| {{#Wiki_filter:September 3, 2013 | | {{#Wiki_filter:UNITED STATES September 3, 2013 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT | | MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - |
| | | THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2013006) |
| 05000289/2013006) | |
|
| |
|
| ==Dear Mr. Pacilio:== | | ==Dear Mr. Pacilio:== |
| On August 15, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Three Mile Island Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. | | On August 15, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Three Mile Island Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. |
|
| |
|
| The NRC determined the performance at Three Mile Island Unit 1 during the most recent | | The NRC determined the performance at Three Mile Island Unit 1 during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of a low to moderate safety significant (White) finding in the Mitigating Systems Cornerstone. Specifically, a White finding associated with the TMI external flood barrier system was identified during the fourth quarter of 2012 as detailed in NRC Inspection Report 05000289/2012005. |
|
| |
|
| quarter was within the Regulatory Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because of a low to moderate safety significant (White) finding in the Mitigating Systems Cornerstone. Specifically, a White finding associated with the TMI external flood barrier system was identified during the fourth quarter of 2012 as detailed in NRC Inspection Report 05000289/2012005.
| | On July 26, 2013, your staff notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection of One or Two White Inputs in a Strategic Performance Area, beginning on September 9, 2013. The inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition and cause is identified, and the corrective actions are sufficient to prevent recurrence. |
| | |
| On July 26, 2013, your staff notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, "Supplemental Inspection of One or Two White Inputs in a Strategic Performance Area," beginning on September 9, 2013. The inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition and cause is identified, and the corrective actions are sufficient to prevent recurrence. | |
|
| |
|
| The enclosed inspection plan lists the inspections scheduled through December 31, 2014. | | The enclosed inspection plan lists the inspections scheduled through December 31, 2014. |
Line 38: |
Line 35: |
| Routine inspections performed by resident inspectors are not included in the inspection plan. | | Routine inspections performed by resident inspectors are not included in the inspection plan. |
|
| |
|
| In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, | | In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, and Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. |
| "Post-Approval Site Inspection for License Renewal," and Temporary Instruction (TI) 2515/182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks." The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possi ble to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
| |
|
| |
|
| In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) |
| | component of the NRC's Agencywide Documents Access and Management system (ADAMS). |
| | |
| | ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| Please contact Gordon Hunegs at (610)337-5046 with any questions you have regarding this letter. | | Please contact Gordon Hunegs at (610)337-5046 with any questions you have regarding this letter. |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ Darrell J. Roberts, Director Division of Reactor Projects | | /RA/ |
| | | Darrell J. Roberts, Director Division of Reactor Projects Docket Nos.: 50-289 License Nos.: DPR-50 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ |
| Docket Nos.: 50-289 License Nos.: DPR-50 | |
| | |
| Enclosure: Inspection Plan cc w/encl: Distribution via ListServ | |
|
| |
|
| ML13246A131 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME mmt DWerkheiser/ BB for BBickett/ BB GHunegs/ GKH DRoberts/ DJR DATE 08/ 26 /13 08/26 /13 09/ 27 /13 08/ 30/13 | | ML13246A131 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME mmt DWerkheiser/ BB for BBickett/ BB GHunegs/ GKH DRoberts/ DJR DATE 08/ 26 /13 08/26 /13 09/ 27 /13 08/ 30/13 |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24038A0222024-02-0505 February 2024 Achp Letter on Section 106 Programmatic Agreement Participation IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 ML23342A1242024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23325A1092024-01-0505 January 2024 Review of the Management Plan for Three Mile Island Station, Unit No. 2, Debris Material ML23354A2062023-12-20020 December 2023 (TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23354A2112023-12-20020 December 2023 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 ML23243A9082023-08-29029 August 2023 Shpo Letter to TMI-2 Regarding Section 106 Activities IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 ML23216A1742023-08-14014 August 2023 Consultation Letter to David Morrison for TMI-2 ML23216A1772023-08-14014 August 2023 Consultation Letter to Rebecca Countess for TMI-2 ML23216A1752023-08-14014 August 2023 Consultation Letter to Joanna Cain for TMI-2 ML23216A1732023-08-14014 August 2023 Consultation Letter to Christine Turner for TMI-2 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 ML23216A1782023-08-14014 August 2023 Consultation Letter to Steve Letavic for TMI-2 ML23221A1402023-08-0808 August 2023 (TMI-2), Response to Requests for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML23200A1882023-07-31031 July 2023 TMI-2 Correction Letter Amendment 67 ML23209A7632023-07-28028 July 2023 Letter from PA Shpo to TMI-2 Solutions on Cultural and Historic Impacts of Decommissioning ML23192A8272023-07-10010 July 2023 TMI-2 Solutions, LLC - Response to Shpo Request for Additional Information for Er Project 2021PR03278.006, TMI-2 Decommissioning Project ML23167A4642023-07-0505 July 2023 Letter - TMI-2- Exemption 10 CFR Part 20 Append G Issuance ML23167A0312023-06-28028 June 2023 Acceptance Review and Schedule for the Request for Exemption from a Requirement from 10 CFR 20, Appendix G, Section Iii.E, EPID L-2023-LLE-0016 ML23171B0222023-06-19019 June 2023 (TMI-2) - Notification Pursuant to 10 CFR 72.140(d) Regarding Application of Previously Approved TMI-2 Quality Assurance Program to Independent Spent Fuel Storage Installation Activities ML23137A2822023-05-17017 May 2023 (TMI-2), Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23138A0662023-05-17017 May 2023 TMI-2 NHPA Section 106 Shpo Letter to NRC 5-17-23 ML23026A3132023-05-0202 May 2023 Issuance of Exemption from 10 CFR 70.24 (EPID-L-2023-LLE-0003) ML23122A1842023-05-0101 May 2023 Shpo_Er_Summary_Letter ML23121A2492023-05-0101 May 2023 License Amendment Request, Historic and Cultural Resources Review, Response to Request for Additional Information ML23117A0012023-04-26026 April 2023 Commitment Revision Summary Report ML23027A0832023-04-24024 April 2023 Environmental Assessment/Finding of No Significant Impact - Request for Exemption from 10 CFR 70.24 ML23108A0802023-04-18018 April 2023 Annual Radiological Effluent Release Report ML23108A0822023-04-18018 April 2023 Annual Radiological Environmental Operating Report IR 05000320/20230012023-04-12012 April 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report No. 05000320/2023001 ML23102A0382023-04-10010 April 2023 Occupational Radiation Exposure Annual Report ML23108A2002023-04-10010 April 2023 CFR 20.2206(b) Personnel Radiation Exposure Report for 2022 ML23094A2582023-04-0606 April 2023 Letter to Sidney Hill, Chief, Onondaga Nation, Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for TMI 2 ML23093A0572023-04-0606 April 2023 Letter to Joanna Cain, President, Re., Ongoing Activities Related to the Proposed License Amendment Request for Three Mile Island Nuclear Station, Unit 2 ML23094A2362023-04-0606 April 2023 Letter to Carissa Speck, Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for Three Mile Island Nuclear Station, Unit 2 ML23094A2542023-04-0606 April 2023 Ltr J Bendremer Thpo Stockbridge-Munsee Community Band of Mohican Indians Re Initiation of Consultation Under Section 106 of the NHPA for Proposed License Amendment Request for TMI 2 ML23086C0652023-04-0606 April 2023 Ltr Larry Heady, Thpo, De. Tribe of Indian; Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for TMI Nuclear Station, Unit 2 ML23093A0562023-04-0606 April 2023 Letter to Steve Minnick, Site Decommissioning Director, Re., Ongoing Activities Related to the Proposed License Amendment Request for Three Mile Island Nuclear Station, Unit 2 ML23094A2602023-04-0606 April 2023 Letter to William Tarrant, Seneca-Cayuga Nation, Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for TMI 2 ML23094A2392023-04-0606 April 2023 Letter to Courtney Gerzetich, Thpo, Onedia Nation of Wisconsin, Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for TMI 2 ML23093A0592023-04-0606 April 2023 Letter to Rebecca Countess, Chair, Re., Ongoing Activities Related to the Proposed License Amendment Request for Three Mile Island Nuclear Station, Unit 2 2024-02-05
[Table view] Category:Inspection Plan
MONTHYEARML22011A1312022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan ML21012A4342021-01-13013 January 2021 Security Inspection Plan ML20015A5772020-01-15015 January 2020 Security and Emergency Preparedness Inspection Plan for Three Mile Island Generating Station, Unit 1 IR 05000289/20190052019-08-28028 August 2019 Updated Inspection Plan Inspection Report 05000289/2019005 IR 05000289/20180062019-03-0404 March 2019 Annual Assessment Letter for Three Mile Island Station, Unit 1 (Report 05000289/2018006) IR 05000289/20180052018-08-28028 August 2018 Updated Inspection Plan Inspection Report 05000289/2018005 IR 05000289/20170062018-02-28028 February 2018 Annual Assessment Letter for Three Mile Island Station-Unit 1 (Reports 05000289-2017006 and 05000289-2017402 and 05000289-2017501) IR 05000289/20170052017-08-28028 August 2017 Updated Inspection Plan for Three Mile Island Station, Unit 1, with Report 22 (Report 05000289/2017005) IR 05000289/20160062017-03-0101 March 2017 Annual Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289/2016006) IR 05000289/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289/2016005) IR 05000289/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289/2015006) IR 05000289/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289/2015005) IR 05000289/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289/2014001) IR 05000289/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000289-14-006 IR 05000289/20130012014-03-0404 March 2014 ROP-14 2013 Three Mile Island Nuclear Station Unit 1, Annual Assessment Letter, Report 05000289/2013001, and Inspection Plan IR 05000289/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan Report 05000289-13-006 IR 05000289/20120012013-03-0404 March 2013 Annual Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289-12-001) IR 05000289/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Three Mile Island Nuclear Station (Report 05000289/2012006) TMI-12-069, Submittal of Inspection Plan for Reactor Internals2012-04-16016 April 2012 Submittal of Inspection Plan for Reactor Internals IR 05000289/20110012012-03-0505 March 2012 Annual Assessment Letter for Three Mile Island Nuclear Generating Station Unit 1 (Report 05000289-11-001) ML1124206742011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Three Mile Island IR 05000289/20100012011-03-0404 March 2011 Annual Assessment Letter for Three Mile Island Nuclear Generating Station, Unit 1, EOC-11 (Report 05000289-10-001) ML1024407172010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Three Mile Island ML1006213042010-03-0303 March 2010 Annual Performance Review and Inspection Plan Three Mile Island 2009 EOC Letter and Report 22 (05000289-10-001) ML0924402202009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Three Mile Island (September 1, 2009) IR 05000289/20090012009-03-0404 March 2009 Annual Assessment Letter - Three Mile Island Unit 1 (05000289/2009001) IR 05000289/20080012008-03-0303 March 2008 2007 Annual Assessment Letter - Three Mile Island (Report 05000289/2008001) ML0734706292007-12-13013 December 2007 ROP 8 - Three Mile Island - Change to Inspection Plan, 12/13/07 ML0724309352007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan IR 05000289/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Three Mile Island (05000289/2007001) ML0706004472006-10-31031 October 2006 1R21 Outage - NRC Inspection Question Log Complied by Amergen (12 Pages) ML0606202072006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Three Mile Island Unit 1 (Report 05-289/2006001) ML0524207232005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Three Mile Island, Unit 1 ML0424401732004-08-30030 August 2004 TMI ROP5 Mid-Cycle Performance Review and Inspection Plan ML0323907022003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for TMI, Unit 1 IR 05000289/20030012003-03-0404 March 2003 2003-Annual Assessment Letter - Three Mile Island, Unit 1 (Report No. 50-289/2003-001) ML0223803152002-08-26026 August 2002 2002 Three Mile Island Unit 1 Mid-Cycle Performance Review & Inspection Plan IR 05000289/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Three Mile Island Station, Unit 1 (Report 50-289/02-01) 2022-01-31
[Table view] |
Text
UNITED STATES September 3, 2013
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2013006)
Dear Mr. Pacilio:
On August 15, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Three Mile Island Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Three Mile Island Unit 1 during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of a low to moderate safety significant (White) finding in the Mitigating Systems Cornerstone. Specifically, a White finding associated with the TMI external flood barrier system was identified during the fourth quarter of 2012 as detailed in NRC Inspection Report 05000289/2012005.
On July 26, 2013, your staff notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection of One or Two White Inputs in a Strategic Performance Area, beginning on September 9, 2013. The inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition and cause is identified, and the corrective actions are sufficient to prevent recurrence.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Routine inspections performed by resident inspectors are not included in the inspection plan.
In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, and Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Gordon Hunegs at (610)337-5046 with any questions you have regarding this letter.
Sincerely,
/RA/
Darrell J. Roberts, Director Division of Reactor Projects Docket Nos.: 50-289 License Nos.: DPR-50 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ