ML17037C195: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17037C195
| number = ML17037C195
| issue date = 07/21/1975
| issue date = 07/21/1975
| title = Nine Mile Point Unit 1 - Letter Responding to the June 18, 1975 Letter with Attached Refueling Information and Advising of Plans for Shutdown on September 13, 1975
| title = Letter Responding to the June 18, 1975 Letter with Attached Refueling Information and Advising of Plans for Shutdown on September 13, 1975
| author name = Rhode G K
| author name = Rhode G
| author affiliation = Niagara Mohawk Power Corp
| author affiliation = Niagara Mohawk Power Corp
| addressee name = Goller K R
| addressee name = Goller K
| addressee affiliation = NRC/NRR
| addressee affiliation = NRC/NRR
| docket = 05000220
| docket = 05000220
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:N ISTRIBUTION FOR PART 50 DO.T MATERIAL (TEMPO RA R Y FO RM)CONTROL NO: FILE FROMNiagara Mohawk Power Co.Syracuse, N.Y.G.K.Rhode DATE OF DOC 7>>21>>DATE R EC'D LTR TWX gPT OTHER TO: Karl R.Gokler ORIG 1 Signed.CC OTHER SENTNRC PDR SENT LOCAL PDR CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO: 50-220 DESCRIPTION:
{{#Wiki_filter:N     ISTRIBUTION FOR PART 50 DO           .T MATERIAL (TEMPO RA R Y FO RM)
Re our ltr.of 6-18-75 trans the following.
CONTROL NO:
~ENCLOSURES:
FILE FROMNiagara Mohawk Power Co.           DATE OF DOC      DATE  R EC'D      LTR      TWX gPT            OTHER Syracuse, N. Y.
r Advising Refueling shutdown schedul'eMfor 9-d3-75...Scheduled date dog c~sgaiV doll outug refueling,11-9-75 PLANT NAME Nine nile Pt.g 1 FOR ACTION/INFORMATION VCRt 7>>30-75 BUTLER (L)W/Copies CLARK (L)W/Copies PARR (L)W/Copies KNIEL (L)W/Copies SCHWENCER (L)W/Copies STOLZ (L)W/Copies VASSALLO (L)W/Copies PURPLE (L)W/Copies ZIEMANN (L)W/Copies DICKER (E)W/Copies KNIGHTON (E)W/Copies YOUNGBLOOD W/Copies REGAN (E)W/Copies LEAR (L)W/copies SPIES W/Copies (E)LPH W/opuses E C PDR~OGC, ROOM P.506A~GOSSI CK/STAF F CASE GIAMBUSSO BOYD'OORE(L)DEYOUNG{L)SKOVHOLT (L)GOLLER (L)(Ltr)P.COLLINS DENISE~REG OPR FILE 5 REGION (2)HIPC TECH REVIEW SCHROEDER MACCARY KNIG HT PAWLI CK I SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO ZeCOLLINS LAI NAS BENAROYA VOLLMER INTERNAL DISTR I BUTION LIC ASST R.DI GGS (L)H.GEARIN (L)E.GOULBOURNE P.KREUTZER{E)J.LEE (L)M.RU3HBROOI({L)
G.K. Rhode                       7>>21>>
S.REED (E)M.SE R V I C E{L)S.SHEPPARD (L)M.SLATER (E)H.SMITH (L)S.TEETS (L)/G.WILLIAMS (E)V.WILSON (L)R.INGRAM (L)M.DUNCAN DENTON G R I MES GAMMILL KASTNE R BALLARD SPANGLER ENVI RO MULLER DICKER KNIG HTON YOUNG 8 LOOD REGAN PROJECT LDR+H R LESS EXTERNAL DISTRIBUTION A/T IND~BRAITMAN SALTZMAN (L)ME LTZ PLANS MCDONALD CHAPMAN~dH-H~i rl>P'+e E.COUPE PETERSON HARTFIELD (2)KLECKER EISENHUT Wl G G I NTO N~1-LOCAL PDR~1-TIC (ABERNATHY)
TO:                                           ORIG        CC    OTHER          SENTNRC PDR Karl R. Gokler                     1 Signed   .                       SENT LOCAL PDR CLASS       UNCLASS     PROP INFO           INPUT       NO CYS REC'D           DOCKET NO:
()(2)(10-NATIONAL LABS~1-NSIC (BUCHANAN) 1-W.PENNINGTON, Rm E-201 GT 1-ASLB 1-CONSULTANTS 1-Newton Anderson NEWM AR K/B LUME/AG BAB I AN/Q ACRSW~~/SENT 1-P D R-SAN/LA/N Y 1-BROOKHAVEN NAT LAB 1-G.ULRIKSON ORNL 0 w~
50-220 DESCRIPTION:                                            ENCLOSURES:
Regulatory File Cy.NIAGARA MOHAWK POWER CORPORATION
r Re   our   ltr. of 6-18-75 trans the following. ~       Advising Refueling shutdown schedul'eMfor 9-d3-75...Scheduled date dog c~sgaiV doll outug refueling,11-9-75 PLANT NAME Nine       nile Pt. g 1 FOR ACTION/INFORMATION                                 VCRt   7>>30-75 BUTLER (L)               SCHWENCER (L) ZIEMANN (L)                REGAN (E)
,<<>)",~;NIAGARA~MOHAWK 300 ERIE BOULEVARD WEST SYRACUSE.N.Y.13202 July 21, 1975 Mr.Karl R.Goller, Assistant Director Operating Reactors Division of Reactor Licensing United States Nuclear Regulatory Commission Washington, D.C.20555 Re: Nine Mile.Point Unit 1.Docket No.50-220  
W/ Copies               W/ Copies         W/ Copies           W/ Copies CLARK (L)               STOLZ (L)         DICKER (E)            LEAR (L)
W/ Copies               W/ Copies          W/ Copies           W/copies PARR (L)                 VASSALLO (L)       KNIGHTON (E)        SPIES W/ Copies               W/ Copies           W/ Copies           W/ Copies KNIEL (L)                PURPLE (L)        YOUNGBLOOD (E)         LPH W/ Copies               W/ Copies          W/ Copies           W/ opuses INTERNAL DISTR I BUTION E                     TECH REVIEW        DENTON                LIC ASST                  A/T IND  ~
C PDR               SCHROEDER          G R I MES        R. DI GGS (L)                  BRAITMAN
~
~
OGC, ROOM P.506A GOSSI   CK/STAF   F MACCARY KNIG HT GAMMILL KASTNE R H. GEARIN (L)
E. GOULBOURNE (L)
SALTZMAN ME LTZ CASE                    PAWLICK I          BALLARD          P. KREUTZER {E)
GIAMBUSSO                SHAO              SPANGLER          J. LEE (L)                     PLANS BOYD                    STELLO                              M. RU3HBROOI({L)               MCDONALD
          'OORE(L)        HOUSTON            ENVI RO          S. REED (E)                   CHAPMAN DEYOUNG {L)              NOVAK              MULLER          M. SE R V I C E { L)           ~dH-H~i rl>P'+e SKOVHOLT (L)            ROSS              DICKER            S. SHEPPARD (L)               E. COUPE GOLLER (L) (Ltr)        IPPOLITO          KNIG HTON        M. SLATER (E)                   PETERSON P. COLLINS              TEDESCO            YOUNG 8 LOOD      H. SMITH (L)                   HARTFIELD (2)
DENISE                                      REGAN                TEETS (L) /                 KLECKER
~ FILE 5 REGION (2)
REG OPR ZeCOLLINS LAINAS            PROJECT LDR    +G.S. WILLIAMS     (E)           EISENHUT BENAROYA                            V. WILSON (L)                 Wl G G I NTO N HIPC                    VOLLMER            H  R LESS        R. INGRAM (L)
M. DUNCAN EXTERNAL DISTRIBUTION
~1     LOCAL PDR
  ~1 TIC (ABERNATHY)         ( )(2)(10 NATIONAL LABS                             1 P D R-SAN/LA/NY NSIC (BUCHANAN)                 W. PENNINGTON, Rm E-201 GT                 BROOKHAVEN NAT LAB
~  1 1 ASLB 1
1 CONSULTANTS 1
1 G. ULRIKSON ORNL 1  Newton Anderson                   NEWMAR K/B LUME/AGBABI AN
    /Q ACRSW~~/SENT
 
0 w ~
 
Regulatory     File Cy.
NIAGARA MOHAWK POWER CORPORATION NIAGARA
                                          ~
                                          ,<<>)",~;
MOHAWK 300 ERIE BOULEVARD WEST SYRACUSE. N. Y. 13202 July 21, 1975 Mr. Karl R. Goller, Assistant Director Operating Reactors Division of Reactor Licensing United States Nuclear Regulatory Commission Washington, D. C.       20555 Re: Nine Mile. Point Unit         1
                                  .Docket No. 50-220
 
==Dear Mr. Goller:==
 
The  attached refueling information        for  Nine Mile Point Unit    1 is in response to    your June 18, 1975 letter.          Our present plans provide for plant shutdown on September 13, 1975 and            start-up, following the refueling, on November 9, 1975.
The  reload license amendment submittal will be provided by August 15, 1975 in accordance      with the requirements of Enclosure 1 of your  letter . We regret that this does not meet your requested            90 day lead-time. A'eavy licensing workload at our fuel supplier is the reason  for the delay.
Sincerely, NIAGARA MOHAWK POWER CORPORATION
                                                        .R dW Yice President-Engineering Attachment 79oW j
 
c i
a
 
Refuel in  Information  Re  uest
: 1. Name  of Facility:  Nine  Nile Point Unit 1
: 2. Scheduled date  for next refueling  shutdown:    September  13, 1975
: 3. Scheduled date  for restart following refueling:        November 9; 1975
: 4. Will refueling or resumption of operation thereafter require        a  technical specification change or other license amendment?:        Yes There  will be minor changes  to Minimun Critical Power Ratio (MCPR} and possible changes to Rod Block Limits. The MCPR changes will arise from cycle dependent analyses of the most limiting MCPR transient. The possible changes to the Rod Block Limits will be based on cycle dependent analyses of the Rod Withdrawal Error transient.
: 5. Scheduled date(s) for submitting proposed    licensing action    and  supporting information: August 15, 1975.
: 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
A cycle dependent analysis may require review of a Control        Rod Drop accident which is outside the generic boundary approach.


==Dear Mr.Goller:==
The attached refueling information for Nine Mile Point Unit 1 is in response to your June 18, 1975 letter.Our present plans provide for plant shutdown on September 13, 1975 and start-up, following the refueling, on November 9, 1975.The reload license amendment submittal will be provided by August 15, 1975 in accordance with the requirements of Enclosure 1 of your letter.We regret that this does not meet your requested 90 day lead-time.
A'eavy licensing workload at our fuel supplier is the reason for the delay.Sincerely, NIAGARA MOHAWK POWER CORPORATION.R dW Yice President-Engineering Attachment 79oW j c i a Refuel in Information Re uest 1.Name of Facility: Nine Nile Point Unit 1 2.Scheduled date for next refueling shutdown: September 13, 1975 3.Scheduled date for restart following refueling:
November 9;1975 4.Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?:
Yes There will be minor changes to Minimun Critical Power Ratio (MCPR}and possible changes to Rod Block Limits.The MCPR changes will arise from cycle dependent analyses of the most limiting MCPR transient.
The possible changes to the Rod Block Limits will be based on cycle dependent analyses of the Rod Withdrawal Error transient.
5.Scheduled date(s)for submitting proposed licensing action and supporting information:
August 15, 1975.6.Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
A cycle dependent analysis may require review of a Control Rod Drop accident which is outside the generic boundary approach.
ka 4}}
ka 4}}

Latest revision as of 08:07, 30 October 2019

Letter Responding to the June 18, 1975 Letter with Attached Refueling Information and Advising of Plans for Shutdown on September 13, 1975
ML17037C195
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/21/1975
From: Rhode G
Niagara Mohawk Power Corp
To: Goller K
Office of Nuclear Reactor Regulation
References
Download: ML17037C195 (6)


Text

N ISTRIBUTION FOR PART 50 DO .T MATERIAL (TEMPO RA R Y FO RM)

CONTROL NO:

FILE FROMNiagara Mohawk Power Co. DATE OF DOC DATE R EC'D LTR TWX gPT OTHER Syracuse, N. Y.

G.K. Rhode 7>>21>>

TO: ORIG CC OTHER SENTNRC PDR Karl R. Gokler 1 Signed . SENT LOCAL PDR CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:

50-220 DESCRIPTION: ENCLOSURES:

r Re our ltr. of 6-18-75 trans the following. ~ Advising Refueling shutdown schedul'eMfor 9-d3-75...Scheduled date dog c~sgaiV doll outug refueling,11-9-75 PLANT NAME Nine nile Pt. g 1 FOR ACTION/INFORMATION VCRt 7>>30-75 BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)

W/ Copies W/ Copies W/ Copies W/copies PARR (L) VASSALLO (L) KNIGHTON (E) SPIES W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L) PURPLE (L) YOUNGBLOOD (E) LPH W/ Copies W/ Copies W/ Copies W/ opuses INTERNAL DISTR I BUTION E TECH REVIEW DENTON LIC ASST A/T IND ~

C PDR SCHROEDER G R I MES R. DI GGS (L) BRAITMAN

~

~

OGC, ROOM P.506A GOSSI CK/STAF F MACCARY KNIG HT GAMMILL KASTNE R H. GEARIN (L)

E. GOULBOURNE (L)

SALTZMAN ME LTZ CASE PAWLICK I BALLARD P. KREUTZER {E)

GIAMBUSSO SHAO SPANGLER J. LEE (L) PLANS BOYD STELLO M. RU3HBROOI({L) MCDONALD

'OORE(L) HOUSTON ENVI RO S. REED (E) CHAPMAN DEYOUNG {L) NOVAK MULLER M. SE R V I C E { L) ~dH-H~i rl>P'+e SKOVHOLT (L) ROSS DICKER S. SHEPPARD (L) E. COUPE GOLLER (L) (Ltr) IPPOLITO KNIG HTON M. SLATER (E) PETERSON P. COLLINS TEDESCO YOUNG 8 LOOD H. SMITH (L) HARTFIELD (2)

DENISE REGAN TEETS (L) / KLECKER

~ FILE 5 REGION (2)

REG OPR ZeCOLLINS LAINAS PROJECT LDR +G.S. WILLIAMS (E) EISENHUT BENAROYA V. WILSON (L) Wl G G I NTO N HIPC VOLLMER H R LESS R. INGRAM (L)

M. DUNCAN EXTERNAL DISTRIBUTION

~1 LOCAL PDR

~1 TIC (ABERNATHY) ( )(2)(10 NATIONAL LABS 1 P D R-SAN/LA/NY NSIC (BUCHANAN) W. PENNINGTON, Rm E-201 GT BROOKHAVEN NAT LAB

~ 1 1 ASLB 1

1 CONSULTANTS 1

1 G. ULRIKSON ORNL 1 Newton Anderson NEWMAR K/B LUME/AGBABI AN

/Q ACRSW~~/SENT

0 w ~

Regulatory File Cy.

NIAGARA MOHAWK POWER CORPORATION NIAGARA

~

,<<>)",~;

MOHAWK 300 ERIE BOULEVARD WEST SYRACUSE. N. Y. 13202 July 21, 1975 Mr. Karl R. Goller, Assistant Director Operating Reactors Division of Reactor Licensing United States Nuclear Regulatory Commission Washington, D. C. 20555 Re: Nine Mile. Point Unit 1

.Docket No. 50-220

Dear Mr. Goller:

The attached refueling information for Nine Mile Point Unit 1 is in response to your June 18, 1975 letter. Our present plans provide for plant shutdown on September 13, 1975 and start-up, following the refueling, on November 9, 1975.

The reload license amendment submittal will be provided by August 15, 1975 in accordance with the requirements of Enclosure 1 of your letter . We regret that this does not meet your requested 90 day lead-time. A'eavy licensing workload at our fuel supplier is the reason for the delay.

Sincerely, NIAGARA MOHAWK POWER CORPORATION

.R dW Yice President-Engineering Attachment 79oW j

c i

a

Refuel in Information Re uest

1. Name of Facility: Nine Nile Point Unit 1
2. Scheduled date for next refueling shutdown: September 13, 1975
3. Scheduled date for restart following refueling: November 9; 1975
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?: Yes There will be minor changes to Minimun Critical Power Ratio (MCPR} and possible changes to Rod Block Limits. The MCPR changes will arise from cycle dependent analyses of the most limiting MCPR transient. The possible changes to the Rod Block Limits will be based on cycle dependent analyses of the Rod Withdrawal Error transient.
5. Scheduled date(s) for submitting proposed licensing action and supporting information: August 15, 1975.
6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

A cycle dependent analysis may require review of a Control Rod Drop accident which is outside the generic boundary approach.

ka 4