MONTHYEARML14064A3232013-12-31031 December 2013 000N0123-FBIR-NP, Rev. 0, Fuel Bundle Information Report for Nine Mile Point 2 Reload 14 Cycle 15. Project stage: Request ML14002A1702014-01-0202 January 2014 Unacceptable Application with Opportunity to Supplement - Nine Mile Point Nuclear Station, Unit 2 - MF3056, License Amendment Request - Maximum Extended Load Line Limit Analysis Plus Project stage: Other ML14002A2202014-01-0202 January 2014 Revised Unacceptable Application with Opportunity to Supplement - Nine Mile Point Nuclear Station, Unit 2 - License Amendment Request - Maximum Extended Load Line Limit Analysis Plus Project stage: Other ML14023A6542014-01-21021 January 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Commitment Date to Provide Supplemental Information Project stage: Supplement ML14028A3982014-01-28028 January 2014 MF3056 - Acceptance of Requested Licensing Action License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Acceptance Review ML14064A3222014-01-31031 January 2014 00N0123-SRLR, Rev. 2, Supplemental Reload Licensing Report for Nine Mile Point 2 (NMP2) Reload 14 Cycle 15 Extended Power Uprate (Epu)/Maximum Extended Load Line Limit Plus (Mellla+). Project stage: Request ML14051A1382014-02-14014 February 2014 Response to Request for Supplemental Information to License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus Project stage: Supplement ML14043A0062014-02-20020 February 2014 First Round of Requests for Additional Information Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mella+) Project stage: RAI ML14064A3212014-02-25025 February 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Core Reload and Safety Limit Supplemental Information Project stage: Supplement ML14064A3242014-02-28028 February 2014 000N2495-R1-NP, Rev. 0, Nine Mile Point Nuclear Station Unit 2 Comparison of Mellla+ Reference Design to Cycle 15 Design Characteristics. Project stage: Request ML14029A0392014-03-0505 March 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated November 1, 2013 Project stage: Withholding Request Acceptance ML14051A0152014-03-0606 March 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated February 14, 2014 Project stage: Withholding Request Acceptance ML14071A4662014-03-10010 March 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Response to Srxb RAI 1 and RAI 2 Project stage: Request ML14071A2422014-03-12012 March 2014 NMP Unit 2, MF3056, 2nd Round of Draft RAIs - LAR License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Draft RAI ML14083A0232014-03-31031 March 2014 Second Round of Request for Additional Information Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: RAI ML14139A4162014-05-14014 May 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Response to RAI STSB-1 and RAI STSB-2 Project stage: Response to RAI ML14204A3692014-08-14014 August 2014 Third Round of Request for Additional Information & Enclosure 1, Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mellla+) (Tac No. MF3056) Project stage: RAI ML14072A0152014-09-0303 September 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated March 10, 2014 Project stage: Withholding Request Acceptance ML14246A3962014-09-0303 September 2014 NMP Unit 2, MF3056, 4th Round of Draft RAIs - LAR License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Draft RAI ML14065A0902014-09-0303 September 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated February 25, 2014 (Tac No. MF3056) Project stage: Withholding Request Acceptance NMP2L2556, Response to Request for Additional Information, License Amendment Request for Maximum Extended Load Line Limit Analysis Plus2014-09-15015 September 2014 Response to Request for Additional Information, License Amendment Request for Maximum Extended Load Line Limit Analysis Plus Project stage: Response to RAI ML14260A1202014-11-0606 November 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated September 15, 2014 (Tac No. MF3056) Project stage: Withholding Request Acceptance ML14314A2142014-11-10010 November 2014 MF3056, E-mail Capture - LAR Mellla+, Simulator Audit Plan, November 20-21, 2014 at the Plant Site Project stage: Other ML14321A0642014-11-17017 November 2014 Point Unit 2, MF3056, LAR Mellla+, Supplement to the Simulator Audit Plan Project stage: Other ML14351A4282014-12-11011 December 2014 Updated TIP Comparisons for Current Operating Conditions, GE-PPO- 1GYEF-KG1-742, Enclosure 2 Project stage: Request ML15002A1622015-01-26026 January 2015 Request for Withholding Information from Public Disclosure Submission Dated December 11, 2014, for Supplement Information for NRC Simulator Audit LAR for Mellla+ Project stage: Withholding Request Acceptance ML15033A0022015-01-30030 January 2015 MF3056, LAR - Mellla+, Revised RAI - Neutron Fluence Calculation Related Project stage: RAI ML15051A4642015-02-18018 February 2015 Response to Fifth Request for Additional Information Concerning License Amendment Request for Maximum Extended Load Line Limit Analysis Plus Project stage: Request ML15056A3792015-03-16016 March 2015 Request for Withholding Information from Public Disclosure Submission Dated February 18, 2015, for License Amendment Request Pursuant to 10 CFR 50.90 Maximum Extended Load Line Limit Analysis Plus Project stage: Withholding Request Acceptance ML15105A4432015-05-0404 May 2015 Draft Safety Evaluation for License Amendment Request - Mellla+ Project stage: Draft Approval ML15114A1602015-05-0707 May 2015 Issuance of Simulator Audit Report License Amendment Request Regarding MELLLA Plus Project stage: Approval ML15096A0762015-09-0202 September 2015 Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus Project stage: Approval ML15210A3262015-09-0404 September 2015 LTR-15-0388-1 - John W. Stetkar Letter Nine Mile Point Nuclear Station Unit 2 Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request Project stage: Other 2014-03-12
[Table View] |
MF3056, E-mail Capture - LAR Mellla+, Simulator Audit Plan, November 20-21, 2014 at the Plant SiteML14314A214 |
Person / Time |
---|
Site: |
Nine Mile Point |
---|
Issue date: |
11/10/2014 |
---|
From: |
Bhalchandra Vaidya Plant Licensing Branch 1 |
---|
To: |
David Gudger, Kristensen K, Tom Loomis, Reynolds R Exelon Corp, Exelon Nuclear Generation Corp |
---|
Vaidya B, NRR/DORL, 415-3308 |
References |
---|
TAC MF3056 |
Download: ML14314A214 (2) |
|
|
---|
Category:Audit Plan
MONTHYEARML23025A3862023-01-31031 January 2023 Regulatory Audit Plan in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 ML22214A0042022-08-0202 August 2022 Audit Plan to Support the Review of Amendments to Revise Criticality Safety Analysis Methodologies (Epids L-2022-LLA-0085, L-2021-LLA-0124, and L-2021-LLA-0159) ML20094J1562020-04-22022 April 2020 Audit Plan Supplement in Support of Review of License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times ML20094K4222020-04-20020 April 2020 Audit Plan Supplement in Support of Review of License Amendment Request Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML20037A0652020-02-0606 February 2020 Audit Plan Regarding License Amendment Request Regarding Risk Informed Categorization and Treatment of Structures, Systems and Components (L-2019-LLA-0290) ML17220A3282017-08-10010 August 2017 Nuclear Regulatory Commission Audits of Licensee Responses to Phase 2 of Order EA-13-109 to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML15289A5262015-10-20020 October 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 ML14314A2142014-11-10010 November 2014 MF3056, E-mail Capture - LAR Mellla+, Simulator Audit Plan, November 20-21, 2014 at the Plant Site ML14083A6202014-03-26026 March 2014 Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051 2023-01-31
[Table view] Category:E-Mail
MONTHYEARML24008A0592024-01-0808 January 2024 E-mail Dated 1-8-2024 from R. Guzman to R. Reynolds Correct TS Page 204 for License Amendment No. 250 Adoption of TSTF-505 ML24008A2622024-01-0808 January 2024 Acceptance Review Determination for Relief Request I5R-12, Concerning Installation of a FSWOL on RPV Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23205A2432023-07-19019 July 2023 NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23205A2412023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 6a, 6b, and 6c TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23205A2422023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 17 and 19 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7692023-06-14014 June 2023 Draft Audit Results File TSTF-505 and 50.69 (E-mail Dated 6/14/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7672023-06-13013 June 2023 Share File Observations on Response to Question 06 and 22 TSTF-505 and 50.69 (E-mail Dated 6/13/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23149A0012023-05-29029 May 2023 Audit Agenda TSTF-505 and 50.69 (E-mail Dated 5/29/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23142A0222023-05-22022 May 2023 Regulatory Audit Questions (PRA) TSTF-505 and 50.69 (E-mail Dated 5/22/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23118A3882023-04-28028 April 2023 Regulatory Audit Questions TSTF-505 and 50.69 (E-mail Dated 4/28/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23104A3472023-04-14014 April 2023 Verbal Authorization for Relief Request I5R-14, Proposed Alternative Associated with N2E Dissimilar Metal Weld Overlay Repair with Laminar Indication ML23093A1782023-04-0303 April 2023 E-mail from T. Loomis to R. Guzman Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3 ML23090A1302023-03-31031 March 2023 Verbal Authorization for Relief Request I5R-11, Proposed Alternative Repair of Recirculation Inlet Nozzle N2E Dissimilar Metal Weld ML23087A2912023-03-28028 March 2023 Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM Weld ML23061A0522023-03-0202 March 2023 Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the Torus ML23047A3832023-02-15015 February 2023 (2-15-2023 Email from J. Nelson to R. Guzman) Long Island Power Authority and Long Island Lighting Company Request for Threshold Determination ML23033A0142023-02-0202 February 2023 E-mail Dated 2-2-2023 from R.Guzman to R.Reynolds Correction to Error in NMP1 TSTF-505 and 50.69 Audit Plan ML23019A3092023-01-19019 January 2023 Acceptance Review Determination License Amendment Request to Adopt 10 CFR 50.69 Categorization Process ML23019A3032023-01-19019 January 2023 Acceptance Review Determination License Amendment Requets to Adopt TSTF-505 ML23013A3332023-01-13013 January 2023 Acceptance Review Determination Proposed Alternative for Weld Overlay Repair to the Torus ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22342B1462022-11-21021 November 2022 NRR E-mail Capture - Acceptance Review for TSTF 295A ML22314A2262022-11-10010 November 2022 E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22252A1522022-09-0909 September 2022 Acceptance Review Determination Partial Adoption of TSTF-568 to Revise TS 3.3.1 for Primary Containment Oxygen Concentration ML22207A0192022-07-26026 July 2022 (E-mail Dated 7/26/2022) Setup of Online Reference Portal for Revision to Alternative Source Term Calculation for MSIV and Non-MSIV Leakage ML22207A0122022-07-26026 July 2022 Acceptance Review Determination Revision to Alternative Source Term Analysis for Containment Leakage ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22194A9412022-07-13013 July 2022 Request for Additional Information Relief Request CS-PR-02 (7/13/2022 e-mail) ML22173A0802022-06-22022 June 2022 E-mail Dated 6/22/2022, Acceptance of Requested License Amendment Request to Revise Surveillance Requirements to Reduce Number of Fast Starts of EDGs ML22075A0362022-03-16016 March 2022 Acceptance Review Determination - Relief Request CS-PR-02 Associated with Pump Periodic Verification Test of Core Spray System Pumps, E-mail Dated 3/16/2022 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21320A3472021-11-16016 November 2021 Request for Additional Information LAR to Revise TSs to Adopt TSTF-582, Revision 0 ML21306A3312021-11-0202 November 2021 Request for Additional Information Alternative Request GV-RR-10 (11/2/2021 e-mail) ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21298A0912021-10-25025 October 2021 E-mail Dated 10/25/2021, Acceptance of Requested License Amendment Request to Adopt Technical Specification Task Force Traveler 582 ML21292A2122021-10-19019 October 2021 NRR E-mail Capture - NRC Notification to the State of New York Regarding a Nine Mile Point Nuclear Station, Unit 2 Amendment - Adopt TSTF-501, Rev. 1 ML21278A6872021-10-0505 October 2021 Acceptance Review Determination - Relief Request GV-RR-10 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21168A3462021-06-17017 June 2021 Acceptance of Requested Licensing Action License Amendment Request - Adoption of TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (EPID L-2021-LLA-0096) (Email) 2024-01-08
[Table view] |
Text
From: Vaidya, Bhalchandra Sent: Monday, November 10, 2014 11:02 AM To: 'Terry.Syrell@exeloncorp.com'; Kristensen, Kenneth J:(NMP)
(kenneth.kristensen@exeloncorp.com); Loomis, Thomas R:(GenCo-Nuc) (thomas.loomis@exeloncorp.com); Reynolds, Ronnie J.:(GenCo-Nuc) (Ronnie.Reynolds@exeloncorp.com);
David.Gudger@exeloncorp.com Cc: Beasley, Benjamin; Stattel, Richard; Thorp, John; Bucholtz, Kristy; Elliott, Robert; Dozier, Jerry; Shoop, Undine; Guzzetta, Ashley;
'Huang, Tai'; Jackson, Christopher; Karipineni, Nageswara; Dennig, Robert; Panicker, Mathew; Dean, Jeremy; Weerakkody, Sunil; Eagle, Eugene; Green, Brian; Ki, DaBin; Chung, Donald
Subject:
Nine Mile Point Unit 2, MF3056, LAR re: MELLLA+, Simulator Audit Plan, November 20-21, 2014 at the Plant Site
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT NO. 2 - FORTH ROUND OF REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST PURSUANT TO 10 CFR 50.90: MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS (MELLLA+) (TAC NO.
MF3056)
By letter dated November 1, 2013 (Agencywide Document Access and Management System (ADAMS)
Package Accession No. ML13316B090), as supplemented by letters dated January 21, 2014 (ADAMS Accession No. ML14023A654), February 14, 2014 (ADAMS Package Accession No. ML14051A155),
February 25, 2014 (ADAMS Accession No. ML14064A321), March 10, 2014 (ADAMS Accession No. ML14071A466), May 14, 2014 (ADAMS Accession No. ML14139A416), and June 13, 2014 (ADAMS Accession No ML14169A034), Nine Mile Point Nuclear Station, LLC (the licensee) submitted a license amendment request for Nine Mile Point Nuclear Station, Unit 2. The proposed amendment would allow (1) operation in the expanded maximum extended load line limit analysis plus (MELLLA+) domain; (2) use of the Detect and Suppress Solution - Confirmation Density, DSS-CD stability solution; (3) use of the TRACG04 analysis code; (4) increase the isotopic enrichment of boron-10 in the sodium pentaborate solution used to prepare the neutron absorber solution in the Standby Liquid Control System (SLS); and (5) increase the Safety Limit Minimum Critical Power Ratio (SLMCPR) for two recirculation loops in operation.
During its review of the LAR, the U.S. Nuclear Regulatory Commission (NRC) staff identified several open items associated with the safety analyses that warrants resolution with an audit.
The audit is required to close all the open items and to complete the staffs review of the application.
Provided below is the NRC staffs audit plan to review the Operator actions related to Nine Mile Point Nuclear Station Unit-2 maximum extended load line limit analysis plus (MELLLA+)
licensing amendment request. The main purpose of the audit is to witness the operator actions using the simulator during potential thermal-hydraulic instability events. The audit is planned for November 20-21, 2014 in Oswego, New York.
============================================================
=========
AUDIT PLAN RELATED TO LICENSE AMENDMENT REQUEST FOR MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS EXELON GENERATION COMPANY, LLC NINE MILE POINT NUCLEAR STATION, UNIT 2 DOCKET NO. 50-410
Purpose and Scope By letter dated November 1, 2013 (Agency wide Documents Access and Management System (ADAMS) Accession No. ML13316B090), Exelon Generation Company, LLC (Exelon, the licensee), submitted a License Amendment Request (LAR) for maximum extended load line limit analysis plus (MELLLA+) operation. The proposed LAR would allow operation in the expanded MELLLA+ operating domain. During its review of the LAR, the U.S. Nuclear Regulatory Commission (NRC) staff identified several open items associated with the safety analyses that warrant resolution with an audit. The audit is required to close all the open items and to complete the staffs review of the Application.
Audit Agenda The audit will take place from November 20 to November 21 (if needed), 2014, at Nine Mile Point Unit-2 site, Oswego, New York. The following are the planned discussion topics:
- Status of MELLLA+ upgrade
- Experiences/problems with the extended power uprate (EPU) implementation and implications for MELLLA+ implementation
- Implementation of Detect and Suppress Solution (DSS)-Confirmation Density (CD)
- Review of Supplemental Reload Licensing Report (SRLR) and Traversing Incore Probe (TIP)
Report
- Simulator Exercises/Emergency Operating Procedures
- Confirmation of feasibility of manual actions Staff review of Emergency Operating Procedures (EOPs) related to plant operation during plant instability events.
Staff tour of the simulator before the exercise to familiarize with the instrumentation and control of the simulator.
In addition, the NRC staff would like a brief simulator demonstration of the MELLLA+ operation using plant procedures by the licensed operators. The purpose of this demonstration is to provide a better understanding of the operation of the oscillation power range monitor and the transfer to automatic backup stability protection during NUMAC system failures. The NRC staff would like to observe an inoperability of both functions, which would lead to a manual operator action during an instability event. (Note: We suggest including one or more licensed operators in the requested support personnel section. We would like to discuss the operator actions and the use of EOPs during an instability event with licensed operators during the simulator activity.)
The following scenarios are recommended:
From full EPU power and low flow (~85%) perform the following transients:
Full isolation ATWS with complete rod failure. Transient initiates with a MSIV closure, with complete failure to insert rods. Alternate rod insertion fails. Only SLCS is effective.
Depressurization and HCTL related actions.
ATWS/Stability. Transient initiates with turbine trip with bypass. Simulate unstable power oscillations (verbal operator instruction is acceptable to simulate the oscillations).
Audit Team The audit team will consist of:
- Ashley Guzzetta, Reactor Systems Branch Technical Reviewer, Office of Nuclear Reactor Regulation (NRR) (Team Leader)
- Rich Stattel, Instrumentation & Controls Branch Technical Reviewer, NRR
- George Lapinsky, DaBin Ki, PRA Operations & Human Factors Branch Reviewers, NRR
- Benjamin Beasley, Branch Chief, Plant Licensing, NRR The following support personnel are requested:
- Licensing staff from Exelon
- Cognizant staff engineers from Exelon (specifically thermal hydraulics and Analysts)
Documents Requested for Staff Examination The NRC staff requests that documentation pertaining to the MELLLA+ LAR be made available, especially the following:
- 1. EOPs related to thermal-hydraulic instability events
- 2. SRLR, and
- 3. TIP Report for a recent cycle Logistical Considerations The NRC staff prefers to be able to process searches, electronically, in the design record files and retrieve documents from that system as needed during the audit. The following logistics are also requested:
- Telephone available to call NRC Headquarters if necessary
- Private space for internal NRC staff discussion separate from the licensee or GEHitachi Nuclear Energy Americas LLC staff
- A white board in the conference room to assist in discussion
- A projector and screen for presentations Documentation of Audit Within 45 days of the audit, the NRC staff will prepare a detailed audit report documenting the information reviewed during the audit, and any open items identified as a result of the audit. The NRC staff will also document its understanding of the proposed resolution of any identified open items. The audit report will be provided to the licensee in draft form for proprietary markup.
============================================================
=======
If you have any questions regarding the Audit Plan please let me know.
Bhalchandra K. Vaidya Licensing Project Manager
NRC/NRR/DORL/LPL1-1 (301)-415-3308 (O) bhalchandra.vaidya@nrc.gov