| title = | | title = Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000275/2017002 and 05000323/2017002) and Request for Information | ||
| author name = Farnholtz T | | author name = Farnholtz T | ||
| author affiliation = NRC/RGN-IV/DRS/EB-1 | | author affiliation = NRC/RGN-IV/DRS/EB-1 | ||
| addressee name = Halpin E | | addressee name = Halpin E | ||
| addressee affiliation = Pacific Gas & Electric Co | | addressee affiliation = Pacific Gas & Electric Co | ||
| docket = 05000275, 05000323 | | docket = 05000275, 05000323 | ||
Line 14: | Line 14: | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000275/2017002]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:April 13, 2017 | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 E. LAMAR BLVD | |||
ARLINGTON, TX 76011-4511 | |||
April 13, 2017 | |||
Mr. Edward D. Halpin, Senior Vice President, | |||
Generation and Chief Nuclear Officer | |||
Pacific Gas and Electric Company | |||
Diablo Canyon Power Plant | |||
P.O. Box 56, Mail Code 104/6 | |||
Avila Beach, CA 93424 | |||
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF | |||
EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS INSPECTION | |||
(05000275/2017002 AND 05000323/2017002) AND REQUEST FOR | |||
INFORMATION | |||
Dear Mr. Halpin: | |||
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff | |||
will conduct the baseline inspection of evaluations of changes, tests, and experiments at your | |||
Diablo Canyon Power Plant, Units 1 and 2, from June 19-23, 2017. The inspection will consist | |||
of three reactor inspectors from the NRCs Region IV office for one week. The inspection will be | |||
conducted in accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes, | |||
Tests, and Experiments. | |||
Experience has shown that this inspection is resource intensive for both the NRC inspectors | |||
and your staff. In order to minimize the impact to your on-site resources and to ensure a | |||
productive inspection, we have enclosed a request for documents needed for this inspection. | |||
Please note that the documents are requested to be provided by June 12, 2017. Upon review | |||
of these documents, the inspectors will select additional documentation for review upon arrival. | |||
It is important that all of these documents are up-to-date and complete in order to minimize the | |||
number of additional documents requested during the preparation and the on-site portions of the | |||
inspection. | |||
We have discussed the schedule for these inspection activities with your staff and understand | |||
that our regulatory contact for this inspection will be David Madsen of your licensing | |||
organization. If there are any questions about this inspection or the material requested, please | |||
contact the lead inspector, Gerond A. George, by telephone at 817-200-1562 or by e-mail at | |||
Gerond.George@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, control | |||
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
E. Halpin 2 | |||
requesting document displays a currently valid Office of Management and Budget control | |||
number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its | |||
enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records (PARS) component of NRC's document system | |||
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Thomas R. Farnholtz, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket Nos. 50-275 and 50-323 | |||
License Nos. DPR-80 and DPR-82 | |||
Enclosure: | |||
Evaluations of Changes, Tests, | |||
and Experiments Inspection | |||
Request for Information | |||
Electronic Distribution for Diablo Canyon | |||
Power Plant | |||
ML17103A639 | |||
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: | |||
By: TFarnholtz Yes No Publicly Available Sensitive NRC-002 | |||
OFFICE SRI:EB1 C:EB1 | |||
NAME GGeorge TFarnholtz | |||
SIGNATURE /RA/ /RA/ | |||
DATE 4/13/17 4/13/17 | |||
Request for Information | |||
Evaluations of Changes, Tests, and Experiments Inspection | |||
Diablo Canyon Power Plant, Units 1 and 2 | |||
Inspection Report: 05000275/2017002 and 05000323/2017002 | |||
Inspection Dates: June 19-23, 2017 | |||
Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments | |||
Lead Inspector: Gerond A. George, Senior Reactor Inspector | |||
Request for Information | |||
Evaluations of Changes, Tests, and Experiments Inspection Diablo Canyon Power Plant, Units 1 and 2 | |||
Inspection Report: | |||
Inspection Dates: | |||
Lead Inspector: | |||
Information Requested for the In-Office Preparation Week | Information Requested for the In-Office Preparation Week | ||
The following information should be sent to the Region IV office in hard copy or electronic | |||
format (preferred) by June 12, 2017, to the attention of Gerond A. George. | format (preferred) by June 12, 2017, to the attention of Gerond A. George. We request that you | ||
categorize the documents in your response with the numbered list below. | categorize the documents in your response with the numbered list below. If only hard copies of | ||
inspectors will select specific items from the information requested below and request from your staff additional documents needed during the on-site inspection weeks. | the requested documents are available or if the electronic format is too large, please inform the | ||
items requested be available and ready for review on the first day of inspection. | lead inspector and provide the documents on the first day of the on-site inspection. Also, the | ||
possible. | inspectors will select specific items from the information requested below and request from your | ||
staff additional documents needed during the on-site inspection weeks. We ask that the specific | |||
items requested be available and ready for review on the first day of inspection. If you have any | |||
questions regarding this information request, please contact the lead inspector as soon as | |||
did not result in an application for a license amendment. | possible. | ||
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations. | |||
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully | |||
implemented changes, tests, and experiments performed since the last triennial | |||
modification inspection that did not result in an evaluation. | |||
3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes, | |||
tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that | |||
did not result in an application for a license amendment. | |||
4. A list with descriptions of all temporary plant modifications implemented since the last | |||
triennial 10 CFR 50.59 inspection. | |||
5. A list with descriptions of all compensatory actions for degraded or non-conforming | |||
conditions implemented since the last triennial 10 CFR 50.59 inspection. | |||
6. A list with descriptions of all corrective action documents related to 10 CFR 50.59 | |||
screenings and evaluations since the last triennial 10 CFR 50.59 inspection. | |||
7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, | |||
including qualification dates. | |||
8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or | |||
evaluations, including qualification dates. | |||
9. Current revisions of the Technical Specifications and Bases and the Updated Final | |||
Safety Analysis Report. | |||
Enclosure | |||
817-200-1526 | 10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 | ||
Chad.Stott@nrc.gov | programs. | ||
11. A copy of the most recent submittal of the report containing a brief description of any | |||
Mailing Address: | changes, tests, and experiments, including a summary of the evaluation of each, | ||
required by 10 CFR 50.59(d)(2). | |||
Attn: | 12. A list of systems and system designators and a set of one-line (i.e., simplified) system | ||
1600 East Lamar Blvd. | diagrams. | ||
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can | |||
determine the safety and/or risk significance of the screenings, evaluations, and modifications. | |||
Inspector Contact Information: | |||
Gerond A. George Shiattin Makor Chad Stott | |||
Senior Reactor Inspector Reactor Inspector Reactor Inspector | |||
817-200-1562 817-200-1507 817-200-1526 | |||
Gerond.George@nrc.gov Shiattin.Makor@nrc.gov Chad.Stott@nrc.gov | |||
Mailing Address: | |||
U.S. NRC, Region IV | |||
Attn: Gerond A. George | |||
1600 East Lamar Blvd. | |||
Arlington, TX 76011-4125 | Arlington, TX 76011-4125 | ||
2 | |||
}} | }} |
Latest revision as of 04:38, 30 October 2019
ML17103A639 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 04/13/2017 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Halpin E Pacific Gas & Electric Co |
References | |
IR 2017002 | |
Download: ML17103A639 (5) | |
See also: IR 05000275/2017002
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
April 13, 2017
Mr. Edward D. Halpin, Senior Vice President,
Generation and Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF
EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS INSPECTION
(05000275/2017002 AND 05000323/2017002) AND REQUEST FOR
INFORMATION
Dear Mr. Halpin:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct the baseline inspection of evaluations of changes, tests, and experiments at your
Diablo Canyon Power Plant, Units 1 and 2, from June 19-23, 2017. The inspection will consist
of three reactor inspectors from the NRCs Region IV office for one week. The inspection will be
conducted in accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes,
Tests, and Experiments.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by June 12, 2017. Upon review
of these documents, the inspectors will select additional documentation for review upon arrival.
It is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and the on-site portions of the
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be David Madsen of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Gerond A. George, by telephone at 817-200-1562 or by e-mail at
Gerond.George@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
E. Halpin 2
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-275 and 50-323
License Nos. DPR-80 and DPR-82
Enclosure:
Evaluations of Changes, Tests,
and Experiments Inspection
Request for Information
Electronic Distribution for Diablo Canyon
Power Plant
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: TFarnholtz Yes No Publicly Available Sensitive NRC-002
OFFICE SRI:EB1 C:EB1
NAME GGeorge TFarnholtz
SIGNATURE /RA/ /RA/
DATE 4/13/17 4/13/17
Request for Information
Evaluations of Changes, Tests, and Experiments Inspection
Diablo Canyon Power Plant, Units 1 and 2
Inspection Report: 05000275/2017002 and 05000323/2017002
Inspection Dates: June 19-23, 2017
Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments
Lead Inspector: Gerond A. George, Senior Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by June 12, 2017, to the attention of Gerond A. George. We request that you
categorize the documents in your response with the numbered list below. If only hard copies of
the requested documents are available or if the electronic format is too large, please inform the
lead inspector and provide the documents on the first day of the on-site inspection. Also, the
inspectors will select specific items from the information requested below and request from your
staff additional documents needed during the on-site inspection weeks. We ask that the specific
items requested be available and ready for review on the first day of inspection. If you have any
questions regarding this information request, please contact the lead inspector as soon as
possible.
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully
implemented changes, tests, and experiments performed since the last triennial
modification inspection that did not result in an evaluation.
3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,
tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that
did not result in an application for a license amendment.
4. A list with descriptions of all temporary plant modifications implemented since the last
triennial 10 CFR 50.59 inspection.
5. A list with descriptions of all compensatory actions for degraded or non-conforming
conditions implemented since the last triennial 10 CFR 50.59 inspection.
6. A list with descriptions of all corrective action documents related to 10 CFR 50.59
screenings and evaluations since the last triennial 10 CFR 50.59 inspection.
7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
including qualification dates.
8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
evaluations, including qualification dates.
9. Current revisions of the Technical Specifications and Bases and the Updated Final
Safety Analysis Report.
Enclosure
10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59
programs.
11. A copy of the most recent submittal of the report containing a brief description of any
changes, tests, and experiments, including a summary of the evaluation of each,
required by 10 CFR 50.59(d)(2).
12. A list of systems and system designators and a set of one-line (i.e., simplified) system
diagrams.
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Inspector Contact Information:
Gerond A. George Shiattin Makor Chad Stott
Senior Reactor Inspector Reactor Inspector Reactor Inspector
817-200-1562 817-200-1507 817-200-1526