ML15098A284: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML15098A284 | | number = ML15098A284 | ||
| issue date = 04/07/2015 | | issue date = 04/07/2015 | ||
| title = | | title = Notification of Evaluations of Changes, Tests and Experiments and Permanent Plant Modification (05000498/2015007 and 05000499/2015007) and Request for Information | ||
| author name = Farmholtz T | | author name = Farmholtz T | ||
| author affiliation = NRC/RGN-IV/DRS/EB-1 | | author affiliation = NRC/RGN-IV/DRS/EB-1 | ||
| addressee name = Koehl D | | addressee name = Koehl D | ||
| addressee affiliation = South Texas Project Nuclear Operating Co | | addressee affiliation = South Texas Project Nuclear Operating Co | ||
| docket = 05000498, 05000499 | | docket = 05000498, 05000499 | ||
Line 14: | Line 14: | ||
| page count = 6 | | page count = 6 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000498/2015007]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 E. LAMAR BLVD. | |||
ARLINGTON, TX 76011-4511 | |||
April 7, 2015 | |||
Mr. Dennis L. Koehl | |||
President and CEO/CNO | |||
STP Nuclear Operating Company | |||
P.O. Box 289 | |||
Wadsworth, TX 77483 | |||
SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF | |||
EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND | |||
PERMANENT PLANT MODIFICATIONS INSPECTION (05000498/2015007 and | |||
05000499/2015007) AND REQUEST FOR INFORMATION | |||
Dear Mr. Koehl: | |||
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff | |||
will conduct the baseline inspection of changes, tests, experiments, and permanent plant | |||
modifications at your South Texas Project, Units 1 and 2, from June 1-5, 2015, and June 15-20, | |||
2015. The inspection will consist of three reactor inspectors from the NRCs Region IV office for | |||
two weeks. The inspection will be conducted in accordance with NRC Inspection | |||
Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant | |||
Modifications. | |||
Experience has shown that this inspection is resource intensive for both the NRC inspectors | |||
and your staff. In order to minimize the impact to your onsite resources and to ensure a | |||
productive inspection, we have enclosed a request for documents needed for this inspection. | |||
Please note that the documents are requested to be provided by May 26, 2015. Upon review of | |||
these documents, the inspectors will select additional documentation for review upon arrival. It | |||
is important that all of these documents are up-to-date and complete in order to minimize the | |||
number of additional documents requested during the preparation and/or the onsite portions of | |||
the inspection. | |||
We have discussed the schedule for these inspection activities with your staff and understand | |||
that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing | |||
organization. If there are any questions about this inspection or the material requested, please | |||
contact the lead inspector, Gerond George, by telephone at 817-200-1562 or by e-mail at | |||
Gerond.George@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject to the | |||
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | |||
requirements were approved by the Office of Management and Budget, Control | |||
Number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
D. Koehl -2- | |||
requesting document displays a currently valid Office of Management and Budget Control | |||
Number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its | |||
enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records (PARS) component of NRC's document system | |||
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Thomas R. Farnholtz, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Dockets: 50-498; 50-499 | |||
Licenses: NPF-76; NPF-80 | |||
Enclosure: | |||
Evaluations of Changes, Tests, and Experiments | |||
and Permanent Plant Modifications Inspection | |||
Request for Information | |||
Electronic Distribution to the South Texas Project | |||
Request for Information | |||
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications | |||
Inspection | |||
South Texas Project | |||
Inspection Report: 05000498/2015007 and 05000499/2015007 | |||
Onsite Inspection Dates: June 1-5, 2015 | |||
June 15-20, 2015 | |||
Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments | |||
and Permanent Plant Modifications | |||
Lead Inspector: Gerond A. George, Senior Reactor Inspector | |||
Information Requested for the In-Office Preparation Week | |||
The following information should be sent to the Region IV office in hard copy or electronic | |||
format (preferred) by May 26, 2015, to the attention of Gerond A. George. We request that you | |||
categorize the documents in your response with the numbered list below. If only hard copies of | |||
the requested documents are available or if the electronic format is too large, please inform the | |||
lead inspector and provide the documents on the first day of the onsite inspection. Also, the | |||
inspectors will select specific items from the information requested below and request from your | |||
staff additional documents needed during the onsite inspection weeks. We ask that the specific | |||
items requested be available and ready for review on the first day of inspection. If you have any | |||
questions regarding this information request, please contact the lead inspector as soon as | |||
possible. | |||
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations. | |||
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since | |||
the last triennial modification inspection that did not result in an evaluation. | |||
3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial | |||
modification inspection that did not result in an application for license amendment. | |||
4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 | |||
screenings and evaluations since the last triennial modification inspection. | |||
5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, | |||
including qualification dates. | |||
6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or | |||
evaluations, including qualification dates. | |||
7. Procedure(s) for implementing permanent plant modifications. | |||
8. A list with descriptions of all permanent plant modifications since the last triennial | |||
modification inspection. | |||
-1- Enclosure | |||
9. A list with descriptions of all corrective action documents related to permanent plant | |||
modifications since the last triennial modification inspection. | |||
10. Current revisions of the Technical Specifications and Bases and the Updated Final | |||
Safety Analysis Report. | |||
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can | |||
determine the safety and/or risk significance of the screenings, evaluations, and modifications. | |||
Note: For this inspection, permanent plant modifications include permanent plant changes, | |||
design changes, set point changes, procedure changes, equivalency evaluations, suitability | |||
analyses, calculations, and commercial grade dedications. | |||
Inspector Contact Information: | |||
Gerond A. George Jonathan Braisted Inspector Number 3 to be | |||
Senior Reactor Inspector Reactor Inspector named at later date. | |||
817-200-1562 817-200-1194 | |||
Gerond.George@nrc.gov Jonathan.Braisted@nrc.gov | |||
Mailing Address: | |||
U.S. NRC, Region IV | |||
Attn: Gerond A. George | |||
1600 East Lamar Blvd. | |||
Arlington, TX 76011-4125 | |||
-2- | |||
D. Koehl -2- | |||
requesting document displays a currently valid Office of Management and Budget Control | |||
Number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its | |||
enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records (PARS) component of NRC's document system | |||
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Thomas R. Farnholtz, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Dockets: 50-498; 50-499 | |||
Licenses: NPF-76; NPF-80 | |||
Enclosure: | |||
Evaluations of Changes, Tests, and Experiments | |||
and Permanent Plant Modifications Inspection | |||
Request for Information | |||
Electronic Distribution to South Texas Project | |||
D. Koehl - 2 - | |||
In accordance with 10 CFR 2.390 of the | |||
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system | |||
(ADAMS). | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Dockets: | |||
Licenses: | |||
Enclosure: | |||
Evaluations of Changes, Tests, and Experiments | |||
Request for Information | |||
Electronic Distribution to South Texas Project | |||
Distribution | Distribution | ||
See next page | |||
ADAMS Accession Number: ML15098A284 | |||
SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword | |||
By: GAG Yes No Non-Sensitive Publicly Available NRC-002 | |||
OFFICE SRI:DRS/EB1 C:DRS/EB1 | |||
NAME GGeorge TFarnholtz | |||
SIGNATURE /RA/ /RA/ | |||
DATE 4/6/15 4/7/15 | |||
OFFICIAL RECORD COPY | |||
Letter to Dennis Koehl from Thomas Farnholtz dated April 7, 2015 | |||
SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF | |||
EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND | |||
PERMANENT PLANT MODIFICATIONS INSPECTION (05000498/2015007 and | |||
05000499/2015007) AND REQUEST FOR INFORMATION | |||
Electronic Distribution: | |||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
PERMANENT PLANT MODIFICATIONS INSPECTION (05000498/2015007 and | DRP Director (Troy.Pruett@nrc.gov) | ||
05000499/2015007) AND REQUEST FOR INFORMATION | DRP Deputy Director (Ryan.Lantz@nrc.gov) | ||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | Senior Resident Inspector (Alfred.Sanchez@nrc.gov) | ||
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) | Resident Inspector (Nicholas.Hernandez@nrc.gov) | ||
DRS Deputy Director (Jeff.Clark@nrc.gov) | Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) | ||
Senior Resident Inspector (Alfred.Sanchez@nrc.gov) | Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) | ||
Resident Inspector (Nicholas.Hernandez@nrc.gov) Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) | Project Engineer, DRP/B (Fabian.Thomas@nrc.gov) | ||
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov) | Project Engineer, DRP/B (Steven.Janicki@nrc.gov) | ||
Project Engineer, DRP/B (Steven.Janicki@nrc.gov) | STP Administrative Assistant (Lynn.Wright@nrc.gov) | ||
STP Administrative Assistant (Lynn.Wright@nrc.gov) | Public Affairs Officer (Victor.Dricks@nrc.gov) | ||
Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) | Public Affairs Officer (Lara.Uselding@nrc.gov) | ||
Project Manager (Lisa.Regner@nrc.gov) | Project Manager (Lisa.Regner@nrc.gov) | ||
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | RITS Coordinator (Marisa.Herrera@nrc.gov) | ||
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | Regional Counsel (Karla.Fuller@nrc.gov) | ||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | Technical Support Assistant (Loretta.Williams@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
RIV/ETA: OEDO (Michael.Waters@nrc.gov) | RIV/ETA: OEDO (Michael.Waters@nrc.gov) | ||
}} | }} |
Latest revision as of 13:16, 31 October 2019
ML15098A284 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 04/07/2015 |
From: | Farmholtz T Region 4 Engineering Branch 1 |
To: | Koehl D South Texas |
G. George | |
References | |
IR 2015007 | |
Download: ML15098A284 (6) | |
See also: IR 05000498/2015007
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511
April 7, 2015
Mr. Dennis L. Koehl
President and CEO/CNO
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, TX 77483
SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF
EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND
PERMANENT PLANT MODIFICATIONS INSPECTION (05000498/2015007 and
05000499/2015007) AND REQUEST FOR INFORMATION
Dear Mr. Koehl:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct the baseline inspection of changes, tests, experiments, and permanent plant
modifications at your South Texas Project, Units 1 and 2, from June 1-5, 2015, and June 15-20,
2015. The inspection will consist of three reactor inspectors from the NRCs Region IV office for
two weeks. The inspection will be conducted in accordance with NRC Inspection
Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant
Modifications.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by May 26, 2015. Upon review of
these documents, the inspectors will select additional documentation for review upon arrival. It
is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Gerond George, by telephone at 817-200-1562 or by e-mail at
Gerond.George@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control
Number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
D. Koehl -2-
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Dockets: 50-498; 50-499
Enclosure:
Evaluations of Changes, Tests, and Experiments
and Permanent Plant Modifications Inspection
Request for Information
Electronic Distribution to the South Texas Project
Request for Information
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
Inspection
South Texas Project
Inspection Report: 05000498/2015007 and 05000499/2015007
Onsite Inspection Dates: June 1-5, 2015
June 15-20, 2015
Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments
and Permanent Plant Modifications
Lead Inspector: Gerond A. George, Senior Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by May 26, 2015, to the attention of Gerond A. George. We request that you
categorize the documents in your response with the numbered list below. If only hard copies of
the requested documents are available or if the electronic format is too large, please inform the
lead inspector and provide the documents on the first day of the onsite inspection. Also, the
inspectors will select specific items from the information requested below and request from your
staff additional documents needed during the onsite inspection weeks. We ask that the specific
items requested be available and ready for review on the first day of inspection. If you have any
questions regarding this information request, please contact the lead inspector as soon as
possible.
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since
the last triennial modification inspection that did not result in an evaluation.
3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial
modification inspection that did not result in an application for license amendment.
4. A list with descriptions of all corrective action documents related to 10 CFR 50.59
screenings and evaluations since the last triennial modification inspection.
5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
including qualification dates.
6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
evaluations, including qualification dates.
7. Procedure(s) for implementing permanent plant modifications.
8. A list with descriptions of all permanent plant modifications since the last triennial
modification inspection.
-1- Enclosure
9. A list with descriptions of all corrective action documents related to permanent plant
modifications since the last triennial modification inspection.
10. Current revisions of the Technical Specifications and Bases and the Updated Final
Safety Analysis Report.
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Note: For this inspection, permanent plant modifications include permanent plant changes,
design changes, set point changes, procedure changes, equivalency evaluations, suitability
analyses, calculations, and commercial grade dedications.
Inspector Contact Information:
Gerond A. George Jonathan Braisted Inspector Number 3 to be
Senior Reactor Inspector Reactor Inspector named at later date.
817-200-1562 817-200-1194
Gerond.George@nrc.gov Jonathan.Braisted@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Gerond A. George
1600 East Lamar Blvd.
Arlington, TX 76011-4125
-2-
D. Koehl -2-
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Dockets: 50-498; 50-499
Enclosure:
Evaluations of Changes, Tests, and Experiments
and Permanent Plant Modifications Inspection
Request for Information
Electronic Distribution to South Texas Project
Distribution
See next page
ADAMS Accession Number: ML15098A284
SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword
By: GAG Yes No Non-Sensitive Publicly Available NRC-002
OFFICE SRI:DRS/EB1 C:DRS/EB1
NAME GGeorge TFarnholtz
SIGNATURE /RA/ /RA/
DATE 4/6/15 4/7/15
OFFICIAL RECORD COPY
Letter to Dennis Koehl from Thomas Farnholtz dated April 7, 2015
SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF
EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND
PERMANENT PLANT MODIFICATIONS INSPECTION (05000498/2015007 and
05000499/2015007) AND REQUEST FOR INFORMATION
Electronic Distribution:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Nicholas.Hernandez@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Lisa.Regner@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)