| | title = Nine Mile Point Nuclear Station, Unit 2 - Request for Additional Information Regarding Bypass Leakage Paths(Cac No. MF5900) | | | title = Request for Additional Information Regarding Bypass Leakage Paths |
| | author name = Mozafari B L | | | author name = Mozafari B |
| | author affiliation = NRC/NRR/DORL/LPLI-1 | | | author affiliation = NRC/NRR/DORL/LPLI-1 |
| | addressee name = Hanson B C | | | addressee name = Hanson B |
| | addressee affiliation = Exelon Nuclear, Nine Mile Point Nuclear Station, LLC | | | addressee affiliation = Exelon Nuclear, Nine Mile Point Nuclear Station, LLC |
| | docket = 05000410 | | | docket = 05000410 |
| | license number = NPF-069 | | | license number = NPF-069 |
| | contact person = Mozafari B L | | | contact person = Mozafari B |
| | case reference number = CAC MF5900 | | | case reference number = CAC MF5900 |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear Nine Mile Point Nuclear Station, LLC 4300 Winfield Road Warrenville, IL 60555 December 17, 2015 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 17, 2015 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear Nine Mile Point Nuclear Station, LLC 4300 Winfield Road Warrenville, IL 60555 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| | NINE MILE POINT NUCLEAR STATION, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING (CAC NO. MF5900) |
|
| |
|
| NINE MILE POINT NUCLEAR STATION, UNIT 2 -REQUEST FOR ADDITIONAL INFORMATION REGARDING (CAC NO. MF5900)
| | ==Dear Mr. Hanson:== |
|
| |
|
| ==Dear Mr. Hanson:==
| | By application-dated March 23, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15082A368) Exelon Generation Company, LLC (Exelon) requested an amendment to the Technical Specifications for Nine Mile Point Nuclear Station, Unit 2 (NMP2). Specifically, the proposed change would relocate TS Table 3.6.1.3-1, "Secondary Containment Bypass Leakage Paths Leakage Rate Limits," and references to the Table to the Technical Requirements Manual. Exelon stated that the changes follow the guidance provided in Generic Letter 91-08, "Removal of Component Lists from Technical Specifications." |
| By application-dated March 23, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15082A368) | |
| Exelon Generation | |
| : Company, LLC (Exelon) requested an amendment to the Technical Specifications for Nine Mile Point Nuclear Station, Unit 2 (NMP2). Specifically, the proposed change would relocate TS Table 3.6.1.3-1, "Secondary Containment Bypass Leakage Paths Leakage Rate Limits,"
| |
| and references to the Table to the Technical Requirements Manual. Exelon stated that the changes follow the guidance provided in Generic Letter 91-08, "Removal of Component Lists from Technical Specifications." | |
| The NRC staff has determined that a request for additional information (RAI) is necessary to complete its review of the amendment request. | | The NRC staff has determined that a request for additional information (RAI) is necessary to complete its review of the amendment request. |
| The enclosed RAI was discussed with your staff on December 8, 2015, and it was agreed that your response would be provided within 30 days from the date our call and draft RAI email dated December 8, 2015. Do not hesitate to contact me at 301-415-2020 if any clarification call is necessary. | | The enclosed RAI was discussed with your staff on December 8, 2015, and it was agreed that your response would be provided within 30 days from the date our call and draft RAI email dated December 8, 2015. Do not hesitate to contact me at 301-415-2020 if any clarification call is necessary. |
| Docket No. 50-410 | | Brenda Mozafari, Sr. Project Manag Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| RAI cc w/encl: Distribution via Listserv Brenda Mozafari, Sr. Project Manag Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION EXELON GENERATION COMPANY. | | RAI cc w/encl: Distribution via Listserv |
| LLC NINE MILE POINT NUCLEAR STATION, UNIT 2 By application dated March 23, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15082A368) | | |
| Exelon Generation | | REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION EXELON GENERATION COMPANY. LLC NINE MILE POINT NUCLEAR STATION, UNIT 2 By application dated March 23, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15082A368) Exelon Generation Company, LLC (Exelon) requested an amendment to the Technical Specifications for Nine Mile Point Nuclear Station, Unit 2 (NMP2). |
| : Company, LLC (Exelon) requested an amendment to the Technical Specifications for Nine Mile Point Nuclear Station, Unit 2 (NMP2). Specifically, the proposed change would relocate TS Table 3.6.1.3-1, "Secondary Containment Bypass Leakage Paths Leakage Rate Limits,"
| | Specifically, the proposed change would relocate TS Table 3.6.1.3-1, "Secondary Containment Bypass Leakage Paths Leakage Rate Limits," and references to the Table to the Technical Requirements Manual. Exelon stated that the changes follow the guidance provided in Generic Letter 91-08, "Removal of Component Lists from Technical Specifications." The NRC staff has determined that a request for additional information (RAI) is necessary to complete its review of the amendment request. |
| and references to the Table to the Technical Requirements Manual. Exelon stated that the changes follow the guidance provided in Generic Letter 91-08, "Removal of Component Lists from Technical Specifications." | | RAI STSB-1: |
| The NRC staff has determined that a request for additional information (RAI) is necessary to complete its review of the amendment request. | | In the existing NMP2 TS, Table 3.6.1.3-1 specifies a numerical value for allowable leakage for each leakage path in standard cubic feet per hour. Surveillance Requirement (SR) 3.6.1.3.11 states: |
| RAI STSB-1: In the existing NMP2 TS, Table 3.6.1.3-1 specifies a numerical value for allowable leakage for each leakage path in standard cubic feet per hour. Surveillance Requirement (SR) 3.6.1.3.11 states: Verify the leakage rate for the secondary containment bypass leakage paths is within the limits of Table 3.6.1.3-1 when pressurized to;;:: 40 psig. The proposed change is deletion of Table 3.6.1.3-1 and revision of SR 3.6.1.3.11 to state: Verify the leakage rate for the secondary containment bypass leakage paths is within the limits when pressurized to ;;:: 40 psig. The staff requests additional information to explain why a numerical value limit on the secondary containment bypass leakage is not retained within the proposed SR 3.6.1.3.11 itself. Typically, the safety analysis for a facility assumes a specific amount of bypass leakage when calculating dose consequences. | | Verify the leakage rate for the secondary containment bypass leakage paths is within the limits of Table 3.6.1.3-1 when pressurized to;;:: 40 psig. |
| This leakage limit is reflected in the TS to ensure operation within the bounds of the safety analysis. | | The proposed change is deletion of Table 3.6.1.3-1 and revision of SR 3.6.1.3.11 to state: |
| The regulation at 10 CFR 50.36(c)(3) requires TSs to include items in the category of surveillance requirements, which are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the Limiting Conditions for Operations will be met. The leakage limit for the pathways to be considered operable must be specified in the TS. The staff compared the proposed revision of SR 3.6.1.3.11 with the guidance provided in Generic Letter 91-08. The Generic Letter recommended that the limitation on containment leakage rate be revised to state: Enclosure A combined leakage rate of less than or equal to [0.10 La] for all penetrations that are secondary containment bypass leakage paths when pressurized to Pa. This requirement has also been retained in the Standard TS. Provide a technical justification for not retaining a numerical limit on allowable leakage on the secondary containment bypass pathways or propose a change to SR 3.6.1.3.11 to reflect the appropriate limit. If it is proposed to specify the leakage limit in terms of a combined leakage rate, please review LCO 3.6.1.3 Condition D and its associated Required Actions to ensure consistency with the proposed change to SR 3.6.1.3.11. | | Verify the leakage rate for the secondary containment bypass leakage paths is within the limits when pressurized to ;;:: 40 psig. |
| Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear Nine Mile Point Nuclear Station, LLC 4300 Winfield Road Warrenville, IL 60555 December 17, 2015 | | The staff requests additional information to explain why a numerical value limit on the secondary containment bypass leakage is not retained within the proposed SR 3.6.1.3.11 itself. Typically, the safety analysis for a facility assumes a specific amount of bypass leakage when calculating dose consequences. This leakage limit is reflected in the TS to ensure operation within the bounds of the safety analysis. |
| | The regulation at 10 CFR 50.36(c)(3) requires TSs to include items in the category of surveillance requirements, which are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the Limiting Conditions for Operations will be met. |
| | The leakage limit for the pathways to be considered operable must be specified in the TS. |
| | The staff compared the proposed revision of SR 3.6.1.3.11 with the guidance provided in Generic Letter 91-08. The Generic Letter recommended that the limitation on containment leakage rate be revised to state: |
| | Enclosure |
| | |
| | A combined leakage rate of less than or equal to [0.10 La] for all penetrations that are secondary containment bypass leakage paths when pressurized to Pa. |
| | This requirement has also been retained in the Standard TS. |
| | Provide a technical justification for not retaining a numerical limit on allowable leakage on the secondary containment bypass pathways or propose a change to SR 3.6.1.3.11 to reflect the appropriate limit. If it is proposed to specify the leakage limit in terms of a combined leakage rate, please review LCO 3.6.1.3 Condition D and its associated Required Actions to ensure consistency with the proposed change to SR 3.6.1.3.11. |
| | |
| | December 17, 2015 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear Nine Mile Point Nuclear Station, LLC 4300 Winfield Road Warrenville, IL 60555 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| | NINE MILE POINT NUCLEAR STATION, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING (CAC NO. MF5900) |
|
| |
|
| NINE MILE POINT NUCLEAR STATION, UNIT 2 -REQUEST FOR ADDITIONAL INFORMATION REGARDING (CAC NO. MF5900)
| | ==Dear Mr. Hanson:== |
|
| |
|
| ==Dear Mr. Hanson:==
| | By application dated March 23, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15082A368) Exelon Generation Company, LLC (Exelon) requested an amendment to the Technical Specifications for Nine Mile Point Nuclear Station, Unit 2 (NMP2). Specifically, the proposed change would relocate TS Table 3.6.1.3-1, "Secondary Containment Bypass Leakage Paths Leakage Rate Limits," and references to the Table to the Technical Requirements Manual. Exelon stated that the changes follow the guidance provided in Generic Letter 91-08, "Removal of Component Lists from Technical Specifications." |
| By application dated March 23, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15082A368) | |
| Exelon Generation | |
| : Company, LLC (Exelon) requested an amendment to the Technical Specifications for Nine Mile Point Nuclear Station, Unit 2 (NMP2). Specifically, the proposed change would relocate TS Table 3.6.1.3-1, "Secondary Containment Bypass Leakage Paths Leakage Rate Limits,"
| |
| and references to the Table to the Technical Requirements Manual. Exelon stated that the changes follow the guidance provided in Generic Letter 91-08, "Removal of Component Lists from Technical Specifications." | |
| The NRC staff has determined that the enclosed request for additional information (RAI) is necessary to complete its review of the amendment request. | | The NRC staff has determined that the enclosed request for additional information (RAI) is necessary to complete its review of the amendment request. |
| The enclosed RAI was discussed with your staff on December 8, 2015, and it was agreed that your response would be provided within 30 days from the date our call and draft RAI email dated December 8, 2015. Do not hesitate to contact me at 301-415-2020 if any clarification call is necessary. | | The enclosed RAI was discussed with your staff on December 8, 2015, and it was agreed that your response would be provided within 30 days from the date our call and draft RAI email dated December 8, 2015. Do not hesitate to contact me at 301-415-2020 if any clarification call is necessary. |
| Docket No. 50-410 | | Sincerely, IRA/ |
| | Brenda L. Mozafari, Sr. Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| RAI Sincerely, IRA/ Brenda L. Mozafari, Sr. Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc w/encl: Distribution via Listserv DISTRIBUTION: | | RAI cc w/encl: Distribution via Listserv DISTRIBUTION: |
| PUBLIC LPLl-1 R/F RidsNrrDorlDpr MChernoff, NRR RidsNrrDorllpll-1 RidsN rrLAKGoldstein RidsRgn 1 MailCenter RidsNrrPMNineMilePoint RidsACRS_MailCTR RidsNrrDssStsb ADAMS A ccess1on N ML 15343A043 o.: *t *u db d t d ransmr e >V a e memo OFFICE DORL/LPLl-1 | | PUBLIC RidsNrrDorllpll-1 RidsNrrPMNineMilePoint LPLl-1 R/F RidsN rrLAKGoldstein RidsACRS_MailCTR RidsNrrDorlDpr RidsRgn 1MailCenter RidsNrrDssStsb MChernoff, NRR ADAMS Access1on No.: ML15343A043 *t ransmr*ue db>V d at e d memo OFFICE DORL/LPLl-1 /PM DORL/LPLl-1 /LA DSS/STSB/BC* DORL/LPLl-1 /BC DORL/LPLl-1 /PM NAME BMozafari KGoldstein RElliot TTate BMozafari DATE 12/16/2015 12/10/2015 12/08/2015 12/16/2015 12/17/2015 OFFICIAL RECORD COPY}} |
| /PM DORL/LPLl-1 | |
| /LA DSS/STSB/BC* | |
| DORL/LPLl-1 | |
| /BC NAME BMozafari KGoldstein RElliot TTate DATE 12/16/2015 12/10/2015 12/08/2015 12/16/2015 OFFICIAL RECORD COPY DORL/LPLl-1 | |
| /PM BMozafari 12/17/2015}}
| |
|
---|
Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds NMP2L2880, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23205A2432023-07-19019 July 2023 NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23087A2912023-03-28028 March 2023 Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM Weld ML23061A0522023-03-0202 March 2023 Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the Torus ML23012A2002023-01-13013 January 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000220/2023401 and 05000410/2023401 ML22207A2162022-07-26026 July 2022 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000220/2022010 and 05000410/2022010 ML22194A9412022-07-13013 July 2022 Request for Additional Information Relief Request CS-PR-02 (7/13/2022 e-mail) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21320A3472021-11-16016 November 2021 Request for Additional Information LAR to Revise TSs to Adopt TSTF-582, Revision 0 ML21306A3312021-11-0202 November 2021 Request for Additional Information Alternative Request GV-RR-10 (11/2/2021 e-mail) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21125A1282021-05-0404 May 2021 OPC Document Request - Feb 2021 ML21110A5112021-04-20020 April 2021 Request for Additional Information Review of License Amendment Request to Revise Technical Specifications to Adopt TSTF-582 ML21088A2682021-03-30030 March 2021 Notification of Conduct of a Fire Protection Team Inspection ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML20365A0092020-12-30030 December 2020 Request for Additional Information Concerning Review of License Amendment Request and Relief Request to Change Excess Flow Check Valve Testing Frequency (EPIDs L-2020-LLA-0188 and L-2020-LLR-0114) ML20358A2602020-12-28028 December 2020 Changes to Draft Request for Additional Information Regarding License Amendment Request and Relief Request to Change Excess Flow Check Valve Testing Frequency ML20272A2802020-09-28028 September 2020 Withdrawal and Replacement of Request for Additional Information to Support Review of License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times ML20248H5192020-09-28028 September 2020 Changes to Draft Request for Additional Information Regarding Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times ML20246G6362020-09-0202 September 2020 Request for Additonal Information to Support Review of License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times NMP2L2739, Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 22020-08-28028 August 2020 Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20212L8702020-07-30030 July 2020 Request for Additonal Information Review of License Amendment Requests Regarding Riskinformed Categorization and Treatment of Structures, Systems and Components (L-2019-LLA-0290) ML20213A9352020-07-30030 July 2020 Request for Additional Information Review of License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20045E3582020-02-14014 February 2020 Draft Request for Additional Information Regarding License Amendment Request to Increase Allowable MSIV Leakage Rates ML19296A1862019-10-23023 October 2019 Request for Additional Information Regarding License Amendment Request to Increase Allowable MSIV Leakage Rates (L-2019-LLA-0115) ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test ML19025A1572019-01-25025 January 2019 Request for Additional Information Regarding Primary Containment Oxygen Concentration License Amendment Request ML19025A1202019-01-24024 January 2019 NRR E-mail Capture - Calvert Cliffs, Fitzpatrick, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Response Organization Staffing ML18341A2212018-12-0707 December 2018 Request for Additional Information Regarding Emergency Tech Spec Change Re HPCS Completion Time (EPID -L-2018-LLA-0491) ML18228A6932018-08-15015 August 2018 Request for Additional Information Regarding Reactor Pressure Vessel Water Inventory Control License Amendment Request (L-2017-LLA-0426) ML18205A3922018-07-24024 July 2018 Request for Additional Information Regarding Reactor Pressure Vessel Water Inventory Control License Amendment Request (L-2017-LLA-0426) ML18184A2882018-07-0303 July 2018 Request for Additional Information Regarding Removal of Boraflex Credit from Spent Fuel Pool License Amendment Request(L-2018-LLA-0039) ML18102A2372018-04-12012 April 2018 NRR E-mail Capture - Calvert Cliffs, Ginna, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Schemes (EPID-L-2017-LLA-0237) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17331B1342017-12-12012 December 2017 2, and R.E. Ginna Nuclear Power Plant - Request for Additional Information - Regarding ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17272A0112017-10-10010 October 2017 Request for Additional Information Regarding License Amendment Concerning Reactor Pressure Vessel Water Inventory Control ML17234A3592017-08-30030 August 2017 Request for Additional Information Regarding Relief Request NMP-RR-001 to Utilize Code Case N-702 ML17241A2752017-08-29029 August 2017 Request for Additional Information Response MSA (MF7946,7) and FE (MG0087,8) E-mail Attachment 2024-07-12
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 17, 2015 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear Nine Mile Point Nuclear Station, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING (CAC NO. MF5900)
Dear Mr. Hanson:
By application-dated March 23, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15082A368) Exelon Generation Company, LLC (Exelon) requested an amendment to the Technical Specifications for Nine Mile Point Nuclear Station, Unit 2 (NMP2). Specifically, the proposed change would relocate TS Table 3.6.1.3-1, "Secondary Containment Bypass Leakage Paths Leakage Rate Limits," and references to the Table to the Technical Requirements Manual. Exelon stated that the changes follow the guidance provided in Generic Letter 91-08, "Removal of Component Lists from Technical Specifications."
The NRC staff has determined that a request for additional information (RAI) is necessary to complete its review of the amendment request.
The enclosed RAI was discussed with your staff on December 8, 2015, and it was agreed that your response would be provided within 30 days from the date our call and draft RAI email dated December 8, 2015. Do not hesitate to contact me at 301-415-2020 if any clarification call is necessary.
Brenda Mozafari, Sr. Project Manag Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410
Enclosure:
RAI cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION EXELON GENERATION COMPANY. LLC NINE MILE POINT NUCLEAR STATION, UNIT 2 By application dated March 23, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15082A368) Exelon Generation Company, LLC (Exelon) requested an amendment to the Technical Specifications for Nine Mile Point Nuclear Station, Unit 2 (NMP2).
Specifically, the proposed change would relocate TS Table 3.6.1.3-1, "Secondary Containment Bypass Leakage Paths Leakage Rate Limits," and references to the Table to the Technical Requirements Manual. Exelon stated that the changes follow the guidance provided in Generic Letter 91-08, "Removal of Component Lists from Technical Specifications." The NRC staff has determined that a request for additional information (RAI) is necessary to complete its review of the amendment request.
RAI STSB-1:
In the existing NMP2 TS, Table 3.6.1.3-1 specifies a numerical value for allowable leakage for each leakage path in standard cubic feet per hour. Surveillance Requirement (SR) 3.6.1.3.11 states:
Verify the leakage rate for the secondary containment bypass leakage paths is within the limits of Table 3.6.1.3-1 when pressurized to;;:: 40 psig.
The proposed change is deletion of Table 3.6.1.3-1 and revision of SR 3.6.1.3.11 to state:
Verify the leakage rate for the secondary containment bypass leakage paths is within the limits when pressurized to ;;:: 40 psig.
The staff requests additional information to explain why a numerical value limit on the secondary containment bypass leakage is not retained within the proposed SR 3.6.1.3.11 itself. Typically, the safety analysis for a facility assumes a specific amount of bypass leakage when calculating dose consequences. This leakage limit is reflected in the TS to ensure operation within the bounds of the safety analysis.
The regulation at 10 CFR 50.36(c)(3) requires TSs to include items in the category of surveillance requirements, which are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the Limiting Conditions for Operations will be met.
The leakage limit for the pathways to be considered operable must be specified in the TS.
The staff compared the proposed revision of SR 3.6.1.3.11 with the guidance provided in Generic Letter 91-08. The Generic Letter recommended that the limitation on containment leakage rate be revised to state:
Enclosure
A combined leakage rate of less than or equal to [0.10 La] for all penetrations that are secondary containment bypass leakage paths when pressurized to Pa.
This requirement has also been retained in the Standard TS.
Provide a technical justification for not retaining a numerical limit on allowable leakage on the secondary containment bypass pathways or propose a change to SR 3.6.1.3.11 to reflect the appropriate limit. If it is proposed to specify the leakage limit in terms of a combined leakage rate, please review LCO 3.6.1.3 Condition D and its associated Required Actions to ensure consistency with the proposed change to SR 3.6.1.3.11.
December 17, 2015 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear Nine Mile Point Nuclear Station, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING (CAC NO. MF5900)
Dear Mr. Hanson:
By application dated March 23, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15082A368) Exelon Generation Company, LLC (Exelon) requested an amendment to the Technical Specifications for Nine Mile Point Nuclear Station, Unit 2 (NMP2). Specifically, the proposed change would relocate TS Table 3.6.1.3-1, "Secondary Containment Bypass Leakage Paths Leakage Rate Limits," and references to the Table to the Technical Requirements Manual. Exelon stated that the changes follow the guidance provided in Generic Letter 91-08, "Removal of Component Lists from Technical Specifications."
The NRC staff has determined that the enclosed request for additional information (RAI) is necessary to complete its review of the amendment request.
The enclosed RAI was discussed with your staff on December 8, 2015, and it was agreed that your response would be provided within 30 days from the date our call and draft RAI email dated December 8, 2015. Do not hesitate to contact me at 301-415-2020 if any clarification call is necessary.
Sincerely, IRA/
Brenda L. Mozafari, Sr. Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410
Enclosure:
RAI cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDorllpll-1 RidsNrrPMNineMilePoint LPLl-1 R/F RidsN rrLAKGoldstein RidsACRS_MailCTR RidsNrrDorlDpr RidsRgn 1MailCenter RidsNrrDssStsb MChernoff, NRR ADAMS Access1on No.: ML15343A043 *t ransmr*ue db>V d at e d memo OFFICE DORL/LPLl-1 /PM DORL/LPLl-1 /LA DSS/STSB/BC* DORL/LPLl-1 /BC DORL/LPLl-1 /PM NAME BMozafari KGoldstein RElliot TTate BMozafari DATE 12/16/2015 12/10/2015 12/08/2015 12/16/2015 12/17/2015 OFFICIAL RECORD COPY