ML13336A424: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Catawba Nuclear Station RO/SRO JPM A.1
{{#Wiki_filter:Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam JPM A.1-1 RO / SRO PAGE 1 OF 18
-1 Sep. 2013 NRC Exam PAGE 1 OF 18  


JPM A.1-1 RO / SRO         
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam DATA SHEET Task:      Perform a manual shutdown margin calculation (Unit at Power) per OP/0/A/6100/006 (Reactivity Balance Calculation)
Alternate Path:      N/A Facility JPM #:      RB-121 - Modified Safety Function:    N/A K/A      G2.1.25        Ability to interpret reference materials, such as graphs, curves, tables, etc..
Importance:      3.9 / 4.2          CFR:      41.10 / 43.5 / 451.2 Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator              In-Plant                        Perform            X      Simulate


Catawba Nuclear Station RO/SRO JPM A.1
==References:==
-1 Sep. 2013 NRC Exam PAGE 2 OF 18 DATA SHEET Task: Perform a manual shutdown margin calculation (Unit at Power) per OP/0/A/6100/006 (Reactivity Balance Calculation)
OP/0/A/6100/006 (Reactivity Balance Calculation), Rev. 83 Unit 1 Reactor Operating Data Book (R.O.D.)
Alternate Path:
Task Standard:      Applicant determines that required shutdown margin is 1300 pcm and current shutdown margin is 1321 pcm, and concludes that adequate shutdown margin does exist per the Unit 1 Core Operating Limits Report.
N/A  Facility JPM #:
Validation Time:    25 minutes                          Time Critical:        Yes          No      X Applicant:                                                                   Time Start: __________
RB-121 - Modified  Safety Function:
NAME___________________________                Docket #_______________      Time Finish: __________
N/A  K/A  G 2.1.2 5 Ability to interpret reference materials, such as graphs, curves, tables, etc.
Performance Rating:                                                           Performance Time _____
. Importance:
SAT ____ UNSAT ____
3.9 / 4.2 CFR: 41.10 / 43.5 / 45
Examiner: _____________________________                _____________________________/________
NAME                                      SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 18


===1.2 Preferred===
PAGE 3 0F 18 Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
Evaluation Location:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Preferred Evaluation  Method:
Simulator  In-Plant  Perform X Simulate  References
: OP/0/A/6100/006 (Reactivity Balance Calculation), Rev. 83 Unit 1 Reactor Operating Data Book (R.O.D.)
Task Standard:
Applicant determines that required shutdown margin is 1300 pcm and current shutdown margin is 1 3 2 1 pcm, and concludes that adequate shutdown margin does exist per the Unit 1 Core Operating Limits Report.
Validation Time:
25 minutes  Time Critical:
Yes  No X  Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS PAGE 3 0F 18 Catawba Nuclear Station RO/SRO JPM A.1
-1 Sep. 2013 NRC Exam PAGE 3 OF 18  READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
 
You are the Unit 1 OATC. The Reactivity Computer (REACT) is out of-service.
You are the Unit 1 OATC. The Reactivity Computer (REACT) is out of
Current plant conditions are:
-service. Current plant conditions are:
* Power level = 85%
Power level = 85%
* NC Tavg = 581°F
NC Tavg = 581°F Boron concentration = 959 ppm Core burnup = 300 EFPD Shutdown rod bank position: 226 steps Control rod bank A is at 226 steps.
* Boron concentration = 959 ppm
Control rod bank B is at 226 steps.
* Core burnup = 300 EFPD
Control rod bank C is at 226 steps.
* Shutdown rod bank position: 226 steps
Control rod bank D is at 200 steps.
* Control rod bank A is at 226 steps.
* Control rod bank B is at 226 steps.
* Control rod bank C is at 226 steps.
* Control rod bank D is at 200 steps.
INITIATING CUES:
INITIATING CUES:
You have been informed by the Control Room SRO that the following rods are untrippable:
You have been informed by the Control Room SRO that the following rods are untrippable:
H-4 K-2 Perform a Shutdown Margin Calculation in accordance with OP/0/A/6100/006 (Reactivity Balance Calculation) and determine if Core Operating Limits Report requirement for shutdown margin is satisfied. Calculation verification is waived.
* H-4
EXAMINER NOTE
* K-2 Perform a Shutdown Margin Calculation in accordance with OP/0/A/6100/006 (Reactivity Balance Calculation) and determine if Core Operating Limits Report requirement for shutdown margin is satisfied. Calculation verification is waived.
:
EXAMINER NOTE:
Provide applicant a copy of OP/0/A/6100/006.
Provide applicant a copy of OP/0/A/6100/006.
PAGE 3 OF 18


Catawba Nuclear Station RO/SRO JPM A.1
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                               SAT /
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 4 0F 18  START TIME: _______
UNSAT START TIME: _______
STEP 1: Applicant obtains a copy of OP/0/A/6100/006 (Reactivity Balance Calculation) and from initiating cue determines that Enclosure 4.3 is applicable
STEP 1: Applicant obtains a copy of OP/0/A/6100/006 (Reactivity Balance Calculation) and from initiating cue determines that Enclosure ___ SAT 4.3 is applicable.
. STANDARD: Applicant obtains a copy of OP/0/A/6100/006 (Reactivity Balance Calculation
___ UNSAT STANDARD:
). EXAMINER NOTE
Applicant obtains a copy of OP/0/A/6100/006 (Reactivity Balance Calculation).
: COMMENTS:
EXAMINER NOTE:
COMMENTS:
STEP 2: Review Limits and Precautions of OP/0/A/6100/006.
___ SAT STANDARD:
Limits and Precautions have been reviewed.                                ___UNSAT EXAMINER NOTE:
Applicant should determine from initial conditions that Tavg is within 1°F based on power level and Tref program.
COMMENTS:
PAGE 4 0F 18


___ SAT
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                                SAT /
___ UNSAT STEP 2: Review Limits and Precautions of OP/0/A/6100/006
UNSAT CRITICAL STEP 3: OP/0/A/6100/006 Encl. 3 Step 3.1                                    STEP Determine the following information:
. STANDARD:   Limits and Precautions have been reviewed.
___ SAT STANDARD:
EXAMINER NOTE
___ UNSAT Applicant records the following data using the initial conditions:
: Applicant should determine from initial conditions that Tavg is within 1°F based on power level and Tref program.
* Unit: 1                                                      ____
* Date/Time: Current Date/Time                                ____
* Present Power: 85%                                          ____
* NC System Boron Concentration 959 ppm                        ____
* Current Burnup: 300 EFPD                                    ____
* Present control bank position: 200 SWD, Control Bank D      ____
* Present shutdown bank position: ALL @ 226                    ____
* Quantity of misaligned rods: 0                              ____
* Number of untrippable RCCA(s): 2                            ____
* Untrippable RCCA(s) core location(s): H-4, K-2              ____
Critical Step to accurately record required data for subsequent critical calculations.
EXAMINER NOTE:
Examiner may also refer to KEY at end of this document.
COMMENTS:
STEP 4: Encl. 4.3 - Step 3.3 (Step 3.2 is N/A due to REACT program being unavailable.)      ___ SAT IF performing the calculation manually, perform the following:
___ UNSAT STANDARD:
COMMENTS:
PAGE 5 0F 18


Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                            SAT /
UNSAT STEP 5: Encl. 4.3 - Step 3.3.1 Determine available reactivity worth of trippable RCCAs for ___ SAT conditions in Step 3.1:
___ UNSAT NOTE: Interpolation is NOT required in Step 3.3.1.1.
Reactivity worth may be determined by choosing the lowest reactivity worth from Section 5.7 of the R.O.D. Manual associated with cycle burnups that bound the present cycle burnup recorded in Step 3.1. (R.M.)
STANDARD:
COMMENTS:
COMMENTS:
___ SAT
STEP 6: Encl. 4.3 - Step 3.3.1.1                                      CRITICAL Determine Total Available Rod Worth:          __5086__ pcm    STEP (Section 5.7 of R.O.D. Manual)
___UNSAT 
___ SAT STANDARD:
___ UNSAT Applicant records 5086 pcm bin Step 3.3.1.1 blank provided.
Critical Step to determine Total Available Rod Worth, which is a required value for a subsequent critical calculation for determining present shutdown margin.
COMMENTS:
PAGE 6 0F 18


Catawba Nuclear Station RO/SRO JPM A.1
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                                 SAT /
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 5 0F 18  STEP 3: OP/0/A/6100/006 Encl. 3 Step 3.1 Determine the following information
UNSAT STEP 7: Encl. 4.3 - Step 3.3.1.2 IF only one RCCA is untrippable, determine reactivity worth     ___ SAT penalty for untrippable RCCA core location of Step 3.1.10.
:  STANDARD:  Applicant records the following data using the initial conditions:
___ UNSAT STANDARD:
Unit:  1        ____  Date/Time:  Current Date/Time
Applicant determines that Step 3.3.1.2 is N/A, based on more than one untrippable RCCA.
____  Present Power:
85%      ____  NC System Boron Concentration 959 ppm  ____  Current Burnup:  300 EFPD    ____  Present control bank position:  200 SWD, Control Bank D ____  Present shutdown bank position:  ALL @ 226  ____  Quantity of misaligned rods:
0     ____  Number of untrippable RCCA(s):
2    ____  Untrippable RCCA(s) core location(s):
H-4, K-2  ____  Critical Step to accurately record required data for subsequent critical calculation
: s. EXAMINER NOTE
: Examiner may also refer to KEY at end of this document.
COMMENTS:
COMMENTS:
CRITICAL STEP
STEP 8: Encl. 4.3 - Step 3.3.1.3 Item A                                   CRITICAL IF there are multiple untrippable RCCAs, perform the following:   STEP A. Determine untrippable RCCA of Step 3.1.10 with the highest  ___ SAT reactivity worth penalty. (Section 5.8 of R.O.D. Manual)
___ SAT  ___ UNSAT STEP 4: Encl. 4.3  
___ UNSAT STANDARD:
- Step 3.3 (Step 3.2 is N/A due to REACT program being unavailable.)
Refers to Section 5.8 of the R.O.D. Manual. Determines RCCA H-4 rod worth is 343 pcm, and is the highest reactivity worth penalty.
IF performing the calculation manually, perform the following:
Critical Step to determine rod with the highest reactivity worth, which is used in a subsequent critical calculation for determining present shutdown margin.
STANDARD:  COMMENTS:      ___ SAT  ___ UNSAT 
 
Catawba Nuclear Station RO/SRO JPM A.1
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT  PAGE 6 0F 18  STEP 5: Encl. 4.3
- Step 3.3.1 Determine available reactivity worth of trippable RCCAs for conditions in Step 3.1:
 
NOTE: Interpolation is NOT required in Step 3.3.1.1. Reactivity worth may be determined by choosing the lowest reactivity worth from Section 5.7 of the R.O.D. Manual associated with cycle burnups that bound the present cycle burnup recorded in Step 3.1.  (R.M.)
STANDARD:  COMMENTS:      ___ SAT  ___ UNSAT STEP 6: Encl. 4.3
- Step 3.3.1.1 Determine Total Available Rod Worth:
__5086__ pcm  (Section 5.7 of R.O.D. Manual)
STANDARD:  Applicant records  5086 pcm bin Step 3.3.1.1 blank provided. Critical Step to determine Total Available Rod Worth
, which is a required value for a subsequent critical calculation for determining present shutdown margin.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 7 0F 18
 
Catawba Nuclear Station RO/SRO JPM A.1
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT  PAGE 7 0F 18   STEP 7: Encl. 4.3
- Step 3.3.1.2    IF only one RCCA is untrippable, determine reactivity worth penalty for untrippable RCCA core location of Step 3.1.10.
STANDARD:  Applicant determine s that Step 3.3.1.2 is N/A, based on more than one untrippable RCCA.
COMMENTS:        ___ SAT  ___ UNSAT STEP 8: Encl. 4.3
- Step 3.3.1.3 Item A IF there are multiple untrippable RCCAs, perform the following:


A. Determine untrippable RCCA of Step 3.1.10 with the highest reactivity worth penalty. (Section 5.8 of R.O.D. Manual)
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                                SAT /
STANDARD: Refers to Section 5.8 of the R.O.D. Manual. Determines RCCA H-4 rod worth is 343 pcm, and is the highest reactivity worth penalty.
UNSAT STEP 9: Encl. 4.3 - Step 3.3.1.3 Item B                                  CRITICAL Record reactivity worth of the untrippable RCCA of Step         STEP 3.3.1.3.A. (Section 5.8 of R.O.D. Manual)         ______ pcm
Critical Step to determine rod with the highest reactivity worth , which is used in a subsequent critical calculation for determining present shutdown margin.
___ SAT STANDARD:
___ UNSAT Applicant determines value and records 343 pcm in Step 3.3.1.3.B blank provided.
Critical Step to determine Highest Worth Penalty, which is used in a subsequent critical calculation for determining present shutdown margin.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT  ___ UNSAT 
STEP 10: Encl. 4.3 - Step 3.3.1.3 Item C                                CRITICAL Determine maximum stuck rod worth during cycle (Section 5.7   STEP of the R.O.D. Manual).
 
___ SAT STANDARD:
Catawba Nuclear Station RO/SRO JPM A.1
___ UNSAT Applicant determines required value and records 1046 pcm in Step 3.3.1.3.C blank provided.
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT  PAGE 8 0F 18  STEP 9: Encl. 4.3  
- Step 3.3.1.3 Item B Record reactivity worth of the untrippable RCCA of Step 3.3.1.3.A.  (Section 5.8 of R.O.D. Manual)
______  pcm STANDARD:  Applicant determines value and records 343 p cm in Step 3.3.1.3.B blank provided. Critical Step to determine Highest Worth Penalty
, which is used in a subsequent critical calculation for determining present shutdown margin. COMMENTS:    CRITICAL STEP    ___ SAT  ___ UNSAT STEP 1 0: Encl. 4.3
- Step 3.3.1.3  Item C Determine maximum stuck rod worth during cycle (Section 5.7 of the R.O
.D. Manual).
STANDARD: Applicant determines required value and records 1046 pcm in Step 3.3.1.3.C blank provided.
Critical Step to determine Maximum Stuck Rod Worth, which is used in a subsequent critical calculation for determining present shutdown margin.
Critical Step to determine Maximum Stuck Rod Worth, which is used in a subsequent critical calculation for determining present shutdown margin.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 8 0F 18


Catawba Nuclear Station RO/SRO JPM A.1
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                                   SAT /
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 9 0F 18  STEP 1 1: Encl. 4.3 - Step 3.3.1.3 Item D Calculate total untrippable RCCA reactivity worth penalty below:   STANDARD: Applicant records the following data in appropriate table locations. Refer to EXAM KEY, if desired.
UNSAT STEP 11: Encl. 4.3 - Step 3.3.1.3 Item D                                     CRITICAL Calculate total untrippable RCCA reactivity worth penalty           STEP below:
Number of Untrippable RCCAs
___ SAT
: 2   ____ Highest Worth Penalty
___ UNSAT STANDARD:
: 343 pcm   ____ Max Stuck Rod
Applicant records the following data in appropriate table locations. Refer to EXAM KEY, if desired.
: 1046 pcm     ____   Total untrippable RCCA Worth Penalty for Multiple RCCAs:
* Number of Untrippable RCCAs: 2                           ____
1389 p c m      ____
* Highest Worth Penalty: 343 pcm                           ____
* Max Stuck Rod: 1046 pcm                                 ____
* Total untrippable RCCA Worth Penalty for Multiple RCCAs:
1389 pcm                                                ____
Critical Step to determine Total untrippable RCCA Worth Penalty for Multiple RCCAs, which is used in a subsequent critical calculation for determining present shutdown margin.
Critical Step to determine Total untrippable RCCA Worth Penalty for Multiple RCCAs, which is used in a subsequent critical calculation for determining present shutdown margin.
COMMENTS:
COMMENTS:
PAGE 9 0F 18


CRITICAL STEP    ___ SAT  ___ UNSAT 
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                               SAT /
 
UNSAT STEP 12: Encl. 4.3 - Step 3.3.1.4 Record Total Untrippable RCCA Penalty from Step 3.3.1.2 or   ___ SAT Step 3.3.1.3.D, whichever is applicable.
Catawba Nuclear Station RO/SRO JPM A.1
___ UNSAT STANDARD:
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 10 0F 18  STEP 1 2: Encl. 4.3  
Applicant records Total Untrippable RCCA Penalty as 1389 pcm.
- Step 3.3.1.4 Record Total Untrippable RCCA Penalty from Step 3.3.1.2 or Step 3.3.1.3.D, whichever is applicable.
STANDARD: Applicant records Total Untrippable RCCA Penalty as 1 389 pcm.
Examiner NOTE:
Examiner NOTE:
This step, although important, is not critical, since the value has been previously determined in Step 11 this JPM.
This step, although important, is not critical, since the value has been previously determined in Step 11 this JPM.
COMMENTS:       ___ SAT  ___ UNSAT 
COMMENTS:
PAGE 10 0F 18


Catawba Nuclear Station RO/SRO JPM A.1
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                               SAT /
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 11 0F 18  STEP 1 3: Encl. 4.3  
UNSAT STEP 13: Encl. 4.3 - Step 3.3.1.5                                       CRITICAL Determine Inserted Rod Worth for present bank positions:     STEP
- Step 3.3.1.5 Determine Inserted Rod Worth for present bank positions:
___ SAT
STANDARD: Applicant determines the required values from the table and records the following:
___ UNSAT STANDARD:
Item A.:   58 pcm   ____ Item B.: SD E 0 pcm   ____   SD D 0 pcm   ____   SD C 0 pcm   ____   SD B 0 pcm   ____   SD A 0 pcm   ____   Inserted Worth of Present Position:
Applicant determines the required values from the table and records the following:
58 pcm ____ Critical Step to determine Inserted Worth of Present Position, which is used in a subsequent critical calculation for determining present shutdown margin.
* Item A.:                   58 pcm                   ____
* Item B.:             SD E 0 pcm                     ____
SD D 0 pcm                     ____
SD C 0 pcm                     ____
SD B 0 pcm                     ____
SD A 0 pcm                     ____
* Inserted Worth of Present Position:       58 pcm     ____
Critical Step to determine Inserted Worth of Present Position, which is used in a subsequent critical calculation for determining present shutdown margin.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 11 0F 18


Catawba Nuclear Station RO/SRO JPM A.1
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                                 SAT /
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 12 0F 18  STEP 1 4: Encl. 4.3  
UNSAT STEP 14: Encl. 4.3 - Step 3.3.1.6                                         CRITICAL Calculate available reactivity worth of trippable RCCAs.        STEP
- Step 3.3.1.6 Calculate available reactivity worth of trippable RCCAs
___ SAT
. STANDARD: Applicant determines the required values from the table and records the following:
___ UNSAT STANDARD:
Total Available Rod Worth
Applicant determines the required values from the table and records the following:
:   5086 pcm ____ Untrippable RCCAs Penalty 1389 pcm ____ Inerted Worth of Present Position 58 pcm ____ Available Reactivity Worth of Trippable RCCAs
* Total Available Rod Worth:                 5086 pcm           ____
: 3639 pcm ____
* Untrippable RCCAs Penalty                 1389 pcm           ____
* Inerted Worth of Present Position         58 pcm             ____
Available Reactivity Worth of Trippable RCCAs:   3639 pcm           ____
Critical Step to determine Available Reactivity Worth of Trippable RCCAs, which is used in a subsequent critical calculation for determining present shutdown margin.
Critical Step to determine Available Reactivity Worth of Trippable RCCAs, which is used in a subsequent critical calculation for determining present shutdown margin.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 12 0F 18


Catawba Nuclear Station RO/SRO JPM A.1
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                                 SAT /
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 13 0F 18  STEP 1 5: Encl. 4.3  
UNSAT STEP 15: Encl. 4.3 - Step 3.3.1.7                                         CRITICAL Calculate total misaligned RCCA reactivity worth below:         STEP
- Step 3.3.1.7 Calculate total misaligned RCCA reactivity worth below:
___ SAT
STANDARD: Applicant determines the required values from the table and records the following:
___ UNSAT STANDARD:
Quantity of Misaligned Rods
Applicant determines the required values from the table and records the following:
:   0 ____ Maximum Dropped or Misaligned Rod Worth 200 pcm ____ Total misaligned RCCA Reactivity Worth 0 pcm ____
* Quantity of Misaligned Rods:                     0           ____
* Maximum Dropped or Misaligned Rod Worth         200 pcm     ____
Total misaligned RCCA Reactivity Worth                 0 pcm       ____
Critical Step to determine Total Misaligned RCCA Reactivity Worth, which is used in a subsequent critical calculation for determining present shutdown margin.
Critical Step to determine Total Misaligned RCCA Reactivity Worth, which is used in a subsequent critical calculation for determining present shutdown margin.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 13 0F 18


Catawba Nuclear Station RO/SRO JPM A.1
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                                   SAT /
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 14 0F 18  STEP 1 6: Encl. 4.3  
UNSAT STEP 16: Encl. 4.3 - Step 3.3.2                                             CRITICAL Calculate SDM for present conditions:                             STEP
- Step 3.3.2 Calculate SDM for present conditions:
___ SAT
STANDARD: Applicant determines the required values from the table and records the following:
___ UNSAT STANDARD:
Available reactivity worth of Trippable RCCAs 3639 pcm ____ Total misaligned RCCA reactivity Worth 0 pcm ____ Total Power Defect at present thermal power (Step 3.1.3) and current cycle burnup (Step 3.1.5) 1808 pcm ____ Transient Flux Redistribution Allowance 510 ____   Present SDM     1321 pcm ____ Critical Step to determine Present Shutdown Margin. This value is used to compare with the COLR requirement to detemine if present shutdown margin meets the requirements of the COLR.
Applicant determines the required values from the table and records the following:
* Available reactivity worth of Trippable RCCAs       3639 pcm   ____
* Total misaligned RCCA reactivity Worth               0 pcm       ____
* Total Power Defect at present thermal power (Step 3.1.3) and current cycle burnup (Step 3.1.5)                           1808 pcm   ____
* Transient Flux Redistribution Allowance             510         ____
* Present SDM                                         1321 pcm   ____
Critical Step to determine Present Shutdown Margin. This value is used to compare with the COLR requirement to detemine if present shutdown margin meets the requirements of the COLR.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 14 0F 18


Catawba Nuclear Station RO/SRO JPM A.1
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                               SAT /
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 15 0F 18  STEP 1 7: Encl. 4.3  
UNSAT STEP 17: Encl. 4.3 - Step 3.3.3                                           ___ SAT Sign below to document performance:
- Step 3.3.3 Sign below to document performance:
___ UNSAT Performed by ________________________ Date/Time _____ / _____
Performed by ________________________ Date/Time _____ / _____
STANDARD:
STANDARD: Applicant signs applicable line to document performance.
Applicant signs applicable line to document performance.
COMMENTS:       ___ SAT  ___ UNSAT STEP 1 8: Encl. 4.3  
COMMENTS:
- Step 3.3.4 Ensure that an independent calculation per this enclosure has been separately performed.
STEP 18: Encl. 4.3 - Step 3.3.4 Ensure that an independent calculation per this enclosure has ___ SAT been separately performed.
STANDARD: Applicant ensures an independent calculation has been separately performed.
___ UNSAT STANDARD:
Applicant ensures an independent calculation has been separately performed.
EXAMINER CUE:      "An independent calculation per this enclosure has been performed."
COMMENTS:
PAGE 15 0F 18


EXAMINER CUE: "An independent calculation per this enclosure has been performed."
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                                  SAT /
UNSAT STEP 19: Encl. 4.3 - Step 3.3.5 Verify that both performances of this enclosure yield equivalent ___ SAT results.
___ UNSAT STANDARD:
Applicant verifies that both performances of this enclosure have yielded equivalent results.
EXAMINER CUE:         "Both performances of this enclosure have yielded equivalent results."
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 16 0F 18


Catawba Nuclear Station RO/SRO JPM A.1
Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD                             SAT /
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 16 0F 18  STEP 1 9: Encl. 4.3  
UNSAT STEP 20:   Encl. 4.3 - Step 3.3.6                                    CRITICAL STEP
- Step 3.3.5 Verify that both performances of this enclosure yield equivalent results. STANDARD: Applicant verifies that both performances of this enclosure have yielded equivalent results.
___ SAT
EXAMINER CUE: "Both performances of this enclosure have yielded equivalent results
___ UNSAT STANDARD:
."
Applicant determines that adequate shutdown DOES exist since actual is 1321 pcm and the COLR requirement is 1300 pcm.
EXAMINER CUE:       "Another operator will take actions and complete the procedure."
This step is critical to in order to meet the Task Standard: determine that present shutdown margin DOES exist.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
END OF TASK STOP TIME ________
 
PAGE 17 0F 18
Catawba Nuclear Station RO/SRO JPM A.1
-1 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT  PAGE 17 0F 18   STEP 20: Encl. 4.3
- Step 3.3.6 STANDARD:  Applicant determines that adequate shutdown DOES exist since actual is 1321 pcm and the COLR requirement is 1300 pcm. EXAMINER CUE: "Another operator will take actions and complete the procedure."  This step is critical to in order to meet the Task Standard:  determine that present shutdown margin DOES exist.
COMMENTS:  END OF TASK CRITICAL STEP    ___ SAT  ___ UNSAT 


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
Catawba 2013 NRC Exam
READ TO APPLICANT DIRECTION TO APPLICANT:
- RO/SRO JPM A.1
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
-1  READ TO APPLICANT DIRECTION TO APPLICANT:
INITIAL CONDITIONS:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
You are the Unit 1 OATC. The Reactivity Computer (REACT) is out of-service.
 
Current plant conditions are:
You are the Unit 1 OATC. The Reactivity Computer (REACT) is out of
* Power level = 85%
-service. Current plant conditions are:
* NC Tavg = 581°F
Power level = 85%
* Boron concentration = 959 ppm
NC Tavg = 581°F Boron concentration = 959 ppm Core burnup = 300 EFPD Shutdown rod bank position: 226 steps Control rod bank A is at 226 steps.
* Core burnup = 300 EFPD
Control rod bank B is at 226 steps.
* Shutdown rod bank position: 226 steps
Control rod bank C is at 226 steps.
* Control rod bank A is at 226 steps.
Control rod bank D is at 200 steps.
* Control rod bank B is at 226 steps.
* Control rod bank C is at 226 steps.
* Control rod bank D is at 200 steps.
INITIATING CUES:
INITIATING CUES:
You have been informed by the Control Room SRO that the following rods are untrippable:
* H-4
* K-2 Perform a Shutdown Margin Calculation in accordance with OP/0/A/6100/006 (Reactivity Balance Calculation) and determine if Core Operating Limits Report requirement for shutdown margin is satisfied. Calculation verification is waived.
Catawba 2013 NRC Exam - RO/SRO JPM A.1-1


You have been informed by the Control Room SRO that the following rods are untrippable:
Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam JPM A.1-2 RO / SRO PAGE 1 OF 11
H-4  K-2 Perform a Shutdown Margin Calculation in accordance with OP/0/A/6100/006 (Reactivity Balance Calculation) and determine if Core Operating Limits Report requirement for shutdown margin is satisfied. Calculation verification is waived


Catawba Nuclear Station RO/SRO JPM A
Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam DATA SHEET Task:      Calculate Unit Vent flow manually per PT/1/A/4450/017 (Unit Vent Flow Manual Calculation).
.1-2 Sep. 2013 NRC Exam PAGE 1 OF 11 
Alternate Path:      N/A Facility JPM #:      WG-002 Safety Function:    N/A K/A      G2.1.23      Ability to perform specific system and integrated plant procedures during all modes of plant operation.
Importance:      4.3 / 4.4        CFR:    41.10 / 43.5 / 45.2 / 45.6 Preferred Evaluation Location:                        Preferred Evaluation Method:
Simulator      X    In-Plant                        Perform            X      Simulate


JPM A.1-2 RO / SRO         
==References:==
PT/1/A/4450/017 (Unit Vent Flow Manual Calculation) Rev 013 SLC 16.11-7 (Radioactive Gaseous Effluent Monitoring Instrumentation)
Task Standard:      Unit Vent flow is calculated to be 117450 scfm +/- 1000.
Validation Time:    15 minutes                        Time Critical:        Yes          No      X Applicant:                                                                Time Start: __________
NAME___________________________              Docket #_______________      Time Finish: __________
Performance Rating:                                                        Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________              _____________________________/________
NAME                                      SIGNATURE                DATE
===========================================================================
COMMENTS PAGE 2 OF 11


Catawba Nuclear Station RO/SRO JPM A
Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
.1-2 Sep. 2013 NRC Exam PAGE 2 OF 11 DATA SHEET Task: Calculate Unit Vent flow manually per PT/1/A/4450/017 (Unit Vent Flow Manual Calculation).
Alternate Path: N/A  Facility JPM #:
WG-002  Safety Function:
N/A  K/A  G 2.1.2 3 Ability to perform specific system and integrated plant procedures during all modes of plant operation.
Importance:
4.3 / 4.4 CFR: 41.10 / 43.5 / 45.2 / 45.6  Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator X In-Plant  Perform X Simulate  References
: PT/1/A/4450/017 (Unit Vent Flow Manual Calculation) Rev 013 SLC 16.11-7  (Radioactive Gaseous Effluent Monitoring Instrumentation
)  Task Standard: Unit Vent flow is calculated to be 117450 scfm +/
- 1000. Validation Time:
15 minutes  Time Critical:
Yes  No X  Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station RO/SRO JPM A
.1-2 Sep. 2013 NRC Exam PAGE 3 OF 11  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC  
: 2. Reset to IC #168
#168 3. Enter the password.
: 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
-up window.
: 5. Ensure simulator setup per table below.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE and maintain in FREEZE unless instructed by NRC Examiner to place in RUN
: 8. Place simulator in FREEZE and maintain in FREEZE unless instructed by NRC Examiner to place in RUN.
. 9. May need a footstool for applicants to access and read VA system flow indicator.
: 9. May need a footstool for applicants to access and read VA system flow indicator.
Instructor Action Final Delay Ramp Delete In Event XMT-VA001 (FVA_5280 ABFXU
Instructor Action                 Final   Delay Ramp   Delete In   Event XMT-VA001 (FVA_5280 ABFXU-1 AIR FLOW 56000 MTR)
-1 AIR FLOW MTR) 56000    XMT-VA002 (FVF_5310 OUTLET AIRFLOW TRN A MTR) 0                      Place OOS sticker on 1VFP5310 (VF OTLT AIR FLOW TRN A)
XMT-VA002 (FVF_5310 OUTLET AIRFLOW 0
TRN A MTR)
Place OOS sticker on 1VFP5310 (VF OTLT AIR FLOW TRN A)
PAGE 3 OF 11


PAGE 4 0F 11 Catawba Nuclear Station RO/SRO JPM A
PAGE 4 0F 11 Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
.1-2 Sep. 2013 NRC Exam PAGE 4 OF 11  READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Both Units are at 100% power.
* Both Units are at 100% power.
No VQ release is in progress.
* No VQ release is in progress.
No GWRs are in progress.
* No GWRs are in progress.
The Waste Evaporator and Recycle Evaporator are secured.
* The Waste Evaporator and Recycle Evaporator are secured.
The Unit Vent Stack Flow Rate Meter is INOPERABLE
* The Unit Vent Stack Flow Rate Meter is INOPERABLE.
. Auxiliary Building NLO has called the control room to report 1ABUXF Discharge Air Flow (1ABUX-AFMD-1) is reading 27000 scfm.
* Auxiliary Building NLO has called the control room to report 1ABUXF Discharge Air Flow (1ABUX-AFMD-1) is reading 27000 scfm.
INITIATING CUES:
INITIATING CUES:
Calculate Unit Vent flow per PT/1/A/4450/017 (Unit Vent Flow Manual Calculation) Enclosure 13.1.
Calculate Unit Vent flow per PT/1/A/4450/017 (Unit Vent Flow Manual Calculation) Enclosure 13.1.
EXAMINER NOTE
EXAMINER NOTE:
Provide the applicant with a copy of PT/1/A/4450/017
Provide the applicant with a copy of PT/1/A/4450/017.
.
PAGE 4 OF 11
 
Catawba Nuclear Station RO/SRO JPM A
.1-2 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT  PAGE 5 0F 11   START TIME: _______
STEP 1:  Applicant locates and records VA (Auxiliary Building Ventilation)
System flow.
STANDARD:  Applicant locates 1VAP5280 on 1MC
-3 and records 56, 500 scfm. Critical Step to obtain VA (Auxiliary Building Ventilation) flow required to complete the calculation.
 
EXAMINER NOTE:  Range of 55000 to 57000  scfm is acceptable.


Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam STEP / STANDARD                                  SAT /
UNSAT START TIME: _______
STEP 1: Applicant locates and records VA (Auxiliary Building Ventilation)  CRITICAL System flow.                                                      STEP STANDARD:                                                                ___ SAT Applicant locates 1VAP5280 on 1MC-3 and records 56,500 scfm.              ___ UNSAT Critical Step to obtain VA (Auxiliary Building Ventilation) flow required to complete the calculation.
EXAMINER NOTE: Range of 55000 to 57000 scfm is acceptable.
COMMENTS:
COMMENTS:
CRITICAL STEP
STEP 2: Applicant locates and records VE (Annulus Ventilation) 1A flow     CRITICAL to stack.                                                         STEP STANDARD:                                                                 ___ SAT Applicant locates 1VEP5180, notes VE (Annulus Ventilation) train 1A is shutdown and records 0 scfm.                                               ___UNSAT Critical Step to obtain 1A Train Annulus Ventilation Flow required to complete the calculation.
___ SAT
___ UNSAT STEP 2:   Applicant locates and records VE (Annulus Ventilation) 1A flow to stack. STANDARD:   Applicant locates 1VEP5180, notes VE (Annulus Ventilation) train 1A is shutdown and records 0 scfm. Critical Step to obtain 1A Train Annulus Ventilation Flow required to complete the calculation.
 
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT
PAGE 5 0F 11
___UNSAT 


Catawba Nuclear Station RO/SRO JPM A
Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam STEP / STANDARD                                 SAT /
.1-2 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 6 0F 11  STEP 3:   Applicant locates and records VE (Annulus Ventilation) 1B flow to stack. STANDARD:   Applicant locates 1VEP5200, notes VE (Annulus Ventilation) train 1B is shutdown and records 0 scfm. Critical Step to obtain 1B Train Annulus Ventilation Flow required to complete the calculation.
UNSAT STEP 3: Applicant locates and records VE (Annulus Ventilation) 1B flow   CRITICAL to stack.                                                         STEP STANDARD:                                                               ___ SAT Applicant locates 1VEP5200, notes VE (Annulus Ventilation) train 1B is   ___ UNSAT shutdown and records 0 scfm.
Critical Step to obtain 1B Train Annulus Ventilation Flow required to complete the calculation.
COMMENTS:
COMMENTS:
CRITICAL STEP
STEP 4: Applicant locates and records VF (Fuel Pool Ventilation) 1A flow CRITICAL to stack.                                                         STEP STANDARD:                                                                 ___ SAT Applicant locates 1VFP5310, notes VF (Fuel Pool Ventilation) reading is ___ UNSAT OOS and uses 33130 scfm from enclosure 13.2.
___ SAT  ___ UNSAT STEP 4:   Applicant locates and records VF (Fuel Pool Ventilation) 1A flow to stack. STANDARD:   Applicant locates 1VFP5310, notes VF (Fuel Pool Ventilation) reading is OOS and uses 33130 scfm from enclosure 13.2.
 
This step is critical to ensure the correct value is included in the calculation.
This step is critical to ensure the correct value is included in the calculation.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 6 0F 11


Catawba Nuclear Station RO/SRO JPM A
Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam STEP / STANDARD                                 SAT /
.1-2 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 7 0F 11  STEP 5:   Applicant locates and records VF (Fuel Pool Ventilation) 1B flow to stack. STANDARD:   Applicant locates 1VFP5340, notes VF (Fuel Pool Ventilation) train 1B is shutdown and records 0 scfm. Critical Step to obtain 1B Train Fuel Pool Ventilation Flow required to complete the calculation.
UNSAT STEP 5: Applicant locates and records VF (Fuel Pool Ventilation) 1B flow CRITICAL to stack.                                                         STEP STANDARD:                                                               ___ SAT Applicant locates 1VFP5340, notes VF (Fuel Pool Ventilation) train 1B is ___ UNSAT shutdown and records 0 scfm.
COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT STEP 6:   Applicant records 1ABUX
Critical Step to obtain 1B Train Fuel Pool Ventilation Flow required to complete the calculation.
-AFMD-1 flow. STANDARD:   Applicant records 27000 scfm based on initial cue.
COMMENTS:
Critical Step to ensure the value is used in the calculation.
STEP 6: Applicant records 1ABUX-AFMD-1 flow.                             CRITICAL STEP STANDARD:
COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT 
___ SAT Applicant records 27000 scfm based on initial cue.
___ UNSAT Critical Step to ensure the value is used in the calculation.
COMMENTS:
PAGE 7 0F 11


Catawba Nuclear Station RO/SRO JPM A
Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam STEP / STANDARD                             SAT /
.1-2 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 8 0F 11  STEP 7:   Applicant records VP (Containment Purge) flows. STANDARD: Based on initial cues VP (Containment Purge) is secured. Applicant records flow as 0 scfm or N/A
UNSAT STEP 7: Applicant records VP (Containment Purge) flows.               CRITICAL STEP STANDARD:
. Critical Step to obtain Containment Purge Flows required to complete the calculation.
___ SAT Based on initial cues VP (Containment Purge) is secured. Applicant records flow as 0 scfm or N/A.                                         ___ UNSAT Critical Step to obtain Containment Purge Flows required to complete the calculation.
COMMENTS:    CRITICAL STEP    ___ SAT  ___ UNSAT STEP 8:  Applicant records WG (Waste Gas) flow and VQ (Containment Air Release and Addition) flow. STANDARD:  Based on initial cues, applicant records flow as 0 scfm or N/A
. Critical Step to obtain Waste Gas Flow and Containment Air Release Flow required to complete the calculation.
COMMENTS:    CRITICAL STEP    ___ SAT  ___ UNSAT STEP 9:  Applicant records TL (Main Turbine Seals) flow  STANDARD:  Based on initial cue and procedure notes, applicant records 1260 scfm. Critical Step to obtain Main Turbine Seals flow required to complete the calculation.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT   ___ UNSAT
STEP 8: Applicant records WG (Waste Gas) flow and VQ (Containment      CRITICAL Air Release and Addition) flow.                                STEP STANDARD:                                                              ___ SAT Based on initial cues, applicant records flow as 0 scfm or N/A.        ___ UNSAT Critical Step to obtain Waste Gas Flow and Containment Air Release Flow required to complete the calculation.
COMMENTS:
STEP 9: Applicant records TL (Main Turbine Seals) flow                CRITICAL STEP STANDARD:
___ SAT Based on initial cue and procedure notes, applicant records 1260 scfm.
___ UNSAT Critical Step to obtain Main Turbine Seals flow required to complete the calculation.
COMMENTS:
PAGE 8 0F 11


Catawba Nuclear Station RO/SRO JPM A
Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam STEP / STANDARD                               SAT /
.1-2 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 9 0F 11    STEP 1 0:    Applicant records NB (Reactor Makeup) and WL (Liquid Waste) flows. STANDARD: Based on initial cues, applicant records flow as 0 scfm or N/A.
UNSAT STEP 10:    Applicant records NB (Reactor Makeup) and WL (Liquid         CRITICAL Waste) flows.                                                   STEP STANDARD:
Critical Step to obtain Reactor Makeup and Liquid Waste flows required to complete the calculation.
___ SAT Based on initial cues, applicant records flow as 0 scfm or N/A.
COMMENTS:    CRITICAL STEP
___ UNSAT Critical Step to obtain Reactor Makeup and Liquid Waste flows required to complete the calculation.
___ SAT  ___ UNSAT STEP 1 1:    Applicant records ZJ (Condensate Steam Air Ejectors) flow to stack. STANDARD:  Based on initial cue and procedure notes, applicant records 60 scfm. Critical Step obtain Condensate Steam Air Ejectors flow required to complete the calculation.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT   ___ UNSAT
STEP 11:    Applicant records ZJ (Condensate Steam Air Ejectors) flow to CRITICAL stack.                                                          STEP STANDARD:                                                                ___ SAT Based on initial cue and procedure notes, applicant records 60 scfm. ___ UNSAT Critical Step obtain Condensate Steam Air Ejectors flow required to complete the calculation.
COMMENTS:
PAGE 9 0F 11


Catawba Nuclear Station RO/SRO JPM A
Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam STEP / STANDARD                         SAT /
.1-2 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 10 0F 11  STEP 1 2:   Calculate total vent flow.
UNSAT STEP 12: Calculate total vent flow.                               CRITICAL STEP STANDARD:
STANDARD: Applicant calculates total vent flow to stack as 117450 scfm.
___ SAT Applicant calculates total vent flow to stack as 117450 scfm.
EXAMINER NOTE
___ UNSAT EXAMINER NOTE: Due to reading instruments, 116450 -118450 scfm is considered acceptable.
:   Due to reading instruments, 116450 -118450 scfm is considered acceptable.
This step is critical to calculate total vent flow.
This step is critical to calculate total vent flow.
EXAMINER CUE:
EXAMINER CUE:       "Another operator will continue with the PT."
"Another operator will continue with the PT." COMMENTS: END OF TASK CRITICAL STEP    ___ SAT  ___ UNSAT STOP TIME ________
COMMENTS:
END OF TASK STOP TIME ________
PAGE 10 0F 11
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
Catawba 2013 NRC Exam
READ TO APPLICANT DIRECTION TO APPLICANT:
- RO/SRO JPM A
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
.1-2  READ TO APPLICANT DIRECTION TO APPLICANT:
INITIAL CONDITIONS:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
* Both Units are at 100% power.
Both Units are at 100% power.
* No VQ release is in progress.
No VQ release is in progress.
* No GWRs are in progress.
No GWRs are in progress.
* The Waste Evaporator and Recycle Evaporator are secured.
The Waste Evaporator and Recycle Evaporator are secured.
* The Unit Vent Stack Flow Rate Meter is INOPERABLE.
The Unit Vent Stack Flow Rate Meter is INOPERABLE
* Auxiliary Building NLO has called the control room to report 1ABUXF Discharge Air Flow (1ABUX-AFMD-1) is reading 27000 scfm.
. Auxiliary Building NLO has called the control room to report 1ABUXF Discharge Air Flow (1ABUX
-AFMD-1) is reading 27000 scfm.
INITIATING CUES:
INITIATING CUES:
Provide the applicant with a copy of PT/1/A/4450/017
Provide the applicant with a copy of PT/1/A/4450/017.
.  
Catawba 2013 NRC Exam - RO/SRO JPM A.1-2


Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam PAGE 1 OF 7 JPM A.2 RO-SRO          
Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam JPM A.2 RO-SRO PAGE 1 OF 7


Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam PAGE 2 OF 7 DATA SHEET Task: Classify a D/G Start and Complete a Logbook Entry Alternate Path:
Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam DATA SHEET Task:       Classify a D/G Start and Complete a Logbook Entry Alternate Path:       N/A Facility JPM #:       DG3-010 Safety Function:     N/A K/A       2.2.12         Knowledge of surveillance procedures.
N/A Facility JPM #:
Importance:       3.7 / 4.1         CFR:   41.10 / 45.13 Preferred Evaluation Location:                       Preferred Evaluation Method:
DG3-010 Safety Function:
Simulator               Classroom       X           Perform           X     Simulate
N/A   K/A 2.2.12 Knowledge of surveillance procedures.
 
Importance:
==References:==
3.7 / 4.1 CFR: 41.10 / 45.13 Preferred Evaluation Location:
OMP 2-28 (Diesel Generator Logbook) rev 026 PT/2/A/4350/002 B, (Diesel Generator 2B Operability Test), Rev. 101 Task Standard:       Classify the D/G start as a VALID FAILURE and correctly enter data into the logbook.
Preferred Evaluation Method:
Validation Time:     14 minutes                     Time Critical:       Yes         No       X Applicant:                                                               Time Start: __________
Simulator Classroom X Perform X Simulate   References
NAME___________________________             Docket #_______________     Time Finish: __________
: OMP 2-28 (Diesel Generator Logbook) rev 026 PT/2/A/4350/002 B, (Diesel Generator 2B Operability Test), Rev. 101 Task Standard:
Performance Rating:                                                       Performance Time _____
Classify the D/G start as a VALID FAILURE and correctly enter data into the logbook. Validation Time:
SAT ____ UNSAT ____
14 minutes   Time Critical:   Yes No X   Applicant:
Examiner: _____________________________             _____________________________/________
Time Start:   ______
NAME                                   SIGNATURE                 DATE
____ NAME___________________________
===========================================================================
Docket #_______________
COMMENTS PAGE 2 OF 7
Time Finish: ________
 
__    Performance Rating:
PAGE 3 0F 7 Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
SAT ____ UNSAT ____
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE ===========================================================================
COMMENTS PAGE 3 0F 7 Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam PAGE 3 OF 7  READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 2 is in Mode 1.
* Unit 2 is in Mode 1.
You were an extra operator on shift and assisting the Operation Test Group in a scheduled surveillance test of the 2B Emergency Diesel Generator.
* You were an extra operator on shift and assisting the Operation Test Group in a scheduled surveillance test of the 2B Emergency Diesel Generator.
The test was conducted using procedure PT/2/A/4350/002B (D/G Operability Test). Given the following timeline:
* The test was conducted using procedure PT/2/A/4350/002B (D/G Operability Test).
0830 2B D/G was started
* Given the following timeline:
. Time to reach required frequency was 7.0 seconds.
0830     2B D/G was started.
Time to reach required frequency was 7.0 seconds.
Time to reach required voltage was 6.7 seconds.
Time to reach required voltage was 6.7 seconds.
0845 2B D/G was fully loaded.
0845     2B D/G was fully loaded.
0905 Prior to completing the surveillance, 2B D/G tripped due to a malfunction of the low
0905     Prior to completing the surveillance, 2B D/G tripped due to a malfunction of the low-low lube oil pressure switch.
-low lube oil pressure switch.
* PT/2/A/4350/002B has been completed up to step 12.75 for completing Diesel Generator Logbook entries per OMP 2-28 (Diesel Generator Logbook).
PT/2/A/4350/002B has been completed up to step 12.
INITIATING CUES:
7 5 for completing Diesel Generator Logbook entries per OMP 2
Using the information provided in Initial Conditions, classify the test and fill in all available Diesel Generator Logbook data (Items A through L) on Attachment 10.1 (Diesel Generator Log Sheet) and 10.2 (Index Sheet) of OMP 2-28 and submit to the CRS for review.
-28 (Diesel Generator Logbook)
EXAMINER NOTE:
. INITIATING CUES:
Provide applicant with a copy of OMP 2-28 (total of 11 pages). Attachment 10.2 will include one entry from the previous surveillance.
The applicant may ask for a name for the MCE Rotating Equipment Supervisor and a PIP # when completing the logbook entries. If necessary, this may be done in another room to prevent possible compromise of the exam.
PAGE 3 OF 7


Using the information provided in Initial Conditions, classify the test and fill in all available Diesel Generator Logbook data (Items A through L) on Attachment 10.1 (Diesel Generator Log Sheet) and 10.2 (Index Sheet) of OMP 2-28 and submit to the CRS for revie
Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam STEP / STANDARD                                    SAT /
: w. EXAMINER NOTE
UNSAT START TIME: _______
:
STEP 1:    Based on initial conditions, applicant refers to OMP Section 6 to  CRITICAL determine the TEST CLASSIFICATION.                                  STEP STANDARD:                                                                    ___ SAT Applicant determines that the test is a VALID FAILURE based on criteria      ___ UNSAT 6.4.A.
Provide applicant with a copy of OMP 2
Critical Step step in order to meet the Task Standard: Determine the correct classification.
-28 (total of 11 pages). Attachment 10.2 will include one entry from the previous surveillance.
COMMENTS:
PAGE 4 0F 7


The applicant may ask for a name for the MCE Rotating Equipment Supervisor and a PIP # when completing the logbook entries.
Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam STEP / STANDARD                                  SAT /
If necessary, this may be done in another room to prevent possible compromise of the exam.
UNSAT STEP 2:    Applicant enters appropriate information on Attachment 10.1      CRITICAL using information from the initial conditions.                    STEP STANDARD:
___ SAT Examiner NOTE:      See KEY provided with this document for required entries, including Critical Step aspects identified    ___UNSAT on the KEY.
Enters 2B D/G.
Enters start attempt as "2."
Marks PT/1(2)/4350/002A(B) as procedure used.
Marks Scheduled Surveillance as Reason for D/G Operation.
Marks Turbo Prelube as Type of Diesel Start.
Enters engine start time as 0830.
Enters engine shutdown time as 0905.
Calculates and enters run time as 0.58 hours.
Enters Start Data: Time for Frequency > 57 Hz as 7.0 sec.
Time for Voltage > 3950 volts as 6.7 sec.
Enters classification as VALID FAILURE.
Marks "Record Classification in Index" for Item L.
Applicant may continue past Step L and enter / inquire about the following:
Marks MCE Rotating Equipment supervisor or designee.
Enters reason D/G start was not a valid success: (2B D/G tripped on a malfunction of the LOLO Lube Oil Pressure switch prior to being loaded > 2875 KW for > 1 hour).
EXAMINER CUE:        "CRS will contact MCE Rotating Equipment supervisor."
Marks PIP block since a PIP is required for this start.
EXAMINER CUE: PIP # C-13-02580 The steps in bold are critical because all other entries are required regardless of the classification.
COMMENTS:
PAGE 5 0F 7


Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 4 0F 7  START TIME: _______
Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam STEP / STANDARD                           SAT /
STEP 1: Based on initial conditions, applicant refers to OMP Section 6 to determine the TEST CLASSIFICATION.
UNSAT STEP 3:     Logs the start into the Index Sheet (Enclosure 10.2)      CRITICAL STEP STANDARD:
STANDARD: Applicant determines that the test is a VALID FAILURE based on criteria 6.4.A.
___ SAT Enters Start # as "2".
Critical Step step in order to meet the Task Standard:  Determine the correct classification.
Enters Date as today's date.                                  ___ UNSAT Enters Test Classification as VALID FAILURE.
Enters run time as 0.58 hrs.
Enters yearly run time as 2.08 hrs.
Indicates PIP # will be written in space provided.
The items in bold are critical based on OMP 2-28 section 3 criteria.
COMMENTS:
COMMENTS:
CRITICAL STEP  ___ SAT
END OF TASK STOP TIME ________
___ UNSAT 
PAGE 6 0F 7
 
Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT  PAGE 5 0F 7   STEP 2: Applicant enters appropriate information on Attachment 10.1 using information from the initial conditions.
STANDARD:  Examiner NOTE:
See KEY provided with this document for required entries, including Critical Step aspects identified on the KEY.
Enters 2B D/G
. Enters start attempt as "2."  Marks PT/1(2)/4350/002A(B) as procedure used
. Marks Scheduled Surveillance as Reason for D/G Operation
. Marks Turbo Prelube as Type of Diesel Start. Enters engine start time as 08 3 0. Enters engine shutdown time as 0905. Calculates and enters run time as 0.
58 hours. Enters Start Data:
Time for Frequency
> 57 Hz as 7.0 sec.
Time for Voltage
> 3950 volts as 6.7 sec.
Enters classification as VALID FAILURE
. Marks "Record Classification in Index" for Item L.
Applicant may continue past Step L and enter / inquire about the following:
Marks MCE Rotating Equipment supervisor or designee
. Enters reason D/G start was not a valid success: (2B D/G tripped on a malfunction of the LOLO Lube Oil Pressure switch prior to being loaded > 2875 KW for > 1 hour)
. EXAMINER CUE
: "CRS will contact MCE Rotating Equipment supervisor.
"  Marks PIP block since a PIP is required for this start
. EXAMINER CUE
: PIP # C-1 3-02580 Th e steps in bold are critical because all other entries are required regardless of the classification
. COMMENTS:    CRITICAL STEP
___ SAT    ___UNSAT 


Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT  PAGE 6 0F 7  STEP 3: Logs the start into the Index Sheet (Enclosure 10.2)
STANDARD:    Enters Start # as "2". Enters Date as today
's date. Enters Test Classification as "VALID FAILURE". Enters run time as 0.
58 hrs. Enters yearly run time as 2
.0 8 hrs. Indicates PIP # will be written in space provided
. The items in bold are critical based on OMP 2
-28 section 3 criteria.
COMMENTS:  END OF TASK CRITICAL STEP  ___ SAT  ___ UNSAT STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
Catawba 2013 NRC Exam
READ TO APPLICANT DIRECTION TO APPLICANT:
- RO-SRO JPM A.2 READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Unit 2 is in Mode 1.
* Unit 2 is in Mode 1.
You were an extra operator on shift and assisting the Operation Test Group in a scheduled surveillance test of the 2B Emergency Diesel Generator.
* You were an extra operator on shift and assisting the Operation Test Group in a scheduled surveillance test of the 2B Emergency Diesel Generator.
The test was conducted using procedure PT/2/A/4350/002B (D/G Operability Test). Given the following timeline:
* The test was conducted using procedure PT/2/A/4350/002B (D/G Operability Test).
0830 2B D/G was started.
* Given the following timeline:
Time to reach required frequency was 7.0 seconds. Time to reach required voltage was 6.7 seconds.
0830     2B D/G was started.
0845 2B D/G was fully loaded.
Time to reach required frequency was 7.0 seconds.
0905 Prior to completing the surveillance, 2B D/G tripped due to a malfunction of the low
Time to reach required voltage was 6.7 seconds.
-low lube oil pressure switch.
0845     2B D/G was fully loaded.
PT/2/A/4350/002B has been completed up to step 12.
0905     Prior to completing the surveillance, 2B D/G tripped due to a malfunction of the low-low lube oil pressure switch.
7 5 for completing Diesel Generator Logbook entries per OMP 2
* PT/2/A/4350/002B has been completed up to step 12.75 for completing Diesel Generator Logbook entries per OMP 2-28 (Diesel Generator Logbook).
-28 (Diesel Generator Logbook).
INITIATING CUES:
INITIATING CUES:
Using the information provided in Initial Conditions, classify the test and fill in all available Diesel Generator Logbook data (Items A through L) on Attachment 10.1 (Diesel Generator Log Sheet) and 10.2 (Index Sheet) of OMP 2-28 and submit to the CRS for review.
Using the information provided in Initial Conditions, classify the test and fill in all available Diesel Generator Logbook data (Items A through L) on Attachment 10.1 (Diesel Generator Log Sheet) and 10.2 (Index Sheet) of OMP 2-28 and submit to the CRS for review.
Catawba 2013 NRC Exam - RO-SRO JPM A.2


Catawba Nuclear Station RO-SRO JPM A.3 Sep. 2013 NRC Exam PAGE 1 OF 13  
Catawba Nuclear Station RO-SRO JPM A.3 Sep. 2013 NRC Exam JPM A.3 RO - SRO PAGE 1 OF 13


JPM A.3 RO - SRO         
Catawba Nuclear Station RO-SRO JPM A.3 Sep. 2013 NRC Exam DATA SHEET Task:      Calculate Low Pressure Service Water Discharge flow for a liquid radioactive release.
Alternate Path:      N/A Facility JPM #:      2010 NRC Initial License Exam SRO-D Admin.
Safety Function:    N/A K/A      2.3.11        Ability to control radiation releases Importance:      3.8 / 4.3        CFR:    41.11 / 43.4 / 45.10 Preferred Evaluation Location:                        Preferred Evaluation Method:
Simulator            Classroom        X              Perform            X      Simulate


Catawba Nuclear Station RO-SRO JPM A.3 Sep. 2013 NRC Exam PAGE 2 OF 13 DATA SHEET Task: Calculate Low Pressure Service Water Discharge flow for a liquid radioactive release.
==References:==
Alternate Path:
PT/0/A/4250/011 (RL Temperature And Discharge Flow Determination) rev 050 Task Standard:       Applicant obtains needed data, correctly calculates total discharge flow, and determines that the liquid waste release can NOT continue.
N/A  Facility JPM #:
Validation Time:   15 minutes                         Time Critical:       Yes         No       X Applicant:                                                                 Time Start: __________
2010 NRC Initial License Exam SRO
NAME___________________________               Docket #_______________       Time Finish: __________
-D Admin. Safety Function:
Performance Rating:                                                         Performance Time _____
N/A  K/A  2.3.11 Ability to control radiation releases Importance:
SAT ____ UNSAT ____
3.8 / 4.3 CFR: 41.11 / 43.4 / 45.10 Preferred Evaluation Location:
Examiner: _____________________________               _____________________________/________
Preferred Evaluation  Method:  Simulator  Classroom X  Perform X Simulate  References
NAME                                     SIGNATURE                 DATE
: PT/0/A/4250/011 (RL Temperature And Discharge Flow Determination) rev 050   Task Standard:
===========================================================================
Applicant obtains needed data, correctly calculates total discharge flow, and determines that the liquid waste release can NOT continue.
COMMENTS PAGE 2 OF 13
Validation Time:
 
15 minutes Time Critical:
PAGE 3 0F 13 Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
Yes No X   Applicant:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Time Start:   ______
____ NAME___________________________
Docket #_______________
Time Finish: ________
__    Performance Rating:     SAT ____ UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE ===========================================================================
COMMENTS PAGE 3 0F 13 Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam PAGE 3 OF 13  READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. Unit 1 is currently performing a liquid waste release from the Monitor Tank Building. 2. Low Pressure Service Water (RL) Flow transmitter 0RLP5080 (RL Disch Flow) and OAC points C1P0903 and C2P0903 (RL Line A Disch Flow
: 1. Unit 1 is currently performing a liquid waste release from the Monitor Tank Building.
-Hourly Average) are INOPERABLE and have been removed from service.
: 2. Low Pressure Service Water (RL) Flow transmitter 0RLP5080 (RL Disch Flow) and OAC points C1P0903 and C2P0903 (RL Line A Disch Flow-Hourly Average) are INOPERABLE and have been removed from service.
: 3. The RN system is aligned to the RL discharge header.
: 3. The RN system is aligned to the RL discharge header.
: 4. Units 1 and 2 are both at 100% power.
: 4. Units 1 and 2 are both at 100% power.
INITIATING CUES:
INITIATING CUES:
You are directed to calculate the total RL discharge flow using Enclosure 13.2 (Total Discharge Flow Calculation Sheet) of PT/0/A/4250/011 and determine if adequate flow exists to continue the release per the LWR currently in progress. Record your answer in the spaces below.
You are directed to calculate the total RL discharge flow using Enclosure 13.2 (Total Discharge Flow Calculation Sheet) of PT/0/A/4250/011 and determine if adequate flow exists to continue the release per the LWR currently in progress. Record your answer in the spaces below.
Total RL Discharge Flow GPM. Adequate Flow Exists                                  
Total RL Discharge Flow                             GPM.
. Yes/No EXAMINER NOTE
Adequate Flow Exists                             .
:
Yes/No EXAMINER NOTE:
After reading initiating cue, provide applicant with a copy of PT/0/A/4250/011 marked up as follows:
After reading initiating cue, provide applicant with a copy of PT/0/A/4250/011 marked up as follows:
Step 12.1 signed off.
Step 12.1 signed off.
Enclosure 13.1 signed off up to Step 1.1.4.3 for performing Enclosure 13
Enclosure 13.1 signed off up to Step 1.1.4.3 for performing Enclosure 13.2 Also provide a copy of the LWR permit report.
.2 Also provide a copy of the LWR permit report.
PAGE 3 OF 13


Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 4 0F 13  START TIME: _______
Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD                                   SAT /
STEP 1:   1.1.2 Perform the following calculations to obtain Total Discharge Head: RL Disch Pressure = 0RLP5030 + 3.9 psi RL Disch Pressure = __6 6__ + 3.9 psi =
UNSAT START TIME: _______
_69.9_ psig Lake Elevation = __569__ 0RNP7380 (Lake Wylie Level) or obtained from hydro central per Step 1.1.4.2 of Enclosure 13.1
STEP 1: 1.1.2 Perform the following calculations to obtain Total Discharge CRITICAL Head:                                                         STEP RL Disch Pressure = 0RLP5030 + 3.9 psi                     ___ SAT RL Disch Pressure = __66__ + 3.9 psi = _69.9_ psig         ___ UNSAT Lake Elevation = __569__ 0RNP7380 (Lake Wylie Level) or obtained from hydro central per Step 1.1.4.2 of Enclosure 13.1
(_69.9_ psig x 2.311ft/psig) + (571.7 5 - _569_ft) = _164.3_ft RL Disch Pressure Lake Elev Total Disch Head STANDARD: Applicant calculates RL Discharge pressure as 164.3 ft. (Acceptable range: 163  
(_69.9_ psig x 2.311ft/psig) + (571.75 - _569_ft) =
- 165 ft. based on accounting for rounding and truncation.)
_164.3_ft RL Disch Pressure Lake Elev Total Disch Head STANDARD:
This step is critical because improper entry affect s the calculation for Total RL Discharge Flow.
Applicant calculates RL Discharge pressure as 164.3 ft. (Acceptable range: 163 - 165 ft. based on accounting for rounding and truncation.)
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
EXAMINER NOTE: Step 1.1.1 is N/A because ORLP5030 indicator IS available.
COMMENTS:
PAGE 4 0F 13


EXAMINER NOTE:
Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD                                SAT /
Step 1.1.1 is N/A because ORLP5030 indicator IS available.
UNSAT STEP 2: 1.1.3 Using Total Discharge Head from Step 1.1.2 obtain the RL  CRITICAL Pump Flow value using one of the following:              STEP Enclosure 13.7 (RL Pumps Head / Capacity Table)      ___ SAT OR                                                  ___UNSAT OAC Databook in "Secondary Systems Databook Calcs" using "RL Total Discharge Head vs. RL Pump Flow Rate" STANDARD:
Applicant determines that RL Pump Flow per Enclosure 13.7 is 38,354 GPM.
EXAMINER NOTE: Range of 37,405 - 39,219 GPM is acceptable.
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
COMMENTS:
COMMENTS:
CRITICAL STEP  ___ SAT
PAGE 5 0F 13
___ UNSAT 


Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 5 0F 13  STEP 2:   1.1.3  Using Total Discharge Head from Step 1.1.
Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD                                 SAT /
2 obtain the RL Pump Flow value using one of the following:
UNSAT STEP 3: 1.1.4 Once RL Pump Flow value is obtained, calculate Total RL    CRITICAL Supply based on number of RL pumps in operation:           STEP
Enclosure 13.7 (RL Pumps Head / Capacity Table)
___38354___ X __ __1_______ = _____38354_____
OR  OAC Databook in "Secondary Systems Databook Calcs" using "RL Total Discharge Head vs. RL Pump Flow Rate"  STANDARD: Applicant determines that RL Pump Flow per Enclosure 13.7 is 3 8 , 3 5 4 GPM. EXAMINER NOTE: Range of 37,405 - 39,219 GPM is acceptable.
RL Pump Flow      # of pumps in op. Total RL Supply (A) ___ SAT STANDARD:                                                               ___ UNSAT Applicant calculates Total RL Supply to be 38,354 GPM.
This step is critical because improper entry affect s the calculation for Total RL Discharge Flow.
EXAMINER NOTE: Range carried forward is 37,405 to 39,219 GPM.
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT   ___UNSAT 
STEP 4: 1.1.5 Enter Total RL supply (A) value in Step 1.4.                CRITICAL STEP STANDARD:
___ SAT Applicant enters value calculated for Total RL Supply in blank (A) on page 3 of 3 of Enclosure 13.2.                                        ___ UNSAT EXAMINER NOTE: Steps 1.2.1 and 1.2.2 are not applicable per initiating cue.
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
COMMENTS:
PAGE 6 0F 13


Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 6 0F 13  STEP 3:   1.1.4 Once RL Pump Flow value is obtained, calculate Total RL Supply based on number of RL pumps in operation:
Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD                                 SAT /
___38354___  X  __  __1_______ = _____38354_____ RL Pump Flow
UNSAT STEP 5: 1.2.3 IF either C1P5854 (RN Train A Calculated Total Flow) OR    CRITICAL C1P5855 (RN Train B Calculated Total Flow) is NOT            STEP available, perform the following to obtain total RN flow:
      # of pumps in op. Total RL Supply (A)
___ SAT 1.2.3.1 Calculate RN Pump Train A flow:
STANDARD: Applicant calculates Total RL Supply to be 38,354 GPM. EXAMINER NOTE:  Range carried forward is 37,405 to 39,219 GPM. This step is critical because improper entry affect s the calculation for Total RL Discharge Flow.
____0_____ + ____0_____ = _____0____gpm                    ___ UNSAT 1RNP7520 + 2RNP7520 = RN Pump Train A flow 1.2.3.2 Calculate RN Pump Train B flow:
__17,000__ + ___0____ = _ 17,000__gpm 1RNP7510 + 2RNP7510 = RN Pump Train B flow STANDARD:
Applicant calculates total RN flow to be 17,000 GPM.
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
COMMENTS:
COMMENTS:
CRITICAL STEP  ___ SAT  ___ UNSAT STEP 4:   1.1.5 Enter Total RL supply (A) value in Step 1.4.
STEP 6: 1.2.4 Perform the following calculations to obtain Total RN Flow: CRITICAL STEP
STANDARD: Applicant enters value calculated for Total RL Supply in blank (A) on page 3 of 3 of Enclosure 13.2
_________0________ + _____17,000_______ = _17,000_gpm (B)
. EXAMINER NOTE:  Steps 1.2.1 and 1.2.2 are not applicable per initiating cue.
RN Pump Train A Flow + RN Pump Train B Flow = Total RN Flow        ___ SAT STANDARD:                                                                 ___ UNSAT Applicant calculates total RN flow to be 17,000 GPM.
This step is critical because improper entry affect s the calculation for Total RL Discharge Flow.
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 7 0F 13


Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 7 0F 13  STEP 5:   1.2.3 IF either C1P5854 (RN Train A Calculated Total Flow)
Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD                                   SAT /
OR C1P5855 (RN Train B Calculated Total Flow) is NOT available, perform the following to obtain total RN flow:
UNSAT STEP 7: 1.2.5 Enter Total RN Flow (B) in Step 1.4.                         CRITICAL STEP STANDARD:
1.2.3.1 Calculate RN Pump Train A flow:
___ SAT Applicant enters Total RN Flow calculated in previous step in blank (B) on page 3 of 3.                                                         ___ UNSAT EXAMINER NOTE: Steps 1.3.1 and 1.3.2 are not applicable per data sheet.
____0_____
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
+ ____0_____
= _____0____
gpm 1RNP7520  + 2RNP7520
  = RN Pump Train A flow 1.2.3.2 Calculate RN Pump Train B flow:
__17,000__
+ ___0____  = _ 17,000__
gpm 1RNP7510  + 2RNP7510 = RN Pump Train B flow  STANDARD:  Applicant calculates total RN flow to be 17,000 GPM.
This step is critical because improper entry affect s the calculation for Total RL Discharge Flow.
COMMENTS: 
 
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 6:   1.2.4  Perform the following calculations to obtain Total RN Flow:
_________0________
+  _____17,000_______ = _17,000_gpm (B) RN Pump Train A Flow + RN Pump Train B Flow = Total RN Flow STANDARD:  Applicant calculates total RN flow to be 17,000 GPM.
 
This step is critical because improper entry affect s the calculation for Total RL Discharge Flow.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
STEP 8: 1.3.3 Calculate Cooling Tower Total Evaporation as follows:        CRITICAL STEP 13,500 + 14,000 = 27,500 gpm (C)
 
(C1P5853) (C2P5853) Total Evaporation                    ___ SAT STANDARD:                                                                 ___ UNSAT Applicant calculates Total Cooling Tower Evaporation to be 27,500 GPM and enters this value in blank (C) of step 1.4.
Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT  PAGE 8 0F 13  STEP 7:   1.2.5 Enter Total RN Flow (B) in Step 1.4.
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
STANDARD: Applicant enters Total RN Flow calculated in previous step in blank (B) on page 3 of 3.
EXAMINER NOTE:  Steps 1.3.1 and 1.3.2 are not applicable per data sheet.
This step is critical because improper entry affect s the calculation for Total RL Discharge Flow.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 8:  1.3.3  Calculate Cooling Tower Total Evaporation as follows:
PAGE 8 0F 13
13,500    +    14,000  =    27,500 gpm (C) (C1P5853)  (C2P5853)    Tot al Evaporation  STANDARD:  Applicant calculates Total Cooling Tower Evaporation to be 27,500 GPM and enters this value in blank (C) of step 1.4.


This step is critical because improper entry affect s the calculation for Total RL Discharge Flow.
Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD                                SAT /
UNSAT STEP 9: 1.4 Perform the following calculation to obtain Total RL Disch  CRITICAL Flow:                                                      STEP 38354    +  17,000    -  27,500 =    27,854 gpm    ___ SAT (A)          (B)          (C)
___ UNSAT STANDARD:
Applicant calculates Total RL discharge flow to be 27,854 gpm.
EXAMINER NOTE: Calculation range carried forward would be 26,905 to 28,719 GPM.
This step is critical to ensure that enough RL flow exists to dilute the liquid waste release that is in progress.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 9 0F 13


Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 9 0F 13  STEP 9:   1.4  Perform the following calculation to obtain Total RL Disch Flow:     38354    +    17,000      -    27,500  =     27,854  gpm                             (A)                (B)                (C)
Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD                               SAT /
STANDARD: Applicant calculates Total RL discharge flow to be 27,854 gpm. EXAMINER NOTE: Calculation range carried forward would be 26,905 to 28, 7 19 GPM. This step is critical to ensure that enough RL flow exists to dilute the liquid waste release that is in progress.
UNSAT CRITICAL STEP
___ SAT
___ UNSAT STEP 10: 1.5 Apply dilution safety factor to obtain Total RL Discharge flow from the Calculated Total RL Discharge Flow from Step 1.4 as follows:
(27,854 gpm) X 0.65 = 18,105 gpm STANDARD:
Applicant calculates Total RL Discharge flow to be 18,105 GPM.
EXAMINER NOTE: Calculation range carried forward would be 17,488 to 18,667 GPM.
This step is critical to ensure that enough RL flow exists to dilute the liquid waste release that is in progress.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 10 0F 13


Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 10 0F 13    STEP 1 0:   1.5  Apply dilution safety factor to obtain Total RL Discharge flow from the Calculated Total RL Discharge Flow from Step 1.4 as follows:
Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD                                 SAT /
 
UNSAT STEP 11 Determination of adequate RL flow.                                CRITICAL STEP STANDARD:
(27,854 gpm)
___ SAT Applicant determines that Total RL Discharge Flow is LESS than the "Minimum RL Flow interlock setpoint for radionuclides (gpm)" required  ___ UNSAT by and listed on the Liquid Waste Release Permit Report, and that the release may NOT continue.
X 0.65 = 18,105 gpm STANDARD:  Applicant calculates Total RL Discharge flow to be 18,105 GPM. EXAMINER NOTE: Calculation range carried forward would be 17,488 to 18,667 GPM. This step is critical to ensure that enough RL flow exists to dilute the liquid waste release that is in progress.
This step is critical for ensuring termination of a release with inadequate dilution flow.
EXAMINER NOTE:
The Liquid Waste release Permit Report requires at least 27,600 gpm RL flow in order for the release to continue. If the applicant does NOT apply the dilution safety factor (listed in STEP 10 of this JPM), it will appear that adequate RL flow DOES exist (27,854 gpm). But with the required dilution safety factor, RL flow can only be calculated as 18,105 gpm: inadequate for the release to continue.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
END OF TASK STOP TIME ________
 
PAGE 11 0F 13
Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT  PAGE 11 0F 13   STEP 11  Determination of adequate RL flow.
STANDARD:  Applicant determines that Total RL Discharge Flow is LESS than the "Minimum RL Flow interlock setpoint for radionuclides (gpm)" required by and listed on the Liquid Waste Release Permit Report, and that the release may NOT continue. This step is critical for ensuring termination of a release with inadequate dilution flow.
EXAMINER NOTE
:  The Liquid Waste release Permit Report requires at least 27,600 gpm RL flow in order for the release to continue. If the applicant does NOT apply the dilution safety factor (listed in STEP 10 of this JPM), it will appear that adequate RL flow DOES exist (27,854 gpm). But with the required dilution safety factor, RL flow can only be calculated as 18,105 gpm:  inadequate for the release to continue
. COMMENTS: 


END OF TASK  CRIT ICAL STEP    ___ SAT  ___ UNSAT 
STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
Catawba 2013 NRC Exam
READ TO APPLICANT DIRECTION TO APPLICANT:
- RO - SRO JPM A.3  READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. Unit 1 is currently performing a liquid waste release from the Monitor Tank Building. 2. Low Pressure Service Water (RL) Flow transmitter 0RLP5080 (RL Disch Flow) and OAC points C1P0903 and C2P0903 (RL Line A Disch Flow
: 1. Unit 1 is currently performing a liquid waste release from the Monitor Tank Building.
-Hourly Average) are INOPERABLE and have been removed from service.
: 2. Low Pressure Service Water (RL) Flow transmitter 0RLP5080 (RL Disch Flow) and OAC points C1P0903 and C2P0903 (RL Line A Disch Flow-Hourly Average) are INOPERABLE and have been removed from service.
: 3. The RN system is aligned to the RL discharge header.
: 3. The RN system is aligned to the RL discharge header.
: 4. Units 1 and 2 are both at 100% power.
: 4. Units 1 and 2 are both at 100% power.
INITIATING CUES:
INITIATING CUES:
You are directed to calculate the total RL discharge flow using Enclosure 13.2 (Total Discharge Flow Calculation Sheet) of PT/0/A/4250/011 and determine if adequate flow exists to continue the release per the LWR currently in progress. Record your answer in the spaces below.
You are directed to calculate the total RL discharge flow using Enclosure 13.2 (Total Discharge Flow Calculation Sheet) of PT/0/A/4250/011 and determine if adequate flow exists to continue the release per the LWR currently in progress. Record your answer in the spaces below.
Total RL Discharge Flow GPM. Adequate Flow Exists                                  
Total RL Discharge Flow                             GPM.
. Yes/No      
Adequate Flow Exists                             .
Yes/No Catawba 2013 NRC Exam - RO - SRO JPM A.3


APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
Catawba 2013 NRC Exam
Unit 1 and Unit 2 Data Sheet for 1030 Unit 1 Cooling Tower Evaporation (PID C1P5853) - 13,500 GPM Unit 2 Cooling Tower Evaporation (PID C2P5853) - 14,000 GPM Low Pressure Service Water (RL) Status RL pump A only is in service.
- RO - SRO JPM A.3  Unit 1 and Unit 2 Data Sheet for 1030 Unit 1 Cooling Tower Evaporation (PID C1P5853)  
RL Header Pressure (0RLP5030) - 66 PSIG Lake Wylie Level (0RNP7380) - 569 Feet Nuclear Service Water (RN) Status 1B RN pump is in service OAC points C1P5854, C1P5855, and C1P5856 are removed from service RN Pump Train A flow (1RNP7520) - 0 GPM RN Pump Train A flow (2RNP7520) - 0 GPM RN Pump Train B flow (1RNP7510) - 17,000 GPM RN Pump Train B Flow (2RNP7510) - 0 GPM Catawba 2013 NRC Exam - RO - SRO JPM A.3
- 13,500 GPM Unit 2 Cooling Tower Evaporation (PID C2P5853)  
- 14,000 GPM Low Pressure Service Water (RL) Status


RL pump A only is in service
Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam JPM A.4 SRO PAGE 1 OF 9
. RL Header Pressure (0RLP5030)
- 6 6 PSIG Lake Wylie Level (0RNP7380)
- 569 Feet Nuclear Service Water (RN) Status


1B RN pump is in service OAC points C1P5854, C1P5855, and C1P5856 are removed from service
Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam DATA SHEET Task:      Make Emergency Classification and Complete the Initial Emergency Notification Form Alternate Path:    N/A Facility JPM #:    SEP-018 Safety Function:    N/A K/A      2.4.40      Knowledge of SRO responsibilities in emergency plan implementation.
Importance:      2.7 / 4.5        CFR:    41.10 / 43.5 / 45.11 Preferred Evaluation Location:                        Preferred Evaluation Method:
Simulator            Classroom          X            Perform            X      Simulate


RN Pump Train A flow (1RNP7520)
==References:==
- 0 GPM RN Pump Train A flow (2RNP7520)  
RP/0/A/5000/001 (Classification of Emergency), revision 029 Task Standard:      Event classified as a Site Area Emergency based on the criteria in 4.1.C.4 and 4.1.N.2 (or N.3) within 15 minutes of JPM start.
- 0 GPM RN Pump Train B flow (1RNP7510)
Obtain the preprinted Emergency Notification sheet or complete a blank one for 4.1.S.3. Fill out the sheet within 15 minutes from the time the classification is made.
- 17,000 GPM RN Pump Train B Flow (2RNP7510)  
Validation Time:  22 minutes                        Time Critical:        Yes    X    No Applicant:                                                                  Time Start: __________
- 0 GPM Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam PAGE 1 OF 9 JPM A.4  SRO         
NAME___________________________              Docket #_______________        Time Finish: __________
Performance Rating:                                                        Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________              _____________________________/________
NAME                                      SIGNATURE                    DATE
===========================================================================
COMMENTS PAGE 2 OF 9


Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam PAGE 2 OF 9 DATA SHEET Task:  Make Emergency Classification and Complete the Initial Emergency Notification Form Alternate Path:
PAGE 3 0F 9 Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
N/A  Facility JPM #:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
SEP-018  Safety Function:
INITIAL CONDITIONS:
N/A  K/A  2.4.40 Knowledge of SRO responsibilities in emergency plan implementation.
* A Unit 1 transient initially caused an OP Delta T Reactor Trip signal.
Importance:
* The reactor failed to automatically trip.
2.7 / 4.5 CFR: 41.10 / 43.5 / 45.11 Preferred Evaluation Location:
* The crew successfully completed a manual reactor trip from the control room.
Preferred Evaluation  Method:
* Almost immediately, the unit safety injected.
Simulator  Classroom X  Perform X Simulate  References
* The crew entered EP/1/A/5000/E-0 (Reactor Trip or Safety Injection).
: RP/0/A/5000/001 (Classification of Emergency), revision 029 Task Standard:
* 1C Steam Generator has a stuck open S/G safety.
Event classified as a "Site Area Emergency" based on the criteria in 4.1.C.4 and 4.1.N.2 (or N.3) within 15 minutes of JPM start
* Coolant activity level is 30 Ci/cc Dose Equivalent Iodine (DEI) I-131.
. Obtain the preprinted Emergency Notification sheet or complete a blank one for 4.1.S.3. Fill out the sheet within 15 minutes from the time the classification is made. Validation Time:
* The crew is transitioning to EP/1/A/5000/E-2 (Faulted Steam Generator Isolation).
22 minutes  Time Critical:
The transition brief contained the following additional information:
Yes X No    Applicant:
* NC pumps had to be tripped due to a loss of subcooling.
Time Start:    ______
* NC pressure is 600 psig and stable.
____ NAME___________________________
* 1ETB has an unknown fault and is currently de-energized.
Docket #_______________
* EMF Trip 2 alarms are in:
Time Finish:  ________
1EMF-28 (Steamline 1C) 1EMF-33 (Condenser Air Ejector Exhaust) 1EMF-72 (S/G B Leakage) 1EMF-73 (S/G C Leakage)
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS PAGE 3 0F 9 Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam PAGE 3 OF 9    READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:   A Unit 1 transient initially caused an OP Delta T Reactor Trip signal
. The reactor failed to automatically trip. The crew successfully completed a manual reactor trip from the control room
. Almost immediately, the unit safety injected
. The crew entered EP/1/A/5000/E
-0 (Reactor Trip or Safety Injection).
1C Steam Generator has a stuck open S/G safety
. Coolant activity level is 30 Ci/cc Dose Equivalent Iodine (DEI) I
-131. The crew is transitioning to EP/1/A/5000/E
-2 (Faulted Steam Generator Isolation). The transition brief contained the following additional information:
NC pumps had to be tripped due to a loss of subcooling
. NC pressure is 600 psig and stable
. 1ETB has an unknown fault and is currently de
-energized. EMF Trip 2 alarms are in
1EMF-28 (Steam line 1C) 1EMF-33 (Condenser Air Ejector Exhaust) 1EMF-72 (S/G B Leakage) 1EMF-73 (S/G C Leakage)
Current meteorological data:
Current meteorological data:
Clear conditions
* Clear conditions.
. Wind speed is 5 mph. Wind direction is 270°
* Wind speed is 5 mph.
. INITIATING CUES:
* Wind direction is 270°.
 
INITIATING CUES:
Classify the event and fill out the initial Emergency Notification form through the date and time that you approve it.
Classify the event and fill out the initial Emergency Notification form through the date and time that you approve it.
This JPM is time critical.
This JPM is time critical.
PAGE 3 OF 9


PAGE 4 0F 9 Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam PAGE 4 OF 9  EXAMINER NOTE:
PAGE 4 0F 9 Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam EXAMINER NOTE:
Provide applicant a copy of:
Provide applicant a copy of:
RP/0/A/5000/006 A (Notifications to States and Counties from the Control Room), Enclosure 4.1, "Emergency Notification Form Completion", 7 pages
RP/0/A/5000/006 A (Notifications to States and Counties from the Control Room), Enclosure 4.1, "Emergency Notification Form Completion", 7 pages PAGE 4 OF 9
 
Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT  PAGE 5 0F 9   START TIME: _______
STEP 1: Classify the event using RP/0/A/5000/001, Classification of Emergency.
STANDARD:  Applicant classifies the event as a "Site Area Emergency" based on: Event # 4.1.C.4 and #4.1.N.2 or 3.
 
3 points 4.1.C.4 (SG Secondary Side Release With Primary to
 
Secondary Leakage)
.
AND 5 points 4.1.N.2 (Greater than available makeup capacity as indicated by a loss of NCS Subcooling)
. OR  5 points 4.1.N.3 (Indication that a SG is ruptured and has a Non
-
Isolable secondary side fault.)
 
The above conditions will result in a 4.1.S.3 Site Area Emergency
. EXAMINER NOTE
: It is critical that the classification be made and the emergency be declared within 15 minutes of the recorded start time.
TIME EMERGENCY DECLARED __________________.


Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam STEP / STANDARD                              SAT /
UNSAT START TIME: _______
STEP 1:      Classify the event using RP/0/A/5000/001, Classification of  CRITICAL Emergency.                                                    STEP STANDARD:                                                                ___ SAT Applicant classifies the event as a Site Area Emergency based on:      ___ UNSAT Event # 4.1.C.4 and #4.1.N.2 or 3.
3 points        4.1.C.4 (SG Secondary Side Release With Primary to Secondary Leakage).
AND 5 points        4.1.N.2 (Greater than available makeup capacity as indicated by a loss of NCS Subcooling).
OR 5 points        4.1.N.3 (Indication that a SG is ruptured and has a Non-Isolable secondary side fault.)
The above conditions will result in a 4.1.S.3 Site Area Emergency.
EXAMINER NOTE:
It is critical that the classification be made and the emergency be declared within 15 minutes of the recorded start time.
TIME EMERGENCY DECLARED __________________.
This step is critical to ensure the proper classification will be communicated.
This step is critical to ensure the proper classification will be communicated.
COMMENTS:     CRITICAL STEP  ___ SAT  ___ UNSAT 
COMMENTS:
PAGE 5 0F 9


Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 6 0F 9  STEP 2: Obtain Emergency Notification form.
Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam STEP / STANDARD                           SAT /
STANDARD:   Applicant obtains a blank Emergency Notification form (provided by Examiner).
UNSAT STEP 2:   Obtain Emergency Notification form.                       CRITICAL STEP STANDARD:
This step is critical to ensure that the proper form is transmitted
Applicant obtains a blank Emergency Notification form (provided by   ___ SAT Examiner).
. COMMENTS:
___UNSAT This step is critical to ensure that the proper form is transmitted.
CRITICAL STEP
COMMENTS:
___ SAT
PAGE 6 0F 9
___UNSAT 


Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 7 0F 9  STEP 3: Complete the Emergency Notification Form.
Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam STEP / STANDARD                                   SAT /
EXAMINER NOTE:
UNSAT STEP 3: Complete the Emergency Notification Form.                             CRITICAL EXAMINER NOTE:                                                                 STEP Critical Steps are in BOLD below. Also see attached completed Emergency Notification Form KEY. On the KEY, the Critical Steps are         ___ SAT highlighted in YELLOW.
Critical Steps are in BOLD below. Also see attached completed Emergency Notification Form KEY.
___ UNSAT STANDARD:
On the KEY, the Critical Steps are highlighted in YELLOW.
Line 1: "Drill" is marked.
STANDARD:   Line 1: "Drill" is marked.
Line 2: "Initial" is marked.
Line 2: "Initial" is marked.
Line 3: Catawba Nuclear Site (pre-printed).
Line 3: Catawba Nuclear Site (pre-printed). Line 4: Per attached KEY.
Line 4: Per attached KEY.
Line 5: "None" is marked.
Line 5: "None" is marked.
Line 6: Emergency release "is occurring" due to 1EMF
Line 6: Emergency release "is occurring" due to 1EMF-33 indication of S/G tube leakage.
-33   indication of S/G tube leakage
Line 7: "Under evaluation" marked EXAMINER CUE: "RP is determining release significance."
. Line 7: "Under evaluation" marked EXAMINER CUE
Line 8: "Stable " marked.
: "RP is determining release significance
Line 9: Not required for initial notifications, and NOT critical. If entered, wind direction is 270° and wind speed 5 mph.
."   Line 8: "Stable " marked. Line 9: Not required for initial notifications, and NOT critical.
Line 10: "Declaration" marked and enters current date and time.
If entered, wind direction is 270° and wind speed 5 mph. Line 10: "Declaration" marked and enters current date and time. Line 11: Affected Unit(s) marked as "1". Line 12: Marks box "A" and 0% power
Line 11: Affected Unit(s) marked as "1".
. EXAMINER CUE: "The reactor was tripped 10 minutes ago
Line 12: Marks box "A" and 0% power.
." Enters time minus 10 minutes and enters today's date
EXAMINER CUE: "The reactor was tripped 10 minutes ago."
. Line 13: Includes information on the loss of power and the ATWS.
Enters time minus 10 minutes and enters today's date.
Lines 14,15 and 16  
Line 13: Includes information on the loss of power and the ATWS.
- see Examiner Cue below.
Lines 14,15 and 16 - see Examiner Cue below.
IF ASKED,   EXAMINER CUE: "RP has not determined any release data
IF ASKED, EXAMINER CUE: "RP has not determined any release data."
."   COMMENTS:       CRITICAL STEP  ___ SAT  ___ UNSAT 
COMMENTS:
PAGE 7 0F 9


Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam STEP / STANDARD SAT / UNSAT PAGE 8 0F 9  STEP 3 (cont.) EXAMINER NOTE
Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam STEP / STANDARD                           SAT /
: These steps are not required for initial notifications.
UNSAT STEP 3 (cont.)
Line 17: Signs as Emergency Coordin ator. Date and time on line 17 is based on time of approval
EXAMINER NOTE: These steps are not required for initial notifications.
. See attached, completed, Emergency Notification sheet for a key.
Line 17: Signs as Emergency Coordinator. Date and time on line 17 is based on time of approval.
 
See attached, completed, Emergency Notification sheet for a key.
Time Emergency Notification Form is completed:
Time Emergency Notification Form is completed: _______________
_______________
It is critical that the total time from the declaration time recorded in Step 1 to completing the Emergency Notification Form is < 15 minutes.
It is critical that the total time from the declaration time recorded in Step 1 to completing the Emergency Notification Form is  
COMMENTS:
< 15 minutes. COMMENTS:  
STOP TIME ________
PAGE 8 0F 9


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
Catawba 2013 NRC Exam
READ TO APPLICANT DIRECTION TO APPLICANT:
- SRO JPM A.4 READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
INITIAL CONDITIONS:
A Unit 1 transient initially caused an OP Delta T Reactor Trip signal
* A Unit 1 transient initially caused an OP Delta T Reactor Trip signal.
. The reactor failed to automatically trip. The crew successfully completed a manual reactor trip from the control room
* The reactor failed to automatically trip.
. Almost immediately, the unit safety injected. The crew entered EP/1/A/5000/E
* The crew successfully completed a manual reactor trip from the control room.
-0 (Reactor Trip or Safety Injection).
* Almost immediately, the unit safety injected.
1C Steam Generator has a stuck open S/G safety
* The crew entered EP/1/A/5000/E-0 (Reactor Trip or Safety Injection).
. Coolant activity level is 30 Ci/cc Dose Equivalent Iodine (DEI) I
* 1C Steam Generator has a stuck open S/G safety.
-131. The crew is transitioning to EP/1/A/5000/E
* Coolant activity level is 30 Ci/cc Dose Equivalent Iodine (DEI) I-131.
-2 (Faulted Steam Generator Isolation).
* The crew is transitioning to EP/1/A/5000/E-2 (Faulted Steam Generator Isolation).
The transition brief contained the following additional information:
The transition brief contained the following additional information:
NC pumps had to be tripped due to a loss of subcooling
* NC pumps had to be tripped due to a loss of subcooling.
. NC pressure is 600 psig and stable
* NC pressure is 600 psig and stable.
. 1ETB has an unknown fault and is currently de
* 1ETB has an unknown fault and is currently de-energized.
-energized. EMF Trip 2 alarms are in
* EMF Trip 2 alarms are in:
1EMF-28 (Steamline 1C) 1EMF-33 (Condenser Air Ejector Exhaust) 1EMF-72 (S/G B Leakage) 1EMF-73 (S/G C Leakage)
1EMF-28 (Steamline 1C) 1EMF-33 (Condenser Air Ejector Exhaust) 1EMF-72 (S/G B Leakage) 1EMF-73 (S/G C Leakage)
INITIATING CUES:
INITIATING CUES:
Classify the event and fill out the initial Emergency Notification form through the date and time that you approve it.
Classify the event and fill out the initial Emergency Notification form through the date and time that you approve it.
This JPM is time critical.}}
This JPM is time critical.
Catawba 2013 NRC Exam - SRO JPM A.4}}

Latest revision as of 11:48, 4 November 2019

301 Final Administrative JPMs
ML13336A424
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/26/2013
From:
Duke Energy Carolinas
To:
NRC/RGN-II
References
50-413/13-301, 50-414/13-301
Download: ML13336A424 (58)


Text

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam JPM A.1-1 RO / SRO PAGE 1 OF 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam DATA SHEET Task: Perform a manual shutdown margin calculation (Unit at Power) per OP/0/A/6100/006 (Reactivity Balance Calculation)

Alternate Path: N/A Facility JPM #: RB-121 - Modified Safety Function: N/A K/A G2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc..

Importance: 3.9 / 4.2 CFR: 41.10 / 43.5 / 451.2 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant Perform X Simulate

References:

OP/0/A/6100/006 (Reactivity Balance Calculation), Rev. 83 Unit 1 Reactor Operating Data Book (R.O.D.)

Task Standard: Applicant determines that required shutdown margin is 1300 pcm and current shutdown margin is 1321 pcm, and concludes that adequate shutdown margin does exist per the Unit 1 Core Operating Limits Report.

Validation Time: 25 minutes Time Critical: Yes No X Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 18

PAGE 3 0F 18 Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

You are the Unit 1 OATC. The Reactivity Computer (REACT) is out of-service.

Current plant conditions are:

  • Power level = 85%
  • NC Tavg = 581°F
  • Boron concentration = 959 ppm
  • Core burnup = 300 EFPD
  • Shutdown rod bank position: 226 steps

INITIATING CUES:

You have been informed by the Control Room SRO that the following rods are untrippable:

  • H-4
  • K-2 Perform a Shutdown Margin Calculation in accordance with OP/0/A/6100/006 (Reactivity Balance Calculation) and determine if Core Operating Limits Report requirement for shutdown margin is satisfied. Calculation verification is waived.

EXAMINER NOTE:

Provide applicant a copy of OP/0/A/6100/006.

PAGE 3 OF 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT START TIME: _______

STEP 1: Applicant obtains a copy of OP/0/A/6100/006 (Reactivity Balance Calculation) and from initiating cue determines that Enclosure ___ SAT 4.3 is applicable.

___ UNSAT STANDARD:

Applicant obtains a copy of OP/0/A/6100/006 (Reactivity Balance Calculation).

EXAMINER NOTE:

COMMENTS:

STEP 2: Review Limits and Precautions of OP/0/A/6100/006.

___ SAT STANDARD:

Limits and Precautions have been reviewed. ___UNSAT EXAMINER NOTE:

Applicant should determine from initial conditions that Tavg is within 1°F based on power level and Tref program.

COMMENTS:

PAGE 4 0F 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT CRITICAL STEP 3: OP/0/A/6100/006 Encl. 3 Step 3.1 STEP Determine the following information:

___ SAT STANDARD:

___ UNSAT Applicant records the following data using the initial conditions:

  • Unit: 1 ____
  • Date/Time: Current Date/Time ____
  • Present Power: 85% ____
  • NC System Boron Concentration 959 ppm ____
  • Current Burnup: 300 EFPD ____
  • Present control bank position: 200 SWD, Control Bank D ____
  • Present shutdown bank position: ALL @ 226 ____
  • Quantity of misaligned rods: 0 ____
  • Number of untrippable RCCA(s): 2 ____
  • Untrippable RCCA(s) core location(s): H-4, K-2 ____

Critical Step to accurately record required data for subsequent critical calculations.

EXAMINER NOTE:

Examiner may also refer to KEY at end of this document.

COMMENTS:

STEP 4: Encl. 4.3 - Step 3.3 (Step 3.2 is N/A due to REACT program being unavailable.) ___ SAT IF performing the calculation manually, perform the following:

___ UNSAT STANDARD:

COMMENTS:

PAGE 5 0F 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 5: Encl. 4.3 - Step 3.3.1 Determine available reactivity worth of trippable RCCAs for ___ SAT conditions in Step 3.1:

___ UNSAT NOTE: Interpolation is NOT required in Step 3.3.1.1.

Reactivity worth may be determined by choosing the lowest reactivity worth from Section 5.7 of the R.O.D. Manual associated with cycle burnups that bound the present cycle burnup recorded in Step 3.1. (R.M.)

STANDARD:

COMMENTS:

STEP 6: Encl. 4.3 - Step 3.3.1.1 CRITICAL Determine Total Available Rod Worth: __5086__ pcm STEP (Section 5.7 of R.O.D. Manual)

___ SAT STANDARD:

___ UNSAT Applicant records 5086 pcm bin Step 3.3.1.1 blank provided.

Critical Step to determine Total Available Rod Worth, which is a required value for a subsequent critical calculation for determining present shutdown margin.

COMMENTS:

PAGE 6 0F 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 7: Encl. 4.3 - Step 3.3.1.2 IF only one RCCA is untrippable, determine reactivity worth ___ SAT penalty for untrippable RCCA core location of Step 3.1.10.

___ UNSAT STANDARD:

Applicant determines that Step 3.3.1.2 is N/A, based on more than one untrippable RCCA.

COMMENTS:

STEP 8: Encl. 4.3 - Step 3.3.1.3 Item A CRITICAL IF there are multiple untrippable RCCAs, perform the following: STEP A. Determine untrippable RCCA of Step 3.1.10 with the highest ___ SAT reactivity worth penalty. (Section 5.8 of R.O.D. Manual)

___ UNSAT STANDARD:

Refers to Section 5.8 of the R.O.D. Manual. Determines RCCA H-4 rod worth is 343 pcm, and is the highest reactivity worth penalty.

Critical Step to determine rod with the highest reactivity worth, which is used in a subsequent critical calculation for determining present shutdown margin.

COMMENTS:

PAGE 7 0F 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 9: Encl. 4.3 - Step 3.3.1.3 Item B CRITICAL Record reactivity worth of the untrippable RCCA of Step STEP 3.3.1.3.A. (Section 5.8 of R.O.D. Manual) ______ pcm

___ SAT STANDARD:

___ UNSAT Applicant determines value and records 343 pcm in Step 3.3.1.3.B blank provided.

Critical Step to determine Highest Worth Penalty, which is used in a subsequent critical calculation for determining present shutdown margin.

COMMENTS:

STEP 10: Encl. 4.3 - Step 3.3.1.3 Item C CRITICAL Determine maximum stuck rod worth during cycle (Section 5.7 STEP of the R.O.D. Manual).

___ SAT STANDARD:

___ UNSAT Applicant determines required value and records 1046 pcm in Step 3.3.1.3.C blank provided.

Critical Step to determine Maximum Stuck Rod Worth, which is used in a subsequent critical calculation for determining present shutdown margin.

COMMENTS:

PAGE 8 0F 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 11: Encl. 4.3 - Step 3.3.1.3 Item D CRITICAL Calculate total untrippable RCCA reactivity worth penalty STEP below:

___ SAT

___ UNSAT STANDARD:

Applicant records the following data in appropriate table locations. Refer to EXAM KEY, if desired.

  • Number of Untrippable RCCAs: 2 ____
  • Highest Worth Penalty: 343 pcm ____
  • Max Stuck Rod: 1046 pcm ____
  • Total untrippable RCCA Worth Penalty for Multiple RCCAs:

1389 pcm ____

Critical Step to determine Total untrippable RCCA Worth Penalty for Multiple RCCAs, which is used in a subsequent critical calculation for determining present shutdown margin.

COMMENTS:

PAGE 9 0F 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 12: Encl. 4.3 - Step 3.3.1.4 Record Total Untrippable RCCA Penalty from Step 3.3.1.2 or ___ SAT Step 3.3.1.3.D, whichever is applicable.

___ UNSAT STANDARD:

Applicant records Total Untrippable RCCA Penalty as 1389 pcm.

Examiner NOTE:

This step, although important, is not critical, since the value has been previously determined in Step 11 this JPM.

COMMENTS:

PAGE 10 0F 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 13: Encl. 4.3 - Step 3.3.1.5 CRITICAL Determine Inserted Rod Worth for present bank positions: STEP

___ SAT

___ UNSAT STANDARD:

Applicant determines the required values from the table and records the following:

  • Item A.: 58 pcm ____
  • Item B.: SD E 0 pcm ____

SD D 0 pcm ____

SD C 0 pcm ____

SD B 0 pcm ____

SD A 0 pcm ____

  • Inserted Worth of Present Position: 58 pcm ____

Critical Step to determine Inserted Worth of Present Position, which is used in a subsequent critical calculation for determining present shutdown margin.

COMMENTS:

PAGE 11 0F 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 14: Encl. 4.3 - Step 3.3.1.6 CRITICAL Calculate available reactivity worth of trippable RCCAs. STEP

___ SAT

___ UNSAT STANDARD:

Applicant determines the required values from the table and records the following:

  • Total Available Rod Worth: 5086 pcm ____
  • Untrippable RCCAs Penalty 1389 pcm ____
  • Inerted Worth of Present Position 58 pcm ____

Available Reactivity Worth of Trippable RCCAs: 3639 pcm ____

Critical Step to determine Available Reactivity Worth of Trippable RCCAs, which is used in a subsequent critical calculation for determining present shutdown margin.

COMMENTS:

PAGE 12 0F 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 15: Encl. 4.3 - Step 3.3.1.7 CRITICAL Calculate total misaligned RCCA reactivity worth below: STEP

___ SAT

___ UNSAT STANDARD:

Applicant determines the required values from the table and records the following:

  • Quantity of Misaligned Rods: 0 ____
  • Maximum Dropped or Misaligned Rod Worth 200 pcm ____

Total misaligned RCCA Reactivity Worth 0 pcm ____

Critical Step to determine Total Misaligned RCCA Reactivity Worth, which is used in a subsequent critical calculation for determining present shutdown margin.

COMMENTS:

PAGE 13 0F 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 16: Encl. 4.3 - Step 3.3.2 CRITICAL Calculate SDM for present conditions: STEP

___ SAT

___ UNSAT STANDARD:

Applicant determines the required values from the table and records the following:

  • Available reactivity worth of Trippable RCCAs 3639 pcm ____
  • Total misaligned RCCA reactivity Worth 0 pcm ____
  • Total Power Defect at present thermal power (Step 3.1.3) and current cycle burnup (Step 3.1.5) 1808 pcm ____
  • Transient Flux Redistribution Allowance 510 ____
  • Present SDM 1321 pcm ____

Critical Step to determine Present Shutdown Margin. This value is used to compare with the COLR requirement to detemine if present shutdown margin meets the requirements of the COLR.

COMMENTS:

PAGE 14 0F 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 17: Encl. 4.3 - Step 3.3.3 ___ SAT Sign below to document performance:

___ UNSAT Performed by ________________________ Date/Time _____ / _____

STANDARD:

Applicant signs applicable line to document performance.

COMMENTS:

STEP 18: Encl. 4.3 - Step 3.3.4 Ensure that an independent calculation per this enclosure has ___ SAT been separately performed.

___ UNSAT STANDARD:

Applicant ensures an independent calculation has been separately performed.

EXAMINER CUE: "An independent calculation per this enclosure has been performed."

COMMENTS:

PAGE 15 0F 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 19: Encl. 4.3 - Step 3.3.5 Verify that both performances of this enclosure yield equivalent ___ SAT results.

___ UNSAT STANDARD:

Applicant verifies that both performances of this enclosure have yielded equivalent results.

EXAMINER CUE: "Both performances of this enclosure have yielded equivalent results."

COMMENTS:

PAGE 16 0F 18

Catawba Nuclear Station RO/SRO JPM A.1-1 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 20: Encl. 4.3 - Step 3.3.6 CRITICAL STEP

___ SAT

___ UNSAT STANDARD:

Applicant determines that adequate shutdown DOES exist since actual is 1321 pcm and the COLR requirement is 1300 pcm.

EXAMINER CUE: "Another operator will take actions and complete the procedure."

This step is critical to in order to meet the Task Standard: determine that present shutdown margin DOES exist.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 17 0F 18

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

You are the Unit 1 OATC. The Reactivity Computer (REACT) is out of-service.

Current plant conditions are:

  • Power level = 85%
  • NC Tavg = 581°F
  • Boron concentration = 959 ppm
  • Core burnup = 300 EFPD
  • Shutdown rod bank position: 226 steps

INITIATING CUES:

You have been informed by the Control Room SRO that the following rods are untrippable:

  • H-4
  • K-2 Perform a Shutdown Margin Calculation in accordance with OP/0/A/6100/006 (Reactivity Balance Calculation) and determine if Core Operating Limits Report requirement for shutdown margin is satisfied. Calculation verification is waived.

Catawba 2013 NRC Exam - RO/SRO JPM A.1-1

Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam JPM A.1-2 RO / SRO PAGE 1 OF 11

Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam DATA SHEET Task: Calculate Unit Vent flow manually per PT/1/A/4450/017 (Unit Vent Flow Manual Calculation).

Alternate Path: N/A Facility JPM #: WG-002 Safety Function: N/A K/A G2.1.23 Ability to perform specific system and integrated plant procedures during all modes of plant operation.

Importance: 4.3 / 4.4 CFR: 41.10 / 43.5 / 45.2 / 45.6 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

PT/1/A/4450/017 (Unit Vent Flow Manual Calculation) Rev 013 SLC 16.11-7 (Radioactive Gaseous Effluent Monitoring Instrumentation)

Task Standard: Unit Vent flow is calculated to be 117450 scfm +/- 1000.

Validation Time: 15 minutes Time Critical: Yes No X Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 11

Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #168
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE and maintain in FREEZE unless instructed by NRC Examiner to place in RUN.
9. May need a footstool for applicants to access and read VA system flow indicator.

Instructor Action Final Delay Ramp Delete In Event XMT-VA001 (FVA_5280 ABFXU-1 AIR FLOW 56000 MTR)

XMT-VA002 (FVF_5310 OUTLET AIRFLOW 0

TRN A MTR)

Place OOS sticker on 1VFP5310 (VF OTLT AIR FLOW TRN A)

PAGE 3 OF 11

PAGE 4 0F 11 Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Both Units are at 100% power.
  • No VQ release is in progress.
  • No GWRs are in progress.
  • The Waste Evaporator and Recycle Evaporator are secured.
  • The Unit Vent Stack Flow Rate Meter is INOPERABLE.
  • Auxiliary Building NLO has called the control room to report 1ABUXF Discharge Air Flow (1ABUX-AFMD-1) is reading 27000 scfm.

INITIATING CUES:

Calculate Unit Vent flow per PT/1/A/4450/017 (Unit Vent Flow Manual Calculation) Enclosure 13.1.

EXAMINER NOTE:

Provide the applicant with a copy of PT/1/A/4450/017.

PAGE 4 OF 11

Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT START TIME: _______

STEP 1: Applicant locates and records VA (Auxiliary Building Ventilation) CRITICAL System flow. STEP STANDARD: ___ SAT Applicant locates 1VAP5280 on 1MC-3 and records 56,500 scfm. ___ UNSAT Critical Step to obtain VA (Auxiliary Building Ventilation) flow required to complete the calculation.

EXAMINER NOTE: Range of 55000 to 57000 scfm is acceptable.

COMMENTS:

STEP 2: Applicant locates and records VE (Annulus Ventilation) 1A flow CRITICAL to stack. STEP STANDARD: ___ SAT Applicant locates 1VEP5180, notes VE (Annulus Ventilation) train 1A is shutdown and records 0 scfm. ___UNSAT Critical Step to obtain 1A Train Annulus Ventilation Flow required to complete the calculation.

COMMENTS:

PAGE 5 0F 11

Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 3: Applicant locates and records VE (Annulus Ventilation) 1B flow CRITICAL to stack. STEP STANDARD: ___ SAT Applicant locates 1VEP5200, notes VE (Annulus Ventilation) train 1B is ___ UNSAT shutdown and records 0 scfm.

Critical Step to obtain 1B Train Annulus Ventilation Flow required to complete the calculation.

COMMENTS:

STEP 4: Applicant locates and records VF (Fuel Pool Ventilation) 1A flow CRITICAL to stack. STEP STANDARD: ___ SAT Applicant locates 1VFP5310, notes VF (Fuel Pool Ventilation) reading is ___ UNSAT OOS and uses 33130 scfm from enclosure 13.2.

This step is critical to ensure the correct value is included in the calculation.

COMMENTS:

PAGE 6 0F 11

Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 5: Applicant locates and records VF (Fuel Pool Ventilation) 1B flow CRITICAL to stack. STEP STANDARD: ___ SAT Applicant locates 1VFP5340, notes VF (Fuel Pool Ventilation) train 1B is ___ UNSAT shutdown and records 0 scfm.

Critical Step to obtain 1B Train Fuel Pool Ventilation Flow required to complete the calculation.

COMMENTS:

STEP 6: Applicant records 1ABUX-AFMD-1 flow. CRITICAL STEP STANDARD:

___ SAT Applicant records 27000 scfm based on initial cue.

___ UNSAT Critical Step to ensure the value is used in the calculation.

COMMENTS:

PAGE 7 0F 11

Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 7: Applicant records VP (Containment Purge) flows. CRITICAL STEP STANDARD:

___ SAT Based on initial cues VP (Containment Purge) is secured. Applicant records flow as 0 scfm or N/A. ___ UNSAT Critical Step to obtain Containment Purge Flows required to complete the calculation.

COMMENTS:

STEP 8: Applicant records WG (Waste Gas) flow and VQ (Containment CRITICAL Air Release and Addition) flow. STEP STANDARD: ___ SAT Based on initial cues, applicant records flow as 0 scfm or N/A. ___ UNSAT Critical Step to obtain Waste Gas Flow and Containment Air Release Flow required to complete the calculation.

COMMENTS:

STEP 9: Applicant records TL (Main Turbine Seals) flow CRITICAL STEP STANDARD:

___ SAT Based on initial cue and procedure notes, applicant records 1260 scfm.

___ UNSAT Critical Step to obtain Main Turbine Seals flow required to complete the calculation.

COMMENTS:

PAGE 8 0F 11

Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 10: Applicant records NB (Reactor Makeup) and WL (Liquid CRITICAL Waste) flows. STEP STANDARD:

___ SAT Based on initial cues, applicant records flow as 0 scfm or N/A.

___ UNSAT Critical Step to obtain Reactor Makeup and Liquid Waste flows required to complete the calculation.

COMMENTS:

STEP 11: Applicant records ZJ (Condensate Steam Air Ejectors) flow to CRITICAL stack. STEP STANDARD: ___ SAT Based on initial cue and procedure notes, applicant records 60 scfm. ___ UNSAT Critical Step obtain Condensate Steam Air Ejectors flow required to complete the calculation.

COMMENTS:

PAGE 9 0F 11

Catawba Nuclear Station RO/SRO JPM A.1-2 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 12: Calculate total vent flow. CRITICAL STEP STANDARD:

___ SAT Applicant calculates total vent flow to stack as 117450 scfm.

___ UNSAT EXAMINER NOTE: Due to reading instruments, 116450 -118450 scfm is considered acceptable.

This step is critical to calculate total vent flow.

EXAMINER CUE: "Another operator will continue with the PT."

COMMENTS:

END OF TASK STOP TIME ________

PAGE 10 0F 11

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Both Units are at 100% power.
  • No VQ release is in progress.
  • No GWRs are in progress.
  • The Waste Evaporator and Recycle Evaporator are secured.
  • The Unit Vent Stack Flow Rate Meter is INOPERABLE.
  • Auxiliary Building NLO has called the control room to report 1ABUXF Discharge Air Flow (1ABUX-AFMD-1) is reading 27000 scfm.

INITIATING CUES:

Provide the applicant with a copy of PT/1/A/4450/017.

Catawba 2013 NRC Exam - RO/SRO JPM A.1-2

Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam JPM A.2 RO-SRO PAGE 1 OF 7

Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam DATA SHEET Task: Classify a D/G Start and Complete a Logbook Entry Alternate Path: N/A Facility JPM #: DG3-010 Safety Function: N/A K/A 2.2.12 Knowledge of surveillance procedures.

Importance: 3.7 / 4.1 CFR: 41.10 / 45.13 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator Classroom X Perform X Simulate

References:

OMP 2-28 (Diesel Generator Logbook) rev 026 PT/2/A/4350/002 B, (Diesel Generator 2B Operability Test), Rev. 101 Task Standard: Classify the D/G start as a VALID FAILURE and correctly enter data into the logbook.

Validation Time: 14 minutes Time Critical: Yes No X Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 7

PAGE 3 0F 7 Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 2 is in Mode 1.
  • You were an extra operator on shift and assisting the Operation Test Group in a scheduled surveillance test of the 2B Emergency Diesel Generator.
  • The test was conducted using procedure PT/2/A/4350/002B (D/G Operability Test).
  • Given the following timeline:

0830 2B D/G was started.

Time to reach required frequency was 7.0 seconds.

Time to reach required voltage was 6.7 seconds.

0845 2B D/G was fully loaded.

0905 Prior to completing the surveillance, 2B D/G tripped due to a malfunction of the low-low lube oil pressure switch.

  • PT/2/A/4350/002B has been completed up to step 12.75 for completing Diesel Generator Logbook entries per OMP 2-28 (Diesel Generator Logbook).

INITIATING CUES:

Using the information provided in Initial Conditions, classify the test and fill in all available Diesel Generator Logbook data (Items A through L) on Attachment 10.1 (Diesel Generator Log Sheet) and 10.2 (Index Sheet) of OMP 2-28 and submit to the CRS for review.

EXAMINER NOTE:

Provide applicant with a copy of OMP 2-28 (total of 11 pages). Attachment 10.2 will include one entry from the previous surveillance.

The applicant may ask for a name for the MCE Rotating Equipment Supervisor and a PIP # when completing the logbook entries. If necessary, this may be done in another room to prevent possible compromise of the exam.

PAGE 3 OF 7

Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT START TIME: _______

STEP 1: Based on initial conditions, applicant refers to OMP Section 6 to CRITICAL determine the TEST CLASSIFICATION. STEP STANDARD: ___ SAT Applicant determines that the test is a VALID FAILURE based on criteria ___ UNSAT 6.4.A.

Critical Step step in order to meet the Task Standard: Determine the correct classification.

COMMENTS:

PAGE 4 0F 7

Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 2: Applicant enters appropriate information on Attachment 10.1 CRITICAL using information from the initial conditions. STEP STANDARD:

___ SAT Examiner NOTE: See KEY provided with this document for required entries, including Critical Step aspects identified ___UNSAT on the KEY.

Enters 2B D/G.

Enters start attempt as "2."

Marks PT/1(2)/4350/002A(B) as procedure used.

Marks Scheduled Surveillance as Reason for D/G Operation.

Marks Turbo Prelube as Type of Diesel Start.

Enters engine start time as 0830.

Enters engine shutdown time as 0905.

Calculates and enters run time as 0.58 hours6.712963e-4 days <br />0.0161 hours <br />9.589947e-5 weeks <br />2.2069e-5 months <br />.

Enters Start Data: Time for Frequency > 57 Hz as 7.0 sec.

Time for Voltage > 3950 volts as 6.7 sec.

Enters classification as VALID FAILURE.

Marks "Record Classification in Index" for Item L.

Applicant may continue past Step L and enter / inquire about the following:

Marks MCE Rotating Equipment supervisor or designee.

Enters reason D/G start was not a valid success: (2B D/G tripped on a malfunction of the LOLO Lube Oil Pressure switch prior to being loaded > 2875 KW for > 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />).

EXAMINER CUE: "CRS will contact MCE Rotating Equipment supervisor."

Marks PIP block since a PIP is required for this start.

EXAMINER CUE: PIP # C-13-02580 The steps in bold are critical because all other entries are required regardless of the classification.

COMMENTS:

PAGE 5 0F 7

Catawba Nuclear Station RO-SRO JPM A.2 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 3: Logs the start into the Index Sheet (Enclosure 10.2) CRITICAL STEP STANDARD:

___ SAT Enters Start # as "2".

Enters Date as today's date. ___ UNSAT Enters Test Classification as VALID FAILURE.

Enters run time as 0.58 hrs.

Enters yearly run time as 2.08 hrs.

Indicates PIP # will be written in space provided.

The items in bold are critical based on OMP 2-28 section 3 criteria.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 6 0F 7

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

  • Unit 2 is in Mode 1.
  • You were an extra operator on shift and assisting the Operation Test Group in a scheduled surveillance test of the 2B Emergency Diesel Generator.
  • The test was conducted using procedure PT/2/A/4350/002B (D/G Operability Test).
  • Given the following timeline:

0830 2B D/G was started.

Time to reach required frequency was 7.0 seconds.

Time to reach required voltage was 6.7 seconds.

0845 2B D/G was fully loaded.

0905 Prior to completing the surveillance, 2B D/G tripped due to a malfunction of the low-low lube oil pressure switch.

  • PT/2/A/4350/002B has been completed up to step 12.75 for completing Diesel Generator Logbook entries per OMP 2-28 (Diesel Generator Logbook).

INITIATING CUES:

Using the information provided in Initial Conditions, classify the test and fill in all available Diesel Generator Logbook data (Items A through L) on Attachment 10.1 (Diesel Generator Log Sheet) and 10.2 (Index Sheet) of OMP 2-28 and submit to the CRS for review.

Catawba 2013 NRC Exam - RO-SRO JPM A.2

Catawba Nuclear Station RO-SRO JPM A.3 Sep. 2013 NRC Exam JPM A.3 RO - SRO PAGE 1 OF 13

Catawba Nuclear Station RO-SRO JPM A.3 Sep. 2013 NRC Exam DATA SHEET Task: Calculate Low Pressure Service Water Discharge flow for a liquid radioactive release.

Alternate Path: N/A Facility JPM #: 2010 NRC Initial License Exam SRO-D Admin.

Safety Function: N/A K/A 2.3.11 Ability to control radiation releases Importance: 3.8 / 4.3 CFR: 41.11 / 43.4 / 45.10 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator Classroom X Perform X Simulate

References:

PT/0/A/4250/011 (RL Temperature And Discharge Flow Determination) rev 050 Task Standard: Applicant obtains needed data, correctly calculates total discharge flow, and determines that the liquid waste release can NOT continue.

Validation Time: 15 minutes Time Critical: Yes No X Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 13

PAGE 3 0F 13 Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is currently performing a liquid waste release from the Monitor Tank Building.
2. Low Pressure Service Water (RL) Flow transmitter 0RLP5080 (RL Disch Flow) and OAC points C1P0903 and C2P0903 (RL Line A Disch Flow-Hourly Average) are INOPERABLE and have been removed from service.
3. The RN system is aligned to the RL discharge header.
4. Units 1 and 2 are both at 100% power.

INITIATING CUES:

You are directed to calculate the total RL discharge flow using Enclosure 13.2 (Total Discharge Flow Calculation Sheet) of PT/0/A/4250/011 and determine if adequate flow exists to continue the release per the LWR currently in progress. Record your answer in the spaces below.

Total RL Discharge Flow GPM.

Adequate Flow Exists .

Yes/No EXAMINER NOTE:

After reading initiating cue, provide applicant with a copy of PT/0/A/4250/011 marked up as follows:

Step 12.1 signed off.

Enclosure 13.1 signed off up to Step 1.1.4.3 for performing Enclosure 13.2 Also provide a copy of the LWR permit report.

PAGE 3 OF 13

Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT START TIME: _______

STEP 1: 1.1.2 Perform the following calculations to obtain Total Discharge CRITICAL Head: STEP RL Disch Pressure = 0RLP5030 + 3.9 psi ___ SAT RL Disch Pressure = __66__ + 3.9 psi = _69.9_ psig ___ UNSAT Lake Elevation = __569__ 0RNP7380 (Lake Wylie Level) or obtained from hydro central per Step 1.1.4.2 of Enclosure 13.1

(_69.9_ psig x 2.311ft/psig) + (571.75 - _569_ft) =

_164.3_ft RL Disch Pressure Lake Elev Total Disch Head STANDARD:

Applicant calculates RL Discharge pressure as 164.3 ft. (Acceptable range: 163 - 165 ft. based on accounting for rounding and truncation.)

This step is critical because improper entry affects the calculation for Total RL Discharge Flow.

EXAMINER NOTE: Step 1.1.1 is N/A because ORLP5030 indicator IS available.

COMMENTS:

PAGE 4 0F 13

Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 2: 1.1.3 Using Total Discharge Head from Step 1.1.2 obtain the RL CRITICAL Pump Flow value using one of the following: STEP Enclosure 13.7 (RL Pumps Head / Capacity Table) ___ SAT OR ___UNSAT OAC Databook in "Secondary Systems Databook Calcs" using "RL Total Discharge Head vs. RL Pump Flow Rate" STANDARD:

Applicant determines that RL Pump Flow per Enclosure 13.7 is 38,354 GPM.

EXAMINER NOTE: Range of 37,405 - 39,219 GPM is acceptable.

This step is critical because improper entry affects the calculation for Total RL Discharge Flow.

COMMENTS:

PAGE 5 0F 13

Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 3: 1.1.4 Once RL Pump Flow value is obtained, calculate Total RL CRITICAL Supply based on number of RL pumps in operation: STEP

___38354___ X __ __1_______ = _____38354_____

RL Pump Flow # of pumps in op. Total RL Supply (A) ___ SAT STANDARD: ___ UNSAT Applicant calculates Total RL Supply to be 38,354 GPM.

EXAMINER NOTE: Range carried forward is 37,405 to 39,219 GPM.

This step is critical because improper entry affects the calculation for Total RL Discharge Flow.

COMMENTS:

STEP 4: 1.1.5 Enter Total RL supply (A) value in Step 1.4. CRITICAL STEP STANDARD:

___ SAT Applicant enters value calculated for Total RL Supply in blank (A) on page 3 of 3 of Enclosure 13.2. ___ UNSAT EXAMINER NOTE: Steps 1.2.1 and 1.2.2 are not applicable per initiating cue.

This step is critical because improper entry affects the calculation for Total RL Discharge Flow.

COMMENTS:

PAGE 6 0F 13

Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 5: 1.2.3 IF either C1P5854 (RN Train A Calculated Total Flow) OR CRITICAL C1P5855 (RN Train B Calculated Total Flow) is NOT STEP available, perform the following to obtain total RN flow:

___ SAT 1.2.3.1 Calculate RN Pump Train A flow:

____0_____ + ____0_____ = _____0____gpm ___ UNSAT 1RNP7520 + 2RNP7520 = RN Pump Train A flow 1.2.3.2 Calculate RN Pump Train B flow:

__17,000__ + ___0____ = _ 17,000__gpm 1RNP7510 + 2RNP7510 = RN Pump Train B flow STANDARD:

Applicant calculates total RN flow to be 17,000 GPM.

This step is critical because improper entry affects the calculation for Total RL Discharge Flow.

COMMENTS:

STEP 6: 1.2.4 Perform the following calculations to obtain Total RN Flow: CRITICAL STEP

_________0________ + _____17,000_______ = _17,000_gpm (B)

RN Pump Train A Flow + RN Pump Train B Flow = Total RN Flow ___ SAT STANDARD: ___ UNSAT Applicant calculates total RN flow to be 17,000 GPM.

This step is critical because improper entry affects the calculation for Total RL Discharge Flow.

COMMENTS:

PAGE 7 0F 13

Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 7: 1.2.5 Enter Total RN Flow (B) in Step 1.4. CRITICAL STEP STANDARD:

___ SAT Applicant enters Total RN Flow calculated in previous step in blank (B) on page 3 of 3. ___ UNSAT EXAMINER NOTE: Steps 1.3.1 and 1.3.2 are not applicable per data sheet.

This step is critical because improper entry affects the calculation for Total RL Discharge Flow.

COMMENTS:

STEP 8: 1.3.3 Calculate Cooling Tower Total Evaporation as follows: CRITICAL STEP 13,500 + 14,000 = 27,500 gpm (C)

(C1P5853) (C2P5853) Total Evaporation ___ SAT STANDARD: ___ UNSAT Applicant calculates Total Cooling Tower Evaporation to be 27,500 GPM and enters this value in blank (C) of step 1.4.

This step is critical because improper entry affects the calculation for Total RL Discharge Flow.

COMMENTS:

PAGE 8 0F 13

Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 9: 1.4 Perform the following calculation to obtain Total RL Disch CRITICAL Flow: STEP 38354 + 17,000 - 27,500 = 27,854 gpm ___ SAT (A) (B) (C)

___ UNSAT STANDARD:

Applicant calculates Total RL discharge flow to be 27,854 gpm.

EXAMINER NOTE: Calculation range carried forward would be 26,905 to 28,719 GPM.

This step is critical to ensure that enough RL flow exists to dilute the liquid waste release that is in progress.

COMMENTS:

PAGE 9 0F 13

Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT CRITICAL STEP

___ SAT

___ UNSAT STEP 10: 1.5 Apply dilution safety factor to obtain Total RL Discharge flow from the Calculated Total RL Discharge Flow from Step 1.4 as follows:

(27,854 gpm) X 0.65 = 18,105 gpm STANDARD:

Applicant calculates Total RL Discharge flow to be 18,105 GPM.

EXAMINER NOTE: Calculation range carried forward would be 17,488 to 18,667 GPM.

This step is critical to ensure that enough RL flow exists to dilute the liquid waste release that is in progress.

COMMENTS:

PAGE 10 0F 13

Catawba Nuclear Station RO - SRO JPM A.3 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 11 Determination of adequate RL flow. CRITICAL STEP STANDARD:

___ SAT Applicant determines that Total RL Discharge Flow is LESS than the "Minimum RL Flow interlock setpoint for radionuclides (gpm)" required ___ UNSAT by and listed on the Liquid Waste Release Permit Report, and that the release may NOT continue.

This step is critical for ensuring termination of a release with inadequate dilution flow.

EXAMINER NOTE:

The Liquid Waste release Permit Report requires at least 27,600 gpm RL flow in order for the release to continue. If the applicant does NOT apply the dilution safety factor (listed in STEP 10 of this JPM), it will appear that adequate RL flow DOES exist (27,854 gpm). But with the required dilution safety factor, RL flow can only be calculated as 18,105 gpm: inadequate for the release to continue.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 11 0F 13

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is currently performing a liquid waste release from the Monitor Tank Building.
2. Low Pressure Service Water (RL) Flow transmitter 0RLP5080 (RL Disch Flow) and OAC points C1P0903 and C2P0903 (RL Line A Disch Flow-Hourly Average) are INOPERABLE and have been removed from service.
3. The RN system is aligned to the RL discharge header.
4. Units 1 and 2 are both at 100% power.

INITIATING CUES:

You are directed to calculate the total RL discharge flow using Enclosure 13.2 (Total Discharge Flow Calculation Sheet) of PT/0/A/4250/011 and determine if adequate flow exists to continue the release per the LWR currently in progress. Record your answer in the spaces below.

Total RL Discharge Flow GPM.

Adequate Flow Exists .

Yes/No Catawba 2013 NRC Exam - RO - SRO JPM A.3

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

Unit 1 and Unit 2 Data Sheet for 1030 Unit 1 Cooling Tower Evaporation (PID C1P5853) - 13,500 GPM Unit 2 Cooling Tower Evaporation (PID C2P5853) - 14,000 GPM Low Pressure Service Water (RL) Status RL pump A only is in service.

RL Header Pressure (0RLP5030) - 66 PSIG Lake Wylie Level (0RNP7380) - 569 Feet Nuclear Service Water (RN) Status 1B RN pump is in service OAC points C1P5854, C1P5855, and C1P5856 are removed from service RN Pump Train A flow (1RNP7520) - 0 GPM RN Pump Train A flow (2RNP7520) - 0 GPM RN Pump Train B flow (1RNP7510) - 17,000 GPM RN Pump Train B Flow (2RNP7510) - 0 GPM Catawba 2013 NRC Exam - RO - SRO JPM A.3

Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam JPM A.4 SRO PAGE 1 OF 9

Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam DATA SHEET Task: Make Emergency Classification and Complete the Initial Emergency Notification Form Alternate Path: N/A Facility JPM #: SEP-018 Safety Function: N/A K/A 2.4.40 Knowledge of SRO responsibilities in emergency plan implementation.

Importance: 2.7 / 4.5 CFR: 41.10 / 43.5 / 45.11 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator Classroom X Perform X Simulate

References:

RP/0/A/5000/001 (Classification of Emergency), revision 029 Task Standard: Event classified as a Site Area Emergency based on the criteria in 4.1.C.4 and 4.1.N.2 (or N.3) within 15 minutes of JPM start.

Obtain the preprinted Emergency Notification sheet or complete a blank one for 4.1.S.3. Fill out the sheet within 15 minutes from the time the classification is made.

Validation Time: 22 minutes Time Critical: Yes X No Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 9

PAGE 3 0F 9 Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The reactor failed to automatically trip.
  • Almost immediately, the unit safety injected.
  • The crew entered EP/1/A/5000/E-0 (Reactor Trip or Safety Injection).
  • Coolant activity level is 30 Ci/cc Dose Equivalent Iodine (DEI) I-131.
  • The crew is transitioning to EP/1/A/5000/E-2 (Faulted Steam Generator Isolation).

The transition brief contained the following additional information:

  • NC pumps had to be tripped due to a loss of subcooling.
  • NC pressure is 600 psig and stable.
  • 1ETB has an unknown fault and is currently de-energized.
  • EMF Trip 2 alarms are in:

1EMF-28 (Steamline 1C) 1EMF-33 (Condenser Air Ejector Exhaust) 1EMF-72 (S/G B Leakage) 1EMF-73 (S/G C Leakage)

Current meteorological data:

  • Clear conditions.
  • Wind speed is 5 mph.
  • Wind direction is 270°.

INITIATING CUES:

Classify the event and fill out the initial Emergency Notification form through the date and time that you approve it.

This JPM is time critical.

PAGE 3 OF 9

PAGE 4 0F 9 Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam EXAMINER NOTE:

Provide applicant a copy of:

RP/0/A/5000/006 A (Notifications to States and Counties from the Control Room), Enclosure 4.1, "Emergency Notification Form Completion", 7 pages PAGE 4 OF 9

Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT START TIME: _______

STEP 1: Classify the event using RP/0/A/5000/001, Classification of CRITICAL Emergency. STEP STANDARD: ___ SAT Applicant classifies the event as a Site Area Emergency based on: ___ UNSAT Event # 4.1.C.4 and #4.1.N.2 or 3.

3 points 4.1.C.4 (SG Secondary Side Release With Primary to Secondary Leakage).

AND 5 points 4.1.N.2 (Greater than available makeup capacity as indicated by a loss of NCS Subcooling).

OR 5 points 4.1.N.3 (Indication that a SG is ruptured and has a Non-Isolable secondary side fault.)

The above conditions will result in a 4.1.S.3 Site Area Emergency.

EXAMINER NOTE:

It is critical that the classification be made and the emergency be declared within 15 minutes of the recorded start time.

TIME EMERGENCY DECLARED __________________.

This step is critical to ensure the proper classification will be communicated.

COMMENTS:

PAGE 5 0F 9

Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 2: Obtain Emergency Notification form. CRITICAL STEP STANDARD:

Applicant obtains a blank Emergency Notification form (provided by ___ SAT Examiner).

___UNSAT This step is critical to ensure that the proper form is transmitted.

COMMENTS:

PAGE 6 0F 9

Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 3: Complete the Emergency Notification Form. CRITICAL EXAMINER NOTE: STEP Critical Steps are in BOLD below. Also see attached completed Emergency Notification Form KEY. On the KEY, the Critical Steps are ___ SAT highlighted in YELLOW.

___ UNSAT STANDARD:

Line 1: "Drill" is marked.

Line 2: "Initial" is marked.

Line 3: Catawba Nuclear Site (pre-printed).

Line 4: Per attached KEY.

Line 5: "None" is marked.

Line 6: Emergency release "is occurring" due to 1EMF-33 indication of S/G tube leakage.

Line 7: "Under evaluation" marked EXAMINER CUE: "RP is determining release significance."

Line 8: "Stable " marked.

Line 9: Not required for initial notifications, and NOT critical. If entered, wind direction is 270° and wind speed 5 mph.

Line 10: "Declaration" marked and enters current date and time.

Line 11: Affected Unit(s) marked as "1".

Line 12: Marks box "A" and 0% power.

EXAMINER CUE: "The reactor was tripped 10 minutes ago."

Enters time minus 10 minutes and enters today's date.

Line 13: Includes information on the loss of power and the ATWS.

Lines 14,15 and 16 - see Examiner Cue below.

IF ASKED, EXAMINER CUE: "RP has not determined any release data."

COMMENTS:

PAGE 7 0F 9

Catawba Nuclear Station SRO JPM A.4 Sep. 2013 NRC Exam STEP / STANDARD SAT /

UNSAT STEP 3 (cont.)

EXAMINER NOTE: These steps are not required for initial notifications.

Line 17: Signs as Emergency Coordinator. Date and time on line 17 is based on time of approval.

See attached, completed, Emergency Notification sheet for a key.

Time Emergency Notification Form is completed: _______________

It is critical that the total time from the declaration time recorded in Step 1 to completing the Emergency Notification Form is < 15 minutes.

COMMENTS:

STOP TIME ________

PAGE 8 0F 9

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The reactor failed to automatically trip.
  • Almost immediately, the unit safety injected.
  • The crew entered EP/1/A/5000/E-0 (Reactor Trip or Safety Injection).
  • Coolant activity level is 30 Ci/cc Dose Equivalent Iodine (DEI) I-131.
  • The crew is transitioning to EP/1/A/5000/E-2 (Faulted Steam Generator Isolation).

The transition brief contained the following additional information:

  • NC pumps had to be tripped due to a loss of subcooling.
  • NC pressure is 600 psig and stable.
  • 1ETB has an unknown fault and is currently de-energized.
  • EMF Trip 2 alarms are in:

1EMF-28 (Steamline 1C) 1EMF-33 (Condenser Air Ejector Exhaust) 1EMF-72 (S/G B Leakage) 1EMF-73 (S/G C Leakage)

INITIATING CUES:

Classify the event and fill out the initial Emergency Notification form through the date and time that you approve it.

This JPM is time critical.

Catawba 2013 NRC Exam - SRO JPM A.4