| title = Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 3
| title = Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 3
| author name = Ennis R B
| author name = Ennis R
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = NRC/NRR/DORL/LPLI-2
| addressee affiliation = NRC/NRR/DORL/LPLI-2
| docket = 05000278
| docket = 05000278
| license number =  
| license number =  
| contact person = Ennis R B
| contact person = Ennis R
| document type = Letter, Proprietary Information Review
| document type = Letter, Proprietary Information Review
| page count = 3
| page count = 3
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 November 21, 2013
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 21, 2013 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO.3  
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO.3


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
By Exelon Generation Company, LLC (Exelon) letter to the Nuclear Regulatory Commission (NRC) dated October 16, 2013, and Global Nuclear Fuel-Americas, LLC (GNF-A) affidavit dated July 30, 2013, executed by Mr. Lukas Trosman (attached to Exelon's letter), Exelon requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) Section 2.390: Core Operating Limits Report for Peach Bottom Atomic Power Station Unit 3, Reload 19, Cycle 20, Revision 7 A non-proprietary copy of the document has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; and (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
 
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended.
By Exelon Generation Company, LLC (Exelon) letter to the Nuclear Regulatory Commission (NRC) dated October 16, 2013, and Global Nuclear Fuel- Americas, LLC (GNF-A) affidavit dated July 30, 2013, executed by Mr. Lukas Trosman (attached to Exelon's letter), Exelon requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) Section 2.390:
M. Pacilio Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document.
Core Operating Limits Report for Peach Bottom Atomic Power Station Unit 3, Reload 19, Cycle 20, Revision 7 A non-proprietary copy of the document has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; and (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
 
M. Pacilio                                       Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1420.
If you have any questions regarding this matter, I may be reached at 301-415-1420.
Docket No. 50-278 cc: Mr. Lukas Trosman Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Engineering Manager, Reload Design and Analysis Global Nuclear Fuel -Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv M. Pacilio Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document.
Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-278 cc:     Mr. Lukas Trosman Engineering Manager, Reload Design and Analysis Global Nuclear Fuel - Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
 
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
ML133028895 OFFICE      LPL 1-2/PM        LPL 1-2/LA        LPL 1-2/BC(A)
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
NAME         REnnis           ABaxter           JLamb DATE         11/20/13         11/20/13         11/21/13}}
If you have any questions regarding this matter, I may be reached at 301-415-1420.
Docket No. 50-278 cc: Mr. Lukas Trosman Sincerely, Ira/ Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Engineering Manager, Reload Design and Analysis Global Nuclear Fuel -Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv DISTRIBUTION:
PUBLIC LPL 1-2 R/F RidsNrrDoriLpl1-2 Resource RidsNrrLAABaxter Resource RidsNrrPMPeachBottom Resource ADAMS Accession No.: ML 133028895 OFFICE LPL 1-2/PM LPL 1-2/LA NAME REnnis ABaxter DATE 11/20/13 11/20/13 OFFICIAL RECORD COPY RidsAcrsAcnw_MaiiCTR Resource RidsRgn1 Mail Center Resource RidsNrrDssSnpb Resource RidsNrrDssSrxb Resource LPL 1-2/BC(A)
JLamb 11/21/13}}

Latest revision as of 13:01, 4 November 2019

Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 3
ML13302B895
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 11/21/2013
From: Richard Ennis
Plant Licensing Branch 1
To: Pacilio M
Plant Licensing Branch 1
Ennis R
References
Download: ML13302B895 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 21, 2013 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO.3

Dear Mr. Pacilio:

By Exelon Generation Company, LLC (Exelon) letter to the Nuclear Regulatory Commission (NRC) dated October 16, 2013, and Global Nuclear Fuel- Americas, LLC (GNF-A) affidavit dated July 30, 2013, executed by Mr. Lukas Trosman (attached to Exelon's letter), Exelon requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) Section 2.390:

Core Operating Limits Report for Peach Bottom Atomic Power Station Unit 3, Reload 19, Cycle 20, Revision 7 A non-proprietary copy of the document has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; and (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

M. Pacilio Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1420.

Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-278 cc: Mr. Lukas Trosman Engineering Manager, Reload Design and Analysis Global Nuclear Fuel - Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv

ML133028895 OFFICE LPL 1-2/PM LPL 1-2/LA LPL 1-2/BC(A)

NAME REnnis ABaxter JLamb DATE 11/20/13 11/20/13 11/21/13