|
|
(5 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 05/11/2016 | | | issue date = 05/11/2016 |
| | title = DC Cook 2016 Proposed Exam Submittal Letter | | | title = DC Cook 2016 Proposed Exam Submittal Letter |
| | author name = Evans B E | | | author name = Evans B |
| | author affiliation = Indiana Michigan Power Co | | | author affiliation = Indiana Michigan Power Co |
| | addressee name = | | | addressee name = |
Line 14: |
Line 14: |
| | page count = 2 | | | page count = 2 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:,fl EF |
| | ,ND'ANA lndiana Michigan Power Cook Nuclear Plant M'/C'Il/OAN One Cook Place PoNtEn Bridgman, Ml 49106 lndia na M ichiga n Powe r.com A unit of American Electric Power May 1 1,2016 U. S. Nuclear Regulatory Commission Attn: Mr. Randal Baker Region lll Examiner 2443Warrenville Road, Suite 210 Lisle, lllinois 60532-4352 Donald C, Cook Nuclear Plant Units 1 and 2 2016 NRC EXAMINATION SUBMITTAL |
| | |
| | ==Reference:== |
| | Letter from R, J. Orlikowski, Nuclear Regulatory Commission, to J. P. Gebbie, lndiana Michigan Power Company, "Donald C. Cook Nuclear Power Plant, Units 1 and 2- Confirmation of lnitial License Examination," dated February 17,2016. |
| | Enclosed you will find a copy of the lnitial License Examination for the planned July.2016 Examination at Donald C. Coó Nuclear Plant (CNP). Also enclosed is the proposed examination (RO) schedule based on 3 Senior Reactor Operator (SRO) (U), 6 SRO (l), and 7 Reactor Operator candidates. The examination is being prepared in accordance with NUREG 1021, Revision 10. |
| | The following items are enclosed in the sealed envelope: |
| | : 1) ES-201-3 Examination Security Agreement Forms |
| | : 2) ES-301-1 Administrative Topics (JPM) Outline Form (SRO) |
| | : 3) ES-301-1 Administrative Topics (JPM) Outline Form (RO) |
| | : 4) ES-301-1 Admin JPM Exams a) 2016 NRC-A1a-RO b) 2016 NRC-A1a-SRO c) 2016 NRC-A1b-SRO d) 2016 NRC-A2-RO e) 2016 NRC-A2-SRO 2016 NRC-43 g) 2016 NRC-A4-RO h) 2016 NRC-A4-SRO |
| | : 5) ES-SOt-2 Control Roomiln-Plant systems (JPM) Outline Form (SRO-l) |
| | : 6) ES-301-2 Control Room/ln-Plant systems (JPM) Outline Form (sRo-u) |
| | : 7) ES-301-2 Control Room/ln-Plant systems (JPM) Outline Form (RO) |
| | : 8) ES-301-2 System JPM Exams a) 2016 NRC-SIM01 b) 2016 NRC-SlM02 c) 2016 NRC-SlM03 d) 2016 NRC-SIM04 e) 2016 NRC-SlM05 f) 2016 NRC-SIM06 s) 2016 NRC-SIM07 MAY l2 2016 |
| | |
| | U. S. Nuclear Regulatory Commission Page 2 h) 2016 NRC-SlMo8 i) 2016 NRC-lNP01 j) 2016 NRC-lNPo2 k) 2016 NRC-lNPo3 e) ES-301-3 Operating Test Quality Checklist Form |
| | : 10) Scenario Exams with Forms ES-D-1 &D-2 Forms: |
| | a) NRC2016-01 b) NRC2016-02 c) NRC2016-03 d) NRC2o16-04 e) NRC2016-05 |
| | : 11) ES-301-4 Simulator Scenario Quality Checklist Form |
| | : 12) ES-301-5 Transient and Event Checklist Form - Crew 1 & 3 |
| | : 13) ES-301-5 Transient and Event Checklist Form - Crew 2 |
| | : 14) ES-301-5 Transient and Event Checklist Form - Crew 4 |
| | : 15) ES-301-5 Transient and Event Checklist Form - Crew 5 |
| | : 16) ES-301-6 Competencies Checklist Form - Crew 1 & 3 |
| | : 17) ES-301-6 Competencies Checklist Form - Crew 2 |
| | : 18) ES-301-6 Competencies Checklist Form - Crew 4 1e) ES-301-6 Competencies Checklist Form - Crew 5 |
| | : 20) ES-401-6 Written Examination Quality Checklist Form |
| | : 21) CNP 2016 Written Examination Attachments |
| | : 22) CNP 2016 NRC Written Examination (100 questions with references) |
| | A hard copy of the examination materials is provided for your review. A complete electronic copy of documents without initials or signatures or other handwritten notations for the Public Document Room (ADAMS) has also been provided. This contains the full outline (previously submitted) and electronic PDF versions of the RO and SRO examinations that are to be administered. |
| | None of these materials are to go to the Public Document Room (ADAMS) until after the examination has been completed. |
| | lf you have any questions, please contact Todd Valley or Steve Pettinger at (269) 465-5901' extension 3738, or myself at (269) 466-3407. |
| | HT Sincerelv. |
| | Brian E. Evans Operations Training M Enclosures BEE/tjv}} |
Similar Documents at Cook |
---|
Category:License-Operator
MONTHYEARML24256A1732024-09-12012 September 2024 Form 5.1-1 Post Examination Check Sheet (Dcc Ile 2024) IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24240A0332024-08-0808 August 2024 Form 2.1-1, Examination Preparation Checklist (Dcc 2024) ML24270A0032024-08-0808 August 2024 Form 1.3-1 DC Cook 2024 ML24256A1512024-08-0202 August 2024 Post Examination Comments ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML24239A3672024-06-13013 June 2024 Form 3.4-1, Events and Evolutions Checklist (DC Cook 2024) ML24239A3652024-06-13013 June 2024 Form 2.3-1, Outline Quality Checklist (DC Cook 2024) ML24239A3832024-06-11011 June 2024 Form 2.3-4, Written Quality Checklist (DC Cook 2024) ML24239A3812024-06-11011 June 2024 Form 2.3-2, Operating Test Quality Checklist (DC Cook 2024) ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0232022-08-10010 August 2022 Form 2.3-5 Written Examination Review Worksheet DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22251A0212022-08-10010 August 2022 Form 2.3-3 Operating Test Review Worksheet DC-Cook 2022 ML22251A0272022-08-10010 August 2022 Outline Comments & Resolutions DC-Cook 2022 ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22250A7132022-07-27027 July 2022 Administered Walkthrough Admin DC-Cook 2022 ML22250A7182022-07-27027 July 2022 Administered Written Exam and Answer Key RO & SRO DC-Cook 2022 ML22250A7142022-07-27027 July 2022 Administered Walkthrough Systems Control-Room & In-Plant DC-Cook 2022 ML22250A7162022-07-27027 July 2022 Administered Dynamic Simulator Scenarios Forms 3.3-1 & 2 DC-Cook 2022 ML22250A7192022-07-27027 July 2022 Administered Written Exam References Provided DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A7032022-06-30030 June 2022 Proposed_Walkthrough_SYSTEMS_Control-Room&In-Plant_DC-Cook_2022 ML22250A7072022-06-30030 June 2022 Proposed_Written_Exam_and_Answer_Key_RO&SRO_DC-Cook_2022 ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6812022-06-30030 June 2022 Form 3.3-1 Scenario Outline DC-Cook 2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6852022-06-30030 June 2022 Form 4.1-PWR & Common Exam Outline Administered DC-Cook 2022 ML22250A6882022-06-30030 June 2022 Form 4.1-1 Record of Rejected Knowledge and Abilities DC-Cook 2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6772022-06-30030 June 2022 Form 3.2-2 Control Room/In-Plant Systems Outline DC-Cook 2022 ML22250A6992022-06-30030 June 2022 Proposed_Walkthrough_Admin_DC-Cook_2022 ML22250A7042022-06-30030 June 2022 Proposed_Dynamic_Simulator_Scenarios_Forms_3.3-1&2_DC-Cook_2022 ML22250A6742022-06-30030 June 2022 Form 3.2-1 Admin Topics Outline DC-Cook 2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination ML21110A5272021-04-19019 April 2021 GFE Results, March 2021 IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A4372020-08-25025 August 2020 2020 DC Cook Ile Exam Preparation Checklist ES-201-1 ML21006A4292020-08-25025 August 2020 2020 DC Cook Ile Exam Security Checklists ES-201-3 ML20356A1572020-08-25025 August 2020 2020 DC Cook Ile Transient and Event Checklists ES-301-5 ML20356A0842020-08-25025 August 2020 2020 DC Cook Ile Simulator Scenario Quality Checklist ES-301-4 2024-09-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24256A1732024-09-12012 September 2024 Form 5.1-1 Post Examination Check Sheet (Dcc Ile 2024) IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24240A0332024-08-0808 August 2024 Form 2.1-1, Examination Preparation Checklist (Dcc 2024) ML24270A0032024-08-0808 August 2024 Form 1.3-1 DC Cook 2024 ML24256A1512024-08-0202 August 2024 Post Examination Comments ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML24239A3652024-06-13013 June 2024 Form 2.3-1, Outline Quality Checklist (DC Cook 2024) ML24239A3672024-06-13013 June 2024 Form 3.4-1, Events and Evolutions Checklist (DC Cook 2024) ML24239A3812024-06-11011 June 2024 Form 2.3-2, Operating Test Quality Checklist (DC Cook 2024) ML24239A3832024-06-11011 June 2024 Form 2.3-4, Written Quality Checklist (DC Cook 2024) ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0232022-08-10010 August 2022 Form 2.3-5 Written Examination Review Worksheet DC-Cook 2022 ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22251A0272022-08-10010 August 2022 Outline Comments & Resolutions DC-Cook 2022 ML22251A0212022-08-10010 August 2022 Form 2.3-3 Operating Test Review Worksheet DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22250A7132022-07-27027 July 2022 Administered Walkthrough Admin DC-Cook 2022 ML22250A7192022-07-27027 July 2022 Administered Written Exam References Provided DC-Cook 2022 ML22250A7162022-07-27027 July 2022 Administered Dynamic Simulator Scenarios Forms 3.3-1 & 2 DC-Cook 2022 ML22250A7142022-07-27027 July 2022 Administered Walkthrough Systems Control-Room & In-Plant DC-Cook 2022 ML22250A7182022-07-27027 July 2022 Administered Written Exam and Answer Key RO & SRO DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A7072022-06-30030 June 2022 Proposed_Written_Exam_and_Answer_Key_RO&SRO_DC-Cook_2022 ML22250A6772022-06-30030 June 2022 Form 3.2-2 Control Room/In-Plant Systems Outline DC-Cook 2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6742022-06-30030 June 2022 Form 3.2-1 Admin Topics Outline DC-Cook 2022 ML22250A6992022-06-30030 June 2022 Proposed_Walkthrough_Admin_DC-Cook_2022 ML22250A6882022-06-30030 June 2022 Form 4.1-1 Record of Rejected Knowledge and Abilities DC-Cook 2022 ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6852022-06-30030 June 2022 Form 4.1-PWR & Common Exam Outline Administered DC-Cook 2022 ML22250A6812022-06-30030 June 2022 Form 3.3-1 Scenario Outline DC-Cook 2022 ML22250A7042022-06-30030 June 2022 Proposed_Dynamic_Simulator_Scenarios_Forms_3.3-1&2_DC-Cook_2022 ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A7032022-06-30030 June 2022 Proposed_Walkthrough_SYSTEMS_Control-Room&In-Plant_DC-Cook_2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A2222020-08-25025 August 2020 2020 DC Cook Ile Operating Test Outline Submittal Letter ML20356A2572020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO SRO Written Examination ML20356A0802020-08-25025 August 2020 2020 DC Cook Ile Proposed Exam Submittal Letter ML20356A1522020-08-25025 August 2020 2020 DC Cook Ile Written Exam Outlines ES-401-2 and ES-401-3 ML21006A4182020-08-25025 August 2020 2020 DC Cook Ile Record of Rejected KAs ES-401-4 2024-09-05
[Table view] |
Text
,fl EF
,ND'ANA lndiana Michigan Power Cook Nuclear Plant M'/C'Il/OAN One Cook Place PoNtEn Bridgman, Ml 49106 lndia na M ichiga n Powe r.com A unit of American Electric Power May 1 1,2016 U. S. Nuclear Regulatory Commission Attn: Mr. Randal Baker Region lll Examiner 2443Warrenville Road, Suite 210 Lisle, lllinois 60532-4352 Donald C, Cook Nuclear Plant Units 1 and 2 2016 NRC EXAMINATION SUBMITTAL
Reference:
Letter from R, J. Orlikowski, Nuclear Regulatory Commission, to J. P. Gebbie, lndiana Michigan Power Company, "Donald C. Cook Nuclear Power Plant, Units 1 and 2- Confirmation of lnitial License Examination," dated February 17,2016.
Enclosed you will find a copy of the lnitial License Examination for the planned July.2016 Examination at Donald C. Coó Nuclear Plant (CNP). Also enclosed is the proposed examination (RO) schedule based on 3 Senior Reactor Operator (SRO) (U), 6 SRO (l), and 7 Reactor Operator candidates. The examination is being prepared in accordance with NUREG 1021, Revision 10.
The following items are enclosed in the sealed envelope:
- 1) ES-201-3 Examination Security Agreement Forms
- 2) ES-301-1 Administrative Topics (JPM) Outline Form (SRO)
- 3) ES-301-1 Administrative Topics (JPM) Outline Form (RO)
- 4) ES-301-1 Admin JPM Exams a) 2016 NRC-A1a-RO b) 2016 NRC-A1a-SRO c) 2016 NRC-A1b-SRO d) 2016 NRC-A2-RO e) 2016 NRC-A2-SRO 2016 NRC-43 g) 2016 NRC-A4-RO h) 2016 NRC-A4-SRO
- 5) ES-SOt-2 Control Roomiln-Plant systems (JPM) Outline Form (SRO-l)
- 6) ES-301-2 Control Room/ln-Plant systems (JPM) Outline Form (sRo-u)
- 7) ES-301-2 Control Room/ln-Plant systems (JPM) Outline Form (RO)
- 8) ES-301-2 System JPM Exams a) 2016 NRC-SIM01 b) 2016 NRC-SlM02 c) 2016 NRC-SlM03 d) 2016 NRC-SIM04 e) 2016 NRC-SlM05 f) 2016 NRC-SIM06 s) 2016 NRC-SIM07 MAY l2 2016
U. S. Nuclear Regulatory Commission Page 2 h) 2016 NRC-SlMo8 i) 2016 NRC-lNP01 j) 2016 NRC-lNPo2 k) 2016 NRC-lNPo3 e) ES-301-3 Operating Test Quality Checklist Form
- 10) Scenario Exams with Forms ES-D-1 &D-2 Forms:
a) NRC2016-01 b) NRC2016-02 c) NRC2016-03 d) NRC2o16-04 e) NRC2016-05
- 11) ES-301-4 Simulator Scenario Quality Checklist Form
- 12) ES-301-5 Transient and Event Checklist Form - Crew 1 & 3
- 13) ES-301-5 Transient and Event Checklist Form - Crew 2
- 14) ES-301-5 Transient and Event Checklist Form - Crew 4
- 15) ES-301-5 Transient and Event Checklist Form - Crew 5
- 16) ES-301-6 Competencies Checklist Form - Crew 1 & 3
- 17) ES-301-6 Competencies Checklist Form - Crew 2
- 18) ES-301-6 Competencies Checklist Form - Crew 4 1e) ES-301-6 Competencies Checklist Form - Crew 5
- 20) ES-401-6 Written Examination Quality Checklist Form
- 21) CNP 2016 Written Examination Attachments
- 22) CNP 2016 NRC Written Examination (100 questions with references)
A hard copy of the examination materials is provided for your review. A complete electronic copy of documents without initials or signatures or other handwritten notations for the Public Document Room (ADAMS) has also been provided. This contains the full outline (previously submitted) and electronic PDF versions of the RO and SRO examinations that are to be administered.
None of these materials are to go to the Public Document Room (ADAMS) until after the examination has been completed.
lf you have any questions, please contact Todd Valley or Steve Pettinger at (269) 465-5901' extension 3738, or myself at (269) 466-3407.
HT Sincerelv.
Brian E. Evans Operations Training M Enclosures BEE/tjv