ML15301A814: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION III | |||
2443 WARRENVILLE RD. SUITE 210 | |||
-4352 | LISLE, IL 60532-4352 | ||
October 28, 2015 | |||
EA-15-206 | |||
Mr. Peter A. Gardner | |||
Site Vice President | |||
Monticello Nuclear Generating Plant | |||
Northern States Power Company, Minnesota | |||
-9637 | 2807 West County Road 75 | ||
Monticello, MN 55362-9637 | |||
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF | |||
DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007 | |||
Dear Mr. Gardner: | |||
dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. | This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), | ||
dated October 2, 2015, that provided a response to our inspection report issued on | |||
-Cited Violation (NCV) documented in Monticello | September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. | ||
Inspection | The letter we received contested a Non-Cited Violation (NCV) documented in Monticello | ||
Report 2015007. | Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of | ||
Application Safety-Related Relays Installed Beyond Their Service Life. | |||
-Related Relays Installed Beyond Their Service Life. | We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be | ||
thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon | |||
as we complete our evaluation. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public | |||
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy | |||
In accordance with Title 10 of the Code of Federal Regulations | of this letter will be available electronically for public inspection in the NRCs Public Document | ||
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide | |||
of this letter will be available electronically for public inspection in the | Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC | ||
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Documents Access and Management System (ADAMS). | Sincerely, | ||
-rm/adams.html | /RA/ | ||
Christine A. Lipa, Chief | |||
Engineering Branch 2 | |||
/RA/ | Division of Reactor Safety | ||
Docket No. 50-263 | |||
License No. DPR-22 | |||
cc: Distribution via LISTSERV | |||
-263 License No. DPR | |||
-22 | EA-15-206 | ||
Mr. Peter A. Gardner | |||
Site Vice President | |||
Monticello Nuclear Generating Plant | |||
Northern States Power Company, Minnesota | |||
2807 West County Road 75 | |||
Monticello, MN 55362-9637 | |||
-9637 | SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF | ||
DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007 | |||
Dear Mr. Gardner: | |||
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), | |||
dated October 2, 2015, that provided a response to our inspection report issued on | |||
September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. | |||
-Cited Violation (NCV) documented in Monticello | The letter we received contested a Non-Cited Violation (NCV) documented in Monticello | ||
Inspection | Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of | ||
Report 2015007. | Application Safety-Related Relays Installed Beyond Their Service Life. | ||
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be | |||
-Related Relays Installed Beyond Their Service Life. | thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon | ||
as we complete our evaluation. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public | |||
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy | |||
of this letter will be available electronically for public inspection in the NRCs Public Document | |||
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide | |||
of this letter will be available electronically for public inspection in the | Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC | ||
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
-rm/adams.html | Sincerely, | ||
/RA/ | |||
Christine A. Lipa, Chief | |||
Engineering Branch 2 | |||
Division of Reactor Safety | |||
Division of Reactor Safety | Docket No. 50-263 | ||
License No. DPR-22 | |||
-263 License No. DPR | cc: Distribution via LISTSERV | ||
-22 cc: | DISTRIBUTION: | ||
See next page | |||
ADAMS Accession Number ML15301A814 | |||
Publicly Available Non-Publicly Available Sensitive Non-Sensitive | |||
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy | |||
OFFICE RIII RIII RIII RIII | |||
NAME ADunlop RSkokowski CLipa | |||
DATE 10/26/15 10/26/15 10/28/15 | |||
OFFICIAL RECORD COPY | |||
Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated October 28, 2015. | |||
Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated | SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF | ||
DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007 | |||
DISTRIBUTION: | |||
Janelle Jessie | |||
RidsNrrDorlLpl3-1 Resource | |||
RidsNrrPMMonticello | |||
RidsNrrDirsIrib Resource | |||
Cynthia Pederson | |||
Darrell Roberts | |||
RidsNrrDorlLpl3 | Richard Skokowski | ||
-1 Resource | Allan Barker | ||
Carole Ariano | |||
Linda Linn | |||
DRPIII | |||
DRSIII | |||
Jim Clay | |||
Carmen Olteanu | |||
ROPreports.Resource@nrc.gov | |||
}} | }} |
Revision as of 06:11, 31 October 2019
ML15301A814 | |
Person / Time | |
---|---|
Site: | Monticello |
Issue date: | 10/28/2015 |
From: | Christine Lipa NRC/RGN-III/DRS/EB2 |
To: | Gardner P Northern States Power Co |
References | |
EA-15-206, IR 2015007 | |
Download: ML15301A814 (3) | |
See also: IR 05000263/2015007
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
October 28, 2015
Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362-9637
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF
DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
Dear Mr. Gardner:
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
dated October 2, 2015, that provided a response to our inspection report issued on
September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.
The letter we received contested a Non-Cited Violation (NCV) documented in Monticello
Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of
Application Safety-Related Relays Installed Beyond Their Service Life.
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be
thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon
as we complete our evaluation.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
cc: Distribution via LISTSERV
Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362-9637
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF
DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
Dear Mr. Gardner:
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
dated October 2, 2015, that provided a response to our inspection report issued on
September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.
The letter we received contested a Non-Cited Violation (NCV) documented in Monticello
Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of
Application Safety-Related Relays Installed Beyond Their Service Life.
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be
thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon
as we complete our evaluation.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
cc: Distribution via LISTSERV
DISTRIBUTION:
See next page
ADAMS Accession Number ML15301A814
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII RIII RIII
NAME ADunlop RSkokowski CLipa
DATE 10/26/15 10/26/15 10/28/15
OFFICIAL RECORD COPY
Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated October 28, 2015.
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF
DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
DISTRIBUTION:
RidsNrrDorlLpl3-1 Resource
RidsNrrPMMonticello
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
ROPreports.Resource@nrc.gov