ML13305B047: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/31/2013
| issue date = 10/31/2013
| title = IR 0500400-13-404, 10/3/2013, Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report - Cover Letter
| title = IR 0500400-13-404, 10/3/2013, Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report - Cover Letter
| author name = Franke M E
| author name = Franke M
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Hamrick G T
| addressee name = Hamrick G
| addressee affiliation = Carolina Power & Light Co
| addressee affiliation = Carolina Power & Light Co
| docket = 05000400
| docket = 05000400
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::IR 05000400/2013404]]
See also: [[see also::IR 05000400/2013404]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
[[Issue date::October 31, 2013]]
                                            UNITED STATES
                                NUCLEAR REGULATORY COMMISSION
                                                REGION II
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                      ATLANTA, GEORGIA 30303-1257
                                          October 31, 2013
Mr. George T. Hamrick
Vice President
Shearon Harris Nuclear Power Plant
Carolina Power and Light Company
P.O. Box 165, Mail Code: Zone 1
New Hill, NC 27562-0165
SUBJECT:       SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION
                2515/186 INSPECTION REPORT 0500400/2013404
Dear Mr. Hamrick:
On October 3, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
at your Shearon Harris Nuclear Plant using Temporary Instruction 2515/186, Inspection of
Procedures and Processes for Responding to Potential Aircraft Threats. The enclosed
inspection report documents the inspection results which were discussed on October 3, 2013,
with Mr. John Onfner and other members of your staff.
The objective of this inspection was to assess the implementation procedures and processes of
Shearon Harris Nuclear Plant that are required by Title 10 of the Code of Federal Regulations
(CFR), Part 50.54(hh)(1), which provides the requirements for responding to a potential aircraft
threat. The results from this inspection, along with the results from this inspection performed at
other operating commercial nuclear plants in the United States, will be used to evaluate the U.S.
nuclear industrys readiness to safely respond to similar events. These results will also help the
NRC to determine if additional regulatory actions are warranted.
No findings were identified during this inspection.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS
is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance
with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security
vulnerability. Therefore, the material in the enclosure will not be made available electronically
for public inspection in the NRC Public Document Room or from the PARS component of
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this
transmittal document is decontrolled.
LIMITED INTERNAL
DISTRIBUTION PERMITTED
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION


Mr. George Vice President Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165
                    OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
 
G. Hamrick                                     2
SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 0500400/2013404
NRC's ADAMS. If you choose to provide a response and Security-Related Information is
 
necessary to provide an acceptable response, please mark your entire response Security-
==Dear Mr. Hamrick:==
Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance
On October 3, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Shearon Harris Nuclear Plant using Temporary Instruction 2515/186, "Inspection of Procedures and Processes for Responding to Potential Aircraft Threats". The enclosed inspection report documents the inspection results which were discussed on October 3, 2013, with Mr. John Onfner and other members of your staff.
with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for
The objective of this inspection was to assess the implementation procedures and processes of Shearon Harris Nuclear Plant that are required by Title 10 of the Code of Federal Regulations (CFR), Part 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threat. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States, will be used to evaluate the U.S.
your response contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this
 
letters enclosure will not be available for public inspection.
nuclear industry's readiness to safely respond to similar events. These results will also help the NRC to determine if additional regulatory actions are warranted. No findings were identified during this inspection.
                                                Sincerely,
 
                                                /RA/
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
                                                Mark E. Franke, Chief
 
                                                Operations Branch 2
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
                                                Division of Reactor Safety
Docket No. 50-400
License No. NPF-64
Enclosure: Inspection Report 0500400/2013404
                w/Attachment: Supplemental Information (Official Use Only)
cc: (See page 3)
                    OFFICIAL USE ONLY - SECURITY RELATED INFORMATION


Sincerely,/RA/
Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety Docket No. 50-400 License No. NPF-64


===Enclosure:===
_________________________        x  SUNSI REVIEW COMPLETE      FORM 665 ATTACHED
Inspection Report 0500400/2013404
OFFICE            RII:DRS        RII:DRS      RII:DRS          RII;DRS          RII:DRS
SIGNATURE          RA              RA            RA              RA                RA
NAME              DLANYI          AGOLDAU      BBONSER          BDESAI            MFRANKE
DATE                  10/31/2013      10/31/2013    10/24/2013      10/29/2013        10/31/2013
E-MAIL COPY?        YES    NO    YES      NO    YES    NO      YES      NO      YES      NO  YES    NO    YES    NO
       
                  OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
G. Hamrick                            3
cc:
Lara S. Nichols
Deputy General Counsel
Duke Energy Corporation
550 S.Tyron Street
Mail Code DEC45A
Charlotte, NC 28202
Ernest J. Kapopoulos Jr.
Plant General Manager
Carolina Power and Light Company
Shearon Harris Nuclear Power Plant
5413 Shearon Harris Road
New Hill, NC 27562
Terrence E. Slake
Manager
Nuclear Plant Security
Shearon Harris Nuclear Power Plant
5413 Shearon Harris Road
New Hill, NC 27562
Progress Energy Carolinas, Inc.
ATTN: Mr. Donald L. Griffith
      Training Manager
      Harris Energy & Env. Center
Shearon Harris Nuclear Power Plant
P.O. Box 327, State Road 1127
New Hill, NC 27562-0165
                  OFFICIAL USE ONLY - SECURITY RELATED INFORMATION


===w/Attachment:===
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
Supplemental Information (Official Use Only)
Letter to George T. Hamrick from Mark E. Franke dated October 31, 2013.
cc: (See page 3)
SUBJECT:      SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION
              2515/186 INSPECTION REPORT 0500400/2013404
Distribution:
RidsNrrPMShearonHarris Resource
C. Evans, RII EICS
L. Douglas, RII EICS
RIDSNRRDIRS
PUBLIC
S. Coker, NSIR/DSO/DDSO/ST                T. Dimitriadis, RI
R. Albert, NSIR                            B. Desai, RII
B. Huffman, NSIR/DPR/DDIR/OB              D. Funk, RIII
J. Kozal, NSIR/DPR/DDIR/CB                M. Haire, RIV
E. Bowman, NRR/DPR/PGCB                    [Any required agreement state distribution]
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
}}
}}

Latest revision as of 12:53, 4 November 2019

IR 0500400-13-404, 10/3/2013, Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report - Cover Letter
ML13305B047
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/31/2013
From: Mark Franke
Division of Reactor Safety II
To: Hamrick G
Carolina Power & Light Co
References
IR-13-404
Download: ML13305B047 (5)


See also: IR 05000400/2013404

Text

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

October 31, 2013

Mr. George T. Hamrick

Vice President

Shearon Harris Nuclear Power Plant

Carolina Power and Light Company

P.O. Box 165, Mail Code: Zone 1

New Hill, NC 27562-0165

SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION

2515/186 INSPECTION REPORT 0500400/2013404

Dear Mr. Hamrick:

On October 3, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection

at your Shearon Harris Nuclear Plant using Temporary Instruction 2515/186, Inspection of

Procedures and Processes for Responding to Potential Aircraft Threats. The enclosed

inspection report documents the inspection results which were discussed on October 3, 2013,

with Mr. John Onfner and other members of your staff.

The objective of this inspection was to assess the implementation procedures and processes of

Shearon Harris Nuclear Plant that are required by Title 10 of the Code of Federal Regulations

(CFR), Part 50.54(hh)(1), which provides the requirements for responding to a potential aircraft

threat. The results from this inspection, along with the results from this inspection performed at

other operating commercial nuclear plants in the United States, will be used to evaluate the U.S.

nuclear industrys readiness to safely respond to similar events. These results will also help the

NRC to determine if additional regulatory actions are warranted.

No findings were identified during this inspection.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS

is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance

with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security

vulnerability. Therefore, the material in the enclosure will not be made available electronically

for public inspection in the NRC Public Document Room or from the PARS component of

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled.

LIMITED INTERNAL

DISTRIBUTION PERMITTED

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

G. Hamrick 2

NRC's ADAMS. If you choose to provide a response and Security-Related Information is

necessary to provide an acceptable response, please mark your entire response Security-

Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance

with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for

your response contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this

letters enclosure will not be available for public inspection.

Sincerely,

/RA/

Mark E. Franke, Chief

Operations Branch 2

Division of Reactor Safety

Docket No. 50-400

License No. NPF-64

Enclosure: Inspection Report 0500400/2013404

w/Attachment: Supplemental Information (Official Use Only)

cc: (See page 3)

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

_________________________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS RII:DRS RII;DRS RII:DRS

SIGNATURE RA RA RA RA RA

NAME DLANYI AGOLDAU BBONSER BDESAI MFRANKE

DATE 10/31/2013 10/31/2013 10/24/2013 10/29/2013 10/31/2013

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

G. Hamrick 3

cc:

Lara S. Nichols

Deputy General Counsel

Duke Energy Corporation

550 S.Tyron Street

Mail Code DEC45A

Charlotte, NC 28202

Ernest J. Kapopoulos Jr.

Plant General Manager

Carolina Power and Light Company

Shearon Harris Nuclear Power Plant

5413 Shearon Harris Road

New Hill, NC 27562

Terrence E. Slake

Manager

Nuclear Plant Security

Shearon Harris Nuclear Power Plant

5413 Shearon Harris Road

New Hill, NC 27562

Progress Energy Carolinas, Inc.

ATTN: Mr. Donald L. Griffith

Training Manager

Harris Energy & Env. Center

Shearon Harris Nuclear Power Plant

P.O. Box 327, State Road 1127

New Hill, NC 27562-0165

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

Letter to George T. Hamrick from Mark E. Franke dated October 31, 2013.

SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION

2515/186 INSPECTION REPORT 0500400/2013404

Distribution:

RidsNrrPMShearonHarris Resource

C. Evans, RII EICS

L. Douglas, RII EICS

RIDSNRRDIRS

PUBLIC

S. Coker, NSIR/DSO/DDSO/ST T. Dimitriadis, RI

R. Albert, NSIR B. Desai, RII

B. Huffman, NSIR/DPR/DDIR/OB D. Funk, RIII

J. Kozal, NSIR/DPR/DDIR/CB M. Haire, RIV

E. Bowman, NRR/DPR/PGCB [Any required agreement state distribution]

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION