|
|
(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML13364A064 | | | number = ML13364A064 |
| | issue date = 09/09/2013 | | | issue date = 09/09/2013 |
| | title = Fermi 2013 Exam Es 401-4 Rejected KAs | | | title = Exam Es 401-4 Rejected KAs |
| | author name = | | | author name = |
| | author affiliation = NRC/RGN-III/DRS | | | author affiliation = NRC/RGN-III/DRS |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:ES-401RecordofRejectedK/AsFormES-401-4Tier/GroupRandomlySelectedK/AReasonforRejection1/1(RO)700000K3.01KAselectionresultedinoversamplingerror.SelectionoftheotherK3itemalsoresultedinerror.RandomlyselectedK2.02.1/1(RO)295027K2.01NotApplicabletoFermi-NotMarkIIIContainmentSelected600000K2.01-Notpreviouslyselected1/1(RO)295030A1.01Possibleoversampling(NPSHtopic)with295026K1.01.Randomlyselected295030A1.02.2/2(RO)290002K6.05Nooperationallyvalidquestioncouldbewritten.Randomlyselected290002K6.03.1/1(RO)295024A2.03Nooperationallyvalidquestioncouldbewritten.Randomlyselected295024A2.01.3(RO)ConductofOperations2.1.14Nooperationallyvalidquestioncouldbewritten.Randomlyselected2.1.45.ReplacedJPM(form301-2,h.)OriginalJPM(SwitchOffGasRecombinerChains)didnotrunasexpected.SimulatorGroupisinvestigating.ReplacedwithJPM(PerformSGTSFilter&IsolationDamperOpTest)insameSafetyFunction.ReplacedJPM(form301-2,k.)OriginalJPM(StartupFuelPoolVentilationExhaustRadiationMonitor)couldnotbeperformedasexpected.ReplacedwithJPM(PlaceRHRSWRadiationMonitorinService)insameSafetyFunction.}} | | {{#Wiki_filter:ES-401 Record of Rejected K/As Form ES-401-4 Tier / Randomly Reason for Rejection Group Selected K/A 1/1 (RO) 700000 K3.01 KA selection resulted in oversampling error. Selection of the other K3 item also resulted in error. Randomly selected K2.02. |
| | 1/1 (RO) 295027 K2.01 Not Applicable to Fermi - Not Mark III Containment Selected 600000 K2.01 - Not previously selected 1/1 (RO) 295030 A1.01 Possible oversampling (NPSH topic) with 295026 K1.01. |
| | Randomly selected 295030 A1.02. |
| | 2/2 (RO) 290002 K6.05 No operationally valid question could be written. |
| | Randomly selected 290002 K6.03. |
| | 1/1 (RO) 295024 A2.03 No operationally valid question could be written. |
| | Randomly selected 295024 A2.01. |
| | 3 (RO) Conduct of No operationally valid question could be written. |
| | Operations 2.1.14 Randomly selected 2.1.45. |
| | Replaced JPM Original JPM (Switch Off Gas Recombiner Chains) did not run as (form 301-2, h.) expected. Simulator Group is investigating. Replaced with JPM (Perform SGTS Filter & Isolation Damper Op Test) in same Safety Function. |
| | Replaced JPM Original JPM (Startup Fuel Pool Ventilation Exhaust Radiation (form 301-2, k.) Monitor) could not be performed as expected. Replaced with JPM (Place RHRSW Radiation Monitor in Service) in same Safety Function.}} |
Latest revision as of 10:48, 4 November 2019
Similar Documents at Fermi |
---|
Category:License-Operator
MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21327A4252021-06-16016 June 2021 ES-403-1 ML21326A1202021-06-16016 June 2021 ES-201-2 ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21327A0922021-06-16016 June 2021 ES-301-6 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A3362021-06-16016 June 2021 Handouts to Applicants (Summary) ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter 2024-07-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A0922021-06-16016 June 2021 ES-301-6 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 ML21327A1702021-06-16016 June 2021 ES-401-6 ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4252021-06-16016 June 2021 ES-403-1 2024-07-09
[Table view] |
Text
ES-401 Record of Rejected K/As Form ES-401-4 Tier / Randomly Reason for Rejection Group Selected K/A 1/1 (RO) 700000 K3.01 KA selection resulted in oversampling error. Selection of the other K3 item also resulted in error. Randomly selected K2.02.
1/1 (RO) 295027 K2.01 Not Applicable to Fermi - Not Mark III Containment Selected 600000 K2.01 - Not previously selected 1/1 (RO) 295030 A1.01 Possible oversampling (NPSH topic) with 295026 K1.01.
Randomly selected 295030 A1.02.
2/2 (RO) 290002 K6.05 No operationally valid question could be written.
Randomly selected 290002 K6.03.
1/1 (RO) 295024 A2.03 No operationally valid question could be written.
Randomly selected 295024 A2.01.
3 (RO) Conduct of No operationally valid question could be written.
Operations 2.1.14 Randomly selected 2.1.45.
Replaced JPM Original JPM (Switch Off Gas Recombiner Chains) did not run as (form 301-2, h.) expected. Simulator Group is investigating. Replaced with JPM (Perform SGTS Filter & Isolation Damper Op Test) in same Safety Function.
Replaced JPM Original JPM (Startup Fuel Pool Ventilation Exhaust Radiation (form 301-2, k.) Monitor) could not be performed as expected. Replaced with JPM (Place RHRSW Radiation Monitor in Service) in same Safety Function.