclear Plant (SQN), Units 1 and 2, and Watts Bar Nuclear Plant (WBN), Units 1 and 2. The milestone, commitments, and implementation dates as described in your letter are summarized as follows:
MILESTONE COMMITMENT IMPLEMENTATION DATE 1
Construction of structure SQN: June 2015 WBN: November 2015 2
Develop diverse and redundant power supplies (diesel) for new system components SQN: December 2015 WBN: August 2014 3
Install an enhanced flood mode system for decay heat removal SQN: December 2016 WBN: December 2016 4
Install an enhanced flood mode RCS makeup system SQN: December 2016 WBN: December 2016 The NRC acknowledges that these voluntary commitments are being made by TVA to improve the existing flood mitigating system established at SQN and WBN. We encourage these commitments to increase the safety margins of the established flood mitigation strategy for SQN and WBN. The NRC intends to review these modifications in accordance with our regulatory processes, as appropriate. If for any reason the actions cannot be completed within the specified schedule, TVA is requested to notify NRC in writing of your modified schedule in advance of the change.
J. Shea 2
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRCs Rules of Practice, a copy of this letter and your response, if any, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Victor M. McCree Regional Administrator Docket Nos.: 50-327, 50-328, 50-390, and 50-391 License Nos: DPR-77, DPR-79, NPF-90 CPPR-92 cc: (See page 3)
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP NRR RII:DRP RII:DRP RCroteau MEvans LWert VMcCree NRR RII:DRP RII:DRP SIGNATURE SMS /RA for/
SMS /RA/
WBJ/ RA for/
Via email LDW /RA/
VMM /RA/
NAME JHamman SShaeffer RCroteau JMonniger LWert VMcCree DATE 07/01/2013 07/01/2013 07/01/2013 06/28/2013 07/01/2013 07/01/2013 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
J. Shea 3
cc:
J. T. Carlin Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution P. R. Simmons Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution J. W. Proffitt Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution C. D. Mackaman Program Manager, Corporate Licensing Tennessee Valley Authority Electronic Mail Distribution Edward J. Vigluicci Associate General Counsel, Nuclear Tennessee Valley Authority Electronic Mail Distribution County Mayor Sequoyah 208 Courthouse 625 Georgia Avenue Chattanooga, TN 37402-2801 Tennessee Department of Environment &
Conservation Division of Radiological Health 401 Church Street Nashville, TN 37243 Mr. T. P. Cleary Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Ann Harris 341 Swing Loop Rockwood, TN 37854 David H. Gronek Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Donna K. Guinn Manager, Site Licensing Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Mr. E. D. Schrull Manager, Corporate Licensing Watts Bar Nuclear Plant Tennessee Valley Authority 1101 Market Street, LP 4B-C Chattanooga, TN 37402-2801 Gordon P. Arent Senior Manager, Licensing WBN Unit 2 Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution County Mayor Watts Bar Unit 1 P.O. Box 156 Decatur, TN 37322 County Executive Watts Bar Unit 1 375 Church Street Suite 215 Dayton, TN 37321 O. J. Zeringue General Manager Engineering and Construction Watts Bar Nuclear Plant Unit 2 Electronic Mail Distribution (cc continued next page)
J. Shea 4
(cc: continued)
R. A. Hruby General Manager, Technical Services Watts Bar Nuclear Plant Unit 2 Tennessee Valley Authority Electronic Mail Distribution Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority Electronic Mail Distribution Raul R. Baron Senior Manager, Quality Assurance Quality Assurance, WBN Unit Two Tennessee Valley Authority Electronic Mail Distribution Lawrence Edward Nanney Director Division of Radiological Health TN Dept. of Environment & Conservation Electronic Mail Distribution
J. Shea 5
Letter to Joseph W. Shea from Victor M. McCree dated July 1, 2013
SUBJECT:
TENNESSEE VALLEY AUTHORITY COMMITMENT TO INSTALL IMPROVED FLOOD MITIGATION SYSTEMS AT SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2, AND WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 DISTRIBUTION:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC R. Pascarelli, NRR RidsNrrPMSequoyah Resource