{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                              NUCLEAR REGULATORY COMMISSION
REGION III 2443 WARRENVILLE RD. SUIT
                                                  REGION III
E 210 LISLE, IL 60532
                                      2443 WARRENVILLE RD. SUITE 210
-4352 October 29, 2015
                                            LISLE, IL 60532-4352
  Mr. Peter A. Gardner
                                            October 29, 2015
Site Vice President Monticello Nuclear Generating Plant
Mr. Peter A. Gardner
Northern States Power Company, Minnesota
Site Vice President
2807 West County Road 75
Monticello Nuclear Generating Plant
Monticello, MN 55362
Northern States Power Company, Minnesota
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT  
2807 West County Road 75
- INFORMATION REQUEST FOR AN NRC TRIENNIAL
Monticello, MN 55362-9637
PERMANENT MODIFICATIONS AND 10 CFR 50.59  
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - INFORMATION REQUEST
BASELINE INSPECTION 05000263/2016008
            FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59
Dear Mr. Gardner: On February 29, 2016 , the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59 Baseline Inspection at the Monticello Nuclear Generating Plant. This inspection  
            BASELINE INSPECTION 05000263/2016008
will be performed
Dear Mr. Gardner:
in accordance
On February 29, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin a
with the NRC Baseline Inspection Procedure 71111.17T. The onsite portion of the inspection will take place on February 29 - March 4, 2016, and March 14 - 1 8 , 2016. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site , and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups.
MOD/50.59 Baseline Inspection at the Monticello Nuclear Generating Plant. This inspection
The first group of information is necessary to ensure that the inspection team is adequately  
will be performed in accordance with the NRC Baseline Inspection Procedure 71111.17T.
prepared for the
The onsite portion of the inspection will take place on February 29 - March 4, 2016, and
inspection. This information should be made available via compact disc and delivered to the regional
March 14 - 18, 2016.
office no later than December 17, 2015. The inspection team will review this information and, by January 15, 2016, will request
Experience has shown that these baseline inspections are extremely resource intensive, both
specific items that should be provided for review in the regional office by February 12, 2016
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on
. The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within Group II (i.e., Item [1]), will be requested for review in the regional office prior to the inspection by February 12
the site, and to ensure a productive inspection for both parties, we have enclosed a request for
, 2016, as identified above. The remaining documents should be available by the first day of
documents needed for the inspection. These documents have been divided into three groups.
the onsite inspection, February
The first group of information is necessary to ensure that the inspection team is adequately
29, 201 6. The third group lists information necessary to aid the inspection team in tracking issues identified as a result
prepared for the inspection. This information should be made available via compact disc and
of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up
delivered to the regional office no later than December 17, 2015. The inspection team will
-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
review this information and, by January 15, 2016, will request specific items that should be
   
provided for review in the regional office by February 12, 2016.
P. Gardner
The second group of requested documents contains additional items that the team will
-2- The lead inspector for this inspection is Mr. Alan Dahbur. We
review, or need access to, during the inspection. Certain documents contained within
understand that our regulatory contact for this inspection is
Group II (i.e., Item [1]), will be requested for review in the regional office prior to the inspection
Mr. Andy Kouba
by February 12, 2016, as identified above. The remaining documents should be available by
of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9810 , or via e-mail at Alan.Dahbur@nrc.gov
the first day of the onsite inspection, February 29, 2016.
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
The third group lists information necessary to aid the inspection team in tracking issues
requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   In accordance with Title 10 of the Code of Federal Regulations
identified as a result of the inspection. It is requested that this information be provided to the
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy  
lead inspector as the information is generated during the inspection. It is important that all of
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS)  
these documents are up-to-date and complete in order to minimize the number of additional
component of the NRC's Agencywide
documents requested during the preparation and/or the onsite portions of the inspection.
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
 
-rm/adams.html
P. Gardner                                     -2-
(the Public Electronic Reading Room).
The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory
Sincerely, /RA/
contact for this inspection is Mr. Andy Kouba of your organization. If there are any questions
Robert C. Daley, Chief
about the inspection or the material requested, please contact the lead inspector at
Engineering Branch 3
(630) 829-9810, or via e-mail at Alan.Dahbur@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
Division of Reactor Safety  
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
Docket No. 50
collection requirements were approved by the Office of Management and Budget, Control
-263 License No. DPR
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
-22 Enclosure:
respond to, a request for information or an information collection requirement unless the
Modification and 50.59 Inspection Document Request
requesting document displays a currently valid Office of Management and Budget Control
cc w/encl: Distribution via LISTSERV
Number.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Enclosure Inspection Report
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
: 05000263/2016008
of this letter, its enclosure, and your response (if any) will be available electronically for public
Inspection Dates
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
: February 29 - March 4, 2016
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
, and March 14
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
- 18, 2016 Inspection Procedure
(the Public Electronic Reading Room).
: Inspection
                                              Sincerely,
Procedure 71111.17 T , "Evaluation
                                              /RA/
s of Changes, Tests, and Experiments and Permanent Plant Modifications
                                              Robert C. Daley, Chief
" Lead Inspector
                                              Engineering Branch 3
: Alan Dahbur
                                              Division of Reactor Safety
(630) 829-9810 Alan.Dahbur@nrc.gov
Docket No. 50-263
I. Information Requested for In
License No. DPR-22
-Office Preparation Week
Enclosure:
The following information is requested by
Modification and 50.59 Inspection Document Request
December 17, 2015 , or sooner, to facilitate the selection of
cc w/encl: Distribution via LISTSERV
specific items that will be reviewed during the onsite inspection week. The inspection team will select
 
specific items from the information requested below
Inspection Report:               05000263/2016008
, and submit a list to your staff by
Inspection Dates:                 February 29 - March 4, 2016, and March 14 - 18, 2016
January 15, 2016
Inspection Procedure:             Inspection Procedure 71111.17T, Evaluations of Changes, Tests,
. We will request that certain items  
                                  and Experiments and Permanent Plant Modifications
be made available to the regional office prior to the inspection by
Lead Inspector:                   Alan Dahbur
February 1
                                  (630) 829-9810
2, 2016. We request that the remaining items selected from the lists be available and ready for review on the
                                  Alan.Dahbur@nrc.gov
first day of inspection. All requested information should identify the associated system and cover the time frame from the receipt of information for the last MOD/50.59 inspection November 4, 2013
  I. Information Requested for In-Office Preparation Week
, to the present. The required information identified below should be provided on compact disc (CD). Please provide three copies of each CD submitted (i.e., one for each inspector). The preferred file format is a searchable "pdf" file. The CDs should be indexed
      The following information is requested by December 17, 2015, or sooner, to facilitate
and hyper-linked to facilitate ease of use, if possible.
      the selection of specific items that will be reviewed during the onsite inspection week.
If you have any questions regarding this information, please call the inspection team leader as soon as possible.
      The inspection team will select specific items from the information requested below,
(1) List of "permanent plant modifications" to systems, structures or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency
      and submit a list to your staff by January 15, 2016. We will request that certain items
evaluations, suitability analyses, and commercial grade dedications.)
      be made available to the regional office prior to the inspection by February 12, 2016.
The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification
      We request that the remaining items selected from the lists be available and ready for
and a list of associated calculations and affected procedures.
      review on the first day of inspection. All requested information should identify the
(2) List of all Title 10 , Code of Federal Regulations  
      associated system and cover the time frame from the receipt of information for the
(CFR), Part 50.59 completed evaluations involving
      last MOD/50.59 inspection November 4, 2013, to the present.
: (a) calculations
      The required information identified below should be provided on compact disc (CD).
; (b) procedure revisions
      Please provide three copies of each CD submitted (i.e., one for each inspector).
; (c) changes to the facility (modifications); (d) non-routine operating configurations
      The preferred file format is a searchable pdf file. The CDs should be indexed and
; or (e) departures in methods of analyses. This  
      hyper-linked to facilitate ease of use, if possible. If you have any questions regarding
list should include 50.59
      this information, please call the inspection team leader as soon as possible.
evaluations
      (1)     List of permanent plant modifications to systems, structures or components that
for the following:
                are field work complete. (For the purpose of this inspection, permanent plant
  a. Changes that have been made under the provisions of 10
                modifications include permanent: plant changes, design changes, set point
CFR 50.59 that have been updated in accordance with 10
                changes, equivalency evaluations, suitability analyses, and commercial grade
CFR 50.71(e)(4) since the last MOD/50.59 inspection
                dedications.)
;
                The list should contain the number of each document, the title, the revision
2 b. Modifications that are field work complete; and
                (or date), and the affected system. In addition to the list, please provide a
c. Changes to calculations (or initiation of new calculations) that have been  
                description of each modification and a list of associated calculations and
issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT i
                affected procedures.
nclude any evaluations in which prior U.S. Nuclear Regulatory Commission
      (2)     List of all Title 10, Code of Federal Regulations (CFR), Part 50.59 completed
approval was sought and obtained. (3) A list of all 10
                evaluations involving: (a) calculations; (b) procedure revisions; (c) changes
CFR 50.59 changes that have been screened out as not requiring  
                to the facility (modifications); (d) non-routine operating configurations; or
a full evaluation involving: (a)
                (e) departures in methods of analyses. This list should include 50.59
calculations; (b)
                evaluations for the following:
procedure revisions; (c) changes to the facility (modifications); (d)
                a. Changes that have been made under the provisions of 10 CFR 50.59 that
non-routine operating configurations; or (e) departures in methods of analyses.
                    have been updated in accordance with 10 CFR 50.71(e)(4) since the last
The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
                    MOD/50.59 inspection;
(4) A list of any modifications, procedure revisions, or Updated Final Safety Analysis  
                                                                                            Enclosure
Report (UFSAR) changes where it was determined that 10
 
CFR 50.59 did not apply. (5) A list of calculation changes that have been issued for use.
    b. Modifications that are field work complete; and
(6) A list of corrective action documents (open and closed) that address permanent plant modifications or 10 CFR 50.59 issues, concerns, or processes. These documents should also inclu
    c. Changes to calculations (or initiation of new calculations) that have been
de the corrective action documents associated with the modification and the 50.59 change implementation.
          issued. The list should contain the number and title of each document, a
The list should contain the number, title and revision (or date) of each document,  
          brief description of the change, and the corresponding number and type of
the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.
          the affected document (i.e., the modification or procedure to which the
(7) Copies of procedures addressing the following: modifications, design changes,  
          evaluation applies). The list should NOT include any evaluations in which
set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post
          prior U.S. Nuclear Regulatory Commission approval was sought and
-modification testing, 10
          obtained.
C FR 50.59 evaluation
(3) A list of all 10 CFR 50.59 changes that have been screened out as not requiring
s and screenings, and UFSAR updates.
    a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes
(8) UFSAR updates submitted in accordance with 10
    to the facility (modifications); (d) non-routine operating configurations; or
CFR 50.71(e)(4). Provide copies of the complete submittal.
    (e) departures in methods of analyses.
(9) Copy of the UFSAR change log or a synopsis of the changes. This should include all of the changes made to the UFSAR that were incorporated in the last  
    The list should contain the number and title of each document, a brief description
10 CFR 50.71(e)(4) submittal.
    of the change, and the corresponding number and type of the affected document
(10) Electronic copy of the UFSAR
    (i.e., the modification or procedure to which the evaluation applies).
and Technical Specifications
(4) A list of any modifications, procedure revisions, or Updated Final Safety Analysis
(TSs), if available.
    Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not
(11) Name(s) and phone number
    apply.
(s) for the regulatory and technical contacts.
(5) A list of calculation changes that have been issued for use.
(12) Current management
(6) A list of corrective action documents (open and closed) that address permanent
and engineering organizational chart.
    plant modifications or 10 CFR 50.59 issues, concerns, or processes. These
 
    documents should also include the corrective action documents associated with
3 II. Information Requested to be Available Prior to Inspection
    the modification and the 50.59 change implementation.
. Request s will be M ade for Specific Item (1) Documents by
    The list should contain the number, title and revision (or date) of each document,
January 15, 2016
    the affected system and corresponding documentation (if applicable), and should
, for Availability of
    be sorted in order of significance.
Requested Item (1) Documents in Regional Office by
(7) Copies of procedures addressing the following: modifications, design changes,
February 12, 2016, and Items (2), (3)
    set point changes, equivalency evaluations or suitability analyses, commercial
, and (4) Documents on
    grade dedications, post-modification testing, 10 CFR 50.59 evaluations and
First Day of Inspection (February 29, 2016) (1) Copies of all selected items from Section I. This includes copies of associated
    screenings, and UFSAR updates.
documents such as calculations, post
(8) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide
-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.
    copies of the complete submittal.
(2) Copies of these documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.
(9) Copy of the UFSAR change log or a synopsis of the changes. This should
a. UFSAR, if not previously provided
    include all of the changes made to the UFSAR that were incorporated in the last
; b. Original Final Safety Analysis Report (FSAR)
    10 CFR 50.71(e)(4) submittal.
Volumes; c. Original Safety Evaluation  
(10) Electronic copy of the UFSAR and Technical Specifications (TSs), if available.
Reports and Supplements;
(11) Name(s) and phone number(s) for the regulatory and technical contacts.
d. FSAR Question and Answers;
(12) Current management and engineering organizational chart.
e. Quality Assurance
                                          2
(QA) Plan; f. TSs, if not previously provided
 
; g. Latest Individual  
II. Information Requested to be Available Prior to Inspection. Requests will be Made
Plant Examination
    for Specific Item (1) Documents by January 15, 2016, for Availability of Requested
/Probabilistic  
    Item (1) Documents in Regional Office by February 12, 2016, and Items (2), (3), and
Risk Assessment Report; h. Vendor Manuals; and
    (4) Documents on First Day of Inspection (February 29, 2016)
i. The latest 10 CFR 50.59  
    (1)   Copies of all selected items from Section I. This includes copies of
UFSAR Update Submittal.
            associated documents such as calculations, post-modification test packages,
(3) Please ensure that other supporting documents for the selected items have been  
            10 CFR 50.59 evaluations or screenings, and any corrective action documents.
located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting documents are:
    (2)   Copies of these documents do not need to be solely available to the inspection
a. Drawings supporting the modifications;
            team as long as the inspectors have easy and unrestrained access to them.
b. Procedures affected by the modifications; and
            a. UFSAR, if not previously provided;
c. UFSAR change papers generated due to a 10 CFR 50.59
            b. Original Final Safety Analysis Report (FSAR) Volumes;
evaluation.
            c. Original Safety Evaluation Reports and Supplements;
(4) Assessment and Corrective Actions:
            d. FSAR Question and Answers;
a. The most recent MOD/50.59 QA audit and/or self
            e. Quality Assurance (QA) Plan;
-assessment; and
            f. TSs, if not previously provided;
b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent MOD/50.59 QA audit and/or self
            g. Latest Individual Plant Examination/Probabilistic Risk Assessment Report;
-assessment.
            h. Vendor Manuals; and
 
            i. The latest 10 CFR 50.59 UFSAR Update Submittal.
4 III. Information Requested to be provided throughout the inspection
    (3)   Please ensure that other supporting documents for the selected items have been
(1) Copies of any corrective action documents generated as a result of the
            located and are readily retrievable as the inspection team will likely be requesting
inspection
            these documents during the inspection. Examples of supporting documents are:
team's questions or queries during this inspection.
            a. Drawings supporting the modifications;
(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide daily during the inspection to each inspection team member).
            b. Procedures affected by the modifications; and
If you have any questions regarding the information requested, please contact the inspection team leader.
            c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
  P. Gardner
    (4)   Assessment and Corrective Actions:
-2- The lead inspector for this inspection is Mr. Alan Dahbur. We
            a. The most recent MOD/50.59 QA audit and/or self-assessment; and
understand that our regulatory contact for this inspection is
            b. Corrective action documents (e.g., condition reports, including status of
Mr. Andy Kouba
                corrective actions) generate as a result of the most recent MOD/50.59 QA
of your organization. If there are any questions about the inspection or the material
                audit and/or self-assessment.
requested, please contact the lead inspector at (630) 829-9810 , or via e-mail at Alan.Dahbur@nrc.gov
                                              3
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
 
requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   In accordance with Title 10 of the Code of Federal Regulations
III. Information Requested to be provided throughout the inspection
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy  
        (1)   Copies of any corrective action documents generated as a result of the
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
              inspection teams questions or queries during this inspection.
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
        (2)   Copies of the list of questions submitted by the inspection team members and
-rm/adams.html
              the status/resolution of the information requested (provide daily during the
(the Public Electronic Reading Room).
              inspection to each inspection team member).
Sincerely, /RA/
If you have any questions regarding the information requested, please contact the inspection
Robert C. Daley, Chief
team leader.
Engineering Branch 3
                                                  4
Division of Reactor Safety  
 
Docket No. 50
P. Gardner                                                               -2-
-263 License No. DPR
The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory
-22 Enclosure:
contact for this inspection is Mr. Andy Kouba of your organization. If there are any questions
Modification and 50.59 Inspection Document Request
about the inspection or the material requested, please contact the lead inspector at
cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl
(630) 829-9810, or via e-mail at Alan.Dahbur@nrc.gov.
: Janelle Jessie
This letter does not contain new or amended information collection requirements subject to
RidsNrrDorlLpl3
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
-1 Resource
collection requirements were approved by the Office of Management and Budget, Control
  RidsNrrPMMonticello
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
RidsNrrDirsIrib Resource
respond to, a request for information or an information collection requirement unless the
Cynthia Pederson
requesting document displays a currently valid Office of Management and Budget Control
Darrell Roberts
Number.
Richard Skokowski
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Allan Barker
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
Carole Ariano
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
Linda Linn
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
DRPIII DRSIII Jim Clay Carmen Olteanu
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
  ADAMS Accession Number ML15302A013
(the Public Electronic Reading Room).
  Publicly Available
                                                                          Sincerely,
  Non-Publicly Available
                                                                          /RA/
  Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
                                                                          Robert C. Daley, Chief
OFFICE RIII RIII     NAME ADahbur:cl RDaley  DATE 10/29/15 10/29/15   OFFICIAL RECORD COPY
                                                                          Engineering Branch 3
                                                                          Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
Enclosure:
Modification and 50.59 Inspection Document Request
cc w/encl: Distribution via LISTSERV
DISTRIBUTION w/encl:
Janelle Jessie                                           Darrell Roberts                                    DRPIII
RidsNrrDorlLpl3-1 Resource                               Richard Skokowski                                  DRSIII
RidsNrrPMMonticello                                       Allan Barker                                        Jim Clay
RidsNrrDirsIrib Resource                                 Carole Ariano                                      Carmen Olteanu
Cynthia Pederson                                         Linda Linn
ADAMS Accession Number ML15302A013
    Publicly Available                           Non-Publicly Available                   Sensitive               Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
  OFFICE             RIII                                 RIII
  NAME               ADahbur:cl                           RDaley
   DATE               10/29/15                             10/29/15
                                                            OFFICIAL RECORD COPY
}}
}}

Revision as of 06:10, 31 October 2019

Ltr 10/29/15 Monticello Nuclear Generating Plant - Information Request for an NRC Triennial Permanent Modifications and 10 CFR 50.59 Baseline Inspection 05000263/2016008 (Akd)
ML15302A013
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/29/2015
From: Robert Daley
Engineering Branch 3
To: Gardner P
Northern States Power Co
References
IR 2016008
Download: ML15302A013 (7)


See also: IR 05000263/2016008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

October 29, 2015

Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - INFORMATION REQUEST

FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59

BASELINE INSPECTION 05000263/2016008

Dear Mr. Gardner:

On February 29, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin a

MOD/50.59 Baseline Inspection at the Monticello Nuclear Generating Plant. This inspection

will be performed in accordance with the NRC Baseline Inspection Procedure 71111.17T.

The onsite portion of the inspection will take place on February 29 - March 4, 2016, and

March 14 - 18, 2016.

Experience has shown that these baseline inspections are extremely resource intensive, both

for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on

the site, and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into three groups.

The first group of information is necessary to ensure that the inspection team is adequately

prepared for the inspection. This information should be made available via compact disc and

delivered to the regional office no later than December 17, 2015. The inspection team will

review this information and, by January 15, 2016, will request specific items that should be

provided for review in the regional office by February 12, 2016.

The second group of requested documents contains additional items that the team will

review, or need access to, during the inspection. Certain documents contained within

Group II (i.e., Item [1]), will be requested for review in the regional office prior to the inspection

by February 12, 2016, as identified above. The remaining documents should be available by

the first day of the onsite inspection, February 29, 2016.

The third group lists information necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up-to-date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

P. Gardner -2-

The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory

contact for this inspection is Mr. Andy Kouba of your organization. If there are any questions

about the inspection or the material requested, please contact the lead inspector at

(630) 829-9810, or via e-mail at Alan.Dahbur@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

Enclosure:

Modification and 50.59 Inspection Document Request

cc w/encl: Distribution via LISTSERV

Inspection Report: 05000263/2016008

Inspection Dates: February 29 - March 4, 2016, and March 14 - 18, 2016

Inspection Procedure: Inspection Procedure 71111.17T, Evaluations of Changes, Tests,

and Experiments and Permanent Plant Modifications

Lead Inspector: Alan Dahbur

(630) 829-9810

Alan.Dahbur@nrc.gov

I. Information Requested for In-Office Preparation Week

The following information is requested by December 17, 2015, or sooner, to facilitate

the selection of specific items that will be reviewed during the onsite inspection week.

The inspection team will select specific items from the information requested below,

and submit a list to your staff by January 15, 2016. We will request that certain items

be made available to the regional office prior to the inspection by February 12, 2016.

We request that the remaining items selected from the lists be available and ready for

review on the first day of inspection. All requested information should identify the

associated system and cover the time frame from the receipt of information for the

last MOD/50.59 inspection November 4, 2013, to the present.

The required information identified below should be provided on compact disc (CD).

Please provide three copies of each CD submitted (i.e., one for each inspector).

The preferred file format is a searchable pdf file. The CDs should be indexed and

hyper-linked to facilitate ease of use, if possible. If you have any questions regarding

this information, please call the inspection team leader as soon as possible.

(1) List of permanent plant modifications to systems, structures or components that

are field work complete. (For the purpose of this inspection, permanent plant

modifications include permanent: plant changes, design changes, set point

changes, equivalency evaluations, suitability analyses, and commercial grade

dedications.)

The list should contain the number of each document, the title, the revision

(or date), and the affected system. In addition to the list, please provide a

description of each modification and a list of associated calculations and

affected procedures.

(2) List of all Title 10, Code of Federal Regulations (CFR), Part 50.59 completed

evaluations involving: (a) calculations; (b) procedure revisions; (c) changes

to the facility (modifications); (d) non-routine operating configurations; or

(e) departures in methods of analyses. This list should include 50.59

evaluations for the following:

a. Changes that have been made under the provisions of 10 CFR 50.59 that

have been updated in accordance with 10 CFR 50.71(e)(4) since the last

MOD/50.59 inspection;

Enclosure

b. Modifications that are field work complete; and

c. Changes to calculations (or initiation of new calculations) that have been

issued. The list should contain the number and title of each document, a

brief description of the change, and the corresponding number and type of

the affected document (i.e., the modification or procedure to which the

evaluation applies). The list should NOT include any evaluations in which

prior U.S. Nuclear Regulatory Commission approval was sought and

obtained.

(3) A list of all 10 CFR 50.59 changes that have been screened out as not requiring

a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes

to the facility (modifications); (d) non-routine operating configurations; or

(e) departures in methods of analyses.

The list should contain the number and title of each document, a brief description

of the change, and the corresponding number and type of the affected document

(i.e., the modification or procedure to which the evaluation applies).

(4) A list of any modifications, procedure revisions, or Updated Final Safety Analysis

Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not

apply.

(5) A list of calculation changes that have been issued for use.

(6) A list of corrective action documents (open and closed) that address permanent

plant modifications or 10 CFR 50.59 issues, concerns, or processes. These

documents should also include the corrective action documents associated with

the modification and the 50.59 change implementation.

The list should contain the number, title and revision (or date) of each document,

the affected system and corresponding documentation (if applicable), and should

be sorted in order of significance.

(7) Copies of procedures addressing the following: modifications, design changes,

set point changes, equivalency evaluations or suitability analyses, commercial

grade dedications, post-modification testing, 10 CFR 50.59 evaluations and

screenings, and UFSAR updates.

(8) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide

copies of the complete submittal.

(9) Copy of the UFSAR change log or a synopsis of the changes. This should

include all of the changes made to the UFSAR that were incorporated in the last

10 CFR 50.71(e)(4) submittal.

(10) Electronic copy of the UFSAR and Technical Specifications (TSs), if available.

(11) Name(s) and phone number(s) for the regulatory and technical contacts.

(12) Current management and engineering organizational chart.

2

II. Information Requested to be Available Prior to Inspection. Requests will be Made

for Specific Item (1) Documents by January 15, 2016, for Availability of Requested

Item (1) Documents in Regional Office by February 12, 2016, and Items (2), (3), and

(4) Documents on First Day of Inspection (February 29, 2016)

(1) Copies of all selected items from Section I. This includes copies of

associated documents such as calculations, post-modification test packages,

10 CFR 50.59 evaluations or screenings, and any corrective action documents.

(2) Copies of these documents do not need to be solely available to the inspection

team as long as the inspectors have easy and unrestrained access to them.

a. UFSAR, if not previously provided;

b. Original Final Safety Analysis Report (FSAR) Volumes;

c. Original Safety Evaluation Reports and Supplements;

d. FSAR Question and Answers;

e. Quality Assurance (QA) Plan;

f. TSs, if not previously provided;

g. Latest Individual Plant Examination/Probabilistic Risk Assessment Report;

h. Vendor Manuals; and

i. The latest 10 CFR 50.59 UFSAR Update Submittal.

(3) Please ensure that other supporting documents for the selected items have been

located and are readily retrievable as the inspection team will likely be requesting

these documents during the inspection. Examples of supporting documents are:

a. Drawings supporting the modifications;

b. Procedures affected by the modifications; and

c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

(4) Assessment and Corrective Actions:

a. The most recent MOD/50.59 QA audit and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generate as a result of the most recent MOD/50.59 QA

audit and/or self-assessment.

3

III. Information Requested to be provided throughout the inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during this inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provide daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.

4

P. Gardner -2-

The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory

contact for this inspection is Mr. Andy Kouba of your organization. If there are any questions

about the inspection or the material requested, please contact the lead inspector at

(630) 829-9810, or via e-mail at Alan.Dahbur@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

Enclosure:

Modification and 50.59 Inspection Document Request

cc w/encl: Distribution via LISTSERV

DISTRIBUTION w/encl:

Janelle Jessie Darrell Roberts DRPIII

RidsNrrDorlLpl3-1 Resource Richard Skokowski DRSIII

RidsNrrPMMonticello Allan Barker Jim Clay

RidsNrrDirsIrib Resource Carole Ariano Carmen Olteanu

Cynthia Pederson Linda Linn

ADAMS Accession Number ML15302A013

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII

NAME ADahbur:cl RDaley

DATE 10/29/15 10/29/15

OFFICIAL RECORD COPY