NMP2L2576, License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual

From kanterella
(Redirected from ML15082A368)
Jump to navigation Jump to search

License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual
ML15082A368
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/23/2015
From: Jim Barstow
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP2L2576
Download: ML15082A368 (19)


Text

10 CFR 50.90 NMP2L2576 March 23, 2015 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555 Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 NRC Docket No. 50-410

Subject:

License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual In accordance with 10 CFR 50.90, Exelon Generation Company, LLC (Exelon) requests an amendment to the Technical Specifications, Appendix A, of Renewed Facility Operating License No. NPF-69 for Nine Mile Point Nuclear Station, Unit 2 (NMP2).

The proposed changes will revise NMP2 Technical Specifications (TS) to remove TS Table 11 3.6.1.3-1, "Secondary Containment Bypass Leakage Paths Leakage Rate Limits, and references to the table and relocate the information to the Technical Requirements Manual (TAM). These proposed changes follow the guidance in Generic Letter 91-08, "Removal of 11 Component Lists from Technical Specifications.

The proposed changes have been reviewed by the NMP Plant Operations Review Committee and approved in accordance with Nuclear Safety Review Board procedures.

Exelon requests approval of the proposed amendment by February 26, 2016. The requested approval date supports the implementation of the hardened containment vent modifications at NMP2 to comply with the schedule required by NRC Order EA-13-109, Order to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions, dated June 6, 2013. Once approved, the amendment shall be implemented within 120 days.

There are no regulatory commitments contained in this request.

License Amendment Request Relocation of Secondary Containment Bypass Leakage Rate Limits Table March 23, 2015 Page 2 In accordance with 10 CFR 50.91, "Notice for public comment; State consultation,"

paragraph (b), Exelon is notifying the State of New York of this application of license amendment by transmitting a copy of this letter and its attachments to the designated State Official.

Should you have any questions concerning this submittal, please contact Ron Reynolds at (610) 765-5247.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 23rd day of March 2015.

Respectfully, Jam Barstow Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC Attachments: 1) Evaluation of Proposed Technical Specification Changes

2) Proposed Technical Specification, Bases and TAM Marked-Up Pages cc: USNRC Regional Administrator, Region I w/attachments USNRC Project Manager, NMP w/attachments USNRC Senior Resident Inspector, NMP w/attachments A. L. Peterson, NYSERDA w/attachments

ATTACHMENT 1 EVALUATION OF PROPOSED TECHNICAL SPECIFICATION CHANGES

SUBJECT:

Relocation of Secondary Containment Bypass Leakage Rate Limits Table from Technical Specifications to the Technical Requirements Manual 1.0

SUMMARY

DESCRIPTION 2.0 DETAILED DESCRIPTION

3.0 TECHNICAL EVALUATION

4.0 REGULATORY EVALUATION

4.1 Applicable Regulatory Requirements/Criteria 4.2 Precedent 4.3 No Significant Hazards Consideration 4.4 Conclusions

5.0 ENVIRONMENTAL CONSIDERATION

6.0 REFERENCES

Evaluation of Proposed Attachment 1 Technical Specification Changes Page 1of6 1.0

SUMMARY

DESCRIPTION In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Exelon Generation Company, LLC (Exelon) requests an amendment to Renewed Operating License No. NPF-69 for Nine Mile Point Nuclear Station, Unit 2 (NMP2).

The proposed changes would remove Table 3.6.1.3-1, "Secondary Containment Bypass Leakage Paths Leakage Rate Limits," and references to the table, from the Technical Specification (TS) and relocate the information from the table to the Technical Requirements Manual (TAM) using the guidance provided in Generic Letter (GL) 91-08, "Removal of Component Lists from Technical Specifications." Marked up TS pages and Bases pages are provided in Attachment 2.

Exelon requests approval of the proposed changes. Once approved, the amendment shall be implemented within 120 days.

2.0 DETAILED DESCRIPTION The proposed changes would remove Table 3.6.1.3-1 and references to the table, from the TS and relocate the information from the table to the TAM using the guidance in Generic Letter (GL) 91-08. The TAM is a licensee-controlled document which is controlled under the provisions of 10 CFR 50.59. The TAM is established to provide, in a single location, a variety of information to which ready access is needed in the daily routine operation of the plant.

Therefore, removal of the table from TS will permit administrative control of future changes to the table without processing a license amendment.

3.0 TECHNICAL EVALUATION

The NRC approved NMP2 conversion to Improved Technical Specifications (ITS) on February 15, 2000. The ITS conversion was based on NUREG-1433 and -1434, "Standard Technical Specifications for General Electric Plants BWR4/BWR6," Rev. 1 dated April 1995. As part of the conversion to ITS, NMP2 included a component list for secondary containment bypass leakage paths leakage rate limits. Revision 4 of NUREG-1433, "General Electric BWR/4 Improved Standard Technical Specifications" and Revision 4 of NUREG-1434, "General Electric BWR/6 Improved Standard Technical Specifications" do not require the secondary containment bypass leakage paths leakage rate limits to be listed in a table format within the TS.

NMP2 is proposing to remove Table 3.6.1.3-1 and references to the table from the TS and relocate the information from the table to the TAM following the guidance in GL 91-08. As precedence for this proposed change, two NRC approved license amendment requests from Limerick Generating Station where component tables were removed from the TS using the guidance in GL 91-08 are provided (References 1 and 2).

GL 91-08 provides guidance for preparing a request for a license amendment to remove component lists from TS. This guidance provides an acceptable alternative to identifying every component by its plant identification number as it is currently listed in the tables of TS components. The removal of component lists is acceptable because it does not alter existing TS requirements or those components to which they apply.

Evaluation of Proposed Attachment 1 Technical Specification Changes Page 2 of 6 Section 3 of Enclosure 1 to GL 91-08 provides specific guidance for the removal of secondary containment bypass leakage paths. Section 3 states,

'The TS on containment leakage includes a list of secondary containment bypass leakage paths. The list identifies these leakage paths by penetration number for dual containment plants. The combined leakage rate for all penetrations identified as secondary containment bypass leakage paths is specified.

As part of the plant licensing basis, the FSAR defines the penetrations that are secondary containment bypass leakage paths. This definition of "secondary containment bypass leakage paths" is adequate such that the TS requirements do not require further clarification upon the removal of this list from the TS. Therefore, the TS requirements may be stated in terms of secondary containment bypass leakage paths without further clarification.

For example, the limitation of TS 3.6.1.2.c on containment leakage rates should be revised to state the following:

A combined leakage rate of less than or equal to [0.1 O] La for all penetrations that are secondary containment bypass leakage paths when pressurized to Pa."

Using the guidance in GL 91-08, the proposed license amendment would remove TS Table 3.6.1.3-1 and references to the table from the TS and relocate the information from the table to the TAM. Section 6.0 of the NMP2 USAA currently lists the leakage rate acceptance criteria for each secondary containment bypass leakage paths listed in TS Table 3.6.1.3-1. These proposed changes maintain the consistency with the current USAA requirements regarding secondary containment leakage rate limits.

The TS Surveillance Requirement (SR) in SR 3.6.1.3.11 requires verification of the leakage rate for the secondary containment bypass leakage paths are within their limits when pressurized to greater than or equal to 40 psig. This SR and the surveillance frequency will be unchanged by this proposed license amendment.

4.0 REGULATORY EVALUATION

4.1 Applicable Regulatory Requirements/Criteria The proposed changes have been evaluated to determine whether applicable regulations and requirements continue to be met. Exelon has determined that the proposed changes do not require any exemptions or relief from regulatory requirements other than the TS.

The following applicable regulations and regulatory requirements were reviewed in making this determination:

Generic Letter 91-08, Removal of Component Lists from Technical Specifications dated May 6, 1991 NUREG-1433, Standard Technical Specifications, General Electric BWR/4 Plants, Volume 1, Specifications, Rev. 4

Evaluation of Proposed Attachment 1 Technical Specification Changes Page 3 of 6 NUREG-1433, Standard Technical Specifications, General Electric BWR/4 Plants, Volume 2, Bases, Rev. 4 NUREG-1434, Standard Technical Specifications, General Electric BWR/6 Plants, Volume 1, Specifications, Rev. 4 NUREG-1434, Standard Technical Specifications, General Electric BWR/6 Plants, Volume Bases, Rev.4 10 CFR 50.36, Technical specifications The NRC approved conversion to Improved Standard Technical Specification (ITS) at NMP2 used the guidance in NUREG-1433, Revision 1, and NUREG-1434, Revision 1. This conversion included Table 3.6.1.3-1, Secondary Containment Bypass Leakage Paths Leakage Rate Limits.

For the proposed License Amendment Request, a review was performed of NUREG-1433, Revision 4, and NUREG-1434, Revision 4, to ensure that their requirements are met. Since NMP2 is a General Electric BWR/5 containment design, both NUREGs for BWR4 and BWR6 plants are reviewed. These NUREGs provide the latest guidance for ITS and do not specify the requirement to have a tabulation of the secondary containment bypass leakage paths leakage rate limits in the ITS. Therefore, the removal of Table 3.6.1.3-1 from NMP2 TS and relocation of the information to the TAM does not result in a deviation to the current NUREG guidance for ITS. In addition, the proposed License Amendment Request will not change the current Limiting Condition for Operation (LCO) 3.6.1.3.D for secondary containment operability or the current TS Surveillance Requirement (SR) 3.6.1.3.11 for surveillance of secondary containment leakage.

In conclusion, as a result of the proposed change, the guidance in the current revisions to NUREG 1433 and 1434 are met.

Guidance in GL 91-08 is reviewed for applicability to the proposed License Amendment Request. This GL provides an acceptable alternative to identifying every component by its plant identification number as it is currently listed in the tables of TS components. The guidance allows for the removal of component lists provided it does not alter existing TS requirements or those components to which they apply. Furthermore, this GL provides guidance on including component lists into plant procedures that are subject to the change control provisions for plant procedures in the Administrative Controls Section of the TS. This guidance is applicable to this License Amendment Request because the proposed changes will result in a line-item TS improvement as described in the GL. Enclosure 1 to the GL, Guidance on the Removal of Component Lists From TS, will be used as guidance for the relocation of the information from TS Table 3.6.1.3-1 to the TAM which is subject to the change control provisions of 10 CFR 50.59.

The removal of TS Table 3.6.1.3-1 from the TS meets the criteria of 10 CFR 50.36, "Technical Specifications." Paragraph (c)(2)(ii), Criterion 3 state the following:

(ii) A Technical Specification Limiting Condition for Operation of a nuclear reactor must be established for each item meeting one or more of the following criteria:

Criterion 3. A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.

Evaluation of Proposed Attachment 1 Technical Specification Changes Page 4 of 6 The proposed changes do not remove the leakage limit requirements from TS 3.6.1.3, "Primary Containment Isolation Valves (PCIVs)," and therefore Criterion 3 of 10 CFR 50.36(c)(2)(ii) continues to be met.

Further, 10 CFR 50.36, Paragraph (c)(3), Surveillance Requirements, states the following:

Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.

The proposed changes do not remove the surveillance requirements for secondary containment bypass leakage limitations. SR 3.6.1.3.11 requires verification of the leakage rate for the secondary containment bypass leakage paths are within their limits when pressurized to greater than or equal to 40 psig. This SR and the surveillance frequency is currently in the TS and will be unchanged by this proposed license amendment. Therefore, 10 CFR 50.36(c)(3) continues to be met.

4.2 Precedent A 1995 Limerick License Amendment (Reference 1) was approved by NRC for the relocation of the Reactor Enclosure and Refueling Area Secondary Containment Isolation Valve Tables 3.6.5.2.1-1 and 3.6.5.2.2-1 and references to them from the Technical Specifications to the Updated Final Safety Analysis Report in accordance with the guidance in GL 91-08.

A 1999 Limerick License Amendment (Reference 2) was approved by NRC for the relocation of the Primary Containment Isolation Valve Table 3.6.3-1 and references to the table from the Technical Specifications to the Technical Requirements Manual in accordance with the guidance in GL 91-08.

4.3 No Significant Hazards Consideration Exelon has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment, 11 as discussed below:

1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

Using the guidance in GL 91-08, the NMP2 proposed change would remove Table 3.6.1.3-1 and references to the table from the TS and relocates the information from the table to the TRM, which is a licensee controlled document. This change is consistent with Revision 4 of NUREG-1433, "General Electric BWR/4 Improved Standard Technical Specifications" and Revision 4 of NUREG-1434, "General Electric BWR/6 Improved Standard Technical Specifications." This change is an administrative change that will not alter the manner in which the valves will be operated. Since the proposed change does not alter the manner in which the valves are operated, there is no significant impact on reactor operation.

Evaluation of Proposed Attachment 1 Technical Specification Changes Page 5 of 6 Being an administrative change, the proposed change does not involve a physical change to the valves, nor does it change the safety function of the valves. The proposed TS revision involves no significant changes to the operation of any systems or components in normal or accident operating conditions and no changes to existing structures, systems, or components.

Therefore, the proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The relocation of the table for the secondary containment isolation valves is an administrative change that will not impact the safety function of the secondary containment isolation valves. The proposed change does not affect the manner in which the valves will be operated; therefore, there are no new failure mechanisms created. The proposed change does not involve physical changes to the valves, nor does it change the safety function of the valves. The proposed change does not physically alter secondary containment isolation capability. The secondary containment bypass leakage paths leakage rate limits will not be changed by the proposed amendment.

Therefore, the proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed amendment involve a significant reduction in a margin of safety?

Response: No.

There is no adverse impact on the existing equipment capability as well as associated structures as a result of this administrative change. The proposed changes continue to provide the same limitations for secondary containment bypass leakage paths leakage rate limits as the existing leakage rate limits.

Therefore, the proposed amendment does not involve a significant reduction in a margin of safety.

Based on the above, Exelon concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c) and, accordingly, a finding of no significant hazards consideration is justified.

4.4 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Evaluation of Proposed Attachment 1 Technical Specification Changes Page 6 of 6

5.0 ENVIRONMENTAL CONSIDERATION

A review has determined that the proposed amendment would not change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would not change an inspection or surveillance requirement. However, the proposed amendment not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.

Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.

6.0 REFERENCES

1. Limerick Generating Station, Units 1 and 2 (TAC NOS. M93690 AND M93691) dated November 20, 1995
2. Limerick Generating Station, Units 1 and 2 - Issuance of Amendment Re:

Relocation of the Primary Containment Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual and Deleting References to Tables (TAC NOS. MA8101 and MA8102) dated October 18, 2000.

ATTACHMENT 2 PROPOSED TECHNICAL SPECIFICATION and BASES MARKED-UP PAGES (Unit 2)

TS Pages 3.6.1.3-1, -12, -14 and -15 Bases Pages B3.6.1.3-1 through -3 TAM Pages 3.6-23a and -23b

PCIVs Secondary Containment Bypass 3.6.1.3 Leakage Valve 3.6 CONTAINMENT SYSTEMS DELETE 3.6.1.3 Primary Containment Isolation Valves Va (PCIVs)

LCO 3.6.1.3 Each PCIV and each non-PCIV llisted in Table 3.6.1.3-1 3 6 1 3-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, When associated instrumentation is required to be OPERABLE per LCO 3.3.6.1, "Primary Containment Isolation Instrumentation."

ACTIONS


NOTES -----------------------------------------------------------

1. Penetration flow paths may be unisolated intermittently under administrative controls.
2. Separate Condition entry is allowed for each penetration flow path.
3. Enter applicable Conditions and Required Actions for systems made inoperable by PCIVs.
4. Enter applicable Conditions and Required Actions of LCO 3.6.1.1, "Primary Containment," when PCIV leakage results in exceeding overall containment leakage rate acceptance criteria.

CONDITION REQUIRED ACTION COMPLETION TIME A. -------------NOTE-------------- A.1 Isolate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> except Only applicable to penetration flow path for main steam penetration flow paths by use of at least line with two or more one closed and PCIVs. de-activated AND


automatic valve, closed manual valve, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for main One or more blind flange, or steam line penetration flow paths check valve with flow with one PCIV through the valve inoperable except due secured.

to leakage not within limit. AND (continued)

NMP2 3.6.1.3-1 Amendment 91

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.1.3.6 Perform leakage rate testing for each 184 days primary containment purge valve with resilient seals. AND Once within 92 days after opening the valve SR 3.6.1.3.7 Verify the isolation time of each MSIV is In accordance t 3 seconds and d 5 seconds. with the Inservice Testing Program SR 3.6.1.3.8 Verify each automatic PCIV actuates to 24 months the isolation position on an actual or simulated isolation signal.

SR 3.6.1.3.9 Verify a representative sample of reactor 24 months instrumentation line EFCVs actuates to the isolation position on an actual or simulated instrument line break signal.

SR 3.6.1.3.10 Remove and test the explosive squib from 24 months on a each shear isolation valve of the TIP STAGGERED TEST System. BASIS SR 3.6.1.3.11 Verify the leakage rate for the secondary In accordance containment bypass leakage paths is with 10 CFR 50 within the limits of Table 3 3.6.1.3-1 6 1 3-1 when Appendix J pressurized to t 40 psig. Testing Program Plan (continued)

DELETE NMP2 3.6.1.3-12 Amendment 91, 96

PCIVs DELETE 3.6.1.3 Table 3.6.1.3-1 (page 1 of 2)

Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER PER VALVE LEAK RATE (SCFH) 2MSS*MOV111 1.875 2MSS*MOV112 2MSS*MOV208 0.625 2CMS*SOV74A, B (d) 0.2344 2CMS*SOV75A, B (d) 2CMS*SOV76A, B (d) 2CMS*SOV77A, B (d) 2DER*MOV119 (a) 2DER*RV344 2DER*MOV120 1.25 2DER*MOV130 0.625 2DER*MOV131 2DFR*MOV120 1.875 2DFR*MOV121 (b) 2DFR*RV228 2DFR*MOV139 0.9375 2DFR*MOV140 2WCS*MOV102 2.5 2WCS*MOV112 2FWS*V23A, B 12.0 2FWS*V12A, B 2CPS*AOV104 4.38 2CPS*AOV106 2CPS*AOV105 3.75 2CPS*AOV107 (continued)

(a) The combined leakage rate for these two valves shall be d 1.25 SCFH.

(b) The combined leakage rate for these two valves shall be d 1.875 SCFH.

The information from this Technical Specification section has been relocated to the TRM.

NMP2 3.6.1.3-14 Amendment 91, 104, 106

DELETE PCIVs 3.6.1.3 Table 3.6.1.3-1 (page 2 of 2)

Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER PER VALVE LEAK RATE (SCFH) 2CPS*SOV119 0.625 2CPS*SOV120 2CPS*SOV121 2CPS*SOV122 2IAS*SOV164 0.9375 2IAS*V448 2IAS*SOV165 0.9375 2IAS*V449 2GSN*SOV166 (c) 2GSN*V170 2IAS*SOV166 (c) 2IAS*SOV184 2IAS*SOV167 (c) 2IAS*SOV185 2IAS*SOV168 (c) 2IAS*SOV180 2CPS*SOV132 (c) 2CPS*V50 2CPS*SOV133 (c) 2CPS*V51 (c) The combined leak rate for these penetrations shall be d 3.6 SCFH. The assigned leakage rate through a penetration shall be that of the valve with the highest leakage rate in that penetration. However, if a penetration is isolated by one closed and de-activated automatic valve, closed manual valve, or blind flange, the leakage through the penetration shall be the actual pathway leakage.

(d) The LCO requirements and leakage rate limit shall apply until such time as a modification eliminates the potential secondary containment bypass leakage path.

The information from this Technical Specification section has been relocated to the TRM.

NMP2 3.6.1.3-15 Amendment 91, 106

PCIVs B 3.6.1.3 B 3.6 CONTAINMENT SYSTEMS Secondary Containment Bypass B 3.6.1.3 Primary Containment Isolation Valves (PCIVs)

Leakage Valves DELETE BASES BACKGROUND The function of the PCIVs and the non-PCIVs llisted in Table T 3.6.1.3-1 3 6 1 3-1 (2CMS*SOV74A, (2CMS SOV74A 74B, 74B 75A, 75A 75B, 75B 76A, 76B, 77A 76A 76B 77A, and 77B) 77B), in combination with other accident mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs) to within DELETE limits. Primary containment isolation within the time limits specified for those PCIVs designed to close automatically ensures that the release of radioactive material to the environment will be consistent with the assumptions used in the analyses for a DBA.

The OPERABILITY requirements for PCIVs help ensure that an adequate primary containment boundary is maintained during and after an accident by minimizing potential paths to the environment. Therefore, the OPERABILITY requirements provide assurance that the primary containment function assumed in the safety analysis will be maintained. These isolation devices consist of either passive devices or active (automatic) devices. Manual valves, de-activated automatic valves secured in their closed position (including check valves with flow through the valve secured), blind flanges (which include plugs and caps as listed in Reference 1), and closed systems are considered passive devices. Check valves, or other automatic valves designed to close without operator action following an accident, are considered active devices. Two barriers in series are provided for each penetration, except for penetrations isolated by excess flow check valves, so that no single credible failure or malfunction of an active component can result in a loss of isolation or leakage that exceeds limits assumed in the safety analysis. One of these barriers may be a closed system.

The 12 and 14 inch primary containment purge valves are PCIVs that are qualified for use during all operational conditions. The 12 and 14 inch primary containment purge valves are normally maintained closed in MODES 1, 2, and 3 to ensure the primary containment boundary is maintained.

However, the purge valves may be open when being used for pressure control, inerting, de-inerting, ALARA, or air quality considerations since they are fully qualified.

(continued)

NMP2 B 3.6.1.3-1 Revision 0

PCIVs B 3.6.1.3 BASES BACKGROUND A two inch bypass line is provided when the primary (continued) containment full flow line to the Standby Gas Treatment (SGT) System is isolated.

Secondary Containment Bypass ss Leakage Valve APPLICABLE The PCIVs P LCO was derived from the assumptions related SAFETY ANALYSES to minimizing nim the loss of reactor coolant inventory, and establishing sh the primary containment boundary during major accidents.s. As part of the primary containment boundary, PCIV (and d non-PCIVs listed in Table 3 3.6.1.3-1) 6 1 3-1) OPERABILITY supports leak tightness of primary containment. tt. Therefore, The the safety analysis of any event requiring isolation of DELETE primary containment is applicable to this LCO.

The DBAs that result in a release of radioactive material for which the consequences are mitigated by PCIVs are a loss of coolant accident (LOCA) and a main steam line break Secondary (MSLB) (Refs. 2 and 3). In the analysis for each of these Containment Bypass a accidents, it is assumed that PCIVs are either closed or Leakage Valves un function to close within the required isolation time following low event initiation. This ensures that potential pathss to the environment through PCIVs (including primary containment nm purge valves) are minimized. Of the events DELETE analyzed d in References 2 and 3, the LOCA is the most st limiting event ven due to radiological consequences. In addition, the hee non-PCIVs listed in Table 3.6.1.3-1 3 6 1 3-1 are also assumed to be closed during the LOCA. The closure time of the main steam isolation valves (MSIVs) is a significant variable from a radiological standpoint. The MSIVs are required to close within 3 to 5 seconds since the 3 second closure time is assumed in the MSIV closure (the most severe overpressurization transient) analysis (Ref. 4) and 5 second closure time is assumed in the MSLB analysis (Ref. 3).

Likewise, it is assumed that the primary containment isolates such that release of fission products to the environment is controlled.

The DBA analysis assumes that isolation of the primary containment is complete and leakage terminated, except for the maximum allowable leakage, La, prior to fuel damage.

The single failure criterion required to be imposed in the conduct of unit safety analyses was considered in the original design of the primary containment purge valves.

Two valves in series on each purge line provide assurance that both the supply and exhaust lines could be isolated even if a single failure occurred.

(continued)

NMP2 B 3.6.1.3-2 Revision 0

PCIVs B 3.6.1.3 BASES APPLICABLE PCIVs satisfy Criterion 3 of Reference 5.

SAFETY ANALYSES (continued)

LCO PCIVs form a part of the primary containment boundary. The PCIV safety function is related to minimizing the loss of reactor coolant inventory and establishing the primary containment boundary during a DBA.

The power operated, automatic isolation valves are required to have isolation times within limits and actuate on an automatic isolation signal. The valves covered by this LCO are listed with their associated stroke times in Ref. 1.

The normally closed manual PCIVs are considered OPERABLE when the valves are closed and blind flanges in place, or open under administrative controls. Normally closed automatic PCIVs, which are required by design (e.g., to meet 10 CFR 50 Appendix R requirements) to be de-activated and closed, are considered OPERABLE when the valve is closed and de-activated. These passive isolation valves and devices are those listed in Reference 1. Purge valves with resilient seals, secondary containment bypass valves, MSIVs, and hydrostatically tested valves must meet additional Secondary leakage rate requirements. Other PCIV leakage rates are Containment Bypass addressed add by LCO 3.6.1.1, "Primary Containment," as Type B Leakage Valves or C te testing.

This LCO provi provides assurance that the PCIVs will perform their designed safe safety functions to minimize the loss of reactor coolant inventory entor and establish the primary containment boundary durinduring g accidents. In addition, the LCO ensures leakage through the en non-PCIVs listed in Table 3.6.1.3-1 3 6 1 3-1 are within the limits assumed in the accident analysis.

APPLICABILITY In MODES 1, 2, and 3, a DBA could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, most PCIVs are not required to be OPERABLE and the primary containment purge valves are not required to be normally closed in MODES 4 and 5. Certain valves are required to be OPERABLE, however, to prevent inadvertent reactor vessel draindown. These valves are (continued)

NMP2 B 3.6.1.3-3 Revision 0

INSERT Primary Containment Isolation Valves TRM 3.6.1 TRM Table 3.6.1-3 (page 1 of 2)

Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER VALVE DESCRIPTION PER VALVE LEAK RATE (SCFH)

Main steam drain line 2MSS*MOV111 (inboard) 1.875 2MSS*MOV112 Main steam drain line 2MSS*MOV208 (outboard) 0.625 2CMS*SOV74A, B (d) 0.2344 2CMS*SOV75A, B (d) 4 Post-accident sampling 2CMS*SOV76A, B (d) lines 2CMS*SOV77A, B (d) 2DER*MOV119 Drywell equipment drain (a) 2DER*RV344 lines 2DER*MOV120 1.25 2DER*MOV130 Drywell equipment vent line 0.625 2DER*MOV131 2DFR*MOV120 1.875 Drywell floor drain line 2DFR*MOV121 (b) 2DFR*RV228 2DFR*MOV139 Drywell floor vent line 0.9375 2DFR*MOV140 2WCS*MOV102 RWCU line 2.5 2WCS*MOV112 2FWS*V23A, B Feedwater line 12.0 2FWS*V12A, B 2CPS*AOV104 CPS supply line to drywell 4.38 2CPS*AOV106 2CPS*AOV105 CPS supply line to supp. 3.75 2CPS*AOV107 chamber (continued)

(a) The combined leakage rate for these two valves shall be  1.25 SCFH.

(b) The combined leakage rate for these two valves shall be  1.875 SCFH.

NMP2 TRM 3.6-23a TRM Markup provided for information only.

INSERT Primary Containment Isolation Valves TRM 3.6.1 TRM Table 3.6.1.3-1 (page 2 of 2)

Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER VALVE DESCRIPTION PER VALVE LEAK RATE (SCFH) 2CPS*SOV119 CPS supply line to supp. chamber 0.625 2CPS*SOV120 2CPS*SOV121 2CPS*SOV122 Inst. air to ADS accumulators 2IAS*SOV164 0.9375 2IAS*V448 Inst. air to ADS accumulators 2IAS*SOV165 0.9375 2IAS*V449 N2 purge to TIP index mechanism 2GSN*SOV166 (c) 2GSN*V170 Inst. air to SRV accumulators 2IAS*SOV166 (c) 2IAS*SOV184 Inst. air to drywell 2IAS*SOV167 (c) 2IAS*SOV185 Inst. air to CPS valve in supp.

2IAS*SOV168 chamber (c) 2IAS*SOV180 Inst. air to CPS valve in supp.

2CPS*SOV132 chamber (c) 2CPS*V50 Inst. air to CPS valve in supp.

2CPS*SOV133 chamber (c) 2CPS*V51 (c) The combined leak rate for these penetrations shall be  3.6 SCFH. The assigned leakage rate through a penetration shall be that of the valve with the highest leakage rate in that penetration. However, if a penetration is isolated by one closed and de-activated automatic valve, closed manual valve, or blind flange, the leakage through the penetration shall be the actual pathway leakage.

(d) The LCO requirements and leakage rate limit shall apply until such time as a modification eliminates the potential secondary containment bypass leakage path.

TRM Markup provided for NMP2 TRM 3.6-23b information only.