ML16116A277: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 11/03/2015 | | issue date = 11/03/2015 | ||
| title = 2016 Byron Nuclear Station, Units 1 and 2, Initial License Examination Outline Submittal Letter | | title = 2016 Byron Nuclear Station, Units 1 and 2, Initial License Examination Outline Submittal Letter | ||
| author name = Pederson C | | author name = Pederson C | ||
| author affiliation = NRC/RGN-III | | author affiliation = NRC/RGN-III | ||
| addressee name = | | addressee name = | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Lon November 3, 2015 L TR: BYRON 2015-0131 File: 1.10.0101 (1D.101) Cynthia D. Pederson Regional Administrator -Region Ill | {{#Wiki_filter:Byron Generating Station Lon ti n November 3, 2015 L TR: BYRON 2015-0131 File: 1.10.0101 (1D.101) | ||
Cynthia D. Pederson Regional Administrator - Region Ill lJ. S:Nuctear Regulatory Commission 2443 Warrenviiie Road, Suite 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 | |||
==Subject:== | ==Subject:== | ||
Submittal of Initial Operator Licensing Examination Outline Enclosed are the examination outlines, supporting the Initial License examination scheduled for the weeks of March 14, 2016 through March 25, 2016. The submittal includes all appropriate Examination Standard forms and outlines in accordance with NUREG-1021, "Operator Licensing Examination Standards", Revision 10. In accordance with NUREG-1021, Revision 10, Section ES-201, "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete. Should you have any questions concerning this letter, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (815) 406-2800. For questions concerning examination materials, please contact Mr. Robert F. Peterson, Senior Ops Training Instructor, at (815) 406-3209. Respectfully, 911berAfKearn;;;/ Site Vice President Byron Generating Station FAK/RP/AC/sg Enclosures cc: Michael Bielby, Chief Examiner, NRC Region Ill, w/enclosures Chief Operations Branch NRC, w/o enclosures NRC Senior Resident Inspector, Byron Station, w/o enclosures | Submittal of Initial Operator Licensing Examination Outline Enclosed are the examination outlines, supporting the Initial License examination scheduled for the weeks of March 14, 2016 through March 25, 2016. | ||
The submittal includes all appropriate Examination Standard forms and outlines in accordance with NUREG-1021, "Operator Licensing Examination Standards", Revision 10. | |||
In accordance with NUREG-1021, Revision 10, Section ES-201, "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete. | |||
Should you have any questions concerning this letter, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (815) 406-2800. For questions concerning examination materials, please contact Mr. Robert F. Peterson, Senior Ops Training Instructor, at (815) 406-3209. | |||
Respectfully, | |||
~~aa~L 911berAfKearn;;;/ | |||
Site Vice President Byron Generating Station FAK/RP/AC/sg Enclosures cc: Michael Bielby, Chief Examiner, NRC Region Ill, w/enclosures Chief Operations Branch NRC, w/o enclosures NRC Senior Resident Inspector, Byron Station, w/o enclosures | |||
LTR: BYRON 2015-0131 November 3, 2015 Cynthia D. Pederson Page2 Letter enclosure distribution as fo!!ows: | |||
Cynthia D. Pederson, without enclosures. | |||
Enclosures listed below will be hand delivered to Michael Bielby, Chief Examiner, NRG Region Ill: | |||
* Examination Security Agreements (Form ES-201-3) | * Examination Security Agreements (Form ES-201-3) | ||
* Aamrnrstratrve Topics ornnne(sr(FOrm | * Aamrnrstratrve Topics ornnne(sr(FOrm Es-~sc:ff~1T~ | ||
* Control Room/In-Plant Systems Outline (Form ES-301-2) | * Control Room/In-Plant Systems Outline (Form ES-301-2) | ||
* PWR Examination Outline (Form ES-401-2) | * PWR Examination Outline (Form ES-401-2) | ||
Line 26: | Line 37: | ||
* Scenario Outlines (Form ES-0-1) | * Scenario Outlines (Form ES-0-1) | ||
* Record of Rejected K/As (Form ES-401-4) | * Record of Rejected K/As (Form ES-401-4) | ||
* Completed Checklists: o Examination Outline Quality Checklist (Form ES-201-2) o Transient and Event Checklist (Form ES-301-5) | * Completed Checklists: | ||
Lon November 3, 2015 L TR: BYRON 2015-0131 File: 1.10.0101 (1D.101) Cynthia D. Pederson Regional Administrator -Region Ill | o Examination Outline Quality Checklist (Form ES-201-2) o Transient and Event Checklist (Form ES-301-5) | ||
Byron Generating Station Lon ti n November 3, 2015 L TR: BYRON 2015-0131 File: 1.10.0101 (1D.101) | |||
Cynthia D. Pederson Regional Administrator - Region Ill lJ. S:Nuctear Regulatory Commission 2443 Warrenviiie Road, Suite 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 | |||
==Subject:== | ==Subject:== | ||
Submittal of Initial Operator Licensing Examination Outline Enclosed are the examination outlines, supporting the Initial License examination scheduled for the weeks of March 14, 2016 through March 25, 2016. The submittal includes all appropriate Examination Standard forms and outlines in accordance with NUREG-1021, "Operator Licensing Examination Standards", Revision 10. In accordance with NUREG-1021, Revision 10, Section ES-201, "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete. Should you have any questions concerning this letter, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (815) 406-2800. For questions concerning examination materials, please contact Mr. Robert F. Peterson, Senior Ops Training Instructor, at (815) 406-3209. Respectfully, 911berAfKearn;;;/ Site Vice President Byron Generating Station FAK/RP/AC/sg Enclosures cc: Michael Bielby, Chief Examiner, NRC Region Ill, w/enclosures Chief Operations Branch NRC, w/o enclosures NRC Senior Resident Inspector, Byron Station, w/o enclosures | Submittal of Initial Operator Licensing Examination Outline Enclosed are the examination outlines, supporting the Initial License examination scheduled for the weeks of March 14, 2016 through March 25, 2016. | ||
The submittal includes all appropriate Examination Standard forms and outlines in accordance with NUREG-1021, "Operator Licensing Examination Standards", Revision 10. | |||
In accordance with NUREG-1021, Revision 10, Section ES-201, "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete. | |||
Should you have any questions concerning this letter, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (815) 406-2800. For questions concerning examination materials, please contact Mr. Robert F. Peterson, Senior Ops Training Instructor, at (815) 406-3209. | |||
Respectfully, | |||
~~aa~L 911berAfKearn;;;/ | |||
Site Vice President Byron Generating Station FAK/RP/AC/sg Enclosures cc: Michael Bielby, Chief Examiner, NRC Region Ill, w/enclosures Chief Operations Branch NRC, w/o enclosures NRC Senior Resident Inspector, Byron Station, w/o enclosures | |||
LTR: BYRON 2015-0131 November 3, 2015 Cynthia D. Pederson Page2 Letter enclosure distribution as fo!!ows: | |||
Cynthia D. Pederson, without enclosures. | |||
Enclosures listed below will be hand delivered to Michael Bielby, Chief Examiner, NRG Region Ill: | |||
* Examination Security Agreements (Form ES-201-3) | * Examination Security Agreements (Form ES-201-3) | ||
* Aamrnrstratrve Topics ornnne(sr(FOrm | * Aamrnrstratrve Topics ornnne(sr(FOrm Es-~sc:ff~1T~ | ||
* Control Room/In-Plant Systems Outline (Form ES-301-2) | * Control Room/In-Plant Systems Outline (Form ES-301-2) | ||
* PWR Examination Outline (Form ES-401-2) | * PWR Examination Outline (Form ES-401-2) | ||
Line 38: | Line 62: | ||
* Scenario Outlines (Form ES-0-1) | * Scenario Outlines (Form ES-0-1) | ||
* Record of Rejected K/As (Form ES-401-4) | * Record of Rejected K/As (Form ES-401-4) | ||
* Completed Checklists: o Examination Outline Quality Checklist (Form ES-201-2) o Transient and Event Checklist (Form ES-301-5)}} | * Completed Checklists: | ||
o Examination Outline Quality Checklist (Form ES-201-2) o Transient and Event Checklist (Form ES-301-5)}} |
Latest revision as of 20:17, 30 October 2019
ML16116A277 | |
Person / Time | |
---|---|
Site: | Byron |
Issue date: | 11/03/2015 |
From: | Pederson C NRC/RGN-III |
To: | Exelon Generation Co |
References | |
Download: ML16116A277 (2) | |
Text
Byron Generating Station Lon ti n November 3, 2015 L TR: BYRON 2015-0131 File: 1.10.0101 (1D.101)
Cynthia D. Pederson Regional Administrator - Region Ill lJ. S:Nuctear Regulatory Commission 2443 Warrenviiie Road, Suite 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455
Subject:
Submittal of Initial Operator Licensing Examination Outline Enclosed are the examination outlines, supporting the Initial License examination scheduled for the weeks of March 14, 2016 through March 25, 2016.
The submittal includes all appropriate Examination Standard forms and outlines in accordance with NUREG-1021, "Operator Licensing Examination Standards", Revision 10.
In accordance with NUREG-1021, Revision 10, Section ES-201, "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete.
Should you have any questions concerning this letter, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (815) 406-2800. For questions concerning examination materials, please contact Mr. Robert F. Peterson, Senior Ops Training Instructor, at (815) 406-3209.
Respectfully,
~~aa~L 911berAfKearn;;;/
Site Vice President Byron Generating Station FAK/RP/AC/sg Enclosures cc: Michael Bielby, Chief Examiner, NRC Region Ill, w/enclosures Chief Operations Branch NRC, w/o enclosures NRC Senior Resident Inspector, Byron Station, w/o enclosures
LTR: BYRON 2015-0131 November 3, 2015 Cynthia D. Pederson Page2 Letter enclosure distribution as fo!!ows:
Cynthia D. Pederson, without enclosures.
Enclosures listed below will be hand delivered to Michael Bielby, Chief Examiner, NRG Region Ill:
- Examination Security Agreements (Form ES-201-3)
- Aamrnrstratrve Topics ornnne(sr(FOrm Es-~sc:ff~1T~
- Control Room/In-Plant Systems Outline (Form ES-301-2)
- Generic Knowledge and Abilities Outline (Tier 3) (Form ES-401-3)
- Scenario Outlines (Form ES-0-1)
- Record of Rejected K/As (Form ES-401-4)
- Completed Checklists:
o Examination Outline Quality Checklist (Form ES-201-2) o Transient and Event Checklist (Form ES-301-5)
Byron Generating Station Lon ti n November 3, 2015 L TR: BYRON 2015-0131 File: 1.10.0101 (1D.101)
Cynthia D. Pederson Regional Administrator - Region Ill lJ. S:Nuctear Regulatory Commission 2443 Warrenviiie Road, Suite 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455
Subject:
Submittal of Initial Operator Licensing Examination Outline Enclosed are the examination outlines, supporting the Initial License examination scheduled for the weeks of March 14, 2016 through March 25, 2016.
The submittal includes all appropriate Examination Standard forms and outlines in accordance with NUREG-1021, "Operator Licensing Examination Standards", Revision 10.
In accordance with NUREG-1021, Revision 10, Section ES-201, "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete.
Should you have any questions concerning this letter, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (815) 406-2800. For questions concerning examination materials, please contact Mr. Robert F. Peterson, Senior Ops Training Instructor, at (815) 406-3209.
Respectfully,
~~aa~L 911berAfKearn;;;/
Site Vice President Byron Generating Station FAK/RP/AC/sg Enclosures cc: Michael Bielby, Chief Examiner, NRC Region Ill, w/enclosures Chief Operations Branch NRC, w/o enclosures NRC Senior Resident Inspector, Byron Station, w/o enclosures
LTR: BYRON 2015-0131 November 3, 2015 Cynthia D. Pederson Page2 Letter enclosure distribution as fo!!ows:
Cynthia D. Pederson, without enclosures.
Enclosures listed below will be hand delivered to Michael Bielby, Chief Examiner, NRG Region Ill:
- Examination Security Agreements (Form ES-201-3)
- Aamrnrstratrve Topics ornnne(sr(FOrm Es-~sc:ff~1T~
- Control Room/In-Plant Systems Outline (Form ES-301-2)
- Generic Knowledge and Abilities Outline (Tier 3) (Form ES-401-3)
- Scenario Outlines (Form ES-0-1)
- Record of Rejected K/As (Form ES-401-4)
- Completed Checklists:
o Examination Outline Quality Checklist (Form ES-201-2) o Transient and Event Checklist (Form ES-301-5)