ML15098A284: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15098A284
| number = ML15098A284
| issue date = 04/07/2015
| issue date = 04/07/2015
| title = South Texas Project, Units 1 and 2, Notification of Evaluations of Changes, Tests and Experiments and Permanent Plant Modification (05000498/2015007 and 05000499/2015007) and Request for Information
| title = Notification of Evaluations of Changes, Tests and Experiments and Permanent Plant Modification (05000498/2015007 and 05000499/2015007) and Request for Information
| author name = Farmholtz T R
| author name = Farmholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Koehl D L
| addressee name = Koehl D
| addressee affiliation = South Texas Project Nuclear Operating Co
| addressee affiliation = South Texas Project Nuclear Operating Co
| docket = 05000498, 05000499
| docket = 05000498, 05000499
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
See also: [[followed by::IR 05000498/2015007]]
See also: [[see also::IR 05000498/2015007]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511  
{{#Wiki_filter:UNITED STATES
April 7, 2015  
                            NUCLEAR REGULATORY COMMISSION
                                                REGION IV
                                          1600 E. LAMAR BLVD.
Mr. Dennis L. Koehl President and CEO/CNO  
                                        ARLINGTON, TX 76011-4511
STP Nuclear Operating Company  
                                          April 7, 2015
P.O. Box 289  
Mr. Dennis L. Koehl
Wadsworth, TX 77483 SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND  
President and CEO/CNO
PERMANENT PLANT MODIFICATIONS INSPECTION (05000498/2015007 and 05000499/2015007) AND REQUEST FOR INFORMATION Dear Mr. Koehl:  
STP Nuclear Operating Company
P.O. Box 289
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant  
Wadsworth, TX 77483
modifications at your South Texas Project, Units 1 and 2, from June 1-5, 2015, and June 15-20, 2015. The inspection will consist of three reactor inspectors from the NRC's Region IV office for two weeks. The inspection will be conducted in accordance with NRC Inspection  
SUBJECT:       SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF
Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant  
                EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND
Modifications.
                PERMANENT PLANT MODIFICATIONS INSPECTION (05000498/2015007 and
Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a  
                05000499/2015007) AND REQUEST FOR INFORMATION
productive inspection, we have enclosed a request for documents needed for this inspection.
Dear Mr. Koehl:
Please note that the documents are requested to be provided by May 26, 2015. Upon review of  
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
these documents, the inspectors will select additional documentation for review upon arrival. It  
will conduct the baseline inspection of changes, tests, experiments, and permanent plant
is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  
modifications at your South Texas Project, Units 1 and 2, from June 1-5, 2015, and June 15-20,
2015. The inspection will consist of three reactor inspectors from the NRCs Region IV office for
We have discussed the schedule for these inspection activities with your staff and understand  
two weeks. The inspection will be conducted in accordance with NRC Inspection
that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Gerond George, by telephone at 817-200-1562 or by e-mail at  
Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant
Gerond.George@nrc.gov.  
Modifications.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control  
and your staff. In order to minimize the impact to your onsite resources and to ensure a
Number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the
productive inspection, we have enclosed a request for documents needed for this inspection.
D. Koehl - 2 -   requesting document displays a currently valid Office of Management and Budget Control Number.
Please note that the documents are requested to be provided by May 26, 2015. Upon review of
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
these documents, the inspectors will select additional documentation for review upon arrival. It
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system  
is important that all of these documents are up-to-date and complete in order to minimize the
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).   Sincerely, /RA/ Thomas R. Farnholtz, Chief  
number of additional documents requested during the preparation and/or the onsite portions of
Engineering Branch 1  
the inspection.
Division of Reactor Safety  
We have discussed the schedule for these inspection activities with your staff and understand
Dockets:   50-498; 50-499  
that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing
Licenses: NPF-76; NPF-80  
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Gerond George, by telephone at 817-200-1562 or by e-mail at
Enclosure:   Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection
Gerond.George@nrc.gov.
Request for Information
This letter does not contain new or amended information collection requirements subject to the
Electronic Distribution to the South Texas Project  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
  - 1 - Enclosure  Request for Information Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection South Texas Project Inspection Report:   05000498/2015007 and 05000499/2015007  
requirements were approved by the Office of Management and Budget, Control
Number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to
Onsite Inspection Dates: June 1-5, 2015 June 15-20, 2015 Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
respond to, a request for information or an information collection requirement unless the
Lead Inspector: Gerond A. George, Senior Reactor Inspector   Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by May 26, 2015, to the attention of Gerond A. George. We request that you categorize the documents in your response with the numbered list below. If only hard copies of  
 
the requested documents are available or if the electronic format is too large, please inform the  
D. Koehl                                           -2-
lead inspector and provide the documents on the first day of the onsite inspection. Also, the  
requesting document displays a currently valid Office of Management and Budget Control
inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. If you have any questions regarding this information request, please contact the lead inspector as soon as  
Number.
possible.  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.   2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation.    3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial modification inspection that did not result in an application for license amendment.   4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection.   5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.    6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.    7. Procedure(s) for implementing permanent plant modifications.    8. A list with descriptions of all permanent plant modifications since the last triennial modification inspection.    
enclosure will be available electronically for public inspection in the NRC Public Document
  - 2 - 9. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection.     10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.    
Room or from the Publicly Available Records (PARS) component of NRC's document system
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can  
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
determine the safety and/or risk significance of the screenings, evaluations, and modifications.  
rm/adams.html (the Public Electronic Reading Room).
Note: For this inspection, permanent plant modifications include permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability  
                                              Sincerely,
analyses, calculations, and commercial grade dedications.  
                                                /RA/
                                              Thomas R. Farnholtz, Chief
  Inspector Contact Information:  
                                              Engineering Branch 1
                                              Division of Reactor Safety
Gerond A. George  
Dockets: 50-498; 50-499
Senior Reactor Inspector 817-200-1562 Gerond.George@nrc.gov Jonathan Braisted Reactor Inspector 817-200-1194 Jonathan.Braisted@nrc.gov Inspector Number 3 to be named at later date.   
Licenses: NPF-76; NPF-80
Mailing Address: 
Enclosure:
U.S. NRC, Region IV Attn: Gerond A. George  
      Evaluations of Changes, Tests, and Experiments
1600 East Lamar Blvd.  
      and Permanent Plant Modifications Inspection
Arlington, TX 76011-4125  
      Request for Information
 
Electronic Distribution to the South Texas Project
 
                                      Request for Information
  Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
 
                                              Inspection
                                        South Texas Project
Inspection Report:             05000498/2015007 and 05000499/2015007
 
Onsite Inspection Dates:       June 1-5, 2015
                                June 15-20, 2015
Inspection Procedure:           IP 71111.17T, Evaluations of Changes, Tests, and Experiments
 
                                and Permanent Plant Modifications
D. Koehl - 2 -  requesting document displays a currently valid Office of Management and Budget Control Number.
Lead Inspector:                 Gerond A. George, Senior Reactor Inspector
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
Information Requested for the In-Office Preparation Week
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system  
The following information should be sent to the Region IV office in hard copy or electronic
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).   Sincerely,
format (preferred) by May 26, 2015, to the attention of Gerond A. George. We request that you
/RA/   Thomas R. Farnholtz, Chief  
categorize the documents in your response with the numbered list below. If only hard copies of
Engineering Branch 1  
the requested documents are available or if the electronic format is too large, please inform the
Division of Reactor Safety  
lead inspector and provide the documents on the first day of the onsite inspection. Also, the
Dockets:   50-498; 50-499  
inspectors will select specific items from the information requested below and request from your
Licenses: NPF-76; NPF-80  
staff additional documents needed during the onsite inspection weeks. We ask that the specific
items requested be available and ready for review on the first day of inspection. If you have any
Enclosure:   Evaluations of Changes, Tests, and Experiments   and Permanent Plant Modifications Inspection
questions regarding this information request, please contact the lead inspector as soon as
   Request for Information  
possible.
    1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
Electronic Distribution to South Texas Project  
    2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since
        the last triennial modification inspection that did not result in an evaluation.
Distribution See next page  
     3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial
 
        modification inspection that did not result in an application for license amendment.
    4. A list with descriptions of all corrective action documents related to 10 CFR 50.59
        screenings and evaluations since the last triennial modification inspection.
  ADAMS Accession Number: ML15098A284  SUNSI Review By:  GAG ADAMS:   Yes      No  Sensitive   Non-Sensitive Non-Publicly Available   Publicly Available Keyword NRC-002 OFFICE SRI:DRS/EB1   C:DRS/EB1 NAME GGeorge   TFarnholtz SIGNATURE /RA/   /RA/ DATE 4/6/15   4/7/15 OFFICIAL RECORD COPY  
    5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
  Letter to Dennis Koehl from Thomas Farnholtz dated April 7, 2015   SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND  
        including qualification dates.
PERMANENT PLANT MODIFICATIONS INSPECTION (05000498/2015007 and  
     6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
05000499/2015007) AND REQUEST FOR INFORMATION   Electronic Distribution: Regional Administrator (Marc.Dapas@nrc.gov)  
        evaluations, including qualification dates.
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)  
     7. Procedure(s) for implementing permanent plant modifications.
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)  
     8. A list with descriptions of all permanent plant modifications since the last triennial
DRS Deputy Director (Jeff.Clark@nrc.gov)
        modification inspection.
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)  
                                                  -1-                                   Enclosure
Resident Inspector (Nicholas.Hernandez@nrc.gov) Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)  
 
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)  
    9. A list with descriptions of all corrective action documents related to permanent plant
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)  
        modifications since the last triennial modification inspection.
STP Administrative Assistant (Lynn.Wright@nrc.gov)  
    10. Current revisions of the Technical Specifications and Bases and the Updated Final
Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Lisa.Regner@nrc.gov)  
        Safety Analysis Report.
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)  
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
RITS Coordinator (Marisa.Herrera@nrc.gov)  
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)  
Note: For this inspection, permanent plant modifications include permanent plant changes,
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
design changes, set point changes, procedure changes, equivalency evaluations, suitability
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
analyses, calculations, and commercial grade dedications.
Inspector Contact Information:
Gerond A. George                   Jonathan Braisted                  Inspector Number 3 to be
Senior Reactor Inspector           Reactor Inspector                  named at later date.
817-200-1562                       817-200-1194
Gerond.George@nrc.gov             Jonathan.Braisted@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Gerond A. George
1600 East Lamar Blvd.
Arlington, TX 76011-4125
                                                    -2-
 
D. Koehl                                          -2-
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                                  Sincerely,
                                                  /RA/
                                                  Thomas R. Farnholtz, Chief
                                                  Engineering Branch 1
                                                  Division of Reactor Safety
Dockets: 50-498; 50-499
Licenses: NPF-76; NPF-80
Enclosure:
Evaluations of Changes, Tests, and Experiments
  and Permanent Plant Modifications Inspection
   Request for Information
Electronic Distribution to South Texas Project
Distribution
See next page
ADAMS Accession Number: ML15098A284
  SUNSI Review     ADAMS:             Sensitive             Non-Publicly Available          Keyword
By: GAG            Yes No          Non-Sensitive          Publicly Available               NRC-002
OFFICE               SRI:DRS/EB1                                                       C:DRS/EB1
NAME                 GGeorge                                                           TFarnholtz
SIGNATURE           /RA/                                                             /RA/
DATE                 4/6/15                                                           4/7/15
                                      OFFICIAL RECORD COPY
 
Letter to Dennis Koehl from Thomas Farnholtz dated April 7, 2015
SUBJECT:       SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF
                EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND
                PERMANENT PLANT MODIFICATIONS INSPECTION (05000498/2015007 and
                05000499/2015007) AND REQUEST FOR INFORMATION
Electronic Distribution:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Nicholas.Hernandez@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Lisa.Regner@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
}}
}}

Latest revision as of 13:16, 31 October 2019

Notification of Evaluations of Changes, Tests and Experiments and Permanent Plant Modification (05000498/2015007 and 05000499/2015007) and Request for Information
ML15098A284
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/07/2015
From: Farmholtz T
Region 4 Engineering Branch 1
To: Koehl D
South Texas
G. George
References
IR 2015007
Download: ML15098A284 (6)


See also: IR 05000498/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

April 7, 2015

Mr. Dennis L. Koehl

President and CEO/CNO

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF

EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND

PERMANENT PLANT MODIFICATIONS INSPECTION (05000498/2015007 and

05000499/2015007) AND REQUEST FOR INFORMATION

Dear Mr. Koehl:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff

will conduct the baseline inspection of changes, tests, experiments, and permanent plant

modifications at your South Texas Project, Units 1 and 2, from June 1-5, 2015, and June 15-20,

2015. The inspection will consist of three reactor inspectors from the NRCs Region IV office for

two weeks. The inspection will be conducted in accordance with NRC Inspection

Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant

Modifications.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by May 26, 2015. Upon review of

these documents, the inspectors will select additional documentation for review upon arrival. It

is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, Gerond George, by telephone at 817-200-1562 or by e-mail at

Gerond.George@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

D. Koehl -2-

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-498; 50-499

Licenses: NPF-76; NPF-80

Enclosure:

Evaluations of Changes, Tests, and Experiments

and Permanent Plant Modifications Inspection

Request for Information

Electronic Distribution to the South Texas Project

Request for Information

Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

Inspection

South Texas Project

Inspection Report: 05000498/2015007 and 05000499/2015007

Onsite Inspection Dates: June 1-5, 2015

June 15-20, 2015

Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments

and Permanent Plant Modifications

Lead Inspector: Gerond A. George, Senior Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (preferred) by May 26, 2015, to the attention of Gerond A. George. We request that you

categorize the documents in your response with the numbered list below. If only hard copies of

the requested documents are available or if the electronic format is too large, please inform the

lead inspector and provide the documents on the first day of the onsite inspection. Also, the

inspectors will select specific items from the information requested below and request from your

staff additional documents needed during the onsite inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any

questions regarding this information request, please contact the lead inspector as soon as

possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since

the last triennial modification inspection that did not result in an evaluation.

3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial

modification inspection that did not result in an application for license amendment.

4. A list with descriptions of all corrective action documents related to 10 CFR 50.59

screenings and evaluations since the last triennial modification inspection.

5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,

including qualification dates.

6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or

evaluations, including qualification dates.

7. Procedure(s) for implementing permanent plant modifications.

8. A list with descriptions of all permanent plant modifications since the last triennial

modification inspection.

-1- Enclosure

9. A list with descriptions of all corrective action documents related to permanent plant

modifications since the last triennial modification inspection.

10. Current revisions of the Technical Specifications and Bases and the Updated Final

Safety Analysis Report.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Note: For this inspection, permanent plant modifications include permanent plant changes,

design changes, set point changes, procedure changes, equivalency evaluations, suitability

analyses, calculations, and commercial grade dedications.

Inspector Contact Information:

Gerond A. George Jonathan Braisted Inspector Number 3 to be

Senior Reactor Inspector Reactor Inspector named at later date.

817-200-1562 817-200-1194

Gerond.George@nrc.gov Jonathan.Braisted@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Gerond A. George

1600 East Lamar Blvd.

Arlington, TX 76011-4125

-2-

D. Koehl -2-

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-498; 50-499

Licenses: NPF-76; NPF-80

Enclosure:

Evaluations of Changes, Tests, and Experiments

and Permanent Plant Modifications Inspection

Request for Information

Electronic Distribution to South Texas Project

Distribution

See next page

ADAMS Accession Number: ML15098A284

SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword

By: GAG Yes No Non-Sensitive Publicly Available NRC-002

OFFICE SRI:DRS/EB1 C:DRS/EB1

NAME GGeorge TFarnholtz

SIGNATURE /RA/ /RA/

DATE 4/6/15 4/7/15

OFFICIAL RECORD COPY

Letter to Dennis Koehl from Thomas Farnholtz dated April 7, 2015

SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF

EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND

PERMANENT PLANT MODIFICATIONS INSPECTION (05000498/2015007 and

05000499/2015007) AND REQUEST FOR INFORMATION

Electronic Distribution:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Resident Inspector (Nicholas.Hernandez@nrc.gov)

Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Lisa.Regner@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)