ML15231A839: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 9: Line 9:
| docket = 05000346
| docket = 05000346
| license number =  
| license number =  
| contact person = Reeser D W
| contact person = Reeser D
| package number = ML15217A099
| package number = ML15217A099
| document type = License-Operator, Part 55 Examination Related Material
| document type = License-Operator, Part 55 Examination Related Material
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In
{{#Wiki_filter:ES-301                         Control Room/In-Plant Systems Outline                       Form ES-301-2 Facility:       Davis Besse                                       Date of Examination:__6/15/15 thru 6/26/15 __
-Plant Systems Outline Form ES-301-2 Facility:         Davis Besse Date of Examination:
Exam Level: RO SRO(I) SRO(U)                                   Operating Test No.: __DB NRC 2015__
__6/15/15 thru 6/26/15
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
__ Exam Level:  RO  SRO(I)     SRO(U)         Operating Test No.:
System / JPM Title                                       Type Code*             Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)                                   (JPM New)               N, A, S               1 S2 - (004) / Recover from Letdown Isolation on High Temp (JPM 017)               D, S                 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open)                           (JPM New)           N, A, S, L             4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path - Trip Reactor)                                             (JPM 020)           D, A, S, L             4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak)                               (JPM New)           N, A, S, EN               5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate D, S                  6 (JPM 017)
__DB NRC 2015__ Control Room Systems
S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start)                               (JPM 162)           D, A, S, L               8 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
@ (8 for RO); (7 for SRO
P1 - (004) / Perform Att. 5 of Control Room Evacuation                                       D, E, R 2
-I); (2 or 3 for SRO
DB-OP-02508, CTRM Evacuation                             (JPM 048)
-U) System / JPM Title Type Code*
P2 - (064) / Restore EDG to supply 4160 Essential Bus D, E                  6 DB-OP-02538, Loss of D2P and DBP                         (JPM 079)
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)
P3 - (078) / Bypass and isolate the in service air dryers D, E                  8 DB-OP-02528, IA Malfunctions                           (JPM 078)
(JPM New)         N, A, S 1 S2 - (004) / Recover from Letdown Isolation on Hi gh Temp                       (JPM 017) D, S 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open
@       All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
)         (JPM New)       N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path  
                        *Type Codes                                       Criteria for RO / SRO-I / SRO-U (A)lternate Path                                                                     4-6 /4-6 /2-3 (C)ontrol room (D)irect from bank                                                                   9/8/4 (E)mergency or abnormal in-plant                                                     1/1/1 (EN)gineered safety feature                                                           1 /  1 / > 1 (control room system)
- Trip Reactor)
(L)ow-power / Shutdown                                                               1/1/1 (N)ew or (M)odified from bank including 1(A)                                         2/2/1 (P)revious 2 exams                                                                     3/  3 /  2 (randomly selected)
(JPM 020) D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak
(R)CA                                                                                 1/1/1 (S)imulator NUREG-1021, R9 Supplement 1                                                                  FENOC Facsimile Rev. 1}}
)         (JPM New)
N, A, S, EN 5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate (JPM 017) D, S  6    S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start
)           (JPM 162)
D, A, S, L 8 In-Plant Systems
@ (3 for RO); (3 for SRO
-I); (3 or 2 for SRO
-U) P1 - (004) / Perform Att
. 5 of Control Room Evacuation
 
DB-OP-02508, CTRM Evacuation (JPM 048) D, E, R  2  P2 - (0 64) / Restore EDG to supply 4160 Essential Bus
 
DB-OP-02538, Loss of D2P and DBP (JPM 079) D, E  6  P3 - (078) / Bypass and isolate the in service air dryers DB-OP-02528 , IA Malfunctions (JPM 078) D, E  8 @ All RO and SRO control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
*Type Codes Criteria for RO
/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3      /  / > 1 (control room system)
(randomly selected)}}

Latest revision as of 07:42, 31 October 2019

2015 Davis-Besse Nuclear Power Station Initial License Examination ES-301-2 Sroi Systems Outline
ML15231A839
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/06/2015
From:
NRC/RGN-III
To:
FirstEnergy Nuclear Operating Co
Reeser D
Shared Package
ML15217A099 List:
References
Download: ML15231A839 (1)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/15/15 thru 6/26/15 __

Exam Level: RO SRO(I) SRO(U) Operating Test No.: __DB NRC 2015__

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)

System / JPM Title Type Code* Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion) (JPM New) N, A, S 1 S2 - (004) / Recover from Letdown Isolation on High Temp (JPM 017) D, S 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open) (JPM New) N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path - Trip Reactor) (JPM 020) D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak) (JPM New) N, A, S, EN 5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate D, S 6 (JPM 017)

S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start) (JPM 162) D, A, S, L 8 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1 - (004) / Perform Att. 5 of Control Room Evacuation D, E, R 2

DB-OP-02508, CTRM Evacuation (JPM 048)

P2 - (064) / Restore EDG to supply 4160 Essential Bus D, E 6 DB-OP-02538, Loss of D2P and DBP (JPM 079)

P3 - (078) / Bypass and isolate the in service air dryers D, E 8 DB-OP-02528, IA Malfunctions (JPM 078)

@ All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path 4-6 /4-6 /2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / > 1 (control room system)

(L)ow-power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3/ 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1