|
|
(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML16302A009 | | | number = ML16302A009 |
| | issue date = 10/31/2016 | | | issue date = 10/31/2016 |
| | title = Fitzpatrick Branch Chief Reassignment Ltr 10/31/16 | | | title = Branch Chief Reassignment Ltr 10/31/16 |
| | author name = Wilson G A | | | author name = Wilson G |
| | author affiliation = NRC/NRR/DORL | | | author affiliation = NRC/NRR/DORL |
| | addressee name = Sullivan B | | | addressee name = Sullivan B |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Vice President, Operations Entergy Nuclear Operations, Inc. October 31, 2016 James A. Fitzpatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 31, 2016 Vice President, Operations Entergy Nuclear Operations, Inc. |
| | James A. Fitzpatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| | | JAMES A. FITZPATRICK NUCLEAR POWER PLANT - BRANCH CHIEF REASSIGNMENT FOR PLANT LICENSING BRANCH 1-1 |
| JAMES A. FITZPATRICK NUCLEAR POWER PLANT -BRANCH CHIEF REASSIGNMENT FOR PLANT LICENSING BRANCH 1-1 | |
|
| |
|
| ==Dear Sir/Madam:== | | ==Dear Sir/Madam:== |
|
| |
|
| This letter is to inform you that effective October 31, 2016, through December 3, 2016, the following Senior Project Managers (Sr. PMs) have been assigned as the U.S. Nuclear Regulatory Commission's Acting Chief for Plant Licensing Branch 1-1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation, and have licensing oversight responsibility for James A. FitzPatrick Nuclear Power Plant. Dates Sr. PM Actin Chief Email Address Office Phone Oct. 31 to Nov. 6, 2016 Brenda L. Mozafari 301 415-2020 Nov. 7 to Nov. 13, 2016 Dou las V. Pickett 301 415-1364 Nov 14 to Nov. 20, 2016 Brenda L. Mozafari 301 415-2020 Nov. 21 to Nov. 27, 2016 Richard V. Guzman 301 415-1030 Nov. 28 to Dec. 3, 2016 Dou las V. Pickett 301 415-1364 These Sr. PMs assume all supervisory duties previously held by Mr. Travis L. Tate, as Chief, Plant Licensing Branch 1-1. Docket No. 50-333 cc: Distribution via Listserv Sincerely, G:::::: d Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Vice President, Operations Entergy Nuclear Operations, Inc. October 31, 2016 James A. Fitzpatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 | | This letter is to inform you that effective October 31, 2016, through December 3, 2016, the following Senior Project Managers (Sr. PMs) have been assigned as the U.S. Nuclear Regulatory Commission's Acting Chief for Plant Licensing Branch 1-1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation, and have licensing oversight responsibility for James A. FitzPatrick Nuclear Power Plant. |
| | | Dates Sr. PM Actin Chief Email Address Office Phone Oct. 31 to Nov. 6, 2016 Brenda L. Mozafari 301 415-2020 Nov. 7 to Nov. 13, 2016 Dou las V. Pickett 301 415-1364 Nov 14 to Nov. 20, 2016 Brenda L. Mozafari 301 415-2020 Nov. 21 to Nov. 27, 2016 Richard V. Guzman 301 415-1030 Nov. 28 to Dec. 3, 2016 Dou las V. Pickett 301 415-1364 These Sr. PMs assume all supervisory duties previously held by Mr. Travis L. Tate, as Chief, Plant Licensing Branch 1-1. |
| ==SUBJECT:==
| | Sincerely, G:::::: d Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-333 cc: Distribution via Listserv |
| | |
| JAMES A. FITZPATRICK NUCLEAR POWER PLANT -BRANCH CHIEF REASSIGNMENT FOR PLANT LICENSING BRANCH 1-1
| |
| | |
| ==Dear Sir/Madam:==
| |
|
| |
|
| This letter is to inform you that effective October 31, 2016, through December 3, 2016, the following Senior Project Managers (Sr. PMs) have been assigned as the U.S. Nuclear Regulatory Commission's Acting Chief for Plant Licensing Branch 1-1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation, and have licensing oversight responsibility for James A. FitzPatrick Nuclear Power Plant. Dates Sr. PM Actin Chief Email Address Office Phone Oct. 31 to Nov. 6, 2016 Brenda L. Mozafari 301 415-2020 Nov. 7 to Nov. 13, 2016 Dou las V. Pickett 301 415-1364 Nov 14 to Nov. 20, 2016 Brenda L. Mozafari 301 415-2020 Nov. 21 to Nov. 27, 2016 Richard V. Guzman 301 415-1030 Nov. 28 to Dec. 3, 2016 Dou las V. Pickett 301 415-1364 These Sr. PMs assume all supervisory duties previously held by Mr. Travis L. Tate, as Chief, Plant Licensing Branch 1-1. Docket No. 50-333 cc: Distribution via Listserv DISTRIBUTION:
| | ML16302A009 OFFICE NRR/LPLl-1 /LA NRR/LPLl-1/BC NRR/DORL/DD NAME KGoldstein D.Pickett GWilson DATE 10/28/16 10/28/16 10/31/16}} |
| PUBLIC Sincerely,
| |
| /RAJ George A. Wilson, Jr., Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LPL 1-1 r/f RidsNrrPMFitzpatrick Resource RidsNrrDorl Resource RidsRegion1 MailCenter Resource RidsNrrLAKGoldstein Resource RidsDorlLPLl-1 Resource RidsOd Resouce ADAMS Accession No.: ML 16302A009 OFFICE N RR/LPLl-1
| |
| /LA NRR/LPLl-1/BC NRR/DORL/DD NAME KGoldstein D.Pickett GWilson DATE 10/28/16 10/28/16 10/31/16 OFFICIAL RECORD COPY}} | |
|
---|
Category:Letter
MONTHYEARIR 05000333/20240052024-08-29029 August 2024 Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2024005) ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, “Revise Risk Informed Completion Time (RICT) Program” Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000333/20240022024-08-0707 August 2024 Integrated Inspection Report 05000333/2024002 JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report ML24208A0492024-07-30030 July 2024 Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Proposed No Significant Hazards Consideration Determination (Letter) JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20244032024-07-18018 July 2024 Biennial Problem Identification and Resolution Inspection Report 05000333/2024403 (Cover Letter Only) IR 05000333/20244012024-07-15015 July 2024 Security Baseline Inspection 05000333/2024401 RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24190A1932024-07-0909 July 2024 Correction Letter of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance IR 05000333/20240102024-07-0808 July 2024 Commercial Grade Dedication Inspection Report 05000333/2024010 ML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24136A1162024-06-26026 June 2024 Issuance of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML24176A2412024-06-24024 June 2024 Licensed Operator Positive Fitness-for-Duty Test RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations JAFP-24-0026, Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance2024-06-12012 June 2024 Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000333/20240012024-05-0909 May 2024 Integrated Inspection Report 05000333/2024001 JAFP-24-0023, 2023 Annual Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Annual Radiological Environmental Operating Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report2024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report JAFP-24-0019, 2023 REIRS Transmittal of NRC Form 52024-04-18018 April 2024 2023 REIRS Transmittal of NRC Form 5 ML24106A0152024-04-15015 April 2024 Request for Withholding Information from Public Disclosure Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling ML24107A6972024-04-12012 April 2024 Engine Systems, Inc Part 21 Report Re EMD Cylinder Liner Water Leak ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24068A0532024-03-28028 March 2024 Issuance of Amendment No. 354 Revise Technical Specifications Section 3.3.1.2, Source Range Monitors Instrumentation JAFP-24-0014, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-03-25025 March 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0010, Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2024-02-29029 February 2024 Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-24-0009, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-02-28028 February 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis IR 05000333/20230062024-02-28028 February 2024 Annual Assessment Letter for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2023006) IR 05000333/20230042024-02-0707 February 2024 Integrated Inspection Report 05000333/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2023001 ML24037A0102024-02-0606 February 2024 Requalification Program Inspection ML24018A0012024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000333/2024010) and Request for Information ML24004A2302024-01-0808 January 2024 Project Manager Reassignment ML23356A0832024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0058 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications IR 05000333/20234012023-12-0808 December 2023 Cybersecurity Inspection Report 05000333/2023401 (Cover Letter Only) RS-23-126, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) JAFP-23-0069, Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use IR 05000333/20230032023-11-13013 November 2023 Integrated Inspection Report 05000333/2023003 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000333/20230102023-10-26026 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000333/2023010 JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use IR 05000333/20233012023-10-19019 October 2023 Initial Operator Licensing Examination Report 05000333/2023301 2024-08-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 31, 2016 Vice President, Operations Entergy Nuclear Operations, Inc.
James A. Fitzpatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093
SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - BRANCH CHIEF REASSIGNMENT FOR PLANT LICENSING BRANCH 1-1
Dear Sir/Madam:
This letter is to inform you that effective October 31, 2016, through December 3, 2016, the following Senior Project Managers (Sr. PMs) have been assigned as the U.S. Nuclear Regulatory Commission's Acting Chief for Plant Licensing Branch 1-1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation, and have licensing oversight responsibility for James A. FitzPatrick Nuclear Power Plant.
Dates Sr. PM Actin Chief Email Address Office Phone Oct. 31 to Nov. 6, 2016 Brenda L. Mozafari 301 415-2020 Nov. 7 to Nov. 13, 2016 Dou las V. Pickett 301 415-1364 Nov 14 to Nov. 20, 2016 Brenda L. Mozafari 301 415-2020 Nov. 21 to Nov. 27, 2016 Richard V. Guzman 301 415-1030 Nov. 28 to Dec. 3, 2016 Dou las V. Pickett 301 415-1364 These Sr. PMs assume all supervisory duties previously held by Mr. Travis L. Tate, as Chief, Plant Licensing Branch 1-1.
Sincerely, G:::::: d Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-333 cc: Distribution via Listserv
ML16302A009 OFFICE NRR/LPLl-1 /LA NRR/LPLl-1/BC NRR/DORL/DD NAME KGoldstein D.Pickett GWilson DATE 10/28/16 10/28/16 10/31/16