ML15287A496: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Lingam, Siva Sent: Wednesday, October 14, 2015 3:26 PM To: Soenen, Philippe R (PNS3@pge.com)
{{#Wiki_filter:NRR-PMDAPEm Resource From:                       Lingam, Siva Sent:                       Wednesday, October 14, 2015 3:26 PM To:                         Soenen, Philippe R (PNS3@pge.com)
Cc: Markley, Michael; Jackson, Christopher; E lliott, Robert; Krepel, Sco tt; Grover, Ravinder; Schrader, Kenneth (KJSe@pge.com); 'mjrm@pge.com'
Cc:                         Markley, Michael; Jackson, Christopher; Elliott, Robert; Krepel, Scott; Grover, Ravinder; Schrader, Kenneth (KJSe@pge.com); 'mjrm@pge.com'


==Subject:==
==Subject:==
Diablo Canyon, Units 1 and 2 - Acceptance Review of LAR 15-07 to Revise Reactor Coolant Minimum Flow Specified in Technical S pecification 3.4.1 (CAC Nos. MF6731 and MF6732)By letter dated September 16, 2015 (Agencywide Documents Access and Management System Accession No. ML15259A576), Pacific Gas and Electric Company (PG&E, the licensee) submitted a license amendment request 15-07 for Diablo Canyon Power Plant (DCPP), Units 1 and 2, requesting an approval to revise the Reactor Coolant System (RCS) minimum flow specified in Technical Specification (TS) 3.4.1, "RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits.The proposed change is necessary to correct a non-conservative TS value for Unit 1. The purpose of this e-mail is to provide the results of the U.S.
Diablo Canyon, Units 1 and 2 - Acceptance Review of LAR 15-07 to Revise Reactor Coolant Minimum Flow Specified in Technical Specification 3.4.1 (CAC Nos. MF6731 and MF6732)
Nuclear Regulatory Commission (NRC) staff's acceptanc e review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical re view. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
By letter dated September 16, 2015 (Agencywide Documents Access and Management System Accession No.
 
ML15259A576), Pacific Gas and Electric Company (PG&E, the licensee) submitted a license amendment request 15-07 for Diablo Canyon Power Plant (DCPP), Units 1 and 2, requesting an approval to revise the Reactor Coolant System (RCS) minimum flow specified in Technical Specification (TS) 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits. The proposed change is necessary to correct a non-conservative TS value for Unit 1. The purpose of this e-mail is to provide the results of the U.S.
The NRC staff has reviewed your application and concluded that it does provide technical information in  
Nuclear Regulatory Commission (NRC) staffs acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
 
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.  
 
If you have any questions, please contact me.
If you have any questions, please contact me.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov
Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1


Hearing Identifier: NRR_PMDA Email Number: 2450   Mail Envelope Properties   (Siva.Lingam@nrc.gov20151014152600)
Hearing Identifier:       NRR_PMDA Email Number:             2450 Mail Envelope Properties         (Siva.Lingam@nrc.gov20151014152600)


==Subject:==
==Subject:==
Diablo Canyon, Units 1 and 2 - Acceptance Review of LAR 15-07 to Revise Reactor Coolant Minimum Flow Specified in Technical Specification 3.4.1 (CAC Nos. MF6731 and MF6732)
Diablo Canyon, Units 1 and 2 - Acceptance Review of LAR 15-07 to Revise Reactor Coolant Minimum Flow Specified in Technical Specification 3.4.1 (CAC Nos. MF6731 and MF6732)
Sent Date:   10/14/2015 3:26:21 PM Received Date: 10/14/2015 3:26:00 PM From:   Lingam, Siva Created By:   Siva.Lingam@nrc.gov  
Sent Date:               10/14/2015 3:26:21 PM Received Date:           10/14/2015 3:26:00 PM From:                     Lingam, Siva Created By:               Siva.Lingam@nrc.gov Recipients:
"Markley, Michael" <Michael.Markley@nrc.gov>
Tracking Status: None "Jackson, Christopher" <Christopher.Jackson@nrc.gov>
Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov>
Tracking Status: None "Krepel, Scott" <Scott.Krepel@nrc.gov>
Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov>
Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>
Tracking Status: None
"'mjrm@pge.com'" <mjrm@pge.com>
Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com>
Tracking Status: None Post Office:
Files                              Size                    Date & Time MESSAGE                            2277                  10/14/2015 3:26:00 PM Options Priority:                          Standard Return Notification:                No Reply Requested:                    No Sensitivity:                        Normal Expiration Date:
Recipients Received:


Recipients:    "Markley, Michael" <Michael.Markley@nrc.gov>  Tracking Status: None  "Jackson, Christopher" <Christopher.Jackson@nrc.gov>  Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov>  Tracking Status: None  "Krepel, Scott" <Scott.Krepel@nrc.gov>
NRR-PMDAPEm Resource From:                       Lingam, Siva Sent:                       Wednesday, October 14, 2015 3:26 PM To:                         Soenen, Philippe R (PNS3@pge.com)
Tracking Status: None  "Grover, Ravinder" <Ravinder.Grover@nrc.gov>  Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>  Tracking Status: None  "'mjrm@pge.com'" <mjrm@pge.com>
Cc:                         Markley, Michael; Jackson, Christopher; Elliott, Robert; Krepel, Scott; Grover, Ravinder; Schrader, Kenneth (KJSe@pge.com); 'mjrm@pge.com'
Tracking Status: None  "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com>  Tracking Status: None Post Office:      Files    Size      Date & Time MESSAGE    2277      10/14/2015 3:26:00 PM 
 
Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
1 NRR-PMDAPEm Resource From: Lingam, Siva Sent: Wednesday, October 14, 2015 3:26 PM To: Soenen, Philippe R (PNS3@pge.com)
Cc: Markley, Michael; Jackson, Christopher; E lliott, Robert; Krepel, Sco tt; Grover, Ravinder; Schrader, Kenneth (KJSe@pge.com); 'mjrm@pge.com'


==Subject:==
==Subject:==
Diablo Canyon, Units 1 and 2 - Acceptance Review of LAR 15-07 to Revise Reactor Coolant Minimum Flow Specified in Technical S pecification 3.4.1 (CAC Nos. MF6731 and MF6732)By letter dated September 16, 2015 (Agencywide Documents Access and Management System Accession No. ML15259A576), Pacific Gas and Electric Company (PG&E, the licensee) submitted a license amendment request 15-07 for Diablo Canyon Power Plant (DCPP), Units 1 and 2, requesting an approval to revise the Reactor Coolant System (RCS) minimum flow specified in Technical Specification (TS) 3.4.1, "RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits.The proposed change is necessary to correct a non-conservative TS value for Unit 1. The purpose of this e-mail is to provide the results of the U.S.
Diablo Canyon, Units 1 and 2 - Acceptance Review of LAR 15-07 to Revise Reactor Coolant Minimum Flow Specified in Technical Specification 3.4.1 (CAC Nos. MF6731 and MF6732)
Nuclear Regulatory Commission (NRC) staff's acceptanc e review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical re view. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
By letter dated September 16, 2015 (Agencywide Documents Access and Management System Accession No.
 
ML15259A576), Pacific Gas and Electric Company (PG&E, the licensee) submitted a license amendment request 15-07 for Diablo Canyon Power Plant (DCPP), Units 1 and 2, requesting an approval to revise the Reactor Coolant System (RCS) minimum flow specified in Technical Specification (TS) 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits. The proposed change is necessary to correct a non-conservative TS value for Unit 1. The purpose of this e-mail is to provide the results of the U.S.
The NRC staff has reviewed your application and concluded that it does provide technical information in  
Nuclear Regulatory Commission (NRC) staffs acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
 
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.  
 
If you have any questions, please contact me.
If you have any questions, please contact me.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov
Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1


Hearing Identifier: NRR_PMDA Email Number: 2450   Mail Envelope Properties   (Siva.Lingam@nrc.gov20151014152600)
Hearing Identifier:       NRR_PMDA Email Number:             2450 Mail Envelope Properties         (Siva.Lingam@nrc.gov20151014152600)


==Subject:==
==Subject:==
Diablo Canyon, Units 1 and 2 - Acceptance Review of LAR 15-07 to Revise Reactor Coolant Minimum Flow Specified in Technical Specification 3.4.1 (CAC Nos. MF6731 and MF6732)
Diablo Canyon, Units 1 and 2 - Acceptance Review of LAR 15-07 to Revise Reactor Coolant Minimum Flow Specified in Technical Specification 3.4.1 (CAC Nos. MF6731 and MF6732)
Sent Date:   10/14/2015 3:26:21 PM Received Date: 10/14/2015 3:26:00 PM From:   Lingam, Siva Created By:   Siva.Lingam@nrc.gov  
Sent Date:               10/14/2015 3:26:21 PM Received Date:           10/14/2015 3:26:00 PM From:                     Lingam, Siva Created By:               Siva.Lingam@nrc.gov Recipients:
 
"Markley, Michael" <Michael.Markley@nrc.gov>
Recipients:     "Markley, Michael" <Michael.Markley@nrc.gov> Tracking Status: None "Jackson, Christopher" <Christopher.Jackson@nrc.gov> Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov> Tracking Status: None "Krepel, Scott" <Scott.Krepel@nrc.gov>
Tracking Status: None "Jackson, Christopher" <Christopher.Jackson@nrc.gov>
Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov> Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com> Tracking Status: None "'mjrm@pge.com'" <mjrm@pge.com>
Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov>
Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com> Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   2277     10/14/2015 3:26:00 PM
Tracking Status: None "Krepel, Scott" <Scott.Krepel@nrc.gov>
 
Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov>
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>
Tracking Status: None
"'mjrm@pge.com'" <mjrm@pge.com>
Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com>
Tracking Status: None Post Office:
Files                               Size                   Date & Time MESSAGE                             2277                   10/14/2015 3:26:00 PM Options Priority:                           Standard Return Notification:               No Reply Requested:                   No Sensitivity:                       Normal Expiration Date:
Recipients Received:}}

Revision as of 05:41, 31 October 2019

Acceptance Review of LAR 15-07 to Revise Reactor Coolant Minimum Flow Specified in Technical Specification 3.4.1 (CAC Nos. MF6731 and MF6732)
ML15287A496
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/14/2015
From: Siva Lingam
Plant Licensing Branch IV
To: Soenen P
Pacific Gas & Electric Co
References
MF6731, MF6732
Download: ML15287A496 (2)


Text

NRR-PMDAPEm Resource From: Lingam, Siva Sent: Wednesday, October 14, 2015 3:26 PM To: Soenen, Philippe R (PNS3@pge.com)

Cc: Markley, Michael; Jackson, Christopher; Elliott, Robert; Krepel, Scott; Grover, Ravinder; Schrader, Kenneth (KJSe@pge.com); 'mjrm@pge.com'

Subject:

Diablo Canyon, Units 1 and 2 - Acceptance Review of LAR 15-07 to Revise Reactor Coolant Minimum Flow Specified in Technical Specification 3.4.1 (CAC Nos. MF6731 and MF6732)

By letter dated September 16, 2015 (Agencywide Documents Access and Management System Accession No.

ML15259A576), Pacific Gas and Electric Company (PG&E, the licensee) submitted a license amendment request 15-07 for Diablo Canyon Power Plant (DCPP), Units 1 and 2, requesting an approval to revise the Reactor Coolant System (RCS) minimum flow specified in Technical Specification (TS) 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits. The proposed change is necessary to correct a non-conservative TS value for Unit 1. The purpose of this e-mail is to provide the results of the U.S.

Nuclear Regulatory Commission (NRC) staffs acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)

Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2450 Mail Envelope Properties (Siva.Lingam@nrc.gov20151014152600)

Subject:

Diablo Canyon, Units 1 and 2 - Acceptance Review of LAR 15-07 to Revise Reactor Coolant Minimum Flow Specified in Technical Specification 3.4.1 (CAC Nos. MF6731 and MF6732)

Sent Date: 10/14/2015 3:26:21 PM Received Date: 10/14/2015 3:26:00 PM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:

"Markley, Michael" <Michael.Markley@nrc.gov>

Tracking Status: None "Jackson, Christopher" <Christopher.Jackson@nrc.gov>

Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov>

Tracking Status: None "Krepel, Scott" <Scott.Krepel@nrc.gov>

Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov>

Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>

Tracking Status: None

"'mjrm@pge.com'" <mjrm@pge.com>

Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2277 10/14/2015 3:26:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Lingam, Siva Sent: Wednesday, October 14, 2015 3:26 PM To: Soenen, Philippe R (PNS3@pge.com)

Cc: Markley, Michael; Jackson, Christopher; Elliott, Robert; Krepel, Scott; Grover, Ravinder; Schrader, Kenneth (KJSe@pge.com); 'mjrm@pge.com'

Subject:

Diablo Canyon, Units 1 and 2 - Acceptance Review of LAR 15-07 to Revise Reactor Coolant Minimum Flow Specified in Technical Specification 3.4.1 (CAC Nos. MF6731 and MF6732)

By letter dated September 16, 2015 (Agencywide Documents Access and Management System Accession No.

ML15259A576), Pacific Gas and Electric Company (PG&E, the licensee) submitted a license amendment request 15-07 for Diablo Canyon Power Plant (DCPP), Units 1 and 2, requesting an approval to revise the Reactor Coolant System (RCS) minimum flow specified in Technical Specification (TS) 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits. The proposed change is necessary to correct a non-conservative TS value for Unit 1. The purpose of this e-mail is to provide the results of the U.S.

Nuclear Regulatory Commission (NRC) staffs acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)

Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2450 Mail Envelope Properties (Siva.Lingam@nrc.gov20151014152600)

Subject:

Diablo Canyon, Units 1 and 2 - Acceptance Review of LAR 15-07 to Revise Reactor Coolant Minimum Flow Specified in Technical Specification 3.4.1 (CAC Nos. MF6731 and MF6732)

Sent Date: 10/14/2015 3:26:21 PM Received Date: 10/14/2015 3:26:00 PM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:

"Markley, Michael" <Michael.Markley@nrc.gov>

Tracking Status: None "Jackson, Christopher" <Christopher.Jackson@nrc.gov>

Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov>

Tracking Status: None "Krepel, Scott" <Scott.Krepel@nrc.gov>

Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov>

Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>

Tracking Status: None

"'mjrm@pge.com'" <mjrm@pge.com>

Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2277 10/14/2015 3:26:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: