IR 05000416/2017404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17075A443
| number = ML17075A443
| issue date = 03/16/2017
| issue date = 03/16/2017
| title = Grand Gulf Nuclear Station, Unit 1 - NRC Security Inspection Report 05000416/2017404
| title = NRC Security Inspection Report 05000416/2017404
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Fallacara V
| addressee name = Fallacara V
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:rch 16, 2017
[[Issue date::March 16, 2017]]


Mr. Vincent Fallacara, Acting Site Vice President Entergy Operations, Inc.
==SUBJECT:==
 
GRAND GULF NUCLEAR STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000416/2017404
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
 
SUBJECT: GRAND GULF NUCLEAR STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000416/2017404


==Dear Mr. Fallacara:==
==Dear Mr. Fallacara:==
Line 32: Line 28:
The NRC inspector did not identify any findings or violations of more than minor significance.
The NRC inspector did not identify any findings or violations of more than minor significance.


This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, and Requests for Withholding."
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for Withholding.
 
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
 
Sincerely,/RA/
Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety
 
Docket No. 50-416 License No. NPF-29 Nonpublic


===Enclosure:===
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Inspection Report 05000416/2017404


===w/Attachment:===
Sincerely,
Supplemental Information  
/RA/
Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety Docket No. 50-416 License No. NPF-29 Nonpublic Enclosure:
Inspection Report 05000416/2017404 w/Attachment: Supplemental Information cc w/enclosure:
J. Dorsey, Entergy Operations, Inc.


cc w/enclosure: J. Dorsey, Entergy Operations, Inc. J. Laplante, Entergy Operations, Inc.
J. Laplante, Entergy Operations, Inc.


cc w/o enclosure:
cc w/o enclosure:
Electronic Distribution for Grand Gulf
Electronic Distribution for Grand Gulf ML17075A452 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: MSH Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML17075A443 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: MSH Yes No Publicly Available Sensitive NRC-002 OFFICE PSI:PSB1 SPSI:PSB1 C:PSB1 C:PBC C:PSB1 NAME CJewett RLanfear MHaire GWarnick MHaire SIGNATURE email email email email /RA/
DATE 2/24/17 2/24/17 3/9/17 3/15/17 3/16/17
}}
}}

Latest revision as of 05:42, 30 October 2019

NRC Security Inspection Report 05000416/2017404
ML17075A443
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/16/2017
From: Mark Haire
Plant Support Branch-1
To: Fallacara V
Entergy Operations
References
IR 2017404
Download: ML17075A443 (3)


Text

rch 16, 2017

SUBJECT:

GRAND GULF NUCLEAR STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000416/2017404

Dear Mr. Fallacara:

On February 9, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Grand Gulf Nuclear Station, Unit 1. On February 9, 2017, the NRC inspectors discussed the results of this inspection with Mr. T. Coutu, Director of Regulatory and Performance Improvement, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspector did not identify any findings or violations of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety Docket No. 50-416 License No. NPF-29 Nonpublic Enclosure:

Inspection Report 05000416/2017404 w/Attachment: Supplemental Information cc w/enclosure:

J. Dorsey, Entergy Operations, Inc.

J. Laplante, Entergy Operations, Inc.

cc w/o enclosure:

Electronic Distribution for Grand Gulf ML17075A452 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: MSH Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML17075A443 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: MSH Yes No Publicly Available Sensitive NRC-002 OFFICE PSI:PSB1 SPSI:PSB1 C:PSB1 C:PBC C:PSB1 NAME CJewett RLanfear MHaire GWarnick MHaire SIGNATURE email email email email /RA/

DATE 2/24/17 2/24/17 3/9/17 3/15/17 3/16/17