ML16111A130: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/10/2016
| issue date = 06/10/2016
| title = 2016 Prairie Island Nuclear Generating Plant Initial License Examination Form ES-301-5
| title = 2016 Prairie Island Nuclear Generating Plant Initial License Examination Form ES-301-5
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 13: Line 13:
| page count = 5
| page count = 5
}}
}}
=Text=
{{#Wiki_filter:ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Facility: PRAIRIE ISLAND                    Date of Exam: MAY 2016                        Operating Test No.: PI-ILT-NRC-16 A          E                                              Scenarios - Group 1 P          V            EVAL #1                  EVAL #2            EVAL #4                                T        M P          E                                                                                                O        I L          N            CREW                    CREW                CREW                CREW            T        N I          T          POSITION                POSITION            POSITION            POSITION          A I
M C                    S      A      B        S      A    B      S      A      B      S      A    B    L        U A          T        R      T      O        R      T    O      R      T      O      R      T    O              M(*)
N          Y        O      C        P        O      C    P      O      C      P      O      C    P R    I  U T          P E
RX                  4                                                                              1      1  1  0 NOR                                                1                    2                        2      1  1  1 R1        I/C                1, 5                          5, 7                  3, 7                        6      4  4  2 MAJ                  6                              6                  5, 8                        4      2  2  1 TS                                                                                                  0      0  2  2 RX                                          2                                                      1      1  1  0 NOR                                                      1                                        1      1  1  1 I/C                        1, 3,          3, 4        3, 4,                                      9      4  4  2 I1                                    7                          6, 7 MAJ                          6              6          5, 8                                      4      2  2  1 TS                                                      3, 4                                      2      0  2  2 RX                                                                1                                1      1  1  0 NOR          4                        2                                                            2      1  1  1 I/C        1, 3,                    3, 4,                        4, 6                              10    4  4  2 I2                    5, 7                    5, 7 MAJ          6                        6                          5, 8                              4      2  2  1 TS          1, 2                      3                                                            3      0  2  2 RX                                                                                                        1  1  0 NOR                                                                                                        1  1  1 I/C                                                                                                        4  4  2 MAJ                                                                                                        2  2  1 TS                                                                                                        0  2  2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Facility: PRAIRIE ISLAND                    Date of Exam: MAY 2016                        Operating Test No.: PI-ILT-NRC-16 A          E                                              Scenarios - Group 2 P          V            EVAL #1                  EVAL #2            EVAL #3                                T        M P          E                                                                                                O        I L          N            CREW                    CREW                CREW                CREW            T        N I          T          POSITION                POSITION            POSITION            POSITION          A I
M C                    S      A      B        S      A    B      S      A      B      S      A    B    L        U A          T        R      T      O        R      T    O      R      T      O      R      T    O              M(*)
N          Y        O      C        P        O      C    P      O      C      P      O      C    P R    I  U T          P E
RX                  4                                                                              1      1  1  0 NOR                                                1                    1                        2      1  1  1 R2        I/C                1, 5                          5, 7                  4, 7                        6      4  4  2 MAJ                  6                              6                    6                        3      2  2  1 TS                                                                                                  0      0  2  2 RX                                          2                                                      1      1  1  0 NOR                                                      3                                        1      1  1  1 I/C                        1, 3,          3, 4        2, 4,                                      9      4  4  2 I3                                    7                          5, 7 MAJ                          6              6            6                                        3      2  2  1 TS                                                      2, 4                                      2      0  2  2 RX                                                                3                                1      1  1  0 NOR          4                        2                                                            2      1  1  1 I/C        1, 3,                    3, 4,                        2, 5                              10    4  4  2 I4                    5, 7                    5, 7 MAJ          6                        6                          6                                3      2  2  1 TS          1, 2                      3                                                            3      0  2  2 RX                                                                                                        1  1  0 NOR                                                                                                        1  1  1 I/C                                                                                                        4  4  2 MAJ                                                                                                        2  2  1 TS                                                                                                        0  2  2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Facility: PRAIRIE ISLAND                    Date of Exam: MAY 2016                        Operating Test No.: PI-ILT-NRC-16 A          E                                              Scenarios - Group 3 P          V            EVAL #1                  EVAL #2            EVAL #3                                T        M P          E                                                                                                O        I L          N            CREW                    CREW                CREW                CREW            T        N I          T          POSITION                POSITION            POSITION            POSITION          A I
M C                    S      A      B        S      A    B      S      A      B      S      A    B    L        U A          T        R      T      O        R      T    O      R      T      O      R      T    O              M(*)
N          Y        O      C        P        O      C    P      O      C      P      O      C    P R    I  U T          P E
RX                  4                                                                              1      1  1  0 NOR                                                1                    1                        2      1  1  1 R3        I/C                1, 5                          5, 7                  4, 7                        6      4  4  2 MAJ                  6                              6                    6                        3      2  2  1 TS                                                                                                  0      0  2  2 RX                                          2                                                      1      1  1  0 NOR                                                      3                                        1      1  1  1 I/C                        1, 3,          3, 4        2, 4,                                      9      4  4  2 I5                                    7                          5, 7 MAJ                          6              6            6                                        3      2  2  1 TS                                                      2, 4                                      2      0  2  2 RX                                                                3                                1      1  1  0 NOR          4                        2                                                            2      1  1  1 I/C        1, 3,                    3, 4,                        2, 5                              10    4  4  2 I6                    5, 7                    5, 7 MAJ          6                        6                          6                                3      2  2  1 TS          1, 2                      3                                                            3      0  2  2 RX                                                                                                        1  1  0 NOR                                                                                                        1  1  1 I/C                                                                                                        4  4  2 MAJ                                                                                                        2  2  1 TS                                                                                                        0  2  2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Facility: PRAIRIE ISLAND                    Date of Exam: MAY 2016                        Operating Test No.: PI-ILT-NRC-16 A          E                                              Scenarios - Group 4 P          V            EVAL #1                  EVAL #2            EVAL #3                                T        M P          E                                                                                                O        I L          N            CREW                    CREW                CREW                CREW            T        N I          T          POSITION                POSITION            POSITION            POSITION          A I
M C                    S      A      B        S      A    B      S      A      B      S      A    B    L        U A          T        R      T      O        R      T    O      R      T      O      R      T    O              M(*)
N          Y        O      C        P        O      C    P      O      C      P      O      C    P R    I  U T          P E
RX                  4                                                                              1      1  1  0 NOR                                                1                    1                        2      1  1  1 R4        I/C                1, 5                          5, 7                  4, 7                        6      4  4  2 MAJ                  6                              6                    6                        3      2  2  1 TS                                                                                                  0      0  2  2 RX                                          2                                                      1      1  1  0 NOR                                                      3                                        1      1  1  1 I/C                        1, 3,          3, 4        2, 4,                                      9      4  4  2 I7                                    7                          5, 7 MAJ                          6              6            6                                        3      2  2  1 TS                                                      2, 4                                      2      0  2  2 RX                                                                3                                1      1  1  0 NOR          4                        2                                                            2      1  1  1 I/C        1, 3,                    3, 4,                        2, 5                              10    4  4  2 I8                    5, 7                    5, 7 MAJ          6                        6                          6                                3      2  2  1 TS          1, 2                      3                                                            3      0  2  2 RX                                                                                                        1  1  0 NOR                                                                                                        1  1  1 I/C                                                                                                        4  4  2 MAJ                                                                                                        2  2  1 TS                                                                                                        0  2  2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Facility: PRAIRIE ISLAND                    Date of Exam: MAY 2016                        Operating Test No.: PI-ILT-NRC-16 A          E                                              Scenarios - Group 5 P          V            EVAL #3                  EVAL #4                                                    T        M P          E                                                                                                O        I L          N            CREW                    CREW                CREW                CREW            T        N I          T          POSITION                POSITION            POSITION            POSITION          A I
M C                    S      A      B        S      A    B      S      A      B      S      A    B    L        U A          T        R      T      O        R      T    O      R      T      O      R      T    O              M(*)
N          Y        O      C        P        O      C    P      O      C      P      O      C    P R    I  U T          P E
RX                  3                                                                              1      1  1  0 NOR                                                2                                              1      1  1  1 R5        I/C                2, 5                          3, 7                                              4      4  4  2 MAJ                  6                            5, 8                                              3      2  2  1 TS                                                                                                  0      0  2  2 RX                                          1                                                      1      1  1  0 NOR                          1                                                                      1      1  1  1 R6        I/C                        4, 7            4, 6                                                    4      4  4  2 MAJ                          6              5, 8                                                    3      2  2  1 TS                                                                                                  0      0  2  2 RX                                                                                                  0      1  1  0 NOR          3                        1                                                            2      1  1  1 I/C        2, 4,                    3, 4,                                                          8      4  4  2 U1                    5, 7                    6, 7 MAJ          6                      5, 8                                                          3      2  2  1 TS          2, 4                    3, 4                                                          4      0  2  2 RX                                                                                                        1  1  0 NOR                                                                                                        1  1  1 I/C                                                                                                        4  4  2 MAJ                                                                                                        2  2  1 TS                                                                                                        0  2  2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Facility: PRAIRIE ISLAND                    Date of Exam: MAY 2016                        Operating Test No.: PI-ILT-NRC-16 A          E                                              Scenarios - Group 1 P          V            EVAL #1                  EVAL #2            EVAL #4                                T        M P          E                                                                                                O        I L          N            CREW                    CREW                CREW                CREW            T        N I          T          POSITION                POSITION            POSITION            POSITION          A I
M C                    S      A      B        S      A    B      S      A      B      S      A    B    L        U A          T        R      T      O        R      T    O      R      T      O      R      T    O              M(*)
N          Y        O      C        P        O      C    P      O      C      P      O      C    P R    I  U T          P E
RX                  4                                                                              1      1  1  0 NOR                                                1                    2                        2      1  1  1 R1        I/C                1, 5                          5, 7                  3, 7                        6      4  4  2 MAJ                  6                              6                  5, 8                        4      2  2  1 TS                                                                                                  0      0  2  2 RX                                          2                                                      1      1  1  0 NOR                                                      1                                        1      1  1  1 I/C                        1, 3,          3, 4        3, 4,                                      9      4  4  2 I1                                    7                          6, 7 MAJ                          6              6          5, 8                                      4      2  2  1 TS                                                      3, 4                                      2      0  2  2 RX                                                                1                                1      1  1  0 NOR          4                        2                                                            2      1  1  1 I/C        1, 3,                    3, 4,                        4, 6                              10    4  4  2 I2                    5, 7                    5, 7 MAJ          6                        6                          5, 8                              4      2  2  1 TS          1, 2                      3                                                            3      0  2  2 RX                                                                                                        1  1  0 NOR                                                                                                        1  1  1 I/C                                                                                                        4  4  2 MAJ                                                                                                        2  2  1 TS                                                                                                        0  2  2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Facility: PRAIRIE ISLAND                    Date of Exam: MAY 2016                        Operating Test No.: PI-ILT-NRC-16 A          E                                              Scenarios - Group 2 P          V            EVAL #1                  EVAL #2            EVAL #3                                T        M P          E                                                                                                O        I L          N            CREW                    CREW                CREW                CREW            T        N I          T          POSITION                POSITION            POSITION            POSITION          A I
M C                    S      A      B        S      A    B      S      A      B      S      A    B    L        U A          T        R      T      O        R      T    O      R      T      O      R      T    O              M(*)
N          Y        O      C        P        O      C    P      O      C      P      O      C    P R    I  U T          P E
RX                  4                                                                              1      1  1  0 NOR                                                1                    1                        2      1  1  1 R2        I/C                1, 5                          5, 7                  4, 7                        6      4  4  2 MAJ                  6                              6                    6                        3      2  2  1 TS                                                                                                  0      0  2  2 RX                                          2                                                      1      1  1  0 NOR                                                      3                                        1      1  1  1 I/C                        1, 3,          3, 4        2, 4,                                      9      4  4  2 I3                                    7                          5, 7 MAJ                          6              6            6                                        3      2  2  1 TS                                                      2, 4                                      2      0  2  2 RX                                                                3                                1      1  1  0 NOR          4                        2                                                            2      1  1  1 I/C        1, 3,                    3, 4,                        2, 5                              10    4  4  2 I4                    5, 7                    5, 7 MAJ          6                        6                          6                                3      2  2  1 TS          1, 2                      3                                                            3      0  2  2 RX                                                                                                        1  1  0 NOR                                                                                                        1  1  1 I/C                                                                                                        4  4  2 MAJ                                                                                                        2  2  1 TS                                                                                                        0  2  2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Facility: PRAIRIE ISLAND                    Date of Exam: MAY 2016                        Operating Test No.: PI-ILT-NRC-16 A          E                                              Scenarios - Group 3 P          V            EVAL #1                  EVAL #2            EVAL #3                                T        M P          E                                                                                                O        I L          N            CREW                    CREW                CREW                CREW            T        N I          T          POSITION                POSITION            POSITION            POSITION          A I
M C                    S      A      B        S      A    B      S      A      B      S      A    B    L        U A          T        R      T      O        R      T    O      R      T      O      R      T    O              M(*)
N          Y        O      C        P        O      C    P      O      C      P      O      C    P R    I  U T          P E
RX                  4                                                                              1      1  1  0 NOR                                                1                    1                        2      1  1  1 R3        I/C                1, 5                          5, 7                  4, 7                        6      4  4  2 MAJ                  6                              6                    6                        3      2  2  1 TS                                                                                                  0      0  2  2 RX                                          2                                                      1      1  1  0 NOR                                                      3                                        1      1  1  1 I/C                        1, 3,          3, 4        2, 4,                                      9      4  4  2 I5                                    7                          5, 7 MAJ                          6              6            6                                        3      2  2  1 TS                                                      2, 4                                      2      0  2  2 RX                                                                3                                1      1  1  0 NOR          4                        2                                                            2      1  1  1 I/C        1, 3,                    3, 4,                        2, 5                              10    4  4  2 I6                    5, 7                    5, 7 MAJ          6                        6                          6                                3      2  2  1 TS          1, 2                      3                                                            3      0  2  2 RX                                                                                                        1  1  0 NOR                                                                                                        1  1  1 I/C                                                                                                        4  4  2 MAJ                                                                                                        2  2  1 TS                                                                                                        0  2  2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Facility: PRAIRIE ISLAND                    Date of Exam: MAY 2016                        Operating Test No.: PI-ILT-NRC-16 A          E                                              Scenarios - Group 4 P          V            EVAL #1                  EVAL #2            EVAL #3                                T        M P          E                                                                                                O        I L          N            CREW                    CREW                CREW                CREW            T        N I          T          POSITION                POSITION            POSITION            POSITION          A I
M C                    S      A      B        S      A    B      S      A      B      S      A    B    L        U A          T        R      T      O        R      T    O      R      T      O      R      T    O              M(*)
N          Y        O      C        P        O      C    P      O      C      P      O      C    P R    I  U T          P E
RX                  4                                                                              1      1  1  0 NOR                                                1                    1                        2      1  1  1 R4        I/C                1, 5                          5, 7                  4, 7                        6      4  4  2 MAJ                  6                              6                    6                        3      2  2  1 TS                                                                                                  0      0  2  2 RX                                          2                                                      1      1  1  0 NOR                                                      3                                        1      1  1  1 I/C                        1, 3,          3, 4        2, 4,                                      9      4  4  2 I7                                    7                          5, 7 MAJ                          6              6            6                                        3      2  2  1 TS                                                      2, 4                                      2      0  2  2 RX                                                                3                                1      1  1  0 NOR          4                        2                                                            2      1  1  1 I/C        1, 3,                    3, 4,                        2, 5                              10    4  4  2 I8                    5, 7                    5, 7 MAJ          6                        6                          6                                3      2  2  1 TS          1, 2                      3                                                            3      0  2  2 RX                                                                                                        1  1  0 NOR                                                                                                        1  1  1 I/C                                                                                                        4  4  2 MAJ                                                                                                        2  2  1 TS                                                                                                        0  2  2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Facility: PRAIRIE ISLAND                    Date of Exam: MAY 2016                        Operating Test No.: PI-ILT-NRC-16 A          E                                              Scenarios - Group 5 P          V            EVAL #3                  EVAL #4                                                    T        M P          E                                                                                                O        I L          N            CREW                    CREW                CREW                CREW            T        N I          T          POSITION                POSITION            POSITION            POSITION          A I
M C                    S      A      B        S      A    B      S      A      B      S      A    B    L        U A          T        R      T      O        R      T    O      R      T      O      R      T    O              M(*)
N          Y        O      C        P        O      C    P      O      C      P      O      C    P R    I  U T          P E
RX                  3                                                                              1      1  1  0 NOR                                                2                                              1      1  1  1 R5        I/C                2, 5                          3, 7                                              4      4  4  2 MAJ                  6                            5, 8                                              3      2  2  1 TS                                                                                                  0      0  2  2 RX                                          1                                                      1      1  1  0 NOR                          1                                                                      1      1  1  1 R6        I/C                        4, 7            4, 6                                                    4      4  4  2 MAJ                          6              5, 8                                                    3      2  2  1 TS                                                                                                  0      0  2  2 RX                                                                                                  0      1  1  0 NOR          3                        1                                                            2      1  1  1 I/C        2, 4,                    3, 4,                                                          8      4  4  2 U1                    5, 7                    6, 7 MAJ          6                      5, 8                                                          3      2  2  1 TS          2, 4                    3, 4                                                          4      0  2  2 RX                                                                                                        1  1  0 NOR                                                                                                        1  1  1 I/C                                                                                                        4  4  2 MAJ                                                                                                        2  2  1 TS                                                                                                        0  2  2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.}}

Latest revision as of 20:51, 30 October 2019

2016 Prairie Island Nuclear Generating Plant Initial License Examination Form ES-301-5
ML16111A130
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/10/2016
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Northern States Power Company, Minnesota
References
Download: ML16111A130 (5)


Text

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 1 P V EVAL #1 EVAL #2 EVAL #4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RX 4 1 1 1 0 NOR 1 2 2 1 1 1 R1 I/C 1, 5 5, 7 3, 7 6 4 4 2 MAJ 6 6 5, 8 4 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 1 1 1 1 1 I/C 1, 3, 3, 4 3, 4, 9 4 4 2 I1 7 6, 7 MAJ 6 6 5, 8 4 2 2 1 TS 3, 4 2 0 2 2 RX 1 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 4, 6 10 4 4 2 I2 5, 7 5, 7 MAJ 6 6 5, 8 4 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 2 P V EVAL #1 EVAL #2 EVAL #3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RX 4 1 1 1 0 NOR 1 1 2 1 1 1 R2 I/C 1, 5 5, 7 4, 7 6 4 4 2 MAJ 6 6 6 3 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 3 1 1 1 1 I/C 1, 3, 3, 4 2, 4, 9 4 4 2 I3 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 2, 4 2 0 2 2 RX 3 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 2, 5 10 4 4 2 I4 5, 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 3 P V EVAL #1 EVAL #2 EVAL #3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RX 4 1 1 1 0 NOR 1 1 2 1 1 1 R3 I/C 1, 5 5, 7 4, 7 6 4 4 2 MAJ 6 6 6 3 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 3 1 1 1 1 I/C 1, 3, 3, 4 2, 4, 9 4 4 2 I5 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 2, 4 2 0 2 2 RX 3 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 2, 5 10 4 4 2 I6 5, 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 4 P V EVAL #1 EVAL #2 EVAL #3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RX 4 1 1 1 0 NOR 1 1 2 1 1 1 R4 I/C 1, 5 5, 7 4, 7 6 4 4 2 MAJ 6 6 6 3 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 3 1 1 1 1 I/C 1, 3, 3, 4 2, 4, 9 4 4 2 I7 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 2, 4 2 0 2 2 RX 3 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 2, 5 10 4 4 2 I8 5, 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 5 P V EVAL #3 EVAL #4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RX 3 1 1 1 0 NOR 2 1 1 1 1 R5 I/C 2, 5 3, 7 4 4 4 2 MAJ 6 5, 8 3 2 2 1 TS 0 0 2 2 RX 1 1 1 1 0 NOR 1 1 1 1 1 R6 I/C 4, 7 4, 6 4 4 4 2 MAJ 6 5, 8 3 2 2 1 TS 0 0 2 2 RX 0 1 1 0 NOR 3 1 2 1 1 1 I/C 2, 4, 3, 4, 8 4 4 2 U1 5, 7 6, 7 MAJ 6 5, 8 3 2 2 1 TS 2, 4 3, 4 4 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 1 P V EVAL #1 EVAL #2 EVAL #4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RX 4 1 1 1 0 NOR 1 2 2 1 1 1 R1 I/C 1, 5 5, 7 3, 7 6 4 4 2 MAJ 6 6 5, 8 4 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 1 1 1 1 1 I/C 1, 3, 3, 4 3, 4, 9 4 4 2 I1 7 6, 7 MAJ 6 6 5, 8 4 2 2 1 TS 3, 4 2 0 2 2 RX 1 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 4, 6 10 4 4 2 I2 5, 7 5, 7 MAJ 6 6 5, 8 4 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 2 P V EVAL #1 EVAL #2 EVAL #3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RX 4 1 1 1 0 NOR 1 1 2 1 1 1 R2 I/C 1, 5 5, 7 4, 7 6 4 4 2 MAJ 6 6 6 3 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 3 1 1 1 1 I/C 1, 3, 3, 4 2, 4, 9 4 4 2 I3 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 2, 4 2 0 2 2 RX 3 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 2, 5 10 4 4 2 I4 5, 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 3 P V EVAL #1 EVAL #2 EVAL #3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RX 4 1 1 1 0 NOR 1 1 2 1 1 1 R3 I/C 1, 5 5, 7 4, 7 6 4 4 2 MAJ 6 6 6 3 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 3 1 1 1 1 I/C 1, 3, 3, 4 2, 4, 9 4 4 2 I5 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 2, 4 2 0 2 2 RX 3 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 2, 5 10 4 4 2 I6 5, 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 4 P V EVAL #1 EVAL #2 EVAL #3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RX 4 1 1 1 0 NOR 1 1 2 1 1 1 R4 I/C 1, 5 5, 7 4, 7 6 4 4 2 MAJ 6 6 6 3 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 3 1 1 1 1 I/C 1, 3, 3, 4 2, 4, 9 4 4 2 I7 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 2, 4 2 0 2 2 RX 3 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 2, 5 10 4 4 2 I8 5, 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 5 P V EVAL #3 EVAL #4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RX 3 1 1 1 0 NOR 2 1 1 1 1 R5 I/C 2, 5 3, 7 4 4 4 2 MAJ 6 5, 8 3 2 2 1 TS 0 0 2 2 RX 1 1 1 1 0 NOR 1 1 1 1 1 R6 I/C 4, 7 4, 6 4 4 4 2 MAJ 6 5, 8 3 2 2 1 TS 0 0 2 2 RX 0 1 1 0 NOR 3 1 2 1 1 1 I/C 2, 4, 3, 4, 8 4 4 2 U1 5, 7 6, 7 MAJ 6 5, 8 3 2 2 1 TS 2, 4 3, 4 4 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.