Letter Sequence Supplement |
|---|
|
|
MONTHYEARML14064A3232013-12-31031 December 2013 000N0123-FBIR-NP, Rev. 0, Fuel Bundle Information Report for Nine Mile Point 2 Reload 14 Cycle 15 Project stage: Request ML14002A1702014-01-0202 January 2014 Unacceptable Application with Opportunity to Supplement - Nine Mile Point Nuclear Station, Unit 2 - MF3056, License Amendment Request - Maximum Extended Load Line Limit Analysis Plus Project stage: Other ML14002A2202014-01-0202 January 2014 Revised Unacceptable Application with Opportunity to Supplement - Nine Mile Point Nuclear Station, Unit 2 - License Amendment Request - Maximum Extended Load Line Limit Analysis Plus Project stage: Other ML14023A6542014-01-21021 January 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Commitment Date to Provide Supplemental Information Project stage: Supplement ML14028A3982014-01-28028 January 2014 MF3056 - Acceptance of Requested Licensing Action License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Acceptance Review ML14064A3222014-01-31031 January 2014 00N0123-SRLR, Rev. 2, Supplemental Reload Licensing Report for Nine Mile Point 2 (NMP2) Reload 14 Cycle 15 Extended Power Uprate (Epu)/Maximum Extended Load Line Limit Plus (Mellla+) Project stage: Request ML14051A1382014-02-14014 February 2014 Response to Request for Supplemental Information to License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus Project stage: Supplement ML14043A0062014-02-20020 February 2014 First Round of Requests for Additional Information Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mella+) Project stage: RAI ML14063A4742014-02-25025 February 2014 License Amendment Request to Relocate the Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report - Supplement to Revise Implementation Date Project stage: Supplement ML14064A3212014-02-25025 February 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Core Reload and Safety Limit Supplemental Information Project stage: Supplement ML14064A3242014-02-28028 February 2014 000N2495-R1-NP, Rev. 0, Nine Mile Point Nuclear Station Unit 2 Comparison of Mellla+ Reference Design to Cycle 15 Design Characteristics Project stage: Request ML14029A0392014-03-0505 March 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated November 1, 2013 Project stage: Withholding Request Acceptance ML14051A0152014-03-0606 March 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated February 14, 2014 Project stage: Withholding Request Acceptance ML14071A4662014-03-10010 March 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Response to Srxb RAI 1 and RAI 2 Project stage: Request ML14071A2422014-03-12012 March 2014 NMP Unit 2, MF3056, 2nd Round of Draft RAIs - LAR License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Draft RAI ML14083A0232014-03-31031 March 2014 Second Round of Request for Additional Information Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: RAI ML14139A4162014-05-14014 May 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Response to RAI STSB-1 and RAI STSB-2 Project stage: Response to RAI ML14204A3692014-08-14014 August 2014 Third Round of Request for Additional Information & Enclosure 1, Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mellla+) (Tac No. MF3056) Project stage: RAI ML14065A0902014-09-0303 September 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated February 25, 2014 (Tac No. MF3056) Project stage: Withholding Request Acceptance ML14072A0152014-09-0303 September 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated March 10, 2014 Project stage: Withholding Request Acceptance ML14246A3962014-09-0303 September 2014 NMP Unit 2, MF3056, 4th Round of Draft RAIs - LAR License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Draft RAI NMP2L2556, Response to Request for Additional Information, License Amendment Request for Maximum Extended Load Line Limit Analysis Plus2014-09-15015 September 2014 Response to Request for Additional Information, License Amendment Request for Maximum Extended Load Line Limit Analysis Plus Project stage: Response to RAI ML14260A1202014-11-0606 November 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated September 15, 2014 (Tac No. MF3056) Project stage: Withholding Request Acceptance ML14314A2142014-11-10010 November 2014 MF3056, E-mail Capture - LAR Mellla+, Simulator Audit Plan, November 20-21, 2014 at the Plant Site Project stage: Approval ML14321A0642014-11-17017 November 2014 Point Unit 2, MF3056, LAR Mellla+, Supplement to the Simulator Audit Plan Project stage: Approval ML14351A4282014-12-11011 December 2014 Updated TIP Comparisons for Current Operating Conditions, GE-PPO- 1GYEF-KG1-742, Enclosure 2 Project stage: Request ML15002A1622015-01-26026 January 2015 Request for Withholding Information from Public Disclosure Submission Dated December 11, 2014, for Supplement Information for NRC Simulator Audit LAR for Mellla+ Project stage: Withholding Request Acceptance ML15033A0022015-01-30030 January 2015 MF3056, LAR - Mellla+, Revised RAI - Neutron Fluence Calculation Related Project stage: RAI ML15051A4642015-02-18018 February 2015 Response to Fifth Request for Additional Information Concerning License Amendment Request for Maximum Extended Load Line Limit Analysis Plus Project stage: Request ML15056A3792015-03-16016 March 2015 Request for Withholding Information from Public Disclosure Submission Dated February 18, 2015, for License Amendment Request Pursuant to 10 CFR 50.90 Maximum Extended Load Line Limit Analysis Plus Project stage: Withholding Request Acceptance ML15105A4432015-05-0404 May 2015 Draft Safety Evaluation for License Amendment Request - Mellla+ Project stage: Draft Approval ML15114A1602015-05-0707 May 2015 Issuance of Simulator Audit Report License Amendment Request Regarding MELLLA Plus Project stage: Approval ML15096A0762015-09-0202 September 2015 Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus Project stage: Approval ML15210A3262015-09-0404 September 2015 LTR-15-0388-1 - John W. Stetkar Letter Nine Mile Point Nuclear Station Unit 2 Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request Project stage: Other 2014-03-12
[Table View] |
Text
Christopher R. Costanzo Vice President-Nine Mile Point 315.349.5200 Fax 315.349.1321 E-mail: Christopher.Costanzo@cengllc.com CENG a joint venture of Constellation 6#4eDF
- Energy, 0
NINE MILE POINT NUCLEAR STATION January 21, 2014 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:
SUBJECT:
Document Control Desk Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 Docket No. 50-410 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Commitment Date to Provide Supplemental Information (a) Letter from P. Swift (NMPNS) to Document Control Desk (NRC), dated November 1, 2013, License Amendment Request Pursuant to 10 CFR 50.90:
Maximum Extended Load Line Limit Analysis Plus
REFERENCE:
Nine Mile Point Nuclear Station, LLC (NMPNS) hereby submits a commitment date to provide a supplement to the Nine Mile Point Unit 1 (NMPI) License Amendment Request for Maximum Extended Load Line Limit Analysis Plus, Reference (a), as requested by the NRC staff in an email from B. Vaidya (NRC) dated January 2, 2014, "Unacceptable Application With Opportunity To Supplement - Nine Mile Point Nuclear Station, Unit 2 - License Amendment Request - Maximum Extended Load Line Limit Analysis Plus."
As requested in the January 2, 2014 email, NMPNS commits to supplement the license amendment request application, Reference (a), by February 14, 2014. The supplement will provide the diversity information requested, and the associated analysis, as clarified in the conference call with the NRC staff on January 15, 2014.
Pursuant to 10 CFR 50.91(b)(1), NMPNS has provided a copy of this supplemental letter to the appropriate state representative. This supplemental letter does not change the initial determination of "no significant hazards consideration" justified in the original amendment request, Reference (a).
Nine Mile Point Nuclear Station P.O. Box 63, Lycoming, NY 13093 pot
Document Control Desk January 21, 2014 Page 2 Should you have any questions regarding the information in this submittal, please contact Everett (Chip)
Perkins, Director Licensing, at (315) 349-5219.
Sincerely, CRC/KJK cc:
Regional Administrator, Region I, NRC Project Manager, NRC Resident Inspector, NRC A. L. Peterson, NYSERDA