ML15231A839: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 9: | Line 9: | ||
| docket = 05000346 | | docket = 05000346 | ||
| license number = | | license number = | ||
| contact person = Reeser D | | contact person = Reeser D | ||
| package number = ML15217A099 | | package number = ML15217A099 | ||
| document type = License-Operator, Part 55 Examination Related Material | | document type = License-Operator, Part 55 Examination Related Material | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/15/15 thru 6/26/15 __ | ||
-Plant Systems Outline Form ES-301-2 Facility: | Exam Level: RO SRO(I) SRO(U) Operating Test No.: __DB NRC 2015__ | ||
__6/15/15 thru 6/26/15 | Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U) | ||
System / JPM Title Type Code* Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion) (JPM New) N, A, S 1 S2 - (004) / Recover from Letdown Isolation on High Temp (JPM 017) D, S 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open) (JPM New) N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path - Trip Reactor) (JPM 020) D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak) (JPM New) N, A, S, EN 5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate D, S 6 (JPM 017) | |||
__DB NRC 2015__ Control Room Systems | S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start) (JPM 162) D, A, S, L 8 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | ||
@ (8 for RO); (7 for SRO | P1 - (004) / Perform Att. 5 of Control Room Evacuation D, E, R 2 | ||
-I); (2 or 3 for SRO | DB-OP-02508, CTRM Evacuation (JPM 048) | ||
-U) | P2 - (064) / Restore EDG to supply 4160 Essential Bus D, E 6 DB-OP-02538, Loss of D2P and DBP (JPM 079) | ||
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion) | P3 - (078) / Bypass and isolate the in service air dryers D, E 8 DB-OP-02528, IA Malfunctions (JPM 078) | ||
(JPM New) | @ All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | ||
) | *Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path 4-6 /4-6 /2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / > 1 (control room system) | ||
- Trip Reactor) | (L)ow-power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3/ 3 / 2 (randomly selected) | ||
(JPM 020) | (R)CA 1/1/1 (S)imulator NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1}} | ||
) | |||
N, A, S, EN 5 | |||
) | |||
D, A, S, L 8 In-Plant Systems | |||
@ (3 for RO); (3 for SRO | |||
-I); (3 or 2 for SRO | |||
-U) | |||
. 5 of Control Room Evacuation | |||
DB-OP-02508, CTRM Evacuation (JPM 048) | |||
DB-OP-02538, Loss of D2P and DBP (JPM 079) | |||
-plant) systems must be different and serve different safety functions; all | |||
-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A) | |||
(P)revious 2 exams (R)CA (S)imulator | |||
Latest revision as of 07:42, 31 October 2019
ML15231A839 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 03/06/2015 |
From: | NRC/RGN-III |
To: | FirstEnergy Nuclear Operating Co |
Reeser D | |
Shared Package | |
ML15217A099 | List: |
References | |
Download: ML15231A839 (1) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/15/15 thru 6/26/15 __
Exam Level: RO SRO(I) SRO(U) Operating Test No.: __DB NRC 2015__
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
System / JPM Title Type Code* Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion) (JPM New) N, A, S 1 S2 - (004) / Recover from Letdown Isolation on High Temp (JPM 017) D, S 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open) (JPM New) N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path - Trip Reactor) (JPM 020) D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak) (JPM New) N, A, S, EN 5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate D, S 6 (JPM 017)
S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start) (JPM 162) D, A, S, L 8 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1 - (004) / Perform Att. 5 of Control Room Evacuation D, E, R 2
DB-OP-02508, CTRM Evacuation (JPM 048)
P2 - (064) / Restore EDG to supply 4160 Essential Bus D, E 6 DB-OP-02538, Loss of D2P and DBP (JPM 079)
P3 - (078) / Bypass and isolate the in service air dryers D, E 8 DB-OP-02528, IA Malfunctions (JPM 078)
@ All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path 4-6 /4-6 /2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / > 1 (control room system)
(L)ow-power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3/ 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1