ML17037C195

From kanterella
Jump to navigation Jump to search
Letter Responding to the June 18, 1975 Letter with Attached Refueling Information and Advising of Plans for Shutdown on September 13, 1975
ML17037C195
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/21/1975
From: Rhode G
Niagara Mohawk Power Corp
To: Goller K
Office of Nuclear Reactor Regulation
References
Download: ML17037C195 (6)


Text

N ISTRIBUTION FOR PART 50 DO

.T MATERIAL (TEMPO RA R Y FO RM)

CONTROL NO:

FILE FROMNiagara Mohawk Power Co.

Syracuse, N. Y.

G.K. Rhode DATE OF DOC 7>>21>>

DATE R EC'D LTR TWX gPT OTHER TO:

Karl R. Gokler ORIG 1 Signed CC OTHER SENTNRC PDR SENT LOCAL PDR CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:

50-220 DESCRIPTION:

Re our ltr. of 6-18-75 trans the following.~

ENCLOSURES:

r Advising Refueling shutdown schedul'eMfor 9-d3-75...Scheduled date dog c~sgaiV dolloutug refueling,11-9-75 PLANT NAME Nine nile Pt.

g 1

FOR ACTION/INFORMATION VCRt 7>>30-75 BUTLER (L)

W/ Copies CLARK (L)

W/ Copies PARR (L)

W/ Copies KNIEL (L)

W/ Copies SCHWENCER (L)

W/ Copies STOLZ (L)

W/ Copies VASSALLO (L)

W/ Copies PURPLE (L)

W/ Copies ZIEMANN(L)

W/ Copies DICKER (E)

W/ Copies KNIGHTON (E)

W/ Copies YOUNGBLOOD W/ Copies REGAN (E)

W/ Copies LEAR (L)

W/copies SPIES W/ Copies (E)

LPH W/

opuses E

C PDR

~ OGC, ROOM P.506A

~ GOSSI CK/STAF F CASE GIAMBUSSO BOYD

'OORE(L)

DEYOUNG {L)

SKOVHOLT (L)

GOLLER (L) (Ltr)

P. COLLINS DENISE

~ REG OPR FILE 5 REGION (2)

HIPC TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICK I SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO ZeCOLLINS LAINAS BENAROYA VOLLMER INTERNAL DISTR I BUTION LIC ASST R. DIGGS (L)

H. GEARIN (L)

E. GOULBOURNE P. KREUTZER {E)

J. LEE (L)

M. RU3HBROOI({L)

S. REED (E)

M. SE RVIC E {L)

S. SHEPPARD (L)

M. SLATER (E)

H. SMITH (L)

S. TEETS (L) /

G. WILLIAMS(E)

V. WILSON (L)

R. INGRAM (L)

M. DUNCAN DENTON G R I MES GAMMILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNG8 LOOD REGAN PROJECT LDR +

H R LESS EXTERNAL DISTRIBUTION A/T IND

~

BRAITMAN SALTZMAN (L)

ME LTZ PLANS MCDONALD CHAPMAN

~dH-H~irl>P'+e E. COUPE PETERSON HARTFIELD (2)

KLECKER EISENHUT WlG G I NTON

~1 LOCALPDR

~1 TIC (ABERNATHY)

( )(2)(10 NATIONALLABS

~

1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB 1

CONSULTANTS 1 Newton Anderson NEWMARK/BLUME/AGBABIAN

/Q ACRSW~~/SENT 1 P DR-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON ORNL

0 w

~

Regulatory File Cy.

NIAGARAMOHAWKPOWER CORPORATION

,<<>)",~;

NIAGARA ~

MOHAWK 300 ERIE BOULEVARD WEST SYRACUSE. N. Y. 13202 July 21, 1975 Mr. Karl R. Goller, Assistant Director Operating Reactors Division of Reactor Licensing United States Nuclear Regulatory Commission Washington, D.

C.

20555 Re:

Nine Mile. Point Unit 1

.Docket No. 50-220

Dear Mr. Goller:

The attached refueling information for Nine Mile Point Unit 1

is in response to your June 18, 1975 letter.

Our present plans provide for plant shutdown on September 13, 1975 and start-up, following the refueling, on November 9, 1975.

The reload license amendment submittal will be provided by August 15, 1975 in accordance with the requirements of Enclosure 1 of your letter.

We regret that this does not meet your requested 90 day lead-time.

A'eavy licensing workload at our fuel supplier is the reason for the delay.

Sincerely, NIAGARA MOHAWK POWER CORPORATION

.R dW Yice President-Engineering Attachment 79oW j

c i

a

Refuel in Information Re uest 1.

Name of Facility:

Nine Nile Point Unit 1

2.

Scheduled date for next refueling shutdown:

September 13, 1975 3.

Scheduled date for restart following refueling:

November 9; 1975 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?:

Yes There will be minor changes to Minimun Critical Power Ratio (MCPR} and possible changes to Rod Block Limits.

The MCPR changes will arise from cycle dependent analyses of the most limiting MCPR transient.

The possible changes to the Rod Block Limits will be based on cycle dependent analyses of the Rod Withdrawal Error transient.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

August 15, 1975.

6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

A cycle dependent analysis may require review of a Control Rod Drop accident which is outside the generic boundary approach.

ka 4