ML16111A130
ML16111A130 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 06/10/2016 |
From: | Mcneil D NRC/RGN-III/DRS/OLB |
To: | Northern States Power Company, Minnesota |
References | |
Download: ML16111A130 (5) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 1 P V EVAL #1 EVAL #2 EVAL #4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RX 4 1 1 1 0 NOR 1 2 2 1 1 1 R1 I/C 1, 5 5, 7 3, 7 6 4 4 2 MAJ 6 6 5, 8 4 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 1 1 1 1 1 I/C 1, 3, 3, 4 3, 4, 9 4 4 2 I1 7 6, 7 MAJ 6 6 5, 8 4 2 2 1 TS 3, 4 2 0 2 2 RX 1 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 4, 6 10 4 4 2 I2 5, 7 5, 7 MAJ 6 6 5, 8 4 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 2 P V EVAL #1 EVAL #2 EVAL #3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RX 4 1 1 1 0 NOR 1 1 2 1 1 1 R2 I/C 1, 5 5, 7 4, 7 6 4 4 2 MAJ 6 6 6 3 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 3 1 1 1 1 I/C 1, 3, 3, 4 2, 4, 9 4 4 2 I3 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 2, 4 2 0 2 2 RX 3 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 2, 5 10 4 4 2 I4 5, 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 3 P V EVAL #1 EVAL #2 EVAL #3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RX 4 1 1 1 0 NOR 1 1 2 1 1 1 R3 I/C 1, 5 5, 7 4, 7 6 4 4 2 MAJ 6 6 6 3 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 3 1 1 1 1 I/C 1, 3, 3, 4 2, 4, 9 4 4 2 I5 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 2, 4 2 0 2 2 RX 3 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 2, 5 10 4 4 2 I6 5, 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 4 P V EVAL #1 EVAL #2 EVAL #3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RX 4 1 1 1 0 NOR 1 1 2 1 1 1 R4 I/C 1, 5 5, 7 4, 7 6 4 4 2 MAJ 6 6 6 3 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 3 1 1 1 1 I/C 1, 3, 3, 4 2, 4, 9 4 4 2 I7 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 2, 4 2 0 2 2 RX 3 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 2, 5 10 4 4 2 I8 5, 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 5 P V EVAL #3 EVAL #4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RX 3 1 1 1 0 NOR 2 1 1 1 1 R5 I/C 2, 5 3, 7 4 4 4 2 MAJ 6 5, 8 3 2 2 1 TS 0 0 2 2 RX 1 1 1 1 0 NOR 1 1 1 1 1 R6 I/C 4, 7 4, 6 4 4 4 2 MAJ 6 5, 8 3 2 2 1 TS 0 0 2 2 RX 0 1 1 0 NOR 3 1 2 1 1 1 I/C 2, 4, 3, 4, 8 4 4 2 U1 5, 7 6, 7 MAJ 6 5, 8 3 2 2 1 TS 2, 4 3, 4 4 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 1 P V EVAL #1 EVAL #2 EVAL #4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RX 4 1 1 1 0 NOR 1 2 2 1 1 1 R1 I/C 1, 5 5, 7 3, 7 6 4 4 2 MAJ 6 6 5, 8 4 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 1 1 1 1 1 I/C 1, 3, 3, 4 3, 4, 9 4 4 2 I1 7 6, 7 MAJ 6 6 5, 8 4 2 2 1 TS 3, 4 2 0 2 2 RX 1 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 4, 6 10 4 4 2 I2 5, 7 5, 7 MAJ 6 6 5, 8 4 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 2 P V EVAL #1 EVAL #2 EVAL #3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RX 4 1 1 1 0 NOR 1 1 2 1 1 1 R2 I/C 1, 5 5, 7 4, 7 6 4 4 2 MAJ 6 6 6 3 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 3 1 1 1 1 I/C 1, 3, 3, 4 2, 4, 9 4 4 2 I3 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 2, 4 2 0 2 2 RX 3 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 2, 5 10 4 4 2 I4 5, 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 3 P V EVAL #1 EVAL #2 EVAL #3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RX 4 1 1 1 0 NOR 1 1 2 1 1 1 R3 I/C 1, 5 5, 7 4, 7 6 4 4 2 MAJ 6 6 6 3 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 3 1 1 1 1 I/C 1, 3, 3, 4 2, 4, 9 4 4 2 I5 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 2, 4 2 0 2 2 RX 3 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 2, 5 10 4 4 2 I6 5, 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 4 P V EVAL #1 EVAL #2 EVAL #3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RX 4 1 1 1 0 NOR 1 1 2 1 1 1 R4 I/C 1, 5 5, 7 4, 7 6 4 4 2 MAJ 6 6 6 3 2 2 1 TS 0 0 2 2 RX 2 1 1 1 0 NOR 3 1 1 1 1 I/C 1, 3, 3, 4 2, 4, 9 4 4 2 I7 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 2, 4 2 0 2 2 RX 3 1 1 1 0 NOR 4 2 2 1 1 1 I/C 1, 3, 3, 4, 2, 5 10 4 4 2 I8 5, 7 5, 7 MAJ 6 6 6 3 2 2 1 TS 1, 2 3 3 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A E Scenarios - Group 5 P V EVAL #3 EVAL #4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RX 3 1 1 1 0 NOR 2 1 1 1 1 R5 I/C 2, 5 3, 7 4 4 4 2 MAJ 6 5, 8 3 2 2 1 TS 0 0 2 2 RX 1 1 1 1 0 NOR 1 1 1 1 1 R6 I/C 4, 7 4, 6 4 4 4 2 MAJ 6 5, 8 3 2 2 1 TS 0 0 2 2 RX 0 1 1 0 NOR 3 1 2 1 1 1 I/C 2, 4, 3, 4, 8 4 4 2 U1 5, 7 6, 7 MAJ 6 5, 8 3 2 2 1 TS 2, 4 3, 4 4 0 2 2 RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.