{{#Wiki_filter:December 16, 2013  
{{#Wiki_filter:December 16, 2013 Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
 
Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer  
 
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555  


==SUBJECT:==
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION  
DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==


On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electroni cally for public inspection in the NRC Public Document Room or from the Publicly Avail able Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.       Sincerely,
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
 
Sincerely,
      /RA/ John B. Hickman, Project Manager  
                                                /RA/
 
John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos. 50-010 and 50-171
Reactor Decommissioning Branch Decommissioning and Uranium Recovery           Licensing Directorate Division of Waste Management           and Environmental Protection Office of Federal and State Materials   and Environmental Management Programs  
 
Docket Nos. 50-010 and 50-171  


==Enclosure:==
==Enclosure:==


RAI for Dresden Unit 1 and Peach Bottom, Unit 1  
RAI for Dresden Unit 1 and Peach Bottom, Unit 1 cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists


cc:  Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road  
Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
 
Warrenville, IL 60555  


==SUBJECT:==
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION  
DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==


On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.  
On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
 
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electroni cally for public inspection in the NRC Public Document Room or from the Publicly Avail able Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.       Sincerely,
Sincerely,
 
                                                /RA/
      /RA/ John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery           Licensing Directorate Division of Waste Management           and Environmental Protection Office of Federal and State Materials   and Environmental Management Programs  
John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos. 50-010 and 50-171
 
Docket Nos. 50-010 and 50-171  


==Enclosure:==
==Enclosure:==


RAI for Dresden Unit 1 and  
RAI for Dresden Unit 1 and Peach Bottom, Unit 1 cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists DISTRIBUTION: ROrlikowski, RIII         MFerdas, RI     AKock, NRR KLois, NRR ML13347B326 OFC         DWMEP             DWMEP             DWMEP           DWMEP           DWMEP NAME       JHickman           CHolston         SGiebel         BWatson         JHickman DATE     12 / 16 / 2013     12 / 16 / 2013     12/16 /2013     12 / 16 / 2013 12 / 16 / 2013 OFFICIAL RECORD COPY
 
Peach Bottom, Unit 1  
 
cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists DISTRIBUTION: ROrlikowski, RIII MFerdas, RI AKock, NRR KLois, NRR ML13347B326 OFC DWMEP DWMEP DWMEP DWMEP DWMEP NAME JHickman CHolston SGiebel BWatson JHickman DATE 12 / 16 / 2013 12 / 16 / 2013 12/16 /2013 12 / 16 / 2013 12 / 16 / 2013 OFFICIAL RECORD COPY Enclosure REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2012 DECOMMISSIONING FUNDING STATUS REPORT FOR DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1 The requests for additional information (RAIs) are in response to the 2013 Decommissioning Funding Status (DFS) Report for Dresden Nuclear Power Station, Unit 1 and Peach Bottom Atomic Power Station, Unit 1. On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning
 
Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1 (Dresden 1), and Peach Bottom Atomic Power Station, Unit 1 (Peach Bottom) as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).
RAI #1:  Minimum Formula Amount On April 1, 2013, EGC provided radiological decommissioning costs associated with license termination for Dresden 1 and Peach Bottom. EGC did not provide the required minimum funding assurance amount, based on the formula from 10 CFR 50.75(c).
 
Per 10 CFR 50.75(f)(1), "-the information in this report must include, at a minimum the amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c)."
 
For both Dresden 1 and Peach Bottom provide the amount of decommissioning funds estimated to be required based on the formula from 10 CFR Sections 50.75(b) and (c).
 
RAI # 2:  Decommissioning Costs
 
On April 1, 2013, EGC did not provide the estimated total cost of decommissioning activities as stated in the most recent Site Specific Cost Estimate (SSCE) update. EGC did provide the estimated cost of remaining decommissioning activities.
 
Per 10 CFR 50.82(a)(8)(v)(A) and (B) , "-the report must include the following information, current through the end of the previous calendar year: the amount spent on decommissioning, both cumulative and over the previous calendar year, the remaining balance of any decommissioning funds, and the amount provided by other financial assurance methods being relied upon; an estimate of the costs to complete decommissioning, reflecting any difference
 
between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based."
For both Dresden 1 and Peach Bottom provide the estimated total cost of decommissioning activities as stated in the most recent SSCE update.
 
RAI # 3:  Decommissioning Costs
 
On April 1, 2013, EGC did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
 
2  Per 10 CFR 50.82(a)(8)(v),  The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based."  For both Dresden 1 and Peach Bottom provide the difference between actual and
 
estimated costs for decommissioning work performed during the previous year.
 
Dresden Nuclear Power Station, Unit 1 Service List
 
cc:  Site Vice President - Dresden Nuclear Power Station Exelon Generation Company, LLC
 
6500 North Dresden Road
 
Morris, IL  60450-9765 Plant Manager - Dresden Nuclear Power Station Exelon Generation Company, LLC
 
6500 North Dresden Road Morris, IL  60450-9765
 
Manager Regulatory Assurance - Dresden
 
Nuclear Power Station Exelon Generation Company, LLC 6500 North Dresden Road Morris, IL  60450-9765
 
Senior Vice President, Midwest Operations Exelon Generation Company, LLC
 
4300 Winfield Road Warrenville, IL  60555
 
Vice President, Midwest Operations Exelon Generation Company, LLC
 
4300 Winfield Road Warrenville, IL  60555
 
Senior Vice President - Operations Support Exelon Generation Company, LLC
 
4300 Winfield Road
 
Warrenville, IL 60555 Vice President - Operations Support Exelon Generation Company, LLC
 
4300 Winfield Road
 
Warrenville, IL  60555 Vice President - Licensing and Regulatory
 
Affairs Exelon Generation Company, LLC
 
4300 Winfield Road
 
Warrenville, IL  60555 Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC
 
4300 Winfield Road
 
Warrenville, IL  60555
 
Manager Licensing - Clinton, Dresden,    and Quad Cities Exelon Generation Company, LLC
 
4300 Winfield Road
 
Warrenville, IL  60555 Vice President and Deputy General Counsel Exelon Generation Company, LLC 200 Exelon Way, KSA-3E
 
Kennett Square, PA  19348 Document Control Desk - Licensing Exelon Generation Company, LLC
 
4300 Winfield Road
 
Warrenville, IL  60555
 
Associate General Counsel Exelon Business Services Company, LLC
 
4300 Winfield Road
 
Warrenville, IL  60555
 
Associate General Counsel Exelon Business Services Company, LLC 200 Exelon Way, KSA-3E
 
Kennett Square, PA  19348
 
U.S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station
 
6500 North Dresden Road
 
Morris, IL  60450-9765
 
Chairman Grundy County Board Administration Building
 
1320 Union Street
 
Morris, IL  60450
 
Regional Administrator U.S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Lisle, IL 60532-4352
 
Illinois Department of Nuclear Safety Office of Nuclear Facility Safety  1035 Outer Park Drive Springfield, IL  62704 Peach Bottom Atomic Power Station, Unit 1 Service List
 
cc:  Mr. Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC
 
4300 Winfield Road
 
Warrenville, IL  60555 Mr. Christopher M. Crane President and Chief Operating Officer Exelon Corporation
 
4300 Winfield Road Warrenville, IL  60555
 
Mr. Charles G. Pardee Chief Operating Officer (COO)
Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL  60555
 
Ms. Susan R. Landahl Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL  60555
 
Mr. Ronald J. De Gregorio Senior Vice President, Operations Support Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N
 
Kennett Square, PA  19348
 
Mr. Joseph P. Grimes, Jr.
Senior Vice President, Mid-Atlantic Operations Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N
 
Kennett Square, PA  19348
 
Mr. Stephen E. Kuczynski Senior Vice President, Engineering and Technical Services Exelon Generation Company, LLC
 
4300 Winfield Road
 
Warrenville, IL  60555 Mr. Bryan C. Hanson Senior Vice President, Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL  60555
 
Mr. Keith R. Jury Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC
 
4300 Winfield Road
 
Warrenville, IL  60555
 
Mr. Timothy J. Tulon Vice President, Midwest Operations, Exelon Generation Company, LLC
 
4300 Winfield Road
 
Warrenville, IL  60555 Mr. Christopher H. Mudrick Vice President, Mid-Atlantic Operations Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N
 
Kennett Square, PA  19348 Mr. Robert J. Hovey Vice President, Nuclear Oversight Exelon Generation Company, LLC
 
4300 Winfield Road Warrenville, IL  60555
 
Mr. Tom Dougherty Site Vice President - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA  17314
 
Plant Manager - Peach Bottom Atomic Power Station  Exelon Generation Company, LLC 1848 Lay Road
 
Delta, PA  17314
 
Manager Regulatory Assurance - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road
 
Delta, PA  17314
 
Mr. Roland Fletcher Department of Environment
 
Radiological Health Program 2400 Broening Highway Baltimore, MD  21224
 
Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC
 
Correspondence Control P.O. Box 160 Kennett Square, PA  19348
 
Manager Licensing Exelon Generation Company, LLC Correspondence Control P.O. Box 160 
 
Kennett Square, PA  19348
 
Chief-Division of Nuclear Safety PA Bureau of Radiation Protection Dept. of Environmental Protection P.O. Box 8469
 
Harrisburg, PA  17105-8469
 
Board of Supervisors Peach Bottom Township R.D. #1 Delta, PA  17314
 
Public Service Commission of Maryland Engineering Division Chief Engineer
 
6 St. Paul Center


Baltimore, MD  21202-6806
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2012 DECOMMISSIONING FUNDING STATUS REPORT FOR DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1 The requests for additional information (RAIs) are in response to the 2013 Decommissioning Funding Status (DFS) Report for Dresden Nuclear Power Station, Unit 1 and Peach Bottom Atomic Power Station, Unit 1. On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1 (Dresden 1), and Peach Bottom Atomic Power Station, Unit 1 (Peach Bottom) as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).
RAI #1: Minimum Formula Amount On April 1, 2013, EGC provided radiological decommissioning costs associated with license termination for Dresden 1 and Peach Bottom. EGC did not provide the required minimum funding assurance amount, based on the formula from 10 CFR 50.75(c).
Per 10 CFR 50.75(f)(1), the information in this report must include, at a minimum the amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c).
For both Dresden 1 and Peach Bottom provide the amount of decommissioning funds estimated to be required based on the formula from 10 CFR Sections 50.75(b) and (c).
RAI # 2: Decommissioning Costs On April 1, 2013, EGC did not provide the estimated total cost of decommissioning activities as stated in the most recent Site Specific Cost Estimate (SSCE) update. EGC did provide the estimated cost of remaining decommissioning activities.
Per 10 CFR 50.82(a)(8)(v)(A) and (B) , the report must include the following information, current through the end of the previous calendar year: the amount spent on decommissioning, both cumulative and over the previous calendar year, the remaining balance of any decommissioning funds, and the amount provided by other financial assurance methods being relied upon; an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.
For both Dresden 1 and Peach Bottom provide the estimated total cost of decommissioning activities as stated in the most recent SSCE update.
RAI # 3: Decommissioning Costs On April 1, 2013, EGC did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
Enclosure


Ms. Susan Grey Power Plant and Environmental  Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD  21401 Manager-Financial Control & Co-Owner
2 Per 10 CFR 50.82(a)(8)(v),
The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.
For both Dresden 1 and Peach Bottom provide the difference between actual and estimated costs for decommissioning work performed during the previous year.


Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ  08038-0236 Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555  
Dresden Nuclear Power Station, Unit 1 Service List cc:
Site Vice President - Dresden Nuclear          Director - Licensing and Regulatory Affairs Power Station                                  Exelon Generation Company, LLC Exelon Generation Company, LLC                  4300 Winfield Road 6500 North Dresden Road                        Warrenville, IL 60555 Morris, IL 60450-9765 Manager Licensing - Clinton, Dresden, Plant Manager - Dresden Nuclear                    and Quad Cities Power Station                                  Exelon Generation Company, LLC Exelon Generation Company, LLC                  4300 Winfield Road 6500 North Dresden Road                        Warrenville, IL 60555 Morris, IL 60450-9765 Vice President and Deputy General Counsel Manager Regulatory Assurance - Dresden          Exelon Generation Company, LLC Nuclear Power Station                        200 Exelon Way, KSA-3E Exelon Generation Company, LLC                  Kennett Square, PA 19348 6500 North Dresden Road Morris, IL 60450-9765                          Document Control Desk - Licensing Exelon Generation Company, LLC Senior Vice President, Midwest Operations      4300 Winfield Road Exelon Generation Company, LLC                  Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555                          Associate General Counsel Exelon Business Services Company, LLC Vice President, Midwest Operations              4300 Winfield Road Exelon Generation Company, LLC                  Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555                          Associate General Counsel Exelon Business Services Company, LLC Senior Vice President - Operations Support      200 Exelon Way, KSA-3E Exelon Generation Company, LLC                  Kennett Square, PA 19348 4300 Winfield Road Warrenville, IL 60555                          U.S. Nuclear Regulatory Commission Resident Inspectors Office Vice President - Operations Support            Dresden Station Exelon Generation Company, LLC                  6500 North Dresden Road 4300 Winfield Road                              Morris, IL 60450-9765 Warrenville, IL 60555 Chairman Vice President - Licensing and Regulatory       Grundy County Board Affairs                                         Administration Building Exelon Generation Company, LLC                 1320 Union Street 4300 Winfield Road                             Morris, IL 60450 Warrenville, IL 60555


Associate General Counsel Exelon Generation Company, LLC
Regional Administrator U.S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Lisle, IL 60532-4352 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704


4300 Winfield Road Warrenville, IL 60555  
Peach Bottom Atomic Power Station, Unit 1 Service List cc:
Mr. Michael J. Pacilio                          4300 Winfield Road Senior Vice President                            Warrenville, IL 60555 Exelon Generation Company, LLC 4300 Winfield Road                              Mr. Keith R. Jury Warrenville, IL 60555                            Vice President, Licensing and Regulatory Affairs Mr. Christopher M. Crane                        Exelon Generation Company, LLC President and Chief Operating Officer            4300 Winfield Road Exelon Corporation                              Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555                            Mr. Timothy J. Tulon Vice President, Midwest Operations, Mr. Charles G. Pardee                            Exelon Generation Company, LLC Chief Operating Officer (COO)                    4300 Winfield Road Exelon Generation Company, LLC                  Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555                            Mr. Christopher H. Mudrick Vice President, Mid-Atlantic Operations Ms. Susan R. Landahl                            Exelon Generation Company, LLC Senior Vice President                            200 Exelon Way, KSA 3-N Exelon Generation Company, LLC                  Kennett Square, PA 19348 4300 Winfield Road Warrenville, IL 60555                            Mr. Robert J. Hovey Vice President, Nuclear Oversight Mr. Ronald J. De Gregorio                        Exelon Generation Company, LLC Senior Vice President, Operations Support        4300 Winfield Road Exelon Generation Company, LLC                  Warrenville, IL 60555 200 Exelon Way, KSA 3-N Kennett Square, PA 19348                        Mr. Tom Dougherty Site Vice President - Peach Bottom Atomic Mr. Joseph P. Grimes, Jr.                          Power Station Senior Vice President, Mid-Atlantic              Exelon Generation Company, LLC Operations                                      1848 Lay Road Exelon Generation Company, LLC                  Delta, PA 17314 200 Exelon Way, KSA 3-N Kennett Square, PA 19348                        Plant Manager - Peach Bottom Atomic Power Station Mr. Stephen E. Kuczynski                        Exelon Generation Company, LLC Senior Vice President, Engineering and          1848 Lay Road Technical Services                              Delta, PA 17314 Exelon Generation Company, LLC 4300 Winfield Road                              Manager Regulatory Assurance - Peach Warrenville, IL 60555                              Bottom Atomic Power Station Exelon Generation Company, LLC Mr. Bryan C. Hanson                              1848 Lay Road Senior Vice President, Midwest Operations        Delta, PA 17314 Exelon Generation Company, LLC


Correspondence Control Desk Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348}}
Mr. Roland Fletcher                        Vice President, Licensing and Regulatory Department of Environment                  Affairs Radiological Health Program                Exelon Generation Company, LLC 2400 Broening Highway                      4300 Winfield Road Baltimore, MD 21224                        Warrenville, IL 60555 Director, Licensing and Regulatory Affairs Associate General Counsel Exelon Generation Company, LLC            Exelon Generation Company, LLC Correspondence Control                    4300 Winfield Road P.O. Box 160                              Warrenville, IL 60555 Kennett Square, PA 19348 Correspondence Control Desk Manager Licensing                          Exelon Generation Company, LLC Exelon Generation Company, LLC             200 Exelon Way, KSA 1-N-1 Correspondence Control                    Kennett Square, PA 19348 P.O. Box 160 Kennett Square, PA 19348 Chief-Division of Nuclear Safety PA Bureau of Radiation Protection Dept. of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469 Board of Supervisors Peach Bottom Township R.D. #1 Delta, PA 17314 Public Service Commission of Maryland Engineering Division Chief Engineer 6 St. Paul Center Baltimore, MD 21202-6806 Ms. Susan Grey Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Manager-Financial Control & Co-Owner Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236}}

Latest revision as of 11:25, 4 November 2019

M. Pacilio Ltr. Request for Additional for Decommissioning Funding Status Report for Dresden Unit 1 and Peach Bottom Unit 1
ML13347B326
Person / Time
Site: Dresden, Peach Bottom  Constellation icon.png
Issue date: 12/16/2013
From: John Hickman
NRC/FSME/DWMEP/DURLD/RDB
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Hickman J
References
Download: ML13347B326 (8)


Text

December 16, 2013 Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Pacilio:

On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos.50-010 and 50-171

Enclosure:

RAI for Dresden Unit 1 and Peach Bottom, Unit 1 cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists

Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Pacilio:

On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos.50-010 and 50-171

Enclosure:

RAI for Dresden Unit 1 and Peach Bottom, Unit 1 cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists DISTRIBUTION: ROrlikowski, RIII MFerdas, RI AKock, NRR KLois, NRR ML13347B326 OFC DWMEP DWMEP DWMEP DWMEP DWMEP NAME JHickman CHolston SGiebel BWatson JHickman DATE 12 / 16 / 2013 12 / 16 / 2013 12/16 /2013 12 / 16 / 2013 12 / 16 / 2013 OFFICIAL RECORD COPY

REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2012 DECOMMISSIONING FUNDING STATUS REPORT FOR DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1 The requests for additional information (RAIs) are in response to the 2013 Decommissioning Funding Status (DFS) Report for Dresden Nuclear Power Station, Unit 1 and Peach Bottom Atomic Power Station, Unit 1. On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1 (Dresden 1), and Peach Bottom Atomic Power Station, Unit 1 (Peach Bottom) as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).

RAI #1: Minimum Formula Amount On April 1, 2013, EGC provided radiological decommissioning costs associated with license termination for Dresden 1 and Peach Bottom. EGC did not provide the required minimum funding assurance amount, based on the formula from 10 CFR 50.75(c).

Per 10 CFR 50.75(f)(1), the information in this report must include, at a minimum the amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c).

For both Dresden 1 and Peach Bottom provide the amount of decommissioning funds estimated to be required based on the formula from 10 CFR Sections 50.75(b) and (c).

RAI # 2: Decommissioning Costs On April 1, 2013, EGC did not provide the estimated total cost of decommissioning activities as stated in the most recent Site Specific Cost Estimate (SSCE) update. EGC did provide the estimated cost of remaining decommissioning activities.

Per 10 CFR 50.82(a)(8)(v)(A) and (B) , the report must include the following information, current through the end of the previous calendar year: the amount spent on decommissioning, both cumulative and over the previous calendar year, the remaining balance of any decommissioning funds, and the amount provided by other financial assurance methods being relied upon; an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.

For both Dresden 1 and Peach Bottom provide the estimated total cost of decommissioning activities as stated in the most recent SSCE update.

RAI # 3: Decommissioning Costs On April 1, 2013, EGC did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.

Enclosure

2 Per 10 CFR 50.82(a)(8)(v),

The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.

For both Dresden 1 and Peach Bottom provide the difference between actual and estimated costs for decommissioning work performed during the previous year.

Dresden Nuclear Power Station, Unit 1 Service List cc:

Site Vice President - Dresden Nuclear Director - Licensing and Regulatory Affairs Power Station Exelon Generation Company, LLC Exelon Generation Company, LLC 4300 Winfield Road 6500 North Dresden Road Warrenville, IL 60555 Morris, IL 60450-9765 Manager Licensing - Clinton, Dresden, Plant Manager - Dresden Nuclear and Quad Cities Power Station Exelon Generation Company, LLC Exelon Generation Company, LLC 4300 Winfield Road 6500 North Dresden Road Warrenville, IL 60555 Morris, IL 60450-9765 Vice President and Deputy General Counsel Manager Regulatory Assurance - Dresden Exelon Generation Company, LLC Nuclear Power Station 200 Exelon Way, KSA-3E Exelon Generation Company, LLC Kennett Square, PA 19348 6500 North Dresden Road Morris, IL 60450-9765 Document Control Desk - Licensing Exelon Generation Company, LLC Senior Vice President, Midwest Operations 4300 Winfield Road Exelon Generation Company, LLC Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel Exelon Business Services Company, LLC Vice President, Midwest Operations 4300 Winfield Road Exelon Generation Company, LLC Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel Exelon Business Services Company, LLC Senior Vice President - Operations Support 200 Exelon Way, KSA-3E Exelon Generation Company, LLC Kennett Square, PA 19348 4300 Winfield Road Warrenville, IL 60555 U.S. Nuclear Regulatory Commission Resident Inspectors Office Vice President - Operations Support Dresden Station Exelon Generation Company, LLC 6500 North Dresden Road 4300 Winfield Road Morris, IL 60450-9765 Warrenville, IL 60555 Chairman Vice President - Licensing and Regulatory Grundy County Board Affairs Administration Building Exelon Generation Company, LLC 1320 Union Street 4300 Winfield Road Morris, IL 60450 Warrenville, IL 60555

Regional Administrator U.S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Lisle, IL 60532-4352 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704

Peach Bottom Atomic Power Station, Unit 1 Service List cc:

Mr. Michael J. Pacilio 4300 Winfield Road Senior Vice President Warrenville, IL 60555 Exelon Generation Company, LLC 4300 Winfield Road Mr. Keith R. Jury Warrenville, IL 60555 Vice President, Licensing and Regulatory Affairs Mr. Christopher M. Crane Exelon Generation Company, LLC President and Chief Operating Officer 4300 Winfield Road Exelon Corporation Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555 Mr. Timothy J. Tulon Vice President, Midwest Operations, Mr. Charles G. Pardee Exelon Generation Company, LLC Chief Operating Officer (COO) 4300 Winfield Road Exelon Generation Company, LLC Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555 Mr. Christopher H. Mudrick Vice President, Mid-Atlantic Operations Ms. Susan R. Landahl Exelon Generation Company, LLC Senior Vice President 200 Exelon Way, KSA 3-N Exelon Generation Company, LLC Kennett Square, PA 19348 4300 Winfield Road Warrenville, IL 60555 Mr. Robert J. Hovey Vice President, Nuclear Oversight Mr. Ronald J. De Gregorio Exelon Generation Company, LLC Senior Vice President, Operations Support 4300 Winfield Road Exelon Generation Company, LLC Warrenville, IL 60555 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Tom Dougherty Site Vice President - Peach Bottom Atomic Mr. Joseph P. Grimes, Jr. Power Station Senior Vice President, Mid-Atlantic Exelon Generation Company, LLC Operations 1848 Lay Road Exelon Generation Company, LLC Delta, PA 17314 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Plant Manager - Peach Bottom Atomic Power Station Mr. Stephen E. Kuczynski Exelon Generation Company, LLC Senior Vice President, Engineering and 1848 Lay Road Technical Services Delta, PA 17314 Exelon Generation Company, LLC 4300 Winfield Road Manager Regulatory Assurance - Peach Warrenville, IL 60555 Bottom Atomic Power Station Exelon Generation Company, LLC Mr. Bryan C. Hanson 1848 Lay Road Senior Vice President, Midwest Operations Delta, PA 17314 Exelon Generation Company, LLC

Mr. Roland Fletcher Vice President, Licensing and Regulatory Department of Environment Affairs Radiological Health Program Exelon Generation Company, LLC 2400 Broening Highway 4300 Winfield Road Baltimore, MD 21224 Warrenville, IL 60555 Director, Licensing and Regulatory Affairs Associate General Counsel Exelon Generation Company, LLC Exelon Generation Company, LLC Correspondence Control 4300 Winfield Road P.O. Box 160 Warrenville, IL 60555 Kennett Square, PA 19348 Correspondence Control Desk Manager Licensing Exelon Generation Company, LLC Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-1 Correspondence Control Kennett Square, PA 19348 P.O. Box 160 Kennett Square, PA 19348 Chief-Division of Nuclear Safety PA Bureau of Radiation Protection Dept. of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469 Board of Supervisors Peach Bottom Township R.D. #1 Delta, PA 17314 Public Service Commission of Maryland Engineering Division Chief Engineer 6 St. Paul Center Baltimore, MD 21202-6806 Ms. Susan Grey Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Manager-Financial Control & Co-Owner Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236