|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 Mr. Christopher A. Costanzo Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. 0. Box 63 Lycoming, NY 13093 September 3, 2014 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 September 3, 2014 Mr. Christopher A. Costanzo Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. 0. Box 63 Lycoming, NY 13093 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| NINE MILE POINT NUCLEAR STATION, UNIT NO.2-REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE RE: LICENSE AMENDMENT REQUEST PURSUANT TO 10 CFR 50.90: MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS, DATED MARCH 10, 2014 (TAC NO. MF3056) | | NINE MILE POINT NUCLEAR STATION, UNIT NO.2- REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE RE: LICENSE AMENDMENT REQUEST PURSUANT TO 10 CFR 50.90: MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS, DATED MARCH 10, 2014 (TAC NO. MF3056) |
|
| |
|
| ==Dear Mr. Costanzo:== | | ==Dear Mr. Costanzo:== |
|
| |
|
| By letter dated March 10, 2014 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML14071A460), Nine Mile Point Nuclear Station, LLC (the licensee) submitted the affidavit executed by Peter M. Yandow, Manager, Nuclear Plant Projects [NPP] /Services Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas, LLC (GEH), 3901 Castle Hayne Road, Wilmington, NC 28401, on March 4, 2014. The affidavit requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Part 2, Section 2.390(a)(4): | | By letter dated March 10, 2014 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML14071A460), Nine Mile Point Nuclear Station, LLC (the licensee) submitted the affidavit executed by Peter M. Yandow, Manager, Nuclear Plant Projects [NPP] /Services Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas, LLC (GEH), 3901 Castle Hayne Road, Wilmington, NC 28401, on March 4, 2014. |
| The information sought to be withheld is contained in Enclosure 1 of GEH letter, PPO-IGYEF-KG1-728, "GEH Response to NRC Request for Additional Information in Support of NMP2 MELLLA+ License Amendment Request," dated March 4, 2014. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (4) The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs (4)a. and (4)b. Some examples of categories of information that fit into the definition of proprietary information are: a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; | | The affidavit requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Part 2, Section 2.390(a)(4): |
| : b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; C. A. Costanzo (8) The information identified in paragraph (2) is classified as proprietary because it contains the detailed GEH methodology for maximum extended load line limit analysis and for the GEH Boiling Water Reactor (BWR). These methods, techniques, and data along with their application to the design, modification, and analyses associated with stability were achieved at a significant cost to GEH. The development of the evaluation processes along with the interpretation and application of the analytical results is derived from the extensive experience and information databases that constitute a major GEH asset. The information identified in the affidavit is contained in Attachment 3 (ADAMS Accession No. ML14071A467) of the CENG Letter to NRC, dated March 10, 2014, Nine Mile Point Nuclear Station, Unit No.2; Renewed Facility Operating License No. NPF-69, Docket No. 50-410, "License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus-Response to SRXB RAI 1 AND RAI 2 (TAC No. MF3056)". | | The information sought to be withheld is contained in Enclosure 1 of GEH letter, GE-PPO-IGYEF-KG1-728, "GEH Response to NRC Request for Additional Information in Support of NMP2 MELLLA+ License Amendment Request," dated March 4, 2014. |
| | The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: |
| | (4) The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs (4)a. and (4)b. Some examples of categories of information that fit into the definition of proprietary information are: |
| | : a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; |
| | : b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; |
| | |
| | C. A. Costanzo (8) The information identified in paragraph (2) is classified as proprietary because it contains the detailed GEH methodology for maximum extended load line limit analysis and for the GEH Boiling Water Reactor (BWR). These methods, techniques, and data along with their application to the design, modification, and analyses associated with stability were achieved at a significant cost to GEH. |
| | The development of the evaluation processes along with the interpretation and application of the analytical results is derived from the extensive experience and information databases that constitute a major GEH asset. |
| | The information identified in the affidavit is contained in Attachment 3 (ADAMS Accession No. ML14071A467) of the CENG Letter to NRC, dated March 10, 2014, Nine Mile Point Nuclear Station, Unit No.2; Renewed Facility Operating License No. NPF-69, Docket No. 50-410, "License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus- Response to SRXB RAI 1 AND RAI 2 (TAC No. MF3056)". |
| We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | | We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| Therefore, the submitted information in Attachment 3 of the submission, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. | | Therefore, the submitted information in Attachment 3 of the submission, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. | | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | | |
| C. A. Costanzo The Nonproprietary versions of Attachment 3 of the licensee submittal (Attachment 1 of the licensee's submittal, part of ADAMS Accession No. ML14071A466) has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room. If you have any questions regarding this matter, I may be reached at 301-415-3308. | | C. A. Costanzo The Nonproprietary versions of Attachment 3 of the licensee submittal (Attachment 1 of the licensee's submittal, part of ADAMS Accession No. ML14071A466) has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room. |
| Docket No. 50-41 0 cc: Peter M. Yandow, Sincerely, Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Manager, Nuclear Plant Projects/Services Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas, LLC, 3901 Castle Hayne Road, Wilmington, NC28401 Additional Distribution via Listserv C. A Costanzo The Nonproprietary versions of Attachment 3 of the licensee submittal (Attachment 1 of the licensee's submittal, part of ADAMS Accession No. ML14071A466) has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room. If you have any questions regarding this matter, I may be reached at 301-415-3308.
| | If you have any questions regarding this matter, I may be reached at 301-415-3308. |
| Docket No. 50-410 cc: Peter M. Yandow, Sincerely, IRA/ Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Manager, Nuclear Plant Projects/Services Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas, LLC, 3901 Castle Hayne Road, Wilmington, NC28401 Additional Distribution via Listserv DISTRIBUTION:
| | Sincerely, Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-41 0 cc: Peter M. Yandow, Manager, Nuclear Plant Projects/Services Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas, LLC, 3901 Castle Hayne Road, Wilmington, NC28401 Additional Distribution via Listserv |
| PUBLIC RidsNrrDorllpl1-1 Resource RidsRgn1 MaiiCenter Resource RidsNrrDssSnpb Resource DSchroeder, Region 1 ADAMS Accession No.: ML14072A015 LPL 1-1 R/F RidsNrrLAKGoldstein Resource RidsAcrsAcnw | | |
| _MaiiCTR Resource RidsNrrDssEicb Resource (*)by email RidsNrrDssStsb Resource RidsNrrPMNineMilePoint Resource RidsNrrDssSrxb Resource RidsNrrDssScvb Resource OFFICE NRRILPL 1-1\PM NRRILPL 1-1\LA NRRISRXB/BC NRRISNPB/BC(A(*))
| | ML14071A466) has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room. |
| NRR/EICB/BC(*) | | If you have any questions regarding this matter, I may be reached at 301-415-3308. |
| NAME BVaidya KGoldstein CJackson JDean JThorp DATE 3/24/14 3/24/14 8/19/14 9/02/14 3/26/14 OFFICE NRR/ARCB/BC(*) | | Sincerely, IRA/ |
| NRR!SCVB/BC(*) | | Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410 cc: Peter M. Yandow, Manager, Nuclear Plant Projects/Services Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas, LLC, 3901 Castle Hayne Road, Wilmington, NC28401 Additional Distribution via Listserv DISTRIBUTION: |
| NRR!STSB/BC NRRILPL 1-1/BC NRR/LPL 1-1/PM NAME US hoop RDennig REIIiott BBeasley BVaidya DATE 4/02/14 3/25/14 8/20/14 9/02/14 9/03/14 OFFICIAL RECORD COPY}} | | PUBLIC LPL 1-1 R/F RidsNrrDssStsb Resource RidsNrrDorllpl1-1 Resource RidsNrrLAKGoldstein Resource RidsNrrPMNineMilePoint Resource RidsRgn1 MaiiCenter Resource RidsAcrsAcnw_MaiiCTR Resource RidsNrrDssSrxb Resource RidsNrrDssSnpb Resource RidsNrrDssEicb Resource RidsNrrDssScvb Resource DSchroeder, Region 1 ADAMS Accession No.: ML14072A015 (*)by email OFFICE NRRILPL 1-1\PM NRRILPL 1-1\LA NRRISRXB/BC NRRISNPB/BC(A(*)) NRR/EICB/BC(*) |
| | NAME BVaidya KGoldstein CJackson JDean JThorp DATE 3/24/14 3/24/14 8/19/14 9/02/14 3/26/14 OFFICE NRR/ARCB/BC(*) NRR!SCVB/BC(*) NRR!STSB/BC NRRILPL 1-1/BC NRR/LPL 1-1/PM NAME US hoop RDennig REIIiott BBeasley BVaidya DATE 4/02/14 3/25/14 8/20/14 9/02/14 9/03/14}} |
Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML14064A3232013-12-31031 December 2013 000N0123-FBIR-NP, Rev. 0, Fuel Bundle Information Report for Nine Mile Point 2 Reload 14 Cycle 15. Project stage: Request ML14002A1702014-01-0202 January 2014 Unacceptable Application with Opportunity to Supplement - Nine Mile Point Nuclear Station, Unit 2 - MF3056, License Amendment Request - Maximum Extended Load Line Limit Analysis Plus Project stage: Other ML14002A2202014-01-0202 January 2014 Revised Unacceptable Application with Opportunity to Supplement - Nine Mile Point Nuclear Station, Unit 2 - License Amendment Request - Maximum Extended Load Line Limit Analysis Plus Project stage: Other ML14023A6542014-01-21021 January 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Commitment Date to Provide Supplemental Information Project stage: Supplement ML14028A3982014-01-28028 January 2014 MF3056 - Acceptance of Requested Licensing Action License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Acceptance Review ML14064A3222014-01-31031 January 2014 00N0123-SRLR, Rev. 2, Supplemental Reload Licensing Report for Nine Mile Point 2 (NMP2) Reload 14 Cycle 15 Extended Power Uprate (Epu)/Maximum Extended Load Line Limit Plus (Mellla+). Project stage: Request ML14051A1382014-02-14014 February 2014 Response to Request for Supplemental Information to License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus Project stage: Supplement ML14043A0062014-02-20020 February 2014 First Round of Requests for Additional Information Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mella+) Project stage: RAI ML14064A3212014-02-25025 February 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Core Reload and Safety Limit Supplemental Information Project stage: Supplement ML14064A3242014-02-28028 February 2014 000N2495-R1-NP, Rev. 0, Nine Mile Point Nuclear Station Unit 2 Comparison of Mellla+ Reference Design to Cycle 15 Design Characteristics. Project stage: Request ML14029A0392014-03-0505 March 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated November 1, 2013 Project stage: Withholding Request Acceptance ML14051A0152014-03-0606 March 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated February 14, 2014 Project stage: Withholding Request Acceptance ML14071A4662014-03-10010 March 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Response to Srxb RAI 1 and RAI 2 Project stage: Request ML14071A2422014-03-12012 March 2014 NMP Unit 2, MF3056, 2nd Round of Draft RAIs - LAR License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Draft RAI ML14083A0232014-03-31031 March 2014 Second Round of Request for Additional Information Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: RAI ML14139A4162014-05-14014 May 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Response to RAI STSB-1 and RAI STSB-2 Project stage: Response to RAI ML14204A3692014-08-14014 August 2014 Third Round of Request for Additional Information & Enclosure 1, Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mellla+) (Tac No. MF3056) Project stage: RAI ML14072A0152014-09-0303 September 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated March 10, 2014 Project stage: Withholding Request Acceptance ML14246A3962014-09-0303 September 2014 NMP Unit 2, MF3056, 4th Round of Draft RAIs - LAR License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Draft RAI ML14065A0902014-09-0303 September 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated February 25, 2014 (Tac No. MF3056) Project stage: Withholding Request Acceptance NMP2L2556, Response to Request for Additional Information, License Amendment Request for Maximum Extended Load Line Limit Analysis Plus2014-09-15015 September 2014 Response to Request for Additional Information, License Amendment Request for Maximum Extended Load Line Limit Analysis Plus Project stage: Response to RAI ML14260A1202014-11-0606 November 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated September 15, 2014 (Tac No. MF3056) Project stage: Withholding Request Acceptance ML14314A2142014-11-10010 November 2014 MF3056, E-mail Capture - LAR Mellla+, Simulator Audit Plan, November 20-21, 2014 at the Plant Site Project stage: Other ML14321A0642014-11-17017 November 2014 Point Unit 2, MF3056, LAR Mellla+, Supplement to the Simulator Audit Plan Project stage: Other ML14351A4282014-12-11011 December 2014 Updated TIP Comparisons for Current Operating Conditions, GE-PPO- 1GYEF-KG1-742, Enclosure 2 Project stage: Request ML15002A1622015-01-26026 January 2015 Request for Withholding Information from Public Disclosure Submission Dated December 11, 2014, for Supplement Information for NRC Simulator Audit LAR for Mellla+ Project stage: Withholding Request Acceptance ML15033A0022015-01-30030 January 2015 MF3056, LAR - Mellla+, Revised RAI - Neutron Fluence Calculation Related Project stage: RAI ML15051A4642015-02-18018 February 2015 Response to Fifth Request for Additional Information Concerning License Amendment Request for Maximum Extended Load Line Limit Analysis Plus Project stage: Request ML15056A3792015-03-16016 March 2015 Request for Withholding Information from Public Disclosure Submission Dated February 18, 2015, for License Amendment Request Pursuant to 10 CFR 50.90 Maximum Extended Load Line Limit Analysis Plus Project stage: Withholding Request Acceptance ML15105A4432015-05-0404 May 2015 Draft Safety Evaluation for License Amendment Request - Mellla+ Project stage: Draft Approval ML15114A1602015-05-0707 May 2015 Issuance of Simulator Audit Report License Amendment Request Regarding MELLLA Plus Project stage: Approval ML15096A0762015-09-0202 September 2015 Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus Project stage: Approval ML15210A3262015-09-0404 September 2015 LTR-15-0388-1 - John W. Stetkar Letter Nine Mile Point Nuclear Station Unit 2 Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request Project stage: Other 2014-03-12
[Table View] |
|
---|
Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000220/LER-2023-002, Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 122023-12-15015 December 2023 Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 12 IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 2024-09-04
[Table view] Category:Proprietary Information Review
MONTHYEARML21279A0062021-10-13013 October 2021 Request for Withholding Information from Public Disclosure ML21201A3852021-07-23023 July 2021 Request for Withholding Information Regarding Proposed Alternative to Use ASME Code Case N-893 (EPIDs L-2020-LLR-0147 and -0148) ML21084A1352021-04-0505 April 2021 Request for Withholding Information from Public Disclosure ML21028A7122021-02-0303 February 2021 Request for Withholding Information Regarding Proposed Alternative to Use ASME Code Case N-893 (Epids L-2020-LLR-0147 and -0148) ML20317A1342020-11-12012 November 2020 Request for Withholding Information from Public Disclosure; Guarantees of Payment of Deferred Premiums ML19336A0192019-12-0303 December 2019 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML18093A9122018-04-11011 April 2018 Request for Withholding Information from Public Disclosure for Nine Mile Point Nuclear Station, Unit 1 ML17363A2752018-01-0404 January 2018 Request for Withholding Information from Public Disclosure ML17320A1452017-11-20020 November 2017 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML16337A2762016-12-0909 December 2016 Calvert; Clinton; Dresden; LaSalle; Limerick; Nine Mile Point; Oyster Creek; Peach Bottom; Quad Cities; R.E. Ginna; Three Mile Island - Request for Withholding Information Regarding; Guarantees of Payment of Deferred Premiums ML16153A0072016-06-23023 June 2016 Request for Withholding Information from Public Disclosure Supplement to Response to RAI - Submittal of Post Extended Power Uprate Steam Dryer Inspection ML16098A3222016-04-27027 April 2016 Request to Withhold Emergency Preparedness Documents from Public Disclosure (CAC Nos. MF7504-MF7525) ML15272A0312015-11-12012 November 2015 Request for Withholding Information from Public Disclosure, Submittal Dated September 3, 2015, for License Amendment Request Concerning Safety Limit Minimum Critical Power Ratio Change ML15056A3792015-03-16016 March 2015 Request for Withholding Information from Public Disclosure Submission Dated February 18, 2015, for License Amendment Request Pursuant to 10 CFR 50.90 Maximum Extended Load Line Limit Analysis Plus ML15027A2582015-02-0303 February 2015 Request for Withholding Information from Public Disclosure Submission Dated 1/14/15, for Supplement to Response to RAI - Submittal of Post Extended Power Uprate Steam Dryer Inspection Results (MF4559) ML15002A1622015-01-26026 January 2015 Request for Withholding Information from Public Disclosure Submission Dated December 11, 2014, for Supplement Information for NRC Simulator Audit LAR for Mellla+ ML14260A1202014-11-0606 November 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated September 15, 2014 (Tac No. MF3056) ML14065A0902014-09-0303 September 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated February 25, 2014 (Tac No. MF3056) ML14072A0152014-09-0303 September 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated March 10, 2014 ML14105A1362014-05-0808 May 2014 Request for Withholding Information from Public Disclosure for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant ML14051A0152014-03-0606 March 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated February 14, 2014 ML14003A0052014-01-15015 January 2014 Request for Withholding Information from Public Disclosure Responses to Requests for Additional Information Dated November 4, and December 13, 2013 ML13256A0132013-10-0909 October 2013 Request for Withholding Information from Public Disclosure Responses to Requests for Additional Information Dated July 31, 2013 ML13269A3122013-10-0202 October 2013 Request for Withholding Information from Public Disclosure for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant (TAC Nos. MF2584, MF2585, MF2586, M ML13217A0442013-09-12012 September 2013 Request for Withholding Information from Public Disclosure Responses to Requests for Additional Information Dated July 31, 2013 ML13101A2742013-05-23023 May 2013 Request for Withholding Information from Public Disclosure Submittal of Evaluation to Establish Inspection Intervals for Jet Pump Holddown Beams Fabricated from Modified Alloy 718 Material ML13086A0342013-04-16016 April 2013 MF0345-Proprietary Information Determination Letter to Licensee Submission Dated November 21, 2012 (Proprietary Information Determination Letter) ML12313A0912012-11-15015 November 2012 Request for Withholding Information from Public Disclosure License Response Dated October 31, 2012 ML12314A0232012-11-14014 November 2012 Request for Withholding Information from Public Disclosure Final Steam Dryer Stress Report at 115% CLTP, Continuum Dynamics, Incorporated Report No. 12-18P, Dated October 2012 ML1207200982012-03-15015 March 2012 Request for Withholding Information from Public Disclosure - Proposed LAR Use of Modified Alloy 718 Material in Jet Pump Holddown Beams - Nine Mile Point Nuclear Station Unit No. 2 ML1135004022011-12-28028 December 2011 Request for Withholding Information Form Public Disclosure for Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2, Calvet Cliffs Independent Spent Fuel Storage Installation (Isfsi), Nine Mile Point Nuclear Station, Unit Nos. 1 & 2. ML1122901332011-08-29029 August 2011 Request for Withholding Information from Public Disclosure - Proposed LAR EPU Supplement Dated October 28, 2010 and March 23, 2011 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 ML1122901662011-08-29029 August 2011 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement Dated December 13, 2010 Holtec International and GNF-A Proprietary Documents - NMP2 ML1122901582011-08-29029 August 2011 Request for Withholding Information from Public Disclosure - Proposed LAR EPU Supplement Dated October 8, 2010, January 19 and May 9, 2011 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 ML1122901622011-08-29029 August 2011 Request for Withholding Information from Public Disclosure - Proposed LAR for EPU, Supplements Dated November 5, December 10, 2010, and January 31, February 4, June 13, August 5, 2011 CDI Proprietary Documents - NMP2 ML1122703802011-08-19019 August 2011 Request for Withholding Information from Public Disclosure for Proposed Merger Between Constellation Energy Group, LLC and Exelon Corporation ML1116400612011-06-22022 June 2011 Request for Withholding Information from Public Disclosure - Nine Mile Point, Unit No. 1 Request to Utilize Alternative for Repair of Control Rod Drive Housing Penetrations Dated March 4 and 25, 2011 - Areva Proprietary Documents ML1023709472010-09-13013 September 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement Dated July 30, 2010 GEH and Gnf Proprietary Documents - Nine Mile Point Unit No. 2 ML1023709442010-08-31031 August 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement Dated July 30, 2010 CDI Proprietary Documents - Nine Mile Point Unit No. 2 ML1020906102010-08-0909 August 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation Supplement Dated June 3, 2010 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 ML1020906122010-08-0909 August 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation Supplement Dated June 30, 2010 CDI Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 ML1006804292010-04-0202 April 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement Dated December 23, 2009 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 ML1006804412010-04-0202 April 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement December 23,2 009 C.D.I Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 ML1006804482010-04-0202 April 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement February 19, 2010 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 ML0934106852009-12-10010 December 2009 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation Dated May 27, 2009 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 ML0934300032009-12-10010 December 2009 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement Dated August 28, 2009 C.D.I Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 ML0932706132009-12-10010 December 2009 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation Dated May 27, 2009 C.D.I Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 ML0701804442007-01-29029 January 2007 Withholding from Public Disclosure, Polestar-prepared Calculation, H21C092, U1 LOCA W/Loop, AST Methodology ML0610803382006-04-14014 April 2006 Withholding Letter to G Strambach, GE, GE Evaluation of OPRM Performance During Instability Events at Nine Mile Point Nuclear Station 2 and Perry Nuclear Power Plant (Mfn 06-089) ML0334603412003-12-12012 December 2003 Request for Withholding Information from Public Disclosure 2021-07-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 September 3, 2014 Mr. Christopher A. Costanzo Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. 0. Box 63 Lycoming, NY 13093
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT NO.2- REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE RE: LICENSE AMENDMENT REQUEST PURSUANT TO 10 CFR 50.90: MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS, DATED MARCH 10, 2014 (TAC NO. MF3056)
Dear Mr. Costanzo:
By letter dated March 10, 2014 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML14071A460), Nine Mile Point Nuclear Station, LLC (the licensee) submitted the affidavit executed by Peter M. Yandow, Manager, Nuclear Plant Projects [NPP] /Services Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas, LLC (GEH), 3901 Castle Hayne Road, Wilmington, NC 28401, on March 4, 2014.
The affidavit requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Part 2, Section 2.390(a)(4):
The information sought to be withheld is contained in Enclosure 1 of GEH letter, GE-PPO-IGYEF-KG1-728, "GEH Response to NRC Request for Additional Information in Support of NMP2 MELLLA+ License Amendment Request," dated March 4, 2014.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(4) The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs (4)a. and (4)b. Some examples of categories of information that fit into the definition of proprietary information are:
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies;
- b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product;
C. A. Costanzo (8) The information identified in paragraph (2) is classified as proprietary because it contains the detailed GEH methodology for maximum extended load line limit analysis and for the GEH Boiling Water Reactor (BWR). These methods, techniques, and data along with their application to the design, modification, and analyses associated with stability were achieved at a significant cost to GEH.
The development of the evaluation processes along with the interpretation and application of the analytical results is derived from the extensive experience and information databases that constitute a major GEH asset.
The information identified in the affidavit is contained in Attachment 3 (ADAMS Accession No. ML14071A467) of the CENG Letter to NRC, dated March 10, 2014, Nine Mile Point Nuclear Station, Unit No.2; Renewed Facility Operating License No. NPF-69, Docket No. 50-410, "License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus- Response to SRXB RAI 1 AND RAI 2 (TAC No. MF3056)".
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the submitted information in Attachment 3 of the submission, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
C. A. Costanzo The Nonproprietary versions of Attachment 3 of the licensee submittal (Attachment 1 of the licensee's submittal, part of ADAMS Accession No. ML14071A466) has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room.
If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely, Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-41 0 cc: Peter M. Yandow, Manager, Nuclear Plant Projects/Services Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas, LLC, 3901 Castle Hayne Road, Wilmington, NC28401 Additional Distribution via Listserv
ML14071A466) has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room.
If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely, IRA/
Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410 cc: Peter M. Yandow, Manager, Nuclear Plant Projects/Services Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas, LLC, 3901 Castle Hayne Road, Wilmington, NC28401 Additional Distribution via Listserv DISTRIBUTION:
PUBLIC LPL 1-1 R/F RidsNrrDssStsb Resource RidsNrrDorllpl1-1 Resource RidsNrrLAKGoldstein Resource RidsNrrPMNineMilePoint Resource RidsRgn1 MaiiCenter Resource RidsAcrsAcnw_MaiiCTR Resource RidsNrrDssSrxb Resource RidsNrrDssSnpb Resource RidsNrrDssEicb Resource RidsNrrDssScvb Resource DSchroeder, Region 1 ADAMS Accession No.: ML14072A015 (*)by email OFFICE NRRILPL 1-1\PM NRRILPL 1-1\LA NRRISRXB/BC NRRISNPB/BC(A(*)) NRR/EICB/BC(*)
NAME BVaidya KGoldstein CJackson JDean JThorp DATE 3/24/14 3/24/14 8/19/14 9/02/14 3/26/14 OFFICE NRR/ARCB/BC(*) NRR!SCVB/BC(*) NRR!STSB/BC NRRILPL 1-1/BC NRR/LPL 1-1/PM NAME US hoop RDennig REIIiott BBeasley BVaidya DATE 4/02/14 3/25/14 8/20/14 9/02/14 9/03/14