ML16340B905
ML16340B905 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 12/02/2016 |
From: | NRC/RGN-III |
To: | Indiana Michigan Power Co, American Electric Power |
Shared Package | |
ML15274A375 | List: |
References | |
NRC 2016-01 | |
Download: ML16340B905 (82) | |
Text
Appendix D Scenario Outline Form ES-D-1 Facility: Cook Plant Scenario No: NRC 2016-01 Op-Test No: ______________
Examiners: ________________________ Operators: _____________________________
Initial Conditions: MOL; 52% power, 521 MW, 945.8 ppm, 588 F 178 Steps on D East MDAFW pump OOS.
Turnover: Stable at 52% power. The unit is shutting down and the reactor must be in Mode 3 within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> due to exceeding the LCO for the East MDAFW pump. It has been out of service to perform motor replacement for 73 hours8.449074e-4 days <br />0.0203 hours <br />1.207011e-4 weeks <br />2.77765e-5 months <br />. Currently in 1-OHP 4021.001.003, Power Reduction.
Event Event Event Malf. No.
No. Type* Description N-1 Swap #1 Control Fluid Pump for #3 Control Fluid Pump BOP 2 R-RO Continue Power Reduction 3 U1_101ACRA1 C- Loss of Control Room North Air Handling Unit (Global) BOP TS U1_NTP131 to I-RO 4 RCS THOT instrument (NTP-131) fails HIGH 650°F TS U1_FDC_251 to I-BOP Main Feedwater Pump Delta-P Controller Setpoint fails high 5 200 over 15 min.
ramp over 15 minutes.
U1_CV04C C-RO QRV- 162 (75 gpm orifice)Fails Closed due to a solenoid 6 fault Trip of East MFP and Loss of ALL Feedwater 7 U1_FW05A Major U1_ED05E M Loss of Bus T11A due to fault on Bus 1A 8
ALL U1_TC02 C- Main Turbine Fails to Trip/
9 U1_RP07A BOP U1_RP07B U1_FW51 C- TDAFW pump T&TV failure due to blown control power fuse 10 BOP West AFW pump power is lost (East AFW is OOS)
U1_FW48C
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Summary The crew is directed to swap Control Fluid pumps due to potential problem with one of the running pumps.
The crew is directed to continue power reduction to shut down.
After the power change, a trip of the North Control Room Air Handling Unit will occur. The crew will need to investigate the cause, start the South Air Handling Unit, and address Technical Specifications.
The next event will involve the RCS Th Inst (NTP-131) fails High. This will result in control rod movement requiring the crew to respond using IFR-001. After disabling the channel rods can be restored.
The MFP Delta P Controller Setpoint fails high over 9 minutes. The crew will be required to respond using IFR-001 and controlling MFP speed in manual.
The next event will involve a failure of letdown orifice failing closed due to a solenoid fault.
The crew will respond and restore letdown to service.
The major event will involve a trip of the East MFP resulting in a loss of all feedwater. The crew will manually trip the reactor. On the trip bus T11Awill be lost due to a fault and the AB EDG will trip causing a loss of one train of power. This will result in a loss of the West MDAFP.
The Main Turbine will fail to trip requiring the closure of the steam stop valves.
The TDAFP will fail to start due to blown control power fuses. This will require a transition to FR-H-1, Loss of Secondary Heat Sink. When heat sink is restored via AFW cross-tie or with the TDAFP (local or repaired), the scenario is complete.
Critical Tasks Manually isolate Steam Lines (turbine trip) prior to ECA-2.1 Establish FW Flow to SG before Bleed and Feed is required Procedures E-0, Reactor Trip or Safety Injection FR-H-1, Loss of Secondary Heat Sink
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-01 Event No.: 1 Event
Description:
Swap #1 Control Fluid Pump for #3 Control Fluid Pump Time Position Applicant's Actions or Behavior US Directs use of 1-OHP-4021-050-006, Main and MFP Turbine Control Fluid Operation, Attachment 1, Control Fluid System Operation, Section 4.2, for swapping Control Fluid Pumps.
BOP Places Control Fluid Pump #1 in RUN.
BOP Acknowledges Alarms on MT DCS Ann. Panel:
- Drop 179, No Ctrl Fluid Pump in Auto 2
- Drop 208, More than 1 CTRL FLD Pump in Manual and Running BOP Places Control Fluid Pump #3 in OFF.
BOP Places Control Fluid Pump #3 in AUTO 2.
BOP Acknowledges Alarms clearing on MT DCS Panel.
RO Provides peer checks during evolution as appropriate.
Cook Plant Unit 1 & 2 Page 3 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-01 Event No.: 2 Event
Description:
Continue Power Reduction Time Position Applicant's Actions or Behavior RO Calculates boric acid addition per OHP-4021-005-002, Attachment 9, Boration or Dilution Volume Determination.
RO Briefs crew on reactivity plan for power reduction.
US Reviews / concurs with reactivity plan.
US Directs RO to commence Power Reduction in accordance with OHP-4021-001-003.
RO Performs BORATION:
- Place RC Makeup Blend Control Switch in STOP.
- Place RC Makeup Blend Control Mode Selector Switch in BORATE.
- Set desired batch on BA Flow Totalizer.
- Adjust BA Flow Ctrl (RU-33) to desired flow.
- Place RC Makeup Blend Control Switch in START.
RO Commences power reduction:
- Lowers turbine load (reactor power) using HMI.
- Maintains Tavg/Tref deviation within limits by boration and turbine load adjustments.
- Ensures Axial Flux Difference (AFD) is maintained within target band by manual control rod movement as needed.
BOP/RO BOP acts as peer checker for RO during blender operations and RO verifies appropriate reactivity feedback.
BOP Monitors main electrical generator temperatures.
Cook Plant Unit 1 & 2 Page 4 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-01 Event No.: 3 Event
Description:
Loss of North Control Room North Air Handling Unit Time Position Applicant's Actions or Behavior BOP Recognizes and reports annunciator on Panel #103, Drop 23, indicative of the loss of the North Control Room Air Handling Unit.
US/BOP Starts the South Control Room Air Handling Unit per OHP-4024-203, Drop 23 annunciator response by placing the South Control Room Air Handling Unit to RUN.
(NOTE: May attempt 1 restart of the North Control Room Air Handling Unit per ARP)
US Refers to Tech Specs (TS):
TS 3.7.11 Control Room Air Conditioning (CRAC) System
- (Condition A) due to a loss of 1 cooling system.
Cook Plant Unit 1 & 2 Page 5 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-01 Event No.: 4 Event
Description:
Loop 3 RCS Hot Leg Temperature Transmitter (NTP-131) Fails High Time Position Applicant's Actions or Behavior RO Recognizes and reports annunciators on Ann. Panel 111 which are indicative of a RCS RTD failure.
RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
- Place rod control in manual after verifying no runback in progress, if previously in auto.
- Identifies that PRZ Program Level is affected by this failure.
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US Enters and directs actions of 01-OHP-4022-012-003, Continuous Control Bank Movement procedure, if rods moved.
RO If 1-OHP-4022-012-003 is entered, then performs the following as directed:
- 1. Checks for no turbine runback
- 2. Ensures control rods are in manual with no rod motion
- 3. Checks rod position above low-low rod insertion limit Note: Delta T failure may affect RIL Setpoint - Must use COLR or manually calculate.
- 4. Checks axial flux difference (AFD) within target band
- 5. Initiates restoration of equilibrium conditions using either:
- Control rod movement
- Turbine load adjustment
- Boron adjustment
- 6. Identifies failed RTD channel US Enters and directs actions of 1-OHP-4022-013-007, RCS RTD Instrument Malfunction procedure.
Continued on next page Cook Plant Unit 1 & 2 Page 6 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-01 Event No.: 4 Event
Description:
Loop 3 RCS Hot Leg Temperature Transmitter (NTP-131) Fails High Time Position Applicant's Actions or Behavior RO 1. Ensures control rods are in manual.
- 2. Reports Loop 3 as failed RCS temperature channel and aligns the following switches:
- Tavg defeat switch to Loop 3 position
- T defeat switch to Loop 3 position
- T/OPT/OTT recorder switch to Loop 1,2, or 4 US Initiates actions to trip bistables associated with RCS loop 3 RTD failure per Attachment C of 1-OHP 4022-013-007.
US Refers to TS LCO:
- TS 3.3.1, Reactor Trip System (RTS) Instrumentation (Table 3.3.1-1) o Function 6, Overtemperature T. Condition D o Function 7, Overpower T. Condition D
Instrumentation (Table 3.3.2-1) o Function 4e, Steam Line Isolation - High Steam Flow in Two Steam Lines (per steam line), Coincident with Tavg - Low Low Condition D o Function 8c, ESFAS Interlocks - Tavg - Low Low, P-12.
Condition D May refer to the following if LEFM readings are Magenta on PPC
- TRM 8.7.14, Leading Edge Flow Meter (Mode 1 > 3250 applicability)
Cook Plant Unit 1 & 2 Page 7 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-01 Event No.: 5 Event
Description:
Main Feedwater Pump Delta-P Controller Setpoint Fails High Time Position Applicant's Actions or Behavior Note: Malfunction will cause the Total Steam Flow summing unit for the Feed Pump Delta-P circuit to fail low thus driving the Delta-P setpoint high.
BOP Recognizes and reports annunciator on Ann. Panel 115, Drop 42, FPT DCS Trouble, and indications of a failure affecting main feedwater to all steam generators (SGs):
- Main FW Pump Differential Pressure Controller.
- May Identify
- All feedwater regulating valves closing.
- Main feedwater pump speed rising.
Note: Ann. OHP-4024-DCS-MFP, Drop C-10, DP SETPOINT STEAM FLOW XMTR FAIL, contains actions to address setpoint failure.
RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
Verifies/Places Main FW Pump to speed control in manual and lowers output (MFW Pump Speed) to restore DP and match feedwater flow with steam flow and restore SG levels to program.
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
CREW Identifies that Main Feedwater Pump Delta-P Controller Setpoint has failed high.
BOP Monitors/adjusts MFP differential pressure (via manual control of FWP Delta-P or Main FW Pump Speed controllers) to while maintaining SG levels at program.
RO Monitors nuclear power during feedwater transient.
Cook Plant Unit 1 & 2 Page 8 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-01 Event No.: 6 Event
Description:
75 GPM Letdown Orifice Valve (QRV-162) Fails Closed Time Position Applicant's Actions or Behavior RO Identifies and reports rise in pressurizer (PRZ) or lowering VCT level due to a loss of letdown flow as a result of QRV-162 failing closed.
US/RO Minimizes charging flow to that amount required for seal injection.
NOTE If required, Shift Manager will direct that normal letdown (75 gpm) be re-established.
US Directs RO to restore normal letdown (using QRV-161, 75 gpm letdown orifice) per 1-OHP-4021-003-001, Attachment 13.
RO Restores normal letdown per Attachment 13, Section 4.1 as follows:
- 1. Places QRV-302 in divert position.
- 2. Verifies orifice isolations closed (QRV-160, 161 and 162).
- 3. Adjusts CRV-470 controller to >50% output.
- 4. Verifies open letdown isolation valves:
- a. QCR-300, CVCS letdown cntmt isol
- b. QCR-301, CVCS letdown cntmt isol
- c. QRV-111, RC letdown to regen hx
- d. QRV-112, RC letdown to regen hx
- 5. Adjusts QRV-301 controller to 50% output.
- 6. Checks/adjusts charging flow to > 75 gpm.
- 7. Opens QRV-161, 75 gpm letdown orifice isolation.
- 8. Adjusts QRV-301 to maintain 160 - 350 psig on QPC-301.
- 9. Places QRV-301 in auto (if desired).
- 10. Nulls and returns CRV-470 controller to auto.
- 11. Adjusts charging flow as required to maintain PRZ level.
- 12. Places PRZ level control in automatic (if desired).
- 13. Places QRV-302 in normal (demin) position when letdown temperature is stable.
Cook Plant Unit 1 & 2 Page 9 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-01 Event No.: 7/8/9/10 Event
Description:
Loss of Bus T11A due to fault; Failure of Turbine Trip; Loss of control power to TDAFP T&TV & Trip of West MDAFP Time Position Applicant's Actions or Behavior RO/US Determines that a loss of feedwater is occurring based on the following:
- Both FW pumps tripped
- SG level change
- FW & Steam flow mismatch US Directs RO to manually trip the reactor Directs RO/BOP to perform the immediate actions of E-0, Reactor Trip or Safety Injection RO Performs the (primary) immediate actions of E-0:
- 1. Checks reactor trip
- 2. Checks safety injection status Performs the (secondary) immediate actions of E-0:
- 1. Checks Turbine Trip US/BOP
- Determines that ALL Turbine Stop Valves are NOT Closed
- Attempts manual turbine trip via the Solenoid Trip.
Critical
- Attempts to manually actuate AMSAC Task #1 2. Determines that Turbine did NOT trip.
US Ensures immediate actions of E-0 are completed.
Crew Determines SI has Actuated Crew Performs E-0 Actions as directed
- Perform Attachment A
- Attempt to restore AFW US Determines that No AFW pumps are running requiring transition to FR-H.1 at Step 10 RNO.
Op-Test No.: Scenario No.: NRC 2016-01 Event No.: 7/8/9/10 Cook Plant Unit 1 & 2 Page 10 of 16
Appendix D Required Operator Actions Form ES-D-2 Event
Description:
Loss of Bus T11A due to Fault; Failure of Turbine Trip; Loss of control power to TDAFP T&TV & Trip of West MDAFP Time Position Applicant's Actions or Behavior US Announces transition to FR-H.1, Response to Loss of Secondary Heat Sink.
RO/BOP Reviews foldout page for FR-H.1, Response to Loss of Secondary Heat Sink.
US Directs actions of FR-H.1, Response to Loss of Secondary Heat Sink.
US/RO Verifies Bleed and Feed initiation is not required:
- Recognizes one CCP available
- PRZ Pressure < 2335 psig Attempts to establish secondary heat sink to one SG:
- Starts TDAFP from Control Room or Locally US/BOP
- Opens TDAFP FMOs to Obtain total feed flow > 240E3 PPH (FMO-211, 221, 231, 241 are normally throttled open but less than Critical required minimum).
- Establish Crosstie to Unit 2 per OHP-4022--055-003 Attachment A Task #2
- Close U1 FMO-212 & FMO-242
- Direct U2/AEO to perform steps to :
- Close U2 FMO-222, FMO232, FRV-255 & Test Vale Air
- Open of Crosstie 2-FW-129
- Start U2 East AFW Pump
- Throttle U1 FMO-212 & FMO-242 to Feed SGs US Announces transition to E-0, Reactor Trip or Safety Injection.
TERMINATE SCENARIO Cook Plant Unit 1 & 2 Page 11 of 16
Critical Task Summary (NRC 2016-01)
Task Elements Results
- 1 Cueing:
Manually
- All turbine stop valves closed status lights - LIT SAT / UNSAT Trip/Isolate Main (E-0, Step 2)
Turbine Performance Indicators:
- Manually Isolate Main Steam Lines
- Must be performed prior to:
o ECA-2.1 Enry o FR-S Series Entry Performance Feedback:
- Main Steam Lines Isolated o MRV-210 o MRV-220 o MRV-230 o MRV-240
- 2 Cueing:
- Must be performed prior to:
- SG Dryout (<17% wide range level)
- Exceeding RCS safety valve limit (2485 psig)
Performance Feedback:
- CETCs - lowering Cook Plant Unit 1 & 2 Page 12 of 16
Simulator Instructions (NRC 2016-01)
Setup:
- 2. Reset control rods and check group step counters.
- 3. Place Master Annunciator Silence pushbutton lockout ring in LOCKOUT position.
- 4. Advance chart recorder paper & clear chart recorder memory.
- 5. Tagout 1E MDAFP as follows:
- Place control switch in pull-to-lock
- Place clearance tag on control switch
- Activate FWR61, final value RO U1_FWR61
- 6. Activate the following (pre-load) malfunctions:
- TC02, Main Turbine Fails to Trip U1_TC02
- FW48C, Failure of TDAFWP AUTO start U1_FW48C
- 7. Assign file U1ReactorTripBreaker to event #9: U1ReactorTripBreaker to
- FW51, TDAFWP T&TV blown control fuse U1_FW51
- ED05E, T11A Bus fault U1_ED05E - On Trig 9 Cook Plant Unit 1 & 2 Page 13 of 16
Simulator Instructions (NRC 2016-01)
Scenario:
EVENT #1 If required, Local Control Fluid Temperature is 124°F EVENT #2 (if desired to use Rod Motion to perform power change insert event 4 prior to placing rods in Manual for power change)
No Additional Actions EVENT #3 Insert Global malfunction U1_101ACRA1 (Loss of Control Room North Air Handling Unit) after crew has performed a power change.
U1_101ACRA1 If contacted as AEO to investigate the North Air Handling Unit Trip, report back after ~ 2 min. delay that Breaker 1-AB-D-2D has an OC trip.
EVENT #4 ICF U1_NTP131 to 650 over 5 sec to cause the Loop 3 Hot Leg RTD to fail high.
U1_NTP131 EVENT #5 ICF U1_FDC_251 to 200 over 15 minutes to cause the Main FWP Delta Pressure Setpoint to fail high.
U1_FDC_251 EVENT #6 After crew has demonstrated ability to raise power, THEN insert IMF CV04C, to cause QRV-162, 75 gpm letdown orifice to fail closed ).
U1_CV04C If desired, direct the Crew as the SM to restore ONLY 75 GPM letdown using section 4.1 of 3.
Cook Plant Unit 1 & 2 Page 14 of 16
Simulator Instructions (NRC 2016-01)
EVENT #7 ICF U1_FW05A to cause the East Main FW Pump to Trip.
U1_FW05A EVENT # 8,9,10 Turbine Trip fails to AUTO actuate (Pre-Loaded)
Steam Line Isolation fails to AUTO actuate (Pre-Loaded)
TD AFW pump fails to start (Pre-Loaded)
After FR-H.1 determination that Bleed & Feed is NOT required, report as the AEO and/or Maintenance that T&TV appears to be functional with NO physical damage evident, but the fuse was blown and has been replaced. Or Inform the Crew that the U2 AFW is ready to Start.
DMF FW51 to replace the blown fuse.
U1_FW51 OR Start TDAFP Locally U1_QT506ACT To Provide AFW through Crosstie to Unit 2 To Simulate Closing U2_FMO-212 and FMO-242 (Close Manual Isolations) - FRV-255 is closed U2_FWR44 U2_FWR47 Open U1 AFW to U2 Crosstie 1-FW-129 and Start u2 West AFW U1_FWR06 ZGI101TA2_U2 Cook Plant Unit 1 & 2 Page 15 of 16
Simulator Instructions (NRC 2016-01)
Local actions after entry into E-0:
Perform Local actions after entry into E-0 as requested:
- Locally stop U1 Ice Condenser AHUs MRF CHR01 to OFF U1_CHR01
- Aux Tour will monitor Spent Fuel Pool Level and Temperatures
- Place PACHMAS in service - MRF CHR02 or 03 with 10 min delay.
U1_CHR02 OR U1_CHR03 (both have 10 minute delay built in)
- U2 has aligned CR vent for U1 SI, Fan 2-HV-AS-2 is running.
- Report Control Room Damper Positions ACRDA-1A, ACRDA-2 are closed. ACRDA-3 is open.
If directed to secure EDG jacket water pumps select OFF then AUTO Remote OFF AUTO EGR 03A U1_EGR03A U1_EGR03A U1_EGR03B U1_EGR03B EGR 03B EGR 04A U1_EGR04A U1_EGR04A U1_EGR04B U1_EGR04B EGR 04B Cook Plant Unit 1 & 2 Page 16 of 16
Appendix D Scenario Outline Form ES-D-1 Facility: Cook Plant Scenario No.: NRC 2016-02 Op-Test No.: ________
Examiners: _________________ Operators: ___________________
Initial Conditions: MOL, 80% power , 888 MW, 864 ppm, 565.7 F 198 Steps on D Turnover: Raise Power to 100%
Event Malf. No. Event Event No. Type* Description U1_QLC451@ I-RO 1 VCT Level Transmitter (QLC-451) fails LOW 0 TS 2 R-RO Raise Turbine and Reactor Power U1_QTC302@
3 C-RO Letdown Temperature Controller fails High 175°F U1_FFC220 I-BOP 4 SG Feed Flow Instrument (FFC-220) fails LOW
@2 TS U1_RC16 to Pressurizer Steam Space Manway Leak 5 100% over 2 M - ALL min. ramp U1_TC03 6 C-BOP Failure of Main Turbine Auto Trip U1_RP20C Slave Relay Failure (CCP,CCW,SI,RH pumps dont auto 7 C-RO U1_ECP start) East CCP trips
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Summary The crew is directed to begin raising power to 100%.
Before the power rise has begun, the VCT Level instrument (QLC-451) failing LOW. This will result in the VCT Low Level alarm and auto makeup. The crew will be required to enter the AOP and address the Technical Requirements Manual. The RO will be required to terminate the auto makeup to RCS.
After an acceptable power change, the Letdown Temperature Controller failing High in AUTO.
This will result in excess letdown cooling. RO will be required to take manual control of CRV-470 and restore temperature to normal band.
The fourth event will involve a failure of #2 Steam Generator Feed Flow instrument (FFC-220)
LOW. This will result in a rise in feedwater flow to #2 SG with corresponding SG level rise.
The BOP will be required to take manual control of FRV-220. Crew will be required to implement AOP actions to stabilize the plant and address Technical Specifications.
The major event will involve a large leak on the PRZ Steam Space Manway. A unit trip will be required. As the crew performs the actions of E-0, the Main Turbine will fail to automatically trip. Additionally the East CCP will trip and a failure of the opposite train slave relay will require manually stating the West CCP and other ECCS equipment. The crew will transition to E-1. The scenario will terminate when the crew has transitioned to ES-1.2 for Post LOCA cooldown.
Critical Tasks Manually trip the Turbine prior to a transition to ECA-2.1 Stop all running RCPs when RCS pressure is below 1300 psig Procedures E-0, Reactor Trip or Safety Injection E-1, Loss of Reactor or Secondary Coolant
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-02 Event No.: 1 Event
Description:
VCT Level Transmitter (QLC-451) fails LOW Time Position Applicant's Actions or Behavior RO Recognizes indication(s) of VCT Level problem and reports annunciators:
- Panel #109 Drop 49 - VCT Level Low RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
- Places RC Makeup Control to Stop US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US Enters and directs actions of OHP-4022-013-017, VCT Level Malfunction RO
- Report failure of VCT Level Transmitter (QLC-451) to US
- Perform MANUAL blend operation to maintain VCT level in band, if required US
- Directs energizing Interposing Relay in accordance with Attachment A US Refers to the following Tech Requirements:
- TRM 8.1.1, Boration Systems Operating - Condition A (Interposing Relay is energized for Refueling Water Sequence)
Cook Plant Unit 1 & 2 Page 3 of 14
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-02 Event No.: 2 Event
Description:
Raise Turbine Load/Reactor Power Time Position Applicants Actions or Behavior RO Calculates the dilution required per OHP-4021-005-002, Attachment 9, Boration or Dilution Volume Determination.
RO Briefs crew on reactivity plan for power escalation.
US Reviews / concurs with reactivity plan.
US Directs RO to commence Power Escalation in accordance with OHP-4021-001-006, Power Escalation (at step 4.77)
RO Performs DILUTION (batch add OR Continuous):
- Place RC Makeup Blend control switch in STOP
- Place RC Makeup Blend Control Mode switch in DILUTE or ALT DILUTE
- Adjust PW to the desired flow rate and/or amount.
- May close QRV-451 if aligning to CCP Suction Only
- Place RC Makeup Blend control switch in START
- May take QRV-303 to Manual and Open as required to maintain VCT Level and Pressure.
RO Commences escalation:
- Raises turbine load (reactor power) using the DCS HMI.
- Maintains Tavg/Tref deviation within limits by dilution and turbine load adjustments.
- Ensures Axial Flux Difference (AFD) is maintained within target band by manual control rod movement as needed.
RO RO verifies appropriate reactivity feedback.
BOP Acts as peer checker for RO during blender operations.
Cook Plant Unit 1 & 2 Page 4 of 14
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-02 Event No.: 3 Event
Description:
CVCS Letdown Temperature Controller (QTC-302) output fails High.
Time Position Applicant's Actions or Behavior RO Recognize and reports annunciator Panel 109 alarms which indicates a loss of CCW cooling to the letdown heat exchanger:
- Drop 8, Letdown HX Outlet Temp High RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
- Places CRV-470, Letdown Temperature Control valve, controller to MANUAL.
- Opens CRV-470 and restores letdown temperature to normal.
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
- Identifies that QTC-302 has failed high
- Determines condition NOT due to makeup US Initiates action to have MTI investigate problem with letdown temperature controller/indicator.
NOTE:
QRV-302 Letdown Demineralizer Divert Valve will reposition based on QTS-301. Diverts past Demins at 143°F. This is a separate switch from the Controller & Instrument that has failed (QTC-302).
Cook Plant Unit 1 & 2 Page 5 of 14
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-02 Event No.: 4 Event
Description:
SG #2 Feedwater Flow Transmitter (FFC-220) Fails LOW Time Position Applicant's Actions or Behavior BOP Recognizes and reports annunciators on Panel #113
- Drop 32, Steam Generator 2 Water LVL HI Deviation
- Drop 43, Steam Generator 2 SF > FWF Mismatch RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
- Verifies FRV-220, SG #2 MFW Reg. Valve controller in manual Lowers controller output to match the operable feed flow channel with steam flow.
- Restores SG #2 level to program.
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US Enters and directs actions of OHP-4022-013-015, Feedwater Flow Instrument Malfunction procedure.
BOP Performs the following actions as directed:
- 1. Reports FFC-220 has failed low
- 2. Places FS-520-C selector switch in channel 2 position.
- 3. Nulls and returns FRV-220 controller to auto.
US Refers to Tech Specs 3.3.1 RTS Instrumentation (Table 3.3.1-1, Function 15, Condition D).
US Initiates actions to trip bistables associated with FFC-220 FW Flow Failure per Attachment B-1 of OHP-4022-013-015.
Cook Plant Unit 1 & 2 Page 6 of 14
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-02 Event No.: 5,6,7 Event
Description:
Pressurizer Steam Space Manway Leak, Failure of Main Turbine Auto Trip, Trip of East CCP with Slave relay Failure Time Position Applicant's Actions or Behavior RO Recognize and reports abnormal RCS leakage:
- RCS pressure lowering with PZR Heaters ON.
- Rising Containment dewpoint, pressure, and radiation.
US Directs RO/BOP to perform the immediate actions of E-0, Reactor Trip or Safety Injection.
RO/BOP Performs the immediate actions of E-0:
- 1. Checks reactor trip
- 2. Checks turbine trip
- 3. Checks power to AC emergency buses
- 4. Checks safety injection status US
- Ensures immediate actions of E-0 are completed
- Directs subsequent actions of E-0.
RO/BOP Check Main Turbine Trip:
- Manually Actuate Turbine Trip Critical -OR-Task #1
- Manually Actuate AMSAC
-OR-
- Manually Isolate Main Steam Lines US/RO Foldout Page - RCP Trip Criteria:
- Stop all RCPs within 5 minutes of when RCS is < 1300 psig and Critical CCP/SI pump running Task #2 BOP Manually controls AFW flow to maintain SG narrow range levels 13% - 50%
once one SG narrow range level is greater than 13%.
Cook Plant Unit 1 & 2 Page 7 of 14
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-02 Event No.: 5,6,7 Event
Description:
Pressurizer Steam Space Manway Leak, Failure of Main Turbine Auto Trip, Trip of East CCP with Slave relay Failure Time Position Applicant's Actions or Behavior RO Determines that East CCP tripped and that the West CCP must be manually started.
Also Identifies that the West RHR, South SI, and West CCW pump failed to auto start on SI.
RO/BOP Completes actions of E-0 through step 19 as directed.
RO/BOP Performs manual actions of E-0, Attachment A as directed by US.
(Note ESW pump and Ventilation are impacted by slave relay failure)
US/RO Checks if RCS is Intact - NO US Announces transition to E-1, Loss of Reactor or Secondary Coolant and directs operator actions.
RO/BOP Completes actions of E-1 through step 12 (Check if RCS Cooldown and Depressurization is required) as directed.
BOP Restore SG narrow range levels >20%, but < 50%.
US/RO Checks if SI Termination Criteria is MET:
RCS Subcooling >40°F Secondary Heat Sink (SG >13% or AFW Flow >240x103)
RCS Pressure rising or stable - NO (May be Rising See next Step)
Pressurizer Level >16%
Crew Transition to ES-1.1, Safety Injection Termination if criteria is met.
ES-1.1 Actions are listed on Page 9.
IF SI Termination Criteria are NOT met, THEN E-1 Actions Are Continued on Page 10.)
Cook Plant Unit 1 & 2 Page 8 of 14
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-02 Event No.: 5,6,7 Event
Description:
Pressurizer Steam Space Manway Leak, Failure of Main Turbine Auto Trip, Trip of East CCP with Slave relay Failure Time Position Applicant's Actions or Behavior Note: Crew may transition to SI termination if criteria is met. This may involve stopping ECCS pumps and realigning charging until parameters change causing them to restart equipment and return to E-1 or ES-1.2. There are several points of transition to ES-1.2 from ES-1.1. The ES-1.1 Steps are listed below. The Scenario may be terminated upon transition to ES-1.2 US Announces transition to ES-1.1, Safety Injection Termination (step 6 of E-1).
RO/BOP Reviews ES-1.1, Foldout Page Criteria.
Monitors RCS Subcooling >40°F and PZR Level >16%, if NOT realign ECCS and GO TO E-1 US Directs Actions of ES-1.1 RO/BOP Performs the following as directed:
- 1. Resets both trains of Safety Injection
- 2. Resets both trains of Phase A
- 3. Establishes Control Air to Containment CREW Check if RCS Pressure is stable or Rising If Lowering, Transition to ES-1.2 RO/BOP Performs the following as directed:
- 1. Establish Normal Charging Flowpath
- 2. Isolate BIT Injection CREW Check if:
- Pressurizer Level is stable and
- RCS Pressure is Stable or Rising If NOT, Transition to ES-1.2 CREW Check if transition is made to ES-1.2, then perform the following:
- Reset SI
- Reset Containment Isolation:
- Establish Control Air To Containment TERMINATE SCENARIO Cook Plant Unit 1 & 2 Page 9 of 14
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-02 Event No.: 5,6,7 Event
Description:
Pressurizer Steam Space Manway Leak, Failure of Main Turbine Auto Trip, Trip of East CCP with Slave relay Failure Time Position Applicant's Actions or Behavior US/RO Check if RHR can be stopped:
- Check RCS Pressure > 300 psig and stable
US Announces transition to ES-1.2, Post LOCA Cooldown and Depressurization (at step 12).
CREW Check if transition is made to ES-1.2, then perform the following:
- Reset SI
- Reset Containment Isolation:
- Establish Control Air To Containment TERMINATE SCENARIO Cook Plant Unit 1 & 2 Page 10 of 14
Critical Task Summary (NRC 2016-02)
Task Elements Results
- 1 Cueing: SAT / UNSAT Manually
- All turbine stop valves closed status lights - LIT Trip/Isolate Main (E-0, Step 2)
Turbine Performance Indicators:
- Manually Actuate Turbine Trip
-OR-
- Manually Actuate AMSAC
-OR-
- Manually Isolate Main Steam Lines
- Prior to entering ECA-2.1 Performance Feedback:
- All turbine stop valves closed status lights - LIT
-OR-
- Main Steam Lines Isolated
- MRV-210
- MRV-220
- MRV-230
- MRV-240 Cueing:
- E-0, Foldout Page, Step 1 Manually trip all
- E-1, Foldout Page, Step 1 Reactor Coolant
- E-1, Step 1 Pumps Performance Indicators:
- Manually stop all Reactor Coolant Pumps (RCPs) when RCS pressure is less than 1300 psig.
- RCPs must be tripped within 5 minutes of the trip criteria being met.
Performance Feedback:
- RCP ammeters - zero current
- RCP trip low flow alarms - lit
- RCS loop flow meters - flow lowering Cook Plant Unit 1 & 2 Page 11 of 14
Simulator Instructions (NRC 2016-02)
Setup:
- 2. Reset control rods and check group step counters
- 3. Place Master Annunciator Silence pushbutton lockout ring in LOCKOUT position
- 4. Advance chart recorder paper & clear chart recorder memory
- 6. Go to RUN and acknowledge/clear alarms
- 7. Verify MW OUT Selected on Main Turbine
- 8. Insert Malfunction:
- TC03 to cause an Automatic Turbine Trip failure U1_TC03
- U1 RX Trip on Trigger 5 U1 RX Trip onT5
- East CCP trip 5 seconds after RX Trip U1_ECP (continued on next page)
Cook Plant Unit 1 & 2 Page 12 of 14
Simulator Instructions (NRC 2016-02)
Scenario:
EVENT #1 After the crew has performed a power escalation, then insert ICF U1_QLC451, final value 0 over 2 sec (QLC-451 fails Low).
U1_QLC451 If directed to energize interposing relay for QLC-451 then use:
- Remote Function RPR157 to Trip LBX-112B U1_RPR157 NOTE: Ensure Crew has Caution Tags (> 2).
EVENT #2 Complete (sign-off) 1-OHP-4021-001-006 up to Step 4.77 EVENT #3 Insert Malfunction U1_QTC302, final value 175 (Letdown Temp Controller fails High) when crew has made a power change.
U1_QTC302 If contacted as MTI investigate Letdown Temp controller, report back after some 5 min.
delay that additional testing will be required to identify the problem.
(USE isd or MP u1_cvxqtc302_inp if local temp is taken with a pyrometer)
Local Indicator QTC-302 reads 175°F.
EVENT #4 Insert Malfunction U1_FFC220, final value 2 (FFC-220 fails LOW) after crew has recovered from Letdown temperature controller failure.
U1_FFC220 Cook Plant Unit 1 & 2 Page 13 of 14
Simulator Instructions (NRC 2016-02)
EVENT #5,6,7 Initiate the following to lead to a Reactor Trip / Safety Injection (E-0 Entry).
IMF RC16, final value 100 (PZR Steam Space LOCA/ PZR Steam Space Manway Leak):
U1_RC16 Turbine Trip Auto Failure U1_TC03.
Slave Relay Failure U1_RP20C East CCP Trip U1_ECP Local actions after entry into E-0:
- Locally stop U1 Ice Condenser AHUs MRF CHR01 to OFF U1_CHR01
- Aux Tour will monitor Spent Fuel Pool Radiation, Level and Temperatures
- Place PACHMAS in service - MRF CHR02 or 03 with 10 min delay.
U1_CHR02 OR U1_CHR03 (both have 10 minute delay built in)
- U2 has aligned CR vent for U1 SI, Fan 2-HV-AS-2 is running.
If directed to secure EDG jacket water pumps select OFF then AUTO Remote OFF AUTO EGR 03A U1_EGR03A U1_EGR03A EGR 03B U1_EGR03B U1_EGR03B EGR 04A U1_EGR04A U1_EGR04A EGR 04B U1_EGR04B U1_EGR04B Cook Plant Unit 1 & 2 Page 14 of 14
Appendix D Scenario Outline Form ES-D-1 Facility: Cook Plant Scenario No: NRC 2016-03 Op-Test No: ________
Examiners: _________________ Operators: _______ ___________
Initial Conditions: MOL 1% Pwr, Manual Aux Feed to SG, Turbine offline Turnover: Start the Middle Condensate Booster Pump, Raise Power to 3% for MFW Pump Start-up (Extra-RO will start the MFP)
Event Malf. No. Event Event No. Type* Description 1 N-BOP Start the Middle Condensate Booster Pump.
2 R-RO Raise Power to 3% Power.
U1_NLP151 I-RO 3 Pressurizer level channel CH 1: 1-NLP-151, fails High 100 TS 4
ED07B C-RO PZR HTR Transformer Fails (11PHC Fails).
TS 5 CLC10 to 0% I-BOP Hotwell Level Transmitter CLC-10 Fails LOW.
6 RX11D C-BOP SG PORV Controller Failure.
@100% TS 7 ED01 M Loss of All AC Power.
ED25 ED03A 1CD EDG Trip.
EG06B 8 EG08A C-BOP 1AB EDG Speed Governor Failure.
9 FW48C C-BOP TD AFW Pump Fails to AUTO start.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Summary The BOP is directed to start the Middle Condensate Booster Pump (CBP). The operator will place the Middle CBP in service in accordance with the normal operating procedure.
The Crew is directed to raise power to 3-4% for MFW Pump Start-up.
The third event will involve the Pressurizer Level Controlling Channel NLP-151 failing high The RO will have to manually control level. The crew will need to implement an Abnormal Operating Procedure, select an operable channel, and restore Pressurizer Level controller to auto, and address Technical Specifications.
A failure of the PZR HTR Bus 11PHC will occur. The PZR SCR heater control will need to be transferred to 11PHA. The crew should also refer to Technical Specifications.
Then the Hotwell Level Transmitter CLC-10 fails LOW. The low failure will cause the Condensate Makeup valve (CRV-55) to fully open and the Condensate Letdown Valve (CRV-155) to fully close causing a rise in actual hotwell level. The BOP will be required to take manual control of the Hotwell Level Controller and return hotwell level to a normal band. The non failed hotwell level input may be selected for subsequent auto control.
The next event will involve the failure of the SG #14 PORV Controller. The controller will fail causing PORV 1-MRV-243 to fully open. This will also cause Reactor power to slightly rise. The BOP will need to take manual action to close the PORV and the US will need to declare the associated radiation monitor inoperable.
The Major event is a loss of all AC power. The reactor will trip. Failure of the EDGs will require entry into ECA-0.0 actions. Failure of the TDAFW Pump to auto start will require a manual start to restore feedwater flow. The crew will be required to take actions to restore Emergency Power (EP). The crew should transition to ECA-0.1 once power has been restored to one Safeguards Bus. The scenario will terminate when the crew has restored emergency power and transitioned to ECA-0.1 or ECA-0.2.
Critical Tasks Establish AFW (Start TDAFWP)
Restore Emergency Power to Safeguards Bus Procedures E-0, Reactor Trip or Safety Injection ECA-0.0, Loss of All AC Power
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-03 Event No.: 1 Event
Description:
Start the Middle Condensate Booster Pump Time Position Applicant's Actions or Behavior US Directs actions of 1-OHP-4021-054-001, Attachment 2, Operation of Hotwell (HW) and Condensate Booster (CB) Pumps to start the Middle CB Pump.
US Directs the following actions to realign condensate system:
- Start the Middle CB pump.
BOP Performs the following to swap CB Pumps as directed:
- 1. Places the following switches in NEUTRAL:
- Standby CB Pump
- Standby HW Pump
- Standby TACW Pump
- 2. Starts the Middle CB Pump.
- 3. Directs operator to verify CRV-224 closed.
- 4. Places the following switches in AUTO:
- Standby CB Pump
- Standby HW pump
- Standby TACW pump Note: If desired, crew may remove power from 1-CRV-202, Middle CBP Emergency Leak-Off.
Note: Ann. 116, Drop 73, CNDST BOOSTER PUMP DISCH PRESSURE LOW may annunciate during this evolution.
Cook Plant Unit 1 & 2 Page 3 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-03 Event No.: 2 Event
Description:
Raise Power to 3-4% Power Time Position Applicant's Actions or Behavior RO Briefs crew on reactivity plan for power rise.
US Reviews reactivity plan.
US Directs RO to commence Power Escalation in accordance with 1-OHP-4021-001-006, Power Escalation procedure.
RO Commences power rise by pulling rods or dilution.
US Acts as reactivity manager.
Cook Plant Unit 1 & 2 Page 4 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-03 Event No.: 3 Event
Description:
Pressurizer level channel CH 1: 1-NLP-151, fails high Time Position Applicant's Actions or Behavior CREW Respond to ANNUNCIATOR #108, Drop 1 Pressurizer Level High-High and Drop 3 Pressurizer Level High Deviation Alarms RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
Restores PRZ level using manual control of EITHER:
- PRZ Level Control (master controller)
-OR-
- 1-QRV-251, CCP discharge flow controller.
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
ATC Note that CH 1: 1-NLP-151, failed high
- Check PRZ Level - Stable or Trending to Program Level -
Place PRZ control in Manual and restore PRZ Level to Program Level
- Check Letdown - IN SERVICE - Minimize Charging Flow if Letdown Isolated US Enters and directs actions of 1-OHP-4022-013-010, Pressurizer Level Instrument Malfunction Continued on Next Page Cook Plant Unit 1 & 2 Page 5 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-03 Event No.: 3 Event
Description:
Pressurizer level channel CH 1: 1-NLP-151, fails high Time Position Applicant's Actions or Behavior ATC Check for Failed PRZ Level Instrument and perform the following:
- IF 1-NLP-151 is the Control channel, THEN verify PRZ Level control in MANUAL using one of the following:
- PRZ Level Control (master controller)
-OR-
- 1-QRV-251, CCP discharge flow controller.
- Verify PRZ Level CTRL selector switch (1-LS-459-D) in CHANNELS 2 & 3 position.
- Verify PRZ Level Rec selector switch (1-LS-459-E) in CHAN 2 or CHAN 3 position.
- Check 1-NPP-151, Pressurizer Pressure Channel 1, for failure.
- Check Letdown And PRZ Heaters In Service:
- PRZ level - Greater than 17%
- Letdown - In Service
- Pressurizer Heaters Not Tripped
- Check PRZ Level Control In Auto:
- 1-QRV-251, CCP discharge flow controller in - Auto
- Check PRZ Level Control in - Auto US Refers to Tech Specs (TS) :
- TS 3.3.1, Reactor Trip System (RTS) Instrumentation (Table 3.3.1-1)
- Function 9, Pressurizer Water Level - High.
- Condition A - Refer to Table
- Condition D - 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to trip bistables (When above P-7)
- TS 3.3.3 Post Accident Monitoring (Minimum channels are met) -
N/A.
- TS 3.3.4 Remote Shutdown Instrumentation Condition A - 30 Days to restore to operable US Initiates actions to trip bistables associated with NLP-151 PZR Level Failure per Attachment A of 1-OHP-4022-013-010.
Cook Plant Unit 1 & 2 Page 6 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-03 Event No.: 4 Event
Description:
Pressurizer Heater Transformer (TR11PHC) Fails Time Position Applicant's Actions or Behavior RO Recognizes and reports annunciators on Panel 108, Drops 46 and 50, indicative of a pressurizer (PRZ) heater power supply failure.
US/RO Reenergizes PRZ control (cycling) group heaters per 1-OHP-4024-108, Drop 46 annunciator response, as follows:
- Opens breaker CB11PHC6
- Closes breaker CB11PHA6 (Drop 50 clears)
RO Monitors PRZ pressure response and ensures normal PRZ heater operations for PHA supplied heaters.
US Refers to Tech Specs (TS):
- TS 3.4.9.b Pressurizer - (Condition B.1) due to a loss of 1 train of pressurizer heaters. Restore B/U heaters to operable within 72 Hours.
Cook Plant Unit 1 & 2 Page 7 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-03 Event No.: 5 Event
Description:
Hotwell Level Transmitter CLC-10 fails Low Time Position Applicants Actions or Behavior BOP Acknowledges and reports alarms on Ann. Panel 116 as applicable:
- Drop 1, CONDENSER A HOTWELL LEVEL HIGH
- Drop 11, CONDENSER B HOTWELL LEVEL HIGH
- Drop 21, CONDENSER C HOTWELL LEVEL HIGH BOP Identifies that Hotwell Level Controller CLC-10 is failed as indicated by:
- Condensate Makeup Valve (CRV-55) fully open
- Condensate Letdown Valve (CRV-155) fully closed
- Rising hotwell level on CLC-30 BOP Places Hotwell Level Controller in MANUAL and adjusts controller output to maintain normal hotwell level.
US/BOP Performs one of the following:
- Maintains Hotwell level in MANUAL.
-OR-
- May select CLC-30 as the controlling channel and places the HW Level Controller back to AUTO.
Cook Plant Unit 1 & 2 Page 8 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-03 Event No.: 6 Event
Description:
SG PORV Controller Failure Time Position Applicant's Actions or Behavior BOP Recognize and reports Annunciator #114 Drop 24 that indicates SG #4 PORV MRV-243 has opened.
BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
US Direct operator actions to close SG #4 PORV and monitor Reactor Power.
US Declares the SG #4 PORV Radiation Monitor MRA-1602 inoperable.
US Refers to the following Tech Specs (TS) / Tech Requirements Manual (TRM):
- TRM 8.3.8. Radiation Monitoring Instrumentation, Condition C.1-Restore channel/monitor to operable status within 7 Days (PORV must be able to auto open for Radiation Monitor but not PORV safety Function.)
Cook Plant Unit 1 & 2 Page 9 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-03 Event No.: 7/8/9 Event
Description:
Complete Loss of All AC Power - 1AB/CD Emergency Diesel Generator Failure; Turbine Driven AFW Pump Fails to Auto Start Time Position Applicant's Actions or Behavior CREW Identifies the need for a Reactor Trip and trips the reactor manually.
US Directs RO/BOP to perform the immediate actions of 1-OHP-4023-E-0 (E-0), Reactor Trip or Safety Injection.
RO Performs the (primary) immediate actions of E-0:
- 1. Verifies reactor trip
- 2. Checks safety injection status BOP Performs the (secondary) immediate actions of E-0:
- 1. Checks turbine trip
- 2. Checks power to AC emergency buses:
- Reports that NO AC emergency buses are energized Note: Crew may enter ECA-0.0, Loss Of All AC Power, directly.
US Announces transition (or entry) to 1-OHP-4023-ECA-0.0 (ECA-0.0), Loss Of All AC Power and directs RO/BOP to perform immediate actions for ECA-0.0.
US Announces RX Trip over Executone RO/BOP Performs the immediate actions of ECA-0.0:
- Checks reactor trip
- Checks turbine trip US Ensures immediate actions are completed and directs subsequent actions of ECA-0.0.
- 1. Checks PRZ PORVs closed (NRV-151, 152 and 153)
- 2. Checks letdown isolation valves closed (QRV-111 and 112)
- 3. Checks excess letdown isolation valves closed (QRV-113 and 114)
BOP Checks AFW flow > 240,000 PPH:
- 1. Manually starts the Turbine Driven AFW (TDAFW) Pump Critical Task 2. May throttle TDAFW FMOs to establish > 240,000 PPH but heat sink
- 1 requirements are met with SG Levels.
Cook Plant Unit 1 & 2 Page 10 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-03 Event No.: 7/8/9 Event
Description:
Complete Loss of All AC Power - 1AB/CD Emergency Diesel Generator Failure; Turbine Driven AFW Pump Fails to Auto Start Time Position Applicant's Actions or Behavior US Identifies that:
- NEITHER the T11A nor the T11D bus is energized US Identifies Emergency Power (EP) source is AVAILABLE.
US Directs Restoration of 4KV Power From EP using Attachment D.
RO/BOP Directs AEO to manually isolate RCP Seals by closing :
- 1-CS-311N
- 1-CS-311S
- 1-CS-307
- 1-QCM-350 (locally)
BOP/US Places the following equipment in Pull-To-Lock:
- MDAFPs
- RHR Pumps
- SI Pumps
- CTS Pumps
- CCW Pumps
- ESW Pumps
- NESW Pumps
- PRZ Heaters BOP/US Identifies that the EITHER Train - Load Conservation lights are NOT LIT and that the Offsite Emergency Power is supplying the EP bus.
BOP Energizes EITHER emergency bus (T11A or T11D) from EP as directed:
Critical Task 1. Checks bus - not faulted
- 2 2. Places EDG supply to bus in pull to lock
- 3. Places Load Conservation Switch in LOAD CON
- 4. Closes 4KV EP supply to bus and energizes bus RO/BOP Isolates Seal Return and RCP CCW Return line from Thermal Barrier:
- QCM-350 OR QCM-250 - CLOSED
- CCM-454 OR CCM-453 - CLOSED Cook Plant Unit 1 & 2 Page 11 of 16
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-03 Event No.: 7/8/9 Event
Description:
Complete Loss of All AC Power - 1AB/CD Emergency Diesel Generator Failure; Turbine Driven AFW Pump Fails to Auto Start Time Position Applicant's Actions or Behavior BOP Energizes emergency bus (T11B or T11C) from EP as directed:
- 1. Checks bus - not faulted
- 2. Places DG supply to bus in pull to lock
- 3. Closes 4KV EP supply to bus and energizes bus RO/BOP Checks RCS Temperature stable or trending to 547ºF.
RO/BOP Realigns Equipment following power restoration:
- Start ESW Pump and verifies discharge valve opens.
- Return Load Conservation Switch to NORMAL.
- Reset and start one Control Room AHU.
US Based on RCS subcooling and PRZ level, announces transition to:
-OR-
- ECA-0.2, Loss of All AC Power Recovery with SI required if Subcooling is < 40 ºF OR Pressurizer level is < 16%.
TERMINATE SCENARIO Cook Plant Unit 1 & 2 Page 12 of 16
Critical Task Summary (NRC 2016-03)
Task Elements Results
- 1 Cueing: SAT / UNSAT
Turbine Driven AFW Pump Performance Indicators:
Establish AFW flow before SG dryout occurs (<15% WR level):
- Manually starts the TDAFP from the control room.
Performance Feedback:
- TDAFP speed rising
- AFW flow indications
- 2 Cueing: SAT / UNSAT
- Restore AC Power (ECA-0.0)
Restore Emergency
- T11 A, B, C, D Energized Lights - NOT Lit Power Performance Indicators:
Power should be restored prior to depressurizing intact SGs to 190 psig (ECA-0.0, Step 19):
Performance Feedback:
- T11A or T11D bus energized
- Power available to safeguards equipment.
Cook Plant Unit 1 & 2 Page 13 of 16
Simulator Instructions (NRC 2016-03)
Setup:
- 1. Reset to IC- 180 1294.93 ppm, 150 steps on Rods, 549.3°F
- 2. Reset control rods and check group step counters.
- 3. Place Master Annunciator Silence pushbutton lockout ring in LOCKOUT position.
- 4. Set Up PPC Digital Display to Point U0485 (Delta T Power)
- 5. Advance chart recorder paper & clear chart recorder memory.
- 6. Verify/Activate the following (pre-load) malfunctions:
- IMF FW48C, TD AFW pump fails to AUTO start U1_FW48C
- IMF SFR401, SJAE Flow to Maintain Steady Low Power Values U1_SFR401
- 7. Assign the following Event Trigger 9:
- IMF ED01, Delay 10 secs, Loss of 345 KV Bus 1 U12_ED01
- IMF ED25, Delay 12 secs, Loss of 765/345 KV Transformer Bank No. 4 U12_ED25
- IMF E03A, Delay 15 secs, Loss Of Reserve Auxiliary Transformer TR-101AB U1_ED03A
- EG06B Delay 30 secs, CD EDG Trip U1_EG06B Cook Plant Unit 1 & 2 Page 14 of 16
Simulator Instructions (NRC 2016-03)
Scenario:
EVENT #1 Report as AEO as required:
- Starting Party is standing-by, the Middle CB Pump is ready for start. Maintenance verified the oil pump is primed and has added oil IAW 1-OHP-4021-054-001.
- Oil Pressure is 5 psig after pump start.
- 1-CRV-224 is closed Report as required to other departmental requests.
If asked to remove power from 1-CRV-202, insert ZDIVDAB13_U1 to OFF C 202 (May need to use Soft Panel for VDAB)
EVENT #2 NOTE: Ensure 1-OHP-4021-001-006, Power Escalation procedure is sign-off thru step 4.7 and steps have been completed on the simulator.
EVENT #3 Insert malfunction U1_NLP151, final value 100 (PZR Level NLP151 fails High) when crew has performed the power change.
U1_NLP151 EVENT #4 After the crew has responded to the PZR level failure, insert IMF ED07B (PZR heater transformer fails). U1_ED07B As AEO, report T11D9 tripped on Overload/Overcurrent.
Cook Plant Unit 1 & 2 Page 15 of 16
Simulator Instructions (NRC 2016-03)
EVENT #5 When the PRZ heater transformer failure is inserted, also insert ICF U1_CLC10, Final Value 0, to fail Hotwell Level Transmitter (CLC-10) Low.
U1_CLC10 Note: Takes ~5 minutes before alarms come in.
Monitor u1_msxcla10_inp for Hotwell level - alarms at 588.333 If Dispatched to restore fuses for 1-CMO-155 U1_EDPR37Z Report back that Fire Watch and Chemistry have been notified.
EVENT #6 After the crew has responded to the Hotwell level transmitter failure, then insert RX11D, final value 100 (SG PORV Controller failure). U1_RX11D EVENT #7 - 9 After the crew has responded to the SG PORV failure, insert Event Trigger 9.
Activate Trigger 9
- IMF ED01, Delay 10 secs, Loss of 345 KV Bus 1
- IMF ED25, Delay 12 secs, Loss of 765/345 KV Transformer Bank No. 4
- IMF E03A, Delay 15 secs, Loss Of Reserve Auxiliary Transformer TR-101AB
- EG06B Delay 30 secs, CD EDG Trip If directed to locally close seal injection valves (1-CS-311N, 311S and 307) then activate remote functions:
- IRF CVR20, Final Value 0 (CLOSE) U1_CVR20
- IRF CVR21, Final Value 0 (CLOSE) U1_CVR21 If directed to locally isolate RCP Seal Water Return Valve (1-QCM-350) then activate remote function:
- IRF CVR77, Final Value 0 (CLOSE) U1_CVR77 Cook Plant Unit 1 & 2 Page 16 of 16
Appendix D Scenario Outline Form ES-D-1 Facility: Cook Plant Scenario No: NRC 2016-04 Op-Test No.: _______
Examiners: _________________ Operators:___________________
Initial Conditions: MOL 57% pwr; 602MW, 931 ppm, 559.6 F, 179 Steps on D East Motor Driven AF Pump OOS.
Turnover: Perform ESW Pump Strainer Backwash. Raise Power to 80%
Event Malf. No. Event Event No. Type* Description 1 N-BOP Perform ESW Strainer Backwash 2
U1_QLC452 I-RO VCT Level Channel QLC 452 fails HIGH to 100 TS 3 R-RO Raise Reactor Power to 80%
4 U1_CBPN C-BOP North CB pump trip; Middle CB pump fails to start in AUTO U1_FW58B U1_FW58C 5 U1_RX08A @ C-RO Spray Valve fails open in Auto 100 6
U1_MPP242 I-BOP SG 4 Pressure Channel (MPP-242) fails High (SG #14 PORV
@1200 psig TS fails open) 7 U1_RC10A to Major Large Break Loss of Coolant Accident on Loop 1 20% over 5 min. ramp (Starts Out Slowly)
U1_RC01A at 50% after 5 min.
8 U1_RHR17 - C-RO 1W RHR Pump Fails to AUTO Start on SI RO, ZLO101TA4_
U![GRN]
9 U1_ERHR C-RO 1E RHR Pump Trips 15 minutes after SI
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Summary The scenario starts with the plant at 57% power with the Both Main FW Pumps in service.
The crew is directed to perform a PMT on the West ESW Pump Strainer (Manual Backwash)
The first failure involves the VCT Level Channel QLC-452 failing high. This will cause the QRV-303 VCT Divert valve to fully divert letdown flow to the HUT. The Operator is required to take Manual control of QRV-303 and direct letdown flow back to the VCT. Crew will be required to implement AOP actions to stabilize the plant and address Technical Specifications (TRM).
After the VCT Level Failure, the crew is directed to raise power.
The next event is a trip of the North Condensate Booster pump. This will result in reduced feedwater capability. BOP will be required to manually start the Middle or South Condensate Booster pump. Crew will be required to implement compensatory actions to stabilize the plant.
A short time later a failure of one of the PZR Spray valves will fail Open while in Auto. The crew will respond to lowering RCS pressure by closing the valve in manual using OHP-4022-IFR-001.
Next a failure of SG #14 Pressure Channel (MPP-242) fails high causing SG #14 PORV to fully open. This will also cause Reactor power to slightly rise. The BOP will need to take manual action to close the PORV, the crew will implement AOP actions, and the US will need to declare the associated radiation monitor inoperable.
Shortly after the SG Pressure Channel failure, a LOCA will slowly develop resulting in a large break LOCA. The plant will trip and Safety Injection will actuate. As the crew performs the actions of E-0 they will note that the 1W RHR pump failed to auto start on the SI. The crew will transition to E-1 and to ES-1.3 to align for cold leg recirculation. The 1E RHR will trip 15 minutes into the event. The crew will have to align ECCS to the recirculation sump without the 1E RHR pump. The scenario will terminate when the crew has aligned ECCS for cold leg injection.
Critical Tasks Establish Low Pressure SI (RHR)
Establish Cold Leg Recirculation Procedures E-0 Reactor Trip or Safety Injection E-1 Loss of Reactor or Secondary Coolant ES-1.3 Transfer to Cold Leg Recirculation
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-04 Event No.: 1 Event
Description:
1W ESW Pump Strainer Backwash Time Position Applicant's Actions or Behavior BOP Perform ESW Strainer Backwash per 12-OHP-4021-019-001 Attachment 36 BOP Manually backwashes the 1W ESW pump strainer.
- Places backwash selector in RIGHT position
- Places strainer control in MANUAL
- May depress manual BACKWASH pushbutton (for additional backwash)
Cook Plant Unit 1 & 2 Page 3 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-04 Event No.: 2 Event
Description:
VCT Level Transmitter (QLC-452) fails HIGH Time Position Applicant's Actions or Behavior RO Recognizes indication of VCT Level problem and reports Annunciator Panel
- 109 (if VCT level on QLC-451 lowers to 14%):
- Drop 48 VOLUME CTRL TANK MAKEUP NOT IN AUTO alarm
- Drop 49 VOLUME CONTROL TANK LEVEL LOW alarm US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US Directs operator actions per 1-OHP-4022-013-017, VCT Instrument Malfunction.
- Place QRV-303 controller in Manual and lowers demand
-OR-
- Place Divert valve (QRV-303) in VCT position.
- Recognizes and reports failure of VCT Level Transmitter (QLC-452).
US Refers TRM 8.1.1, Boration Systems - Operating:
- Condition A (Interposing Relay should be energized for Refueling Water Sequence).
Enters action statement to restore to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
US Direct actions to energize Interposing Relay in accordance with Attachment B.
Cook Plant Unit 1 & 2 Page 4 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-04 Event No.: 3 Event
Description:
Raise Turbine Load / Raise Reactor Power Time Position Applicant's Actions or Behavior RO Calculates the dilution required per 1-OHP-4021-005-002, Attachment 9, Boration or Dilution Volume Determination.
RO Briefs crew on reactivity plan for power escalation.
US Reviews reactivity plan.
US Directs RO to commence Power Escalation in accordance with 1-OHP-4021-001-006.
RO Performs DILUTION (batch add OR continuous):
- Place RC Makeup Blend control switch in STOP
- Place RC Makeup Blend Control Mode switch in DILUTE or ALT DILUTE
- Adjust PW to the desired flow rate and/or amount.
- May close QRV-451 if aligning to CCP Suction Only
- Place RC Makeup Blend control switch in START
- May take QRV-303 to Manual and Open as required to maintain VCT Level and Pressure.
RO/BOP Commences escalation:
- Raises turbine load (reactor power) using the DCS HMI.
- Maintains Tavg/Tref deviation within limits by dilution and turbine load adjustments. (Administrative Limits of +/- 2°F)
- Ensures Axial Flux Difference (AFD) is maintained within target band by manual control rod movement as needed.
BOP Acts as peer checker for RO during blender operations and with RO verifies appropriate reactivity feedback.
RO Verifies appropriate reactivity feedback.
BOP Monitors and maintains main electrical generator temperatures within limits per:
- 1-OHP-4021-059-001, Generator Stator Cooling Water System
- 1-OHP-4021-080-003, Generator Hydrogen Gas System Cook Plant Unit 1 & 2 Page 5 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-04 Event No.: 4 Event
Description:
North CB pump trip; Middle CB pump fails to start in AUTO Time Position Applicant's Actions or Behavior BOP Recognizes feedwater control problem and reports Panel #116 alarms:
Drop 73 - CNDST BOOSTER PUMP DISCH PRESSURE LOW Drop 71 - CNDST BOOSTER PUMP MOTOR INSTANT TRIP US Directs operator actions to stabilize the unit and restore Condensate Booster pump flow.
RO Monitor RCS & Secondary parameters during transient.
- Manually start the Middle CB pump.
- May Place North CB pump control switch to TRIP and back to NEUTRAL (Clear Alarms).
- Monitor Secondary parameters for normal operations.
- May Dispatch an AEO to Check CRV-224 Low Pressure Heater Bypass Closed US/RO Stabilize Power, if desired:
- Place Main Turbine on HOLD (at constant load) as desired.
Cook Plant Unit 1 & 2 Page 6 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-04 Event No.: 5 Event
Description:
Pressurizer Spray Valve NRV-163 Controller Fails to 100%
Time Position Applicant's Actions or Behavior RO Performs the following:
- Recognizes and reports Ann. Panel 108, Drop 8, PRESSURIZER PRESS LOW DEV BACKUP HTRS ON.
- Identifies that NRV-163 PRZ spray valve is open US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US/RO Directs RO to take Manual Control of 1-NRV-163 and Restore Pressurizer pressure.
RO Performs the following:
- Manually closes 1-NRV-163 PRZ Spray Valve
- Monitors PRZ pressure control system and ensures pressure returns to normal conditions (~2235 psig).
US May enter the following TS if Pressure lowers to <2200 psig during the transient:
Condition A Cook Plant Unit 1 & 2 Page 7 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-04 Event No.: 6 Event
Description:
SG #4 Press. Failure (MPP-242) Fails HIGH - #4 SG PORV Opens Time Position Applicant's Actions or Behavior BOP Recognize and reports Annunciator Panel #114, Drop 24, 1-MRV-243 OP OR HSD1 PANEL OVERRIDE alarm that indicates SG #4 PORV (MRV-243) has opened.
Panel 113 Drop 14 May also alarm.
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US Direct operator actions to determine cause, reclose SG #4 PORV, and monitor Reactor Power.
BOP Place SG PORV #4 in Manual and Closes #4 PORV.
US Enters and directs actions of 1-OHP-4022-013-012, Steam Generator Pressure Instrument Malfunction procedure.
BOP Performs the following actions as directed:
- 2. Reports MPP-242 has failed high.
- 3. Returns MFP P controller to auto (if placed in manual).
US Refers to TSs / TRM:
4.d - all Condition D)
- Trip bistables in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />
- TRM 8.3.8. Radiation Monitoring Instrumentation (Table 8.3.8-1, Function 2.b - Condition C)
- Declares MRA-1602 inoperable
- Restore in 7 days US Initiates actions to trip bistables associated with MPP-242 Steam Generator Pressure Instrument Failure per Attachment D-3 of 1-OHP-4022-013-012.
Cook Plant Unit 1 & 2 Page 8 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-04 Event No.: 7/8/9 Event
Description:
Large Break LOCA 1W RHR Pump Fails to Auto Start 1E RHR Pump Trips (after 15 minutes)
Time Position Applicant's Actions or Behavior RO/US Acknowledges Ann. Panel 122, Drop 83, ICE CONDENSER INLET DOORS OPEN, alarm and/or RMS PPC Alarms on Panel 111 and determines that a loss of reactor coolant is occurring based on the following:
- Pressurizer and VCT level change
- Charging and letdown flow mismatch
- Containment radiation monitoring trend
- Containment pressure rise
- Containment sump level rise US May enter and direct actions of 1-OHP-4022-002-020, Excessive Reactor Coolant Leakage procedure.
RO Performs the following actions, if directed:
- 1. Manually raises charging flow to maintain pressurizer level.
- 2. Manually adjusts seal injection flow (6-12 gpm / each RCP).
- 3. Reduces/isolates letdown flow to maintain pressurizer level.
- 4. Attempts to determine RCS leak rate.
US Directs RO/BOP to manually trip the Reactor and perform the immediate actions of E-0, Reactor Trip or Safety Injection (based on RCS leak rate beyond charging or makeup system capability or rising containment pressure).
RO/BOP Perform the immediate actions of E-0:
- 1. Checks reactor trip.
- 2. Checks turbine trip.
- 3. Checks power to AC emergency buses.
- 4. Checks safety injection status.
US Ensures immediate actions of E-0 are completed.
RO/BOP Reviews E-0 Foldout Page Criteria.
US Directs subsequent actions of E-0.
Cook Plant Unit 1 & 2 Page 9 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-04 Event No.: 7/8/9 Event
Description:
Large Break LOCA 1W RHR Pump Fails to Auto Start 1E RHR Pump Trips (after 15 minutes)
Time Position Applicant's Actions or Behavior RO/BOP Performs manual actions of E-0 Attachment A as directed by US.
RO/BOP Performs the following actions as directed:
- Checks SGSVs closed (MSLI).
- Checks CTS actuated Light LIT
- Checks Cntmt Isol Phase B actuated.
- Stops all RCPs.
- Stops All Lower Cntmt Vent Fans (CLVs).
- Stops All CRDM Fans.
RO/BOP Attachment A of E-0 Checks all ECCS pumps running and manually starts:
Critical
- W RHR pump Task #1 RO/BOP Manually controls AFW flow to maintain SG narrow range levels 13% [28%] - 50% once one SG narrow range level is > 13% [28%].
CREW Completes all actions of E-0 through step 19 (Check If RCS Is Intact).
Checks CTS Pumps Started, SML 9A/9B Lights, and Spray Add Flow after actuated light is OFF US Announces transition to E-1, Loss Of Reactor Or Secondary Coolant (at step 19 of E-0).
NOTE:
Momentary entry into FR-P.1 may be required until crew verifies RHR flow sufficient to indicate a LB LOCA has occurred.
RO/BOP Reviews E-1 Foldout Page Criteria (see NOTE regarding cold leg switchover criteria).
NOTE:
When RWST level lowers to < 30% then the crew must immediately Transition to ES-1.3, Transfer To Cold Leg Recirculation.
See Page 12 for applicants actions or behaviors associated with ES-1.3, Transfer To Cold Leg Recirculation.
Cook Plant Unit 1 & 2 Page 10 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-04 Event No.: 7/8/9 Event
Description:
Large Break LOCA 1W RHR Pump Fails to Auto Start 1E RHR Pump Trips (after 15 minutes)
Time Position Applicant's Actions or Behavior US Directs actions of E-1, Loss Of Reactor Or Secondary Coolant.
RO/BOP Acknowledges Annunciator 106, Drop 45, RHR PUMPS MOTOR INSTANT TRIP and reports East RHR pump trip.
US/RO Identifies and reports that the East RHR pump has tripped:
- Recognizes one train of RHR has lost recirculation capability
- Verifies at least one train of cold leg recirculation capability exists BOP Maintains SG narrow range levels 20% [28%] - 50%.
RO/BOP Performs the following as directed:
- 1. Stops running Emergency Diesel Generators (EDGs).
- 2. Dispatches operator to secure EDG jacket water pumps.
US Check if transfer to cold leg recirculation is required (RWST
<30%).
Cook Plant Unit 1 & 2 Page 11 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-04 Event No.: 7/8/9 Event
Description:
Large Break LOCA 1W RHR Pump Fails to Auto Start 1E RHR Pump Trips (after 15 minutes)
Time Position Applicant's Actions or Behavior Applicants actions or behavior associated with ES-1.3, Transfer To Cold Leg Recirculation.
US Announces transition to ES-1.3, Transfer To Cold Leg Recirculation when RWST level < 30% per:
- E-0, Foldout Page, Criteria 3
- E-1, Foldout Page, Criteria 5
- E-1, Step 13 US Directs actions of ES-1.3, Transfer To Cold Leg Recirculation.
RO/BOP Resets both trains of Safety Injection.
RO/BOP Checks CCW return flow on each RHR Hx at 3000-3500 gpm.
(may only perform for the East CCW HX)
RO/BOP Checks the following prior to switching over to cold leg recirc:
- RWST level < 20%
- Cntmt water level > MIN RECIRC LEVEL US/RO Directs/Performs switchover as follows:
NOTE: If RWST level < 9% then stop CCPs and SI pumps.
Critical 1. Stops and locks out East CTS pump (if not previously Task #2 stopped).
- 4. Initiates valve closure:
- IMO-310, East RHR pump suction
- 5. Stops and locks out West CTS pump (if not previously stopped).
- 6. Stops and locks out West RHR pump.
- 8. Initiates valve closure:
- IMO-320, West RHR pump suction
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Crews Scenario No.: NRC 2016-04 Event No.: 7/8/9 Event
Description:
Large Break LOCA 1W RHR Pump Fails to Auto Start 1E RHR Pump Trips (after 15 minutes)
Time Position Applicant's Actions or Behavior US/RO Continues to direct/perform switchover as follows:
- 9. Restores control power to ICM-305, Recirc sump to East Critical RHR/CTS pumps.
Task #2 10. Checks ICM-305 open interlock:
- IMO-310 fully closed
- IMO-215 fully closed
- 11. Opens ICM-305.
- 12. Starts:
- May attempt to start the East RHR pump (1 restart allowed)
- East CTS pump if previously running.
- 13. Restores control power to ICM-306, Recirc sump to West RHR/CTS pumps.
- 14. Checks ICM-306 open interlock:
- IMO-320 fully closed
- IMO-225 fully closed
- 15. Opens ICM-306.
- 16. Starts
- West RHR pump
- Starts the West CTS pump if previously running.
- 17. Checks at least one RHR pump running on the recirc sump TERMINATE SCENARIO Cook Plant Unit 1 & 2 Page 13 of 18
Critical Task Summary (NRC 2016-04)
Task Elements Results
- 1 Cueing: SAT / UNSAT
- Check ECCS Pumps ALL running (E-0, Step 7 -
Manually starts Att. A Step 1) 1W RHR pump
- Check RHR Hx Flow Indicated (E-1, Step 12.
(one low-head RNO)
ECCS pump)
- Check Cold Leg Recirc Capability (E-1, Step 11)
Performance Indicators:
- Starts the W RHR pump and ensures at least one train of low-head ECCS available for cold leg recirculation.
- Must be performed prior to ES-1.3, Step 6.s Check At Least One RHR Pump - Running On Recirculation Sump.
Performance Feedback:
- W RHR pump red run light lit
- W RHR pump current indicated
- W RHR pump flow indicated
- 2 Cueing: SAT / UNSAT
- E-0 Foldout Page, Criteria 3 (switchover criteria)
Establish Cold Leg
- E-1 Foldout Page, Criteria 5 (switchover criteria)
Recirculation Flow
- E-1, Step 13, Check For Transfer To CL Recirc.
Performance Indicators:
- RHR pumps stopped for no longer than 5 minutes during switchover.
Performance Feedback:
- At least one train of ECCS pumps running /
indicating flow with suction aligned to Recirc Sump.
Cook Plant Unit 1 & 2 Page 14 of 18
Simulator Instructions (NRC 2016-04)
Setup:
- 1. Reset to IC-314 MOL 57% pwr; 602MW, 931 ppm, 559.6 F, 179 Steps on D.
- 2. Reset control rods and check group step counters.
- 3. Verify that the North and South CB pumps are running w/ Middle CB pump in AUTO.
- 4. Place Master Annunciator Silence pushbutton lockout ring in LOCKOUT position.
- 5. Advance chart recorder paper.
- 6. Set up PPC Recorders
- 7. Go to RUN and acknowledge/clear alarms.
- 8. Tagout 1E MDAFP as follows:
- Place control switch in pull-to-lock
- Place clearance tag on control switch U1_FWR61
- Activate remote function FWR61, final value RO
- 9. Activate the following pre-load override/malfunction:
- FW58B, Middle CB pump fails to start in AUTO U1_FW58B
- FW58C, South CB pump fails to start in AUTO U1_FW58C
- AN06_U1(48) RHR Alarm OFF AN06_U1(048)
- ZLO101TA4_U1[GRN] ON ZLO101TA4_U1[GRN]
- 10. Assign the following to ET10:
- U1_ERHR with a 15 minute delay to event trigger ET10 U1_ERHR
- 11. Assign the following to ET3
- U1_RHR17 to RI on ET3 RHR to RI
- ZLO101TA4_U1[GRN] clear Clear RHR Stop Light
- 12. Assign the following to ET7:
- Malfunction RC10A to 20% with a 2 minute ramp to event trigger ET7 U1_RC10A
- Malfunction RC01A to 50% with a 5 minute delay to event trigger ET7 U1_RC01A Cook Plant Unit 1 & 2 Page 15 of 18
Simulator Instructions (NRC 2016-04)
Scenario:
EVENT #1 No actions required.
EVENT #2 When the crew has completed the backwash, IMF QLC452, final value 100 (QLC-452 fails HIGH)
U1_QLC452 If directed to energize interposing relay for QLC-452 then use Remote Function RPR158 to Trip LBX-185XB.
U1_RPR158 Report back to control room that interposing relay for QLC-452 has been energized per Attachment B.
EVENT #3 No actions required. (Prompt crew as Shift Manager if required to continue Power Escalation)
EVENT #4 When crew has performed the required power change, insert CBPN (North CB pump trip)
U1_CBPN If contacted as AEO to investigate Condensate Booster pump operations, report back after some 3 min. delay that all parameters are in the normal band and stable on the Middle CB pump. After 2 min., report an overcurrent trip on North CB pump breaker and that the motor smells of burnt insulation.
Report back that 1-CRV-224 Low Pressure Heater Bypass is Closed.
Cook Plant Unit 1 & 2 Page 16 of 18
Simulator Instructions (NRC 2016-04)
EVENT #5 A short time later a failure of 1-NRV-163 PZR Spray valve Controller will cause the valve to fully Open while in Auto U1_RX08A EVENT #6 After crew has addressed the spray valve failure, ICF U1_MPP242 final value 1200 once the power change has been demonstrated U1_MPP242 EVENT #7 After crew has recovered from the failed SG Pressure Channel failure, Activate Trigger 7 to start the RCS Leak\LOCA.
Activate TRG 7 EVENT #8 No additional actions required EVENT #9 Previously setup with a 15 minute delay to trigger ET10 IF the RHR pump fails to trip after 15 minutes ERHR U1_ERHR Cook Plant Unit 1 & 2 Page 17 of 18
Simulator Instructions (NRC 2016-04)
Local actions after entry into E-0:
- Locally stop U1 Ice Condenser AHUs MRF CHR01 to OFF U1_CHR01
- Aux Tour will monitor Spent Fuel Pool Level and Temperatures
- Place PACHMAS in service - MRF CHR02 or 03 with 10 min delay.
U1_CHR02 OR U1_CHR03 (both have 10 minute delay built in)
- U2 has aligned CR vent for U1 SI, Fan 2-HV-AS-2 is running.
If directed to secure EDG jacket water pumps select OFF then AUTO Remote OFF AUTO EGR 03A U1_EGR03A U1_EGR03A EGR 03B U1_EGR03B U1_EGR03B EGR 04A U1_EGR04A U1_EGR04A EGR 04B U1_EGR04B U1_EGR04B Cook Plant Unit 1 & 2 Page 18 of 18
Appendix D Scenario Outline Form ES-D-1 Facility: _Cook Plant Scenario No: _NRC 2016-05_ Op-Test No: _______
Examiners: _________________ Operators:___________________
Initial Conditions: MOL; 52% power, 521 MW, 945.8 ppm, 558 F 176 Steps on D Turnover: Swap NESW Pumps, Shutdown Plant for West FW pump oil system repairs Event Malf. No. Event Event No. Type* Description N-BOP Start South NESW Pump and Stop the North NESW pump.
1 2 R-RO Lower Reactor Power and Turbine Load 3 U1_NPP151 @ I-RO Pressurizer Pressure Channel NPP-151 Fails Low 1700 TS 4 U1_TACSE C-BOP East Turbine Aux Cooling Water pump trip Stator Short 5 RC17C to 50% C-RO Pressurizer PORV NRV-153 Opens.
TS 6 U1_BLP111 @ I-BOP #11 SG level Transmitter fails LOW 0 over 30 sec TS 7 U1_MS01D @ M-ALL Steam Line Break inside Containment (#14 SG) 20 over 2 min 8 U1_RP07A C-BOP Steam Line Isolation fails to AUTO actuate U1_RP07B 9 U1_RP16B C-RO CTS (West) Train B - fails to actuate (AUTO)
U1_RP20E Discharge Valves fail to Open U1_RP20J West CTS fails to Start 10 U1_ECSP stator C-RO East CTS pump Trip short
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Summary The plant is at 50% power and the BOP is directed to swap the NESW pumps.
The crew is directed to start the South NESW Pump and shutdown the North NESW pump. An AEO has been briefed and the starting party is ready for the pump start. After NESW Pumps have been swapped, the crew is directed to lower power.
If required, the crew will be directed by the Shift Manager to lower power.
While reducing power, the Pressurizer Pressure Controlling Channel, NPP-151, fails LOW. The RO will be required to take manual control of Pressurizer Pressure Master Controller and restore normal pressure control. The Crew will implement the Abnormal Operating Procedure, address Technical Specifications, select an operable channel, and restore pressure control to automatic.
Next a trip of the East Turbine Aux Cooling Water pump occurs. This will result in reduced cooling capability. BOP will be required to manually start the West Turbine Aux Cooling Water pump. Crew will be required to stabilize the plant.
Next, the Pressurizer PORV NRV153 will fail partially open. This results in Actual RCS pressure lowering. The RO will be required to take manual actions to isolate the PORV (close block valve) and restore normal pressure conditions.
The #11 Steam Generator Level instrument (BLP-111) fails LOW. This results in a higher feedwater flow and Steam Generator level rises. BOP will be required to take manual control and restore normal level. Crew will be required to implement AOP actions to stabilize the plant and address Technical Specifications.
The major event will involve a Main Steamline Break inside containment on the #14 SG. The unit will trip and a Safety Injection will actuate. Failure of the Main Steamline Isolation actuation circuit will require a manual actuation. As the crew performs the actions of E-0, they should identify the Main Steamline Break inside containment on the #14 SG. The crew will transition to E-2 to isolate #14 SG.
Containment Pressure will rise and CTS fails to Actuate. The crew may be required to transition to FR-Z.1 to restore CTS. The scenario will terminate when the crew has transitioned to ES-1.1.
Critical Tasks Isolate #14 Steam Generator Actuate/Align CTS Procedures E-0, Reactor Trip or Safety Injection E-2, Faulted Steam Generator Isolation FR-Z.1, Response to High Containment Pressure
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Scenario No.: NRC 2016-05 Event No.: 1 Event
Description:
Start South NESW Pump and Stop the North NESW pump Time Position Applicant's Actions or Behavior US Directs BOP to start the South NESW Pump and shutdown the North NESW pump as per 12-OHP-4021-020-002, Attachment 1 Placing An Additional NESW Pump In Service Or Removing A Pump From Service.
BOP Starts South NESW pump after verifying its discharge valve 1-WMO-902 is open.
- Stops the North NESW Pump after closing the discharge valve 1-WMO-901.
- Re-opens North NESW Pump discharge valve.
- Place 1 N NESW pump in AUTO.
US/BOP Notifies Chemistry of NESW alignment change.
Cook Plant Unit 1 & 2 Page 3 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: NRC 2016-05 Event No.: 2 Event
Description:
Reduce Reactor Power / Turbine Load Time Position Applicant's Actions or Behavior RO Calculates boric acid addition per OHP-4021-005-002, Attachment 9, Boration or Dilution Volume Determination.
RO Briefs crew on reactivity plan for power reduction.
US Reviews / concurs with reactivity plan.
US Directs RO to commence Power Reduction in accordance with OHP-4021-001-003.
RO Performs BORATION:
Place RC Makeup Blend Control Switch in STOP.
Place RC Makeup Blend Control Mode Selector Switch in BORATE.
Set desired batch on BA Flow Totalizer.
Adjust BA Flow Ctrl (RU-33) to desired flow.
Place RC Makeup Blend Control Switch in START.
RO Commences power reduction:
- Lowers turbine load (reactor power) using HMI.
- Maintains Tavg/Tref deviation within limits by boration and turbine load adjustments.
- Ensures Axial Flux Difference (AFD) is maintained within target band by manual control rod movement as needed.
BOP/RO BOP acts as peer checker for RO during blender operations and RO verifies appropriate reactivity feedback.
BOP Monitors main electrical generator temperatures.
Cook Plant Unit 1 & 2 Page 4 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: NRC 2016-05 Event No.: 3 Event
Description:
Pressurizer Pressure Channel (NPP-151) Fails Low Time Position Applicant's Actions or Behavior RO Recognizes and reports annunciators on Panel #108 indicative of a pressurizer (PRZ) pressure instrument failure (Drops 8, 9, 10).
RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
- 1. Restores PRZ pressure using manual control of EITHER:
- PRZ pressure master controller
- Both PRZ spray valve controllers US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US Enters and directs actions of OHP-4022-013-009, Pressurizer Pressure Instrument Malfunction procedure.
RO Performs the following actions as directed:
- 1. Reports NPP-151 has failed
- 2. Ensures PRZ pressure master controller is in manual
- 3. Places PRZ Press Ctrl selector switch in Ch 2 & 3 position
- 4. Places the following recorder switches in Ch 2, 3 or 4 position:
- PRZ Press Rec selector
- Delta T selector
- Overpower Delta T selector
- Overtemp Delta T selector
- 5. Verifies QMO-225, E CCP Leakoff is open
- 6. Dispatches Aux operator to open breaker for QMO-225 (1-ABV-D-5C)
- 7. Checks NLP-151, PRZ Level Channel 1 and NLI-151, PRZ Level Cold Calibration instruments for failure
- 8. Nulls (~2235#) and returns the following controllers to auto:
- Both PRZ spray valve controllers
- PRZ pressure master controller
- 9. Verify P-11 is in its correct state.
(Continued on Next Page)
Cook Plant Unit 1 & 2 Page 5 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: NRC 2016-05 Event No.: 3 Event
Description:
Pressurizer Pressure Channel (NPP-151) Fails Low Time Position Applicant's Actions or Behavior US Declares the East Centrifugal Charging Pump inoperable.
US Refers to ITS LCO:
- 3.3.1 RTS Instrumentation (Table 3.3.1-1, Function 6, 8a, 8b - Cond D)
- 3.3.2 ESFAS Instrumentation (Table 3.3.2-1, Function 1d, 8b - Cond D &
G)
- 3.3.4 Remote Shutdown Instrumentation (Table B3.3.4-1 Function 2 Cond A - 30 Days) [1-OHP-4030-114-031 pg. 39]
- 3.5.2 ECCS Subsystems (Cond A - 72 hr)
- TRM 8.1.1 Boration Systems (Cond A - 72 hr)
- TRM 8.7.14 Thermal Power US Initiates actions to trip bistables associated with NPP-151 PZR Pressure Failure per Attachment A of OHP-4022-013-009.
RO Monitors PRZ pressure response and ensures normal PRZ heater operations Cook Plant Unit 1 & 2 Page 6 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: NRC 2016-05 Event No.: 4 Event
Description:
East Turbine Aux Cooling Water Pump Trip Time Position Applicant's Actions or Behavior BOP Recognizes problem and reports annunciator:
Panel #122 Drop 97 Turbine Aux CLG Motor Failure US Directs operator actions to stabilize the unit and restore Turbine Aux Cooling Water capacity.
- Manually start the West Turbine Aux Cooling Water Pump Trip Pump
- May Place East Turbine Aux Cooling Water Pump Trip pump switch to TRIP and back to NEUTRAL (Clear Alarms)
- Monitor Secondary parameters for normal operations Cook Plant Unit 1 & 2 Page 7 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Crews 1, 4, & 5 Scenario No.: NRC 2016-05 Event No.:5 Event
Description:
Pressurizer PORV (NRV-153) Fails Open Time Position Applicant's Actions or Behavior RO Recognizes and reports annunciators on Panel #108 (Drop 23, 24, indicative of a pressurizer PORV opening. (Drops 8, 29, 34, 39, &
45 may also alarm).
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US/RO Isolates failed open PORV per 1-OHP-4024-108, Drop 23:
- Attempts to manually close NRV-153, PRZ PORV.
- Manually closes NMO-153, NRV-153 PRZ PORV Block Valve.
US Declares NRV-153 inoperable, refers to Tech Spec 3.4.11 PORVs and complies with Condition B:
- Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> close and remove power from the PORV block valve (NMO-153).
May enter Technical Specification 3.4.1 RCS Pressure, Temperature, and Flow DNB Limits if Pressure lowers to <2200 psig. (Restore within 2 Hours)
Note: Crew may refer to 1-OHP-4022-002-009, Leaking Pressurizer Power Operated Relief Valve. Continue with next event while crew performs actions of this procedure.
RO Monitors PRZ pressure control system and ensures pressure returns to normal conditions (~2235 psig).
Cook Plant Unit 1 & 2 Page 8 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: NRC 2016-05 Event No.: 6 Event
Description:
- 1 SG Level Channel BLP-111 Fails LOW Time Position Applicant's Actions or Behavior BOP Recognizes failure of BLP-111 Low and reports associated alarms:
Panel #113 Drops 3 and 5 - Level Low alarms RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
- Places controller for FRV-210 in manual, lowers controller output to match feed flow with steam flow and stabilizes SG #1 level, as required.
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US Enters and directs actions of OHP 4022-013-013, Steam Generator Level Instrument Malfunction procedure.
BOP Performs the following actions as directed:
- 1. Restores SG 1 level to program (44%), as required
- 2. Reports BLP-111 has failed low US Refers to the following ITS LCOs:
- 3.3.1 RTS Instrumentation (Table 3.3.1-1, Function 14 - Cond D)
- 3.3.2 ESFAS Instrumentation (Table 3.3.2-1, Function 5b & 6c - Cond D )
- 3.3.3 Post Accident Instrumentation (Table 3.3.3-1 Function 19 - Minimum channels met)
US Direct actions to trip bistables per Attachment A-2 of OHP 4022-013-013.
Declares level channel input inoperable Cook Plant Unit 1 & 2 Page 9 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: NRC 2016-05 Event No.: 7/8/9/10 Event
Description:
Steam Line Break inside Containment (#14 SG) - CTS Actuation Failure Time Position Applicant's Actions or Behavior RO/BOP
- Ann. Panel 122 Drop 84 LIT - ICE COND LOWER DOOR OPEN
- Recognizes and reports rising containment pressure.
US Recognize reactor trip and directs RO/BOP to perform the immediate actions of E-0, Reactor Trip or Safety Injection.
RO/BOP Performs the immediate actions of E-0:
- 1. Checks reactor trip
- 2. Checks turbine trip
- 3. Checks power to AC emergency buses
- 4. Checks safety injection status US Ensures immediate actions of E-0 are completed US/BOP Verify MSLI requirement met:
- 1. Manually closes Main Steam Line Isolation (SG Stop) valves Critical
- MRV-240 (for Faulted SG #14)
Task #1
- 2. (Also closes Intact SG Isolation Valves - Not Critical)
- MRV-210
- MRV-220
- MRV-230 US Identifies that Containment Pressure is > 2.8 psig and directs actions to Stop RCPs and align containment systems as required per Step 6 RNO of E-0 RO Identifies and reports Phase B - Containment Isolation Actuation RO Stops all Reactor Coolant Pumps RO/BOP Places lower Cntmt vent unit fans in OFF Places CRDM fans in STOP Cook Plant Unit 1 & 2 Page 10 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: NRC 2016-05 Event No.: 7/8/9/10 Event
Description:
Steam Line Break inside Containment (#14 SG) - CTS Actuation Failure Time Position Applicant's Actions or Behavior US/RO 1. WHEN White CTS Timer Light IS OFF
- 2. Identifies that East CTS Pump has tripped Critical 3. Manually aligns/starts CNTMT Spray:
Task #2
- Opens W CTS Pump Discharge Valves:
IMO-220 -AND/OR- IMO-221
- Verifies Open IMO-204, Spray Additive Tank Outlet Valve
- Starts West Containment Spray Pump BOP/RO Manually controls AFW flow to maintain SG narrow range levels 13% - 50%
once one SG narrow range level is greater than 13%.
RO/BOP Performs manual actions of E-0, Attachment A as directed by US.
CREW Completes all actions of E-0 through step 17 (Check If SG Secondary Pressure Boundaries Are Intact).
US Announces transition to E-2, Faulted Steam Generator Isolation, for a SG depressurized (at step 17 of E-0).
US Directs actions of E-2, Faulted Steam Generator Isolation.
BOP Checks closed - SGSV Dump valves US/BOP Identifies #4 steam generator as faulted Cook Plant Unit 1 & 2 Page 11 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: NRC 2016-05 Event No.: 7/8/9/10 Event
Description:
Steam Line Break inside Containment (#14 SG) - CTS Actuation Failure Time Position Applicant's Actions or Behavior US/BOP Manually closes the following valves for SG #4:
- FMO-241, TDAFP discharge Critical
- FMO-242, MDAFP discharge Task #1 NOTE: The following should be checked closed (not part of Critical Task -
Already Closed)
- FRV-240, feedwater reg. Valve
- FMO-204, feedwater isolation valve
- MRV-240, SG Stop Valve
- MRV-243, PORV
- DCR-304, blowdown sample valve
- DCR-340, blowdown isolation valve BOP Closes DRV-407, SG stop valve drain valve RO/BOP Performs the following as directed:
- Resets containment isolation phase A
- Directs chemistry to sample all SGs for activity
- Check Secondary Radiation CREW Determines that ECCS flow should be reduced US Announces transition to ES-1.1 SI Termination (at step 8 of E-2).
US Direct Actions to Reset SI and Terminate ECCS Flow per ES-1.1.
RO Perform actions as directed to Reset SI and terminate ECCS Flow:
- 1. Reset SI
- 2. Stop 1 CCP (Charging Pump)
BOP Perform actions as directed to Restore Control Air to Containment
- 1. Reset Containment Isolation Phase B
- 2. Verify Spray Valve Controllers in Manual at Zero Demand.
- 3. Check Air Pressure
- 4. Open Control Air Containment Isolation Valves Cook Plant Unit 1 & 2 Page 12 of 18
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: NRC 2016-05 Event No.: 7/8 /9/10 Event
Description:
Steam Line Break inside Containment (#14 SG) - CTS Actuation Failure Time Position Applicant's Actions or Behavior US Check if Normal Charging can be restored Verify RCS Press Stable or Rising (if Lowering, transition to ES-1.2)
RO Perform actions as directed to Establish Charging Flow:
- 2. Reset and open CCP Leakoff Valves
- 3. Close BIT Inlet and Outlet Valves
- 4. Establish Charging and Seal Injection Flow with QRV-251 and QRV-200
- 5. Control Charging Flow to Stabilize Pressurizer Level RO/BOP Performs the following as directed:
- Resets containment isolation phase A
- Directs chemistry to sample all SGs for activity US Check if Safety Injection Pumps can be secured Pressure > 1650 psig Verify RCS Press Stable or Rising (if Lowering, transition to ES-1.2)
TERMINATE SCENARIO Cook Plant Unit 1 & 2 Page 13 of 18
Critical Task Summary (NRC 2016-05)
Task Elements Results
- 1 Cueing: SAT / UNSAT
- E-2, steps 1, 2 and 5 Isolate Faulted Steam
- Steam generator pressure lowering Generator
- RCS temperature lowering Performance Indicators:
- Isolate SG #4 by closing:
- AFW valves
- SG Stop valve
- SG #4 must be isolated before transitioning out of E-2 Performance Feedback:
- RCS cooldown stops
- Depressurization of intact SGs stop
- 2 Cueing: SAT / UNSAT Containment pressure > 2.8 psig:
Actuate Containment Spray
- CNTMT SPRAY ACTUATED alarm
- LOWER CNTMT PRESS HI-HI alarm
- E-0, step 5, Check CTS not required Performance Indicators:
- Manually align Train B CTS
- One train of CTS must be in service prior to exceeding a Red Path on the Containment (Z) CSFST (containment pressure of 12 psig).
Performance Feedback:
- Flow is indicated on at least one train of Containment Spray Cook Plant Unit 1 & 2 Page 14 of 18
Simulator Instructions (NRC 2016-05)
Setup:
- 1. Reset to IC- 315 MOL; 52% power, 521 MW, 945.8 ppm, 558 F 176 Steps on D
- 2. Reset control rods and check group step counters
- 3. Place Master Annunciator Silence pushbutton lockout ring in LOCKOUT position
- 4. Advance chart recorder paper & clear chart recorder memory.
- 6. Go to RUN and acknowledge/clear alarms
- 7. Verify the following (pre-load) malfunctions:
- RP07A, Train A Steamline Isolation fails to AUTO actuate U1_RP07A
- RP07B, Train B Steamline Isolation fails to AUTO actuate U1_RP07B
- RP16B, Train B Containment Spray fails to AUTO actuate U1_RP16B
- RP20E, Train B Containment Spray Relay K643 Failure U1_RP20E (Discharge Valves and CTS Status light)
- RP20J, Train B Containment Spray Relay K626-X3 Failure U1_RP20J (West CTS Pump)
- ESCP Stator Short, Train A Containment Spray Pump Failure U1_ECSP
- (East CTS Pump trips)
Cook Plant Unit 1 & 2 Page 15 of 18
Simulator Instructions (NRC 2016-05)
Scenario:
EVENT #1 Report back as AEO that South NESW pump is ready for a start and it is operating normally after startup.
EVENT #2 No Additional Actions EVENT #3 Insert malfunction U1_NPP151, final value 1700 (NPP-151 fails LOW)
U1_NPP151 If directed to trip bistables for NPP-151 use:
Override ZLOSTMC2[6] to ON to simulate opening cabinet door open.
ZLOSTMC2_U1[6]
- (Override Lights/Relays - PZR panel):
Remote Bistable RPR076 U1_RPR076 PS-455A RPR077 U1_RPR077 PS-455B RPR078 U1_RPR078 PS-455C RPR079 U1_RPR079 PS-455D RPR117 U1_RPR117 TS-411C RPR118 U1_RPR118 TS-411D
- Override ZLOSTMC2[1] to ON to simulate lifting Test Rack.
ZLOSTMC2_U1[1]
- Delete Override ZLOSTMC2[6] to simulate closing cabinet door.
ZLOSTMC2_U1[6]
If directed to remove power from 1-QMO-225, then activate the remote function for breaker 1-ABV-D-5C. U1_EDPR10J Cook Plant Unit 1 & 2 Page 16 of 18
Simulator Instructions (NRC 2016-05)
EVENT #4 Insert malfunction U1_TACSE (Turbine Aux Cooling Pump trip) when crew has recovered from the Pressurizer Pressure channel failure.
U1_TACSE If contacted as AEO to investigate Turbine Aux Cooling Pump operations, report back after some 3 min. delay that all parameters are in the normal band and stable. Report OL trip on East Turbine Aux Cooling Pump breaker.
EVENT #5 After the crew responds to the Turbine Aux Cooling Pump trip, insert IMF RC17C, final value 50 (PRZ PORV NRV153 fails OPEN). U1_RC17C If contacted to remove power from 1-NMO-153, then activate the remote function for breaker 1-EZC-D-3D. U1_EDPR21J EVENT #6 Insert malfunction U1_BLP111, final value 2 (BLP-111 fails LOW).
U1_BLP111 If directed, to trip bistables for BLP-111 use:
- Override ZLOSTMC2[7] to ON to simulate opening cabinet door open.
ZLOSTMC2_U1[7]
- (Override Lights/Relays - FW panel):
Remote Bistable U1_RPR050 U1_RPR050 LS/519A U1_RPR051 U1_RPR051 LS/519B
- Override ZLOSTMC2[2] to ON to simulate lifting Test Rack.
ZLOSTMC2_U1[2]
- Delete Override ZLOSTMC2[7] to simulate closing cabinet door.
ZLOSTMC2_U1[7]
Cook Plant Unit 1 & 2 Page 17 of 18
Simulator Instructions (NRC 2016-05)
EVENTS #7,8,9,10 Insert malfunction U1_MS01D, final value 20 (#14 SG Steamline Break upstream of MSIV) ramped over 2 minutes:
U1_MS01D Local actions after entry into E-0:
- Locally stop U1 Ice Condenser AHUs MRF U1_CHR01 to OFF.
U1_CHR01
- Aux Tour will monitor Spent Fuel Pool Level and Temperatures
- Place PACHMAS in service - MRF U1_CHR02 or 03 with 10 min delay.
U1_CHR02 OR U1_CHR03 (both have 10 minute delay built in.)
- U2 has aligned CR vent for U1 SI, Fan 2-HV-AS-2 is running.
If directed to secure EDG jacket water pumps select OFF then AUTO:
Remote OFF AUTO EGR 03A U1_EGR03A U1_EGR03A EGR 03B U1_EGR03B U1_EGR03B EGR 04A U1_EGR04A U1_EGR04A EGR 04B U1_EGR04B U1_EGR04B Cook Plant Unit 1 & 2 Page 18 of 18