|
---|
Category:Letter type:NMP
MONTHYEARNMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owners Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owners Activity Report for RFO-27 Inservice Examinations NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications NMP2L2844, Independent Spent Fuel Storage Installation, General License 30-day Cask Registration Notifications2023-06-13013 June 2023 Independent Spent Fuel Storage Installation, General License 30-day Cask Registration Notifications NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3523, Annual Radioactive Environmental Operating Report2023-05-12012 May 2023 Annual Radioactive Environmental Operating Report NMP1L3522, Independent Spent Fuel Storage Installation (ISFSI) - 2022 Radioactive Effluent Release Report2023-04-30030 April 2023 Independent Spent Fuel Storage Installation (ISFSI) - 2022 Radioactive Effluent Release Report NMP1L3525, Core Operating Limits Report2023-04-19019 April 2023 Core Operating Limits Report NMP1L3526, Submittal of Emergency Relief Request I5R-14 Concerning a Proposed Alternative Associated with N2E Safe End-to-Nozzle Dissimilar Metal Weld Repair with Laminar Indication2023-04-13013 April 2023 Submittal of Emergency Relief Request I5R-14 Concerning a Proposed Alternative Associated with N2E Safe End-to-Nozzle Dissimilar Metal Weld Repair with Laminar Indication NMP1L3520, Supplemental Information for License Amendment Request – Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 22023-04-0404 April 2023 Supplemental Information for License Amendment Request – Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2 NMP1L3519, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-30030 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3516, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-29029 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3517, Proposed Alternative Associated with a Weld Overlay Repair to the Torus2023-03-29029 March 2023 Proposed Alternative Associated with a Weld Overlay Repair to the Torus NMP1L3518, Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3, Alternative Classification and Examination Requirements Section XI, Division 12023-03-29029 March 2023 Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3, Alternative Classification and Examination Requirements Section XI, Division 1 NMP1L3515, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-27027 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3513, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-24024 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3499, CFR 50.46 Annual Report2023-01-27027 January 2023 CFR 50.46 Annual Report NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3486, Radiological Emergency Plan Document Revision2022-12-15015 December 2022 Radiological Emergency Plan Document Revision NMP1L3484, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-15015 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors NMP1L3485, Proposed Alternative Associated with a Weld Overlay Repair to the Torus2022-12-0808 December 2022 Proposed Alternative Associated with a Weld Overlay Repair to the Torus NMP2L2823, Supplemental Information for License Amendment Request – Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators2022-10-28028 October 2022 Supplemental Information for License Amendment Request – Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators NMP1L3481, Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates2022-09-15015 September 2022 Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.2022-08-12012 August 2022 License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. NMP1L3478, Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps2022-08-0505 August 2022 Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits NMP1L3467, License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage2022-06-29029 June 2022 License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage NMP1L3465, Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notifications2022-06-17017 June 2022 Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notifications 2024-09-20
[Table view] Category:Technical Specification
MONTHYEARNMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. ML22292A1312022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Technical Specification Bases, Rev. 69 RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.2022-08-12012 August 2022 License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-30030 September 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NMP2L2762, License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2021-05-26026 May 2021 License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability NMP2L2718, Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 22019-12-12012 December 2019 Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls NMP2L2693, Technical Specification Bases, Rev. 572018-10-24024 October 2018 Technical Specification Bases, Rev. 57 NMP2L2664, Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22018-01-12012 January 2018 Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP2L2652, License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note2017-08-22022 August 2017 License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-02-28028 February 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML16309A4002016-10-24024 October 2016 Revision 47 to Technical Specification Bases, List of Effective Pages ML16309A4022016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B2.0, Safety Limits (Sls) ML16309A4032016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.0, Limiting Condition for Operation (LCO) Applicability ML16309A4052016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.2, Power Distribution Limits ML16309A4012016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Table of Contents ML16309A4132016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.9, Refueling Operations ML16309A4082016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.5, Emergency Core Cooling Systems (ECCS) and Reactor Core Isolation Cooling (RCIC) System ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. NMP1L3070, License Amendment Request - Reactivity Anomalies Surveillance2016-03-18018 March 2016 License Amendment Request - Reactivity Anomalies Surveillance NMP2L2592, Supplemental Information Regarding TSTF-425 License Amendment Request2015-09-24024 September 2015 Supplemental Information Regarding TSTF-425 License Amendment Request NMP1L3027, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)2015-05-12012 May 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) ML15089A2312015-03-26026 March 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) NMP1L3010, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)2015-03-26026 March 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) NMP2L2576, License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual2015-03-23023 March 2015 License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual NMP2L2563, License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change2014-11-17017 November 2014 License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change ML14191A2552014-07-10010 July 2014 Nine Mile Point and Ginna, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML12156A3632012-06-0101 June 2012 Emergency License Amendment Request Pursuant to 10 CFR 50.90: Revision of the Main Steam Isolation Valve Allowable Leakage Rate Limit ML11306A2982011-10-27027 October 2011 Submittal of Revision 22 to the Final Safety Analysis Report (Updated), 10 CFR 50.59 Evaluation Summary Report, Technical Specifications Bases Changes, and Report Consistent with 10 CFR 54.37(b) ML11214A2142011-07-25025 July 2011 License Amendment Request, Extension of the Completion Time for Inoperable Diesel Generator - Response to NRC Request for Additional Information ML1109602832011-03-30030 March 2011 License Amendment Request Pursuant to 10 CFR 50.90: Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage ... ML0935000902009-12-0909 December 2009 License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery - Technical Specification 3.8.4, DC Sources - Operating ML0931602572009-10-26026 October 2009 Submittal of Revision 21 to the Final Safety Analysis Report (Updated), 10 CFR 50.59 Evaluation Summary Report, Technical Specifications Bases Changes, and Report Consistent with 10 CFR 54.37(b) ML0907802502009-03-0909 March 2009 Submittal of Amendment Request for Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency ML0906403012009-03-0303 March 2009 License Amendment Request Pursuant to 10 CFR 50.90: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML0827502992008-09-29029 September 2008 Technical Specifications ML0802501622008-01-24024 January 2008 Response to NRC Request for Additional Information Regarding Nine Mile Point Nuclear Station, Unit No. 1, Revision of Rod Worth Minimizer Limiting Condition for Operation During Startup ML0726401032007-09-19019 September 2007 License Amendment Request for Adoption of TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities. ML0721906052007-07-30030 July 2007 Application for Technical Specification Change TSTF-477, Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process ML0721205922007-07-23023 July 2007 Application for Technical Specification Improvement to Adopt TSTF-476, Revison 1, Improved BPWS Control Rod Insertion Process (NEDO-33091), Using the Consolidated Line Item Improvement ML0721205872007-07-23023 July 2007 License Amendment Request Pursuant to 10 CFR 50.90: Revision of Rod Worth Minimizer Limiting Condition for Operation During Startup - Technical Specification Section 3.1.1.b ML0720504232007-07-12012 July 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process 2024-07-31
[Table view] Category:Amendment
MONTHYEARML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-30030 September 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability NMP2L2718, Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 22019-12-12012 December 2019 Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls NMP2L2664, Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22018-01-12012 January 2018 Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP2L2652, License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note2017-08-22022 August 2017 License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-02-28028 February 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP1L3027, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)2015-05-12012 May 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) NMP2L2576, License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual2015-03-23023 March 2015 License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual NMP2L2563, License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change2014-11-17017 November 2014 License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change ML14191A2552014-07-10010 July 2014 Nine Mile Point and Ginna, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML1109602832011-03-30030 March 2011 License Amendment Request Pursuant to 10 CFR 50.90: Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage ... ML0935000902009-12-0909 December 2009 License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery - Technical Specification 3.8.4, DC Sources - Operating ML0907802502009-03-0909 March 2009 Submittal of Amendment Request for Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency ML0906403012009-03-0303 March 2009 License Amendment Request Pursuant to 10 CFR 50.90: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML0827502992008-09-29029 September 2008 Technical Specifications ML0720504742007-07-12012 July 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0707800592007-03-15015 March 2007 Technical Specification 4.1.1 Regarding Control Rod System Surveillance Requirements ML0536202882005-12-16016 December 2005 License Amendment Request: Proposed Changes to Technical Specification 4.1.4 Regarding Core Spray Instrumentation ML0511100732005-04-19019 April 2005 Tech Spec Pages for Amendment 115 and 188 Reporting Requirements for Annual Radiological Environmental Operating Report ML0510204002005-04-0101 April 2005 License Amendment Request Pursuant to 1O CFR 50.90: Request for Amendment to Extend Completion Time for Emergency Uninterruptible Power Supply Inverters ML0503304712005-01-24024 January 2005 Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports ML0424003162004-08-17017 August 2004 Unit I, License Amendment Request Pursuant to 10 CFR 50.90: Addition of 24 Hours for Restoration of Primary Containment Oxygen Concentration ML0421103812004-07-16016 July 2004 License Amendment Request Pursuant to 10 CFR 50.90: Revision of Intermediate Range Monitor Surveillance Frequency and Relocation of Selected Instrumentation Requirements to a License-Controlled Document ML0403302112004-01-27027 January 2004 TS Amendment Pages for License No. NPF-069 ML0330305992003-10-27027 October 2003 TS Pages Amendment 183 ML0324608472003-08-15015 August 2003 License Amendment Request Pursuant to 10 CFR 50.90: Revision of Reactor Pressure Vessel Pressure-Temperature Limits ML0233807302002-11-22022 November 2002 Facility Operating License DPR-63, License Amendment Request: Technical Specifications Section 6.0, Administrative Controls - Response to RA Information TAC No. MB2441 ML0229603382002-10-0707 October 2002 Application for Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process ML0217101682002-06-0707 June 2002 Application for Technical Specification Improvement to Eliminate the Requirements for the Post Accident Sampling System Using the Consolidated Line Item Improvement Process ML0207305992002-03-13013 March 2002 Technical Specifications, Issuance of Amendment Safety Limit Minimum Critical Power Ratio (Tac No. MB3327) ML0206302682002-03-0101 March 2002 Technical Specifications for Amendment No. 103 ML0204301512002-02-11011 February 2002 Issuance of Amendment Ventilation Requirements During Irradiated Fuel Handling ML18018B0461978-03-22022 March 1978 Letter Transmitting an Application for Amendment to Appendix a of the Operating License ML17037C4331977-08-0808 August 1977 Letter Regarding Surveillance Requirements and Limiting Conditions for Operations and Requesting an Application for Amendment to the Operating License That Will Change the Technical Specifications ML17037C4131977-07-22022 July 1977 Letter Enclosing Application for Amendment to Operating License and Proposed Changes to Technical Specifications Concerning Changes in Management and Organization ML17037C4141977-07-18018 July 1977 Letter Enclosing an Application for Amendment to Operating License and Proposed Changes to the Technical Specifications to Provide for More Flexible Operation and Concerning Load Line Limit Analysis ML17037C4161977-07-14014 July 1977 Application for Amendment to Operating License and Proposed Change to Technical Specification Concerning the Emergency Cooling System ML17037C4181977-05-19019 May 1977 Letter Enclosing an Application to Amend Operating License and a Requested Change in the Technical Specifications Relating to Instrumentation Used to Monitor Drywell Suppression Chamber Differential Pressure and Suppression .. ML17037C4341977-03-0404 March 1977 Letter Regarding a Preliminary Review of the December 7, 1976 Request for Technical Specification Changes to Reactor Operating Limits After Reload for Cycle 5 Operation and Requesting Additional Information to Complete Review ML17037C4391976-09-30030 September 1976 Letter Requesting Submittal of an Application for License Amendment to Incorporate the Requirements of the Model Technical Specifications ML17037C4531976-01-19019 January 1976 Letter Transmitting an Application for Amendment to Operating License and a Proposed Change to Technical Specifications (Appendix a) to Clarify Cloride and Oxygen Levels ML17037C1771975-12-19019 December 1975 Letter Enclosing a Corrected Attachment to License Amendment No. 11 Change No. 27 to the Technical Specifications Provisional Operating License No. DPR-16 ML17037C1831975-11-0303 November 1975 Letter Regarding Application for Amendment to Technical Specifications and an Inadvertent Error Not Made on the Persons Listed in the Certificate of Service ML17037C4681975-09-23023 September 1975 Letter Regarding a Stress Assisted Corrosion Problem and an Enclosed Safety Evaluation by the Office of NRR - Supporting Amendment to License No. DPR-63 and Changes to the Technical Specifications Inoperable Control Rod .. 2024-04-12
[Table view] |
Text
10 CFR 50.90 NMP2L2576 March 23, 2015 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555 Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 NRC Docket No. 50-410
Subject:
License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual In accordance with 10 CFR 50.90, Exelon Generation Company, LLC (Exelon) requests an amendment to the Technical Specifications, Appendix A, of Renewed Facility Operating License No. NPF-69 for Nine Mile Point Nuclear Station, Unit 2 (NMP2).
The proposed changes will revise NMP2 Technical Specifications (TS) to remove TS Table 11 3.6.1.3-1, "Secondary Containment Bypass Leakage Paths Leakage Rate Limits, and references to the table and relocate the information to the Technical Requirements Manual (TAM). These proposed changes follow the guidance in Generic Letter 91-08, "Removal of 11 Component Lists from Technical Specifications.
The proposed changes have been reviewed by the NMP Plant Operations Review Committee and approved in accordance with Nuclear Safety Review Board procedures.
Exelon requests approval of the proposed amendment by February 26, 2016. The requested approval date supports the implementation of the hardened containment vent modifications at NMP2 to comply with the schedule required by NRC Order EA-13-109, Order to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions, dated June 6, 2013. Once approved, the amendment shall be implemented within 120 days.
There are no regulatory commitments contained in this request.
License Amendment Request Relocation of Secondary Containment Bypass Leakage Rate Limits Table March 23, 2015 Page 2 In accordance with 10 CFR 50.91, "Notice for public comment; State consultation,"
paragraph (b), Exelon is notifying the State of New York of this application of license amendment by transmitting a copy of this letter and its attachments to the designated State Official.
Should you have any questions concerning this submittal, please contact Ron Reynolds at (610) 765-5247.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 23rd day of March 2015.
Respectfully, Jam Barstow Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC Attachments: 1) Evaluation of Proposed Technical Specification Changes
- 2) Proposed Technical Specification, Bases and TAM Marked-Up Pages cc: USNRC Regional Administrator, Region I w/attachments USNRC Project Manager, NMP w/attachments USNRC Senior Resident Inspector, NMP w/attachments A. L. Peterson, NYSERDA w/attachments
ATTACHMENT 1 EVALUATION OF PROPOSED TECHNICAL SPECIFICATION CHANGES
SUBJECT:
Relocation of Secondary Containment Bypass Leakage Rate Limits Table from Technical Specifications to the Technical Requirements Manual 1.0
SUMMARY
DESCRIPTION 2.0 DETAILED DESCRIPTION
3.0 TECHNICAL EVALUATION
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria 4.2 Precedent 4.3 No Significant Hazards Consideration 4.4 Conclusions
5.0 ENVIRONMENTAL CONSIDERATION
6.0 REFERENCES
Evaluation of Proposed Attachment 1 Technical Specification Changes Page 1of6 1.0
SUMMARY
DESCRIPTION In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Exelon Generation Company, LLC (Exelon) requests an amendment to Renewed Operating License No. NPF-69 for Nine Mile Point Nuclear Station, Unit 2 (NMP2).
The proposed changes would remove Table 3.6.1.3-1, "Secondary Containment Bypass Leakage Paths Leakage Rate Limits," and references to the table, from the Technical Specification (TS) and relocate the information from the table to the Technical Requirements Manual (TAM) using the guidance provided in Generic Letter (GL) 91-08, "Removal of Component Lists from Technical Specifications." Marked up TS pages and Bases pages are provided in Attachment 2.
Exelon requests approval of the proposed changes. Once approved, the amendment shall be implemented within 120 days.
2.0 DETAILED DESCRIPTION The proposed changes would remove Table 3.6.1.3-1 and references to the table, from the TS and relocate the information from the table to the TAM using the guidance in Generic Letter (GL) 91-08. The TAM is a licensee-controlled document which is controlled under the provisions of 10 CFR 50.59. The TAM is established to provide, in a single location, a variety of information to which ready access is needed in the daily routine operation of the plant.
Therefore, removal of the table from TS will permit administrative control of future changes to the table without processing a license amendment.
3.0 TECHNICAL EVALUATION
The NRC approved NMP2 conversion to Improved Technical Specifications (ITS) on February 15, 2000. The ITS conversion was based on NUREG-1433 and -1434, "Standard Technical Specifications for General Electric Plants BWR4/BWR6," Rev. 1 dated April 1995. As part of the conversion to ITS, NMP2 included a component list for secondary containment bypass leakage paths leakage rate limits. Revision 4 of NUREG-1433, "General Electric BWR/4 Improved Standard Technical Specifications" and Revision 4 of NUREG-1434, "General Electric BWR/6 Improved Standard Technical Specifications" do not require the secondary containment bypass leakage paths leakage rate limits to be listed in a table format within the TS.
NMP2 is proposing to remove Table 3.6.1.3-1 and references to the table from the TS and relocate the information from the table to the TAM following the guidance in GL 91-08. As precedence for this proposed change, two NRC approved license amendment requests from Limerick Generating Station where component tables were removed from the TS using the guidance in GL 91-08 are provided (References 1 and 2).
GL 91-08 provides guidance for preparing a request for a license amendment to remove component lists from TS. This guidance provides an acceptable alternative to identifying every component by its plant identification number as it is currently listed in the tables of TS components. The removal of component lists is acceptable because it does not alter existing TS requirements or those components to which they apply.
Evaluation of Proposed Attachment 1 Technical Specification Changes Page 2 of 6 Section 3 of Enclosure 1 to GL 91-08 provides specific guidance for the removal of secondary containment bypass leakage paths. Section 3 states,
'The TS on containment leakage includes a list of secondary containment bypass leakage paths. The list identifies these leakage paths by penetration number for dual containment plants. The combined leakage rate for all penetrations identified as secondary containment bypass leakage paths is specified.
As part of the plant licensing basis, the FSAR defines the penetrations that are secondary containment bypass leakage paths. This definition of "secondary containment bypass leakage paths" is adequate such that the TS requirements do not require further clarification upon the removal of this list from the TS. Therefore, the TS requirements may be stated in terms of secondary containment bypass leakage paths without further clarification.
For example, the limitation of TS 3.6.1.2.c on containment leakage rates should be revised to state the following:
A combined leakage rate of less than or equal to [0.1 O] La for all penetrations that are secondary containment bypass leakage paths when pressurized to Pa."
Using the guidance in GL 91-08, the proposed license amendment would remove TS Table 3.6.1.3-1 and references to the table from the TS and relocate the information from the table to the TAM. Section 6.0 of the NMP2 USAA currently lists the leakage rate acceptance criteria for each secondary containment bypass leakage paths listed in TS Table 3.6.1.3-1. These proposed changes maintain the consistency with the current USAA requirements regarding secondary containment leakage rate limits.
The TS Surveillance Requirement (SR) in SR 3.6.1.3.11 requires verification of the leakage rate for the secondary containment bypass leakage paths are within their limits when pressurized to greater than or equal to 40 psig. This SR and the surveillance frequency will be unchanged by this proposed license amendment.
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria The proposed changes have been evaluated to determine whether applicable regulations and requirements continue to be met. Exelon has determined that the proposed changes do not require any exemptions or relief from regulatory requirements other than the TS.
The following applicable regulations and regulatory requirements were reviewed in making this determination:
Generic Letter 91-08, Removal of Component Lists from Technical Specifications dated May 6, 1991 NUREG-1433, Standard Technical Specifications, General Electric BWR/4 Plants, Volume 1, Specifications, Rev. 4
Evaluation of Proposed Attachment 1 Technical Specification Changes Page 3 of 6 NUREG-1433, Standard Technical Specifications, General Electric BWR/4 Plants, Volume 2, Bases, Rev. 4 NUREG-1434, Standard Technical Specifications, General Electric BWR/6 Plants, Volume 1, Specifications, Rev. 4 NUREG-1434, Standard Technical Specifications, General Electric BWR/6 Plants, Volume Bases, Rev.4 10 CFR 50.36, Technical specifications The NRC approved conversion to Improved Standard Technical Specification (ITS) at NMP2 used the guidance in NUREG-1433, Revision 1, and NUREG-1434, Revision 1. This conversion included Table 3.6.1.3-1, Secondary Containment Bypass Leakage Paths Leakage Rate Limits.
For the proposed License Amendment Request, a review was performed of NUREG-1433, Revision 4, and NUREG-1434, Revision 4, to ensure that their requirements are met. Since NMP2 is a General Electric BWR/5 containment design, both NUREGs for BWR4 and BWR6 plants are reviewed. These NUREGs provide the latest guidance for ITS and do not specify the requirement to have a tabulation of the secondary containment bypass leakage paths leakage rate limits in the ITS. Therefore, the removal of Table 3.6.1.3-1 from NMP2 TS and relocation of the information to the TAM does not result in a deviation to the current NUREG guidance for ITS. In addition, the proposed License Amendment Request will not change the current Limiting Condition for Operation (LCO) 3.6.1.3.D for secondary containment operability or the current TS Surveillance Requirement (SR) 3.6.1.3.11 for surveillance of secondary containment leakage.
In conclusion, as a result of the proposed change, the guidance in the current revisions to NUREG 1433 and 1434 are met.
Guidance in GL 91-08 is reviewed for applicability to the proposed License Amendment Request. This GL provides an acceptable alternative to identifying every component by its plant identification number as it is currently listed in the tables of TS components. The guidance allows for the removal of component lists provided it does not alter existing TS requirements or those components to which they apply. Furthermore, this GL provides guidance on including component lists into plant procedures that are subject to the change control provisions for plant procedures in the Administrative Controls Section of the TS. This guidance is applicable to this License Amendment Request because the proposed changes will result in a line-item TS improvement as described in the GL. Enclosure 1 to the GL, Guidance on the Removal of Component Lists From TS, will be used as guidance for the relocation of the information from TS Table 3.6.1.3-1 to the TAM which is subject to the change control provisions of 10 CFR 50.59.
The removal of TS Table 3.6.1.3-1 from the TS meets the criteria of 10 CFR 50.36, "Technical Specifications." Paragraph (c)(2)(ii), Criterion 3 state the following:
(ii) A Technical Specification Limiting Condition for Operation of a nuclear reactor must be established for each item meeting one or more of the following criteria:
Criterion 3. A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
Evaluation of Proposed Attachment 1 Technical Specification Changes Page 4 of 6 The proposed changes do not remove the leakage limit requirements from TS 3.6.1.3, "Primary Containment Isolation Valves (PCIVs)," and therefore Criterion 3 of 10 CFR 50.36(c)(2)(ii) continues to be met.
Further, 10 CFR 50.36, Paragraph (c)(3), Surveillance Requirements, states the following:
Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
The proposed changes do not remove the surveillance requirements for secondary containment bypass leakage limitations. SR 3.6.1.3.11 requires verification of the leakage rate for the secondary containment bypass leakage paths are within their limits when pressurized to greater than or equal to 40 psig. This SR and the surveillance frequency is currently in the TS and will be unchanged by this proposed license amendment. Therefore, 10 CFR 50.36(c)(3) continues to be met.
4.2 Precedent A 1995 Limerick License Amendment (Reference 1) was approved by NRC for the relocation of the Reactor Enclosure and Refueling Area Secondary Containment Isolation Valve Tables 3.6.5.2.1-1 and 3.6.5.2.2-1 and references to them from the Technical Specifications to the Updated Final Safety Analysis Report in accordance with the guidance in GL 91-08.
A 1999 Limerick License Amendment (Reference 2) was approved by NRC for the relocation of the Primary Containment Isolation Valve Table 3.6.3-1 and references to the table from the Technical Specifications to the Technical Requirements Manual in accordance with the guidance in GL 91-08.
4.3 No Significant Hazards Consideration Exelon has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment, 11 as discussed below:
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
Using the guidance in GL 91-08, the NMP2 proposed change would remove Table 3.6.1.3-1 and references to the table from the TS and relocates the information from the table to the TRM, which is a licensee controlled document. This change is consistent with Revision 4 of NUREG-1433, "General Electric BWR/4 Improved Standard Technical Specifications" and Revision 4 of NUREG-1434, "General Electric BWR/6 Improved Standard Technical Specifications." This change is an administrative change that will not alter the manner in which the valves will be operated. Since the proposed change does not alter the manner in which the valves are operated, there is no significant impact on reactor operation.
Evaluation of Proposed Attachment 1 Technical Specification Changes Page 5 of 6 Being an administrative change, the proposed change does not involve a physical change to the valves, nor does it change the safety function of the valves. The proposed TS revision involves no significant changes to the operation of any systems or components in normal or accident operating conditions and no changes to existing structures, systems, or components.
Therefore, the proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The relocation of the table for the secondary containment isolation valves is an administrative change that will not impact the safety function of the secondary containment isolation valves. The proposed change does not affect the manner in which the valves will be operated; therefore, there are no new failure mechanisms created. The proposed change does not involve physical changes to the valves, nor does it change the safety function of the valves. The proposed change does not physically alter secondary containment isolation capability. The secondary containment bypass leakage paths leakage rate limits will not be changed by the proposed amendment.
Therefore, the proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No.
There is no adverse impact on the existing equipment capability as well as associated structures as a result of this administrative change. The proposed changes continue to provide the same limitations for secondary containment bypass leakage paths leakage rate limits as the existing leakage rate limits.
Therefore, the proposed amendment does not involve a significant reduction in a margin of safety.
Based on the above, Exelon concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c) and, accordingly, a finding of no significant hazards consideration is justified.
4.4 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Evaluation of Proposed Attachment 1 Technical Specification Changes Page 6 of 6
5.0 ENVIRONMENTAL CONSIDERATION
A review has determined that the proposed amendment would not change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would not change an inspection or surveillance requirement. However, the proposed amendment not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
6.0 REFERENCES
- 1. Limerick Generating Station, Units 1 and 2 (TAC NOS. M93690 AND M93691) dated November 20, 1995
- 2. Limerick Generating Station, Units 1 and 2 - Issuance of Amendment Re:
Relocation of the Primary Containment Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual and Deleting References to Tables (TAC NOS. MA8101 and MA8102) dated October 18, 2000.
ATTACHMENT 2 PROPOSED TECHNICAL SPECIFICATION and BASES MARKED-UP PAGES (Unit 2)
TS Pages 3.6.1.3-1, -12, -14 and -15 Bases Pages B3.6.1.3-1 through -3 TAM Pages 3.6-23a and -23b
PCIVs Secondary Containment Bypass 3.6.1.3 Leakage Valve 3.6 CONTAINMENT SYSTEMS DELETE 3.6.1.3 Primary Containment Isolation Valves Va (PCIVs)
LCO 3.6.1.3 Each PCIV and each non-PCIV llisted in Table 3.6.1.3-1 3 6 1 3-1 shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3, When associated instrumentation is required to be OPERABLE per LCO 3.3.6.1, "Primary Containment Isolation Instrumentation."
ACTIONS
NOTES -----------------------------------------------------------
- 1. Penetration flow paths may be unisolated intermittently under administrative controls.
- 2. Separate Condition entry is allowed for each penetration flow path.
- 3. Enter applicable Conditions and Required Actions for systems made inoperable by PCIVs.
- 4. Enter applicable Conditions and Required Actions of LCO 3.6.1.1, "Primary Containment," when PCIV leakage results in exceeding overall containment leakage rate acceptance criteria.
CONDITION REQUIRED ACTION COMPLETION TIME A. -------------NOTE-------------- A.1 Isolate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> except Only applicable to penetration flow path for main steam penetration flow paths by use of at least line with two or more one closed and PCIVs. de-activated AND
automatic valve, closed manual valve, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for main One or more blind flange, or steam line penetration flow paths check valve with flow with one PCIV through the valve inoperable except due secured.
to leakage not within limit. AND (continued)
NMP2 3.6.1.3-1 Amendment 91
PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.1.3.6 Perform leakage rate testing for each 184 days primary containment purge valve with resilient seals. AND Once within 92 days after opening the valve SR 3.6.1.3.7 Verify the isolation time of each MSIV is In accordance t 3 seconds and d 5 seconds. with the Inservice Testing Program SR 3.6.1.3.8 Verify each automatic PCIV actuates to 24 months the isolation position on an actual or simulated isolation signal.
SR 3.6.1.3.9 Verify a representative sample of reactor 24 months instrumentation line EFCVs actuates to the isolation position on an actual or simulated instrument line break signal.
SR 3.6.1.3.10 Remove and test the explosive squib from 24 months on a each shear isolation valve of the TIP STAGGERED TEST System. BASIS SR 3.6.1.3.11 Verify the leakage rate for the secondary In accordance containment bypass leakage paths is with 10 CFR 50 within the limits of Table 3 3.6.1.3-1 6 1 3-1 when Appendix J pressurized to t 40 psig. Testing Program Plan (continued)
DELETE NMP2 3.6.1.3-12 Amendment 91, 96
PCIVs DELETE 3.6.1.3 Table 3.6.1.3-1 (page 1 of 2)
Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER PER VALVE LEAK RATE (SCFH) 2MSS*MOV111 1.875 2MSS*MOV112 2MSS*MOV208 0.625 2CMS*SOV74A, B (d) 0.2344 2CMS*SOV75A, B (d) 2CMS*SOV76A, B (d) 2CMS*SOV77A, B (d) 2DER*MOV119 (a) 2DER*RV344 2DER*MOV120 1.25 2DER*MOV130 0.625 2DER*MOV131 2DFR*MOV120 1.875 2DFR*MOV121 (b) 2DFR*RV228 2DFR*MOV139 0.9375 2DFR*MOV140 2WCS*MOV102 2.5 2WCS*MOV112 2FWS*V23A, B 12.0 2FWS*V12A, B 2CPS*AOV104 4.38 2CPS*AOV106 2CPS*AOV105 3.75 2CPS*AOV107 (continued)
(a) The combined leakage rate for these two valves shall be d 1.25 SCFH.
(b) The combined leakage rate for these two valves shall be d 1.875 SCFH.
The information from this Technical Specification section has been relocated to the TRM.
NMP2 3.6.1.3-14 Amendment 91, 104, 106
DELETE PCIVs 3.6.1.3 Table 3.6.1.3-1 (page 2 of 2)
Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER PER VALVE LEAK RATE (SCFH) 2CPS*SOV119 0.625 2CPS*SOV120 2CPS*SOV121 2CPS*SOV122 2IAS*SOV164 0.9375 2IAS*V448 2IAS*SOV165 0.9375 2IAS*V449 2GSN*SOV166 (c) 2GSN*V170 2IAS*SOV166 (c) 2IAS*SOV184 2IAS*SOV167 (c) 2IAS*SOV185 2IAS*SOV168 (c) 2IAS*SOV180 2CPS*SOV132 (c) 2CPS*V50 2CPS*SOV133 (c) 2CPS*V51 (c) The combined leak rate for these penetrations shall be d 3.6 SCFH. The assigned leakage rate through a penetration shall be that of the valve with the highest leakage rate in that penetration. However, if a penetration is isolated by one closed and de-activated automatic valve, closed manual valve, or blind flange, the leakage through the penetration shall be the actual pathway leakage.
(d) The LCO requirements and leakage rate limit shall apply until such time as a modification eliminates the potential secondary containment bypass leakage path.
The information from this Technical Specification section has been relocated to the TRM.
NMP2 3.6.1.3-15 Amendment 91, 106
PCIVs B 3.6.1.3 B 3.6 CONTAINMENT SYSTEMS Secondary Containment Bypass B 3.6.1.3 Primary Containment Isolation Valves (PCIVs)
Leakage Valves DELETE BASES BACKGROUND The function of the PCIVs and the non-PCIVs llisted in Table T 3.6.1.3-1 3 6 1 3-1 (2CMS*SOV74A, (2CMS SOV74A 74B, 74B 75A, 75A 75B, 75B 76A, 76B, 77A 76A 76B 77A, and 77B) 77B), in combination with other accident mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs) to within DELETE limits. Primary containment isolation within the time limits specified for those PCIVs designed to close automatically ensures that the release of radioactive material to the environment will be consistent with the assumptions used in the analyses for a DBA.
The OPERABILITY requirements for PCIVs help ensure that an adequate primary containment boundary is maintained during and after an accident by minimizing potential paths to the environment. Therefore, the OPERABILITY requirements provide assurance that the primary containment function assumed in the safety analysis will be maintained. These isolation devices consist of either passive devices or active (automatic) devices. Manual valves, de-activated automatic valves secured in their closed position (including check valves with flow through the valve secured), blind flanges (which include plugs and caps as listed in Reference 1), and closed systems are considered passive devices. Check valves, or other automatic valves designed to close without operator action following an accident, are considered active devices. Two barriers in series are provided for each penetration, except for penetrations isolated by excess flow check valves, so that no single credible failure or malfunction of an active component can result in a loss of isolation or leakage that exceeds limits assumed in the safety analysis. One of these barriers may be a closed system.
The 12 and 14 inch primary containment purge valves are PCIVs that are qualified for use during all operational conditions. The 12 and 14 inch primary containment purge valves are normally maintained closed in MODES 1, 2, and 3 to ensure the primary containment boundary is maintained.
However, the purge valves may be open when being used for pressure control, inerting, de-inerting, ALARA, or air quality considerations since they are fully qualified.
(continued)
NMP2 B 3.6.1.3-1 Revision 0
PCIVs B 3.6.1.3 BASES BACKGROUND A two inch bypass line is provided when the primary (continued) containment full flow line to the Standby Gas Treatment (SGT) System is isolated.
Secondary Containment Bypass ss Leakage Valve APPLICABLE The PCIVs P LCO was derived from the assumptions related SAFETY ANALYSES to minimizing nim the loss of reactor coolant inventory, and establishing sh the primary containment boundary during major accidents.s. As part of the primary containment boundary, PCIV (and d non-PCIVs listed in Table 3 3.6.1.3-1) 6 1 3-1) OPERABILITY supports leak tightness of primary containment. tt. Therefore, The the safety analysis of any event requiring isolation of DELETE primary containment is applicable to this LCO.
The DBAs that result in a release of radioactive material for which the consequences are mitigated by PCIVs are a loss of coolant accident (LOCA) and a main steam line break Secondary (MSLB) (Refs. 2 and 3). In the analysis for each of these Containment Bypass a accidents, it is assumed that PCIVs are either closed or Leakage Valves un function to close within the required isolation time following low event initiation. This ensures that potential pathss to the environment through PCIVs (including primary containment nm purge valves) are minimized. Of the events DELETE analyzed d in References 2 and 3, the LOCA is the most st limiting event ven due to radiological consequences. In addition, the hee non-PCIVs listed in Table 3.6.1.3-1 3 6 1 3-1 are also assumed to be closed during the LOCA. The closure time of the main steam isolation valves (MSIVs) is a significant variable from a radiological standpoint. The MSIVs are required to close within 3 to 5 seconds since the 3 second closure time is assumed in the MSIV closure (the most severe overpressurization transient) analysis (Ref. 4) and 5 second closure time is assumed in the MSLB analysis (Ref. 3).
Likewise, it is assumed that the primary containment isolates such that release of fission products to the environment is controlled.
The DBA analysis assumes that isolation of the primary containment is complete and leakage terminated, except for the maximum allowable leakage, La, prior to fuel damage.
The single failure criterion required to be imposed in the conduct of unit safety analyses was considered in the original design of the primary containment purge valves.
Two valves in series on each purge line provide assurance that both the supply and exhaust lines could be isolated even if a single failure occurred.
(continued)
NMP2 B 3.6.1.3-2 Revision 0
PCIVs B 3.6.1.3 BASES APPLICABLE PCIVs satisfy Criterion 3 of Reference 5.
SAFETY ANALYSES (continued)
LCO PCIVs form a part of the primary containment boundary. The PCIV safety function is related to minimizing the loss of reactor coolant inventory and establishing the primary containment boundary during a DBA.
The power operated, automatic isolation valves are required to have isolation times within limits and actuate on an automatic isolation signal. The valves covered by this LCO are listed with their associated stroke times in Ref. 1.
The normally closed manual PCIVs are considered OPERABLE when the valves are closed and blind flanges in place, or open under administrative controls. Normally closed automatic PCIVs, which are required by design (e.g., to meet 10 CFR 50 Appendix R requirements) to be de-activated and closed, are considered OPERABLE when the valve is closed and de-activated. These passive isolation valves and devices are those listed in Reference 1. Purge valves with resilient seals, secondary containment bypass valves, MSIVs, and hydrostatically tested valves must meet additional Secondary leakage rate requirements. Other PCIV leakage rates are Containment Bypass addressed add by LCO 3.6.1.1, "Primary Containment," as Type B Leakage Valves or C te testing.
This LCO provi provides assurance that the PCIVs will perform their designed safe safety functions to minimize the loss of reactor coolant inventory entor and establish the primary containment boundary durinduring g accidents. In addition, the LCO ensures leakage through the en non-PCIVs listed in Table 3.6.1.3-1 3 6 1 3-1 are within the limits assumed in the accident analysis.
APPLICABILITY In MODES 1, 2, and 3, a DBA could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, most PCIVs are not required to be OPERABLE and the primary containment purge valves are not required to be normally closed in MODES 4 and 5. Certain valves are required to be OPERABLE, however, to prevent inadvertent reactor vessel draindown. These valves are (continued)
NMP2 B 3.6.1.3-3 Revision 0
INSERT Primary Containment Isolation Valves TRM 3.6.1 TRM Table 3.6.1-3 (page 1 of 2)
Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER VALVE DESCRIPTION PER VALVE LEAK RATE (SCFH)
Main steam drain line 2MSS*MOV111 (inboard) 1.875 2MSS*MOV112 Main steam drain line 2MSS*MOV208 (outboard) 0.625 2CMS*SOV74A, B (d) 0.2344 2CMS*SOV75A, B (d) 4 Post-accident sampling 2CMS*SOV76A, B (d) lines 2CMS*SOV77A, B (d) 2DER*MOV119 Drywell equipment drain (a) 2DER*RV344 lines 2DER*MOV120 1.25 2DER*MOV130 Drywell equipment vent line 0.625 2DER*MOV131 2DFR*MOV120 1.875 Drywell floor drain line 2DFR*MOV121 (b) 2DFR*RV228 2DFR*MOV139 Drywell floor vent line 0.9375 2DFR*MOV140 2WCS*MOV102 RWCU line 2.5 2WCS*MOV112 2FWS*V23A, B Feedwater line 12.0 2FWS*V12A, B 2CPS*AOV104 CPS supply line to drywell 4.38 2CPS*AOV106 2CPS*AOV105 CPS supply line to supp. 3.75 2CPS*AOV107 chamber (continued)
(a) The combined leakage rate for these two valves shall be 1.25 SCFH.
(b) The combined leakage rate for these two valves shall be 1.875 SCFH.
NMP2 TRM 3.6-23a TRM Markup provided for information only.
INSERT Primary Containment Isolation Valves TRM 3.6.1 TRM Table 3.6.1.3-1 (page 2 of 2)
Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER VALVE DESCRIPTION PER VALVE LEAK RATE (SCFH) 2CPS*SOV119 CPS supply line to supp. chamber 0.625 2CPS*SOV120 2CPS*SOV121 2CPS*SOV122 Inst. air to ADS accumulators 2IAS*SOV164 0.9375 2IAS*V448 Inst. air to ADS accumulators 2IAS*SOV165 0.9375 2IAS*V449 N2 purge to TIP index mechanism 2GSN*SOV166 (c) 2GSN*V170 Inst. air to SRV accumulators 2IAS*SOV166 (c) 2IAS*SOV184 Inst. air to drywell 2IAS*SOV167 (c) 2IAS*SOV185 Inst. air to CPS valve in supp.
2IAS*SOV168 chamber (c) 2IAS*SOV180 Inst. air to CPS valve in supp.
2CPS*SOV132 chamber (c) 2CPS*V50 Inst. air to CPS valve in supp.
2CPS*SOV133 chamber (c) 2CPS*V51 (c) The combined leak rate for these penetrations shall be 3.6 SCFH. The assigned leakage rate through a penetration shall be that of the valve with the highest leakage rate in that penetration. However, if a penetration is isolated by one closed and de-activated automatic valve, closed manual valve, or blind flange, the leakage through the penetration shall be the actual pathway leakage.
(d) The LCO requirements and leakage rate limit shall apply until such time as a modification eliminates the potential secondary containment bypass leakage path.
TRM Markup provided for NMP2 TRM 3.6-23b information only.