IR 05000289/2013006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/03/2013
| issue date = 09/03/2013
| title = Mid-Cycle Performance Review and Inspection Plan Report 05000289-13-006
| title = Mid-Cycle Performance Review and Inspection Plan Report 05000289-13-006
| author name = Roberts D J
| author name = Roberts D
| author affiliation = NRC/RGN-I/DRP/PB6
| author affiliation = NRC/RGN-I/DRP/PB6
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Nuclear
| addressee affiliation = Exelon Nuclear
| docket = 05000289
| docket = 05000289
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION    REGION I  2100 RENAISSANCE BOULEVARD, SUITE 100  KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 3, 2013 Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear
{{#Wiki_filter:UNITED STATES September 3, 2013


4300 Winfield Rd.
==SUBJECT:==
 
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
Warrenville, IL 60555 SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT  
THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2013006)
 
05000289/2013006)


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On August 15, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Three Mile Island Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
On August 15, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Three Mile Island Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined the performance at Three Mile Island Unit 1 during the most recent


quarter was within the Regulatory Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because of a low to moderate safety significant (White) finding in the Mitigating Systems Cornerstone. Specifically, a White finding associated with the TMI external flood barrier system was identified during the fourth quarter of 2012 as detailed in NRC Inspection Report 05000289/2012005.
The NRC determined the performance at Three Mile Island Unit 1 during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of a low to moderate safety significant (White) finding in the Mitigating Systems Cornerstone. Specifically, a White finding associated with the TMI external flood barrier system was identified during the fourth quarter of 2012 as detailed in NRC Inspection Report 05000289/2012005.


On July 26, 2013, your staff notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, "Supplemental Inspection of One or Two White Inputs in a Strategic Performance Area," beginning on September 9, 2013. The inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition and cause is identified, and the corrective actions are sufficient to prevent recurrence.
On July 26, 2013, your staff notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection of One or Two White Inputs in a Strategic Performance Area, beginning on September 9, 2013. The inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition and cause is identified, and the corrective actions are sufficient to prevent recurrence.


The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Line 39: Line 35:
Routine inspections performed by resident inspectors are not included in the inspection plan.
Routine inspections performed by resident inspectors are not included in the inspection plan.


In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003,  
In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, and Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
"Post-Approval Site Inspection for License Renewal," and Temporary Instruction (TI) 2515/182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks." The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possi ble to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management system (ADAMS).


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact Gordon Hunegs at (610)337-5046 with any questions you have regarding this letter.
Please contact Gordon Hunegs at (610)337-5046 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Darrell J. Roberts, Director Division of Reactor Projects  
/RA/
 
Darrell J. Roberts, Director Division of Reactor Projects Docket Nos.: 50-289 License Nos.: DPR-50 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ
Docket Nos.: 50-289 License Nos.: DPR-50  
 
Enclosure: Inspection Plan cc w/encl: Distribution via ListServ  


ML13246A131 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME mmt DWerkheiser/ BB for BBickett/ BB GHunegs/ GKH DRoberts/ DJR DATE 08/ 26 /13 08/26 /13 09/ 27 /13 08/ 30/13
ML13246A131 Non-Sensitive   Publicly Available SUNSI Review Sensitive  Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME mmt DWerkheiser/ BB for BBickett/ BB GHunegs/ GKH DRoberts/ DJR DATE 08/ 26 /13 08/26 /13 09/ 27 /13 08/ 30/13
}}
}}

Latest revision as of 14:01, 4 November 2019

Mid-Cycle Performance Review and Inspection Plan Report 05000289-13-006
ML13246A131
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 09/03/2013
From: Darrell Roberts
NRC/RGN-I/DRP/PB6
To: Pacilio M
Exelon Nuclear
HUNEGS, GK
References
IR-13-006
Download: ML13246A131 (5)


Text

UNITED STATES September 3, 2013

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2013006)

Dear Mr. Pacilio:

On August 15, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Three Mile Island Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Three Mile Island Unit 1 during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of a low to moderate safety significant (White) finding in the Mitigating Systems Cornerstone. Specifically, a White finding associated with the TMI external flood barrier system was identified during the fourth quarter of 2012 as detailed in NRC Inspection Report 05000289/2012005.

On July 26, 2013, your staff notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection of One or Two White Inputs in a Strategic Performance Area, beginning on September 9, 2013. The inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition and cause is identified, and the corrective actions are sufficient to prevent recurrence.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, and Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Gordon Hunegs at (610)337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Darrell J. Roberts, Director Division of Reactor Projects Docket Nos.: 50-289 License Nos.: DPR-50 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ

ML13246A131 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME mmt DWerkheiser/ BB for BBickett/ BB GHunegs/ GKH DRoberts/ DJR DATE 08/ 26 /13 08/26 /13 09/ 27 /13 08/ 30/13