| number = ML17103A639
| number = ML17103A639
| issue date = 04/13/2017
| issue date = 04/13/2017
| title = Diablo Canyon Power Plant, Units 1 and 2 - Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000275/2017002 and 05000323/2017002) and Request for Information
| title = Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000275/2017002 and 05000323/2017002) and Request for Information
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Halpin E D
| addressee name = Halpin E
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::IR 05000275/2017002]]
See also: [[see also::IR 05000275/2017002]]


=Text=
=Text=
{{#Wiki_filter: April 13, 2017   Mr. Edward D. Halpin, Senior Vice President,
{{#Wiki_filter:UNITED STATES
   Generation and Chief Nuclear Officer  
                              NUCLEAR REGULATORY COMMISSION
Pacific Gas and Electric Company  
                                              REGION IV
Diablo Canyon Power Plant  
                                          1600 E. LAMAR BLVD
P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
                                        ARLINGTON, TX 76011-4511
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS INSPECTION  
                                          April 13, 2017
(05000275/2017002 AND 05000323/2017002) AND REQUEST FOR INFORMATION
Mr. Edward D. Halpin, Senior Vice President,
Dear Mr. Halpin:  
   Generation and Chief Nuclear Officer
Pacific Gas and Electric Company
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of evaluations of changes, tests, and experiments at your Diablo Canyon Power Plant, Units 1 and 2, from June 19-23, 2017. The inspection will consist of three reactor inspectors from the NRC's Region IV office for one week. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, "Evaluations of Changes,  
Diablo Canyon Power Plant
Tests, and Experiments.
P.O. Box 56, Mail Code 104/6
Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
Avila Beach, CA 93424
Please note that the documents are requested to be provided by June 12, 2017. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and the on-site portions of the  
SUBJECT:         DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF
inspection.  
                EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS INSPECTION
                (05000275/2017002 AND 05000323/2017002) AND REQUEST FOR
We have discussed the schedule for these inspection activities with your staff and understand  
                INFORMATION
that our regulatory contact for this inspection will be David Madsen of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Gerond A. George, by telephone at 817-200-1562 or by e-mail at Gerond.George@nrc.gov.
Dear Mr. Halpin:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control  
will conduct the baseline inspection of evaluations of changes, tests, and experiments at your
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
Diablo Canyon Power Plant, Units 1 and 2, from June 19-23, 2017. The inspection will consist
respond to, a request for information or an information collection requirement unless the UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 
of three reactor inspectors from the NRCs Region IV office for one week. The inspection will be
E. Halpin 2  requesting document displays a currently valid Office of Management and Budget control number.
conducted in accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes,
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).    Sincerely,  /RA/    Thomas R. Farnholtz, Chief  Engineering Branch 1
Tests, and Experiments.
Division of Reactor Safety
Experience has shown that this inspection is resource intensive for both the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources and to ensure a
Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 
productive inspection, we have enclosed a request for documents needed for this inspection.
Enclosure: 
Please note that the documents are requested to be provided by June 12, 2017. Upon review
Evaluations of Changes, Tests, 
of these documents, the inspectors will select additional documentation for review upon arrival.
  and Experiments Inspection 
It is important that all of these documents are up-to-date and complete in order to minimize the
  Request for Information  Electronic Distribution for Diablo Canyon
number of additional documents requested during the preparation and the on-site portions of the
  Power Plant
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
 
that our regulatory contact for this inspection will be David Madsen of your licensing
E. Halpin 3  DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS INSPECTION (05000275/2017002 AND 05000323/2017002) AND REQUEST FOR INFORMATION - April 13, 2017  DISTRIBUTION: KKennedy, RA SMorris, DRA
organization. If there are any questions about this inspection or the material requested, please
TPruett, DRP
contact the lead inspector, Gerond A. George, by telephone at 817-200-1562 or by e-mail at
AVegel, DRS JClark, DRS RLantz, DRP
Gerond.George@nrc.gov.
JBowen, RIV/OEDO
This letter does not contain new or amended information collection requirements subject
KFuller, RC
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
VDricks, ORA JWeil, OCA BSingal, NRR
collection requirements were approved by the Office of Management and Budget, control
AMoreno, RIV/CAO
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
BMaier, RSLO
respond to, a request for information or an information collection requirement unless the
THipschman, IPAT EUribe, IPAT MHerrera, DRMA
RIV ACES 
JGroom, DRP
MHaire, DRP
RAlexander, DRP MKirk, DRP TSullivan, DRP
CNewport, DRP
JReynoso, DRP
MArel, DRP
 
 
ADAMS ACCESSION NUMBER:  ML17103A639  SUNSI Review  ADAMS:    Non-Publicly Available  Non-Sensitive Keyword:  By:  TFarnholtz  Yes    No Publicly Available  Sensitive  NRC-002 OFFICE SRI:EB1 C:EB1    NAME GGeorge TFarnholtz    SIGNATURE /RA/ /RA/    DATE 4/13/17 4/13/17    OFFICIAL RECORD COPY 
  Enclosure Request for Information Evaluations of Changes, Tests, and Experiments Inspection Diablo Canyon Power Plant, Units 1 and 2 
Inspection Report:  05000275/2017002 and 05000323/2017002
Inspection Dates:  June 19-23, 2017
Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments" 
Lead Inspector:  Gerond A. George, Senior Reactor Inspector 
Information Requested for the In-Office Preparation Week  The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by June 12, 2017, to the attention of Gerond A. George.  We request that you
categorize the documents in your response with the numbered list below.  If only hard copies of the requested documents are available or if the electronic format is too large, please inform the lead inspector and provide the documents on the first day of the on-site inspection.  Also, the
inspectors will select specific items from the information requested below and request from your staff additional documents needed during the on-site inspection weeks.  We ask that the specific
items requested be available and ready for review on the first day of inspection.  If you have any questions regarding this information request, please contact the lead inspector as soon as possible.  1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.  2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully implemented changes, tests, and experiments performed since the last triennial modification inspection that did not result in an evaluation.  3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes, tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that
did not result in an application for a license amendment.    4. A list with descriptions of all temporary plant modifications implemented since the last triennial 10 CFR 50.59 inspection.
5. A list with descriptions of all compensatory actions for degraded or non-conforming conditions implemented since the last triennial 10 CFR 50.59 inspection.  6. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial 10 CFR 50.59 inspection.    7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.  8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.  9. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report. 
  2  10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 programs.    11. A copy of the most recent submittal of the report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each,
required by 10 CFR 50.59(d)(2).    12. A list of systems and system designators and a set of one-line (i.e., simplified) system diagrams. 
Note:  Descriptions should be brief but of sufficient detail to ensure that inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Inspector Contact Information: 
Gerond A. George 
Senior Reactor Inspector
817-200-1562 Gerond.George@nrc.gov  Shiattin Makor Reactor Inspector
817-200-1507 Shiattin.Makor@nrc.gov  Chad Stott Reactor Inspector
817-200-1526 Chad.Stott@nrc.gov   
Mailing Address:  U.S. NRC, Region IV
Attn:  Gerond A. George
1600 East Lamar Blvd.
Arlington, TX 76011-4125 


E. Halpin                                        2
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                                Sincerely,
                                                /RA/
                                                Thomas R. Farnholtz, Chief
                                                Engineering Branch 1
                                                Division of Reactor Safety
Docket Nos. 50-275 and 50-323
License Nos. DPR-80 and DPR-82
Enclosure:
Evaluations of Changes, Tests,
  and Experiments Inspection
  Request for Information
Electronic Distribution for Diablo Canyon
  Power Plant
ML17103A639
SUNSI Review            ADAMS:            Non-Publicly Available  Non-Sensitive Keyword:
  By: TFarnholtz          Yes  No      Publicly Available      Sensitive    NRC-002
OFFICE          SRI:EB1      C:EB1
NAME            GGeorge      TFarnholtz
SIGNATURE        /RA/          /RA/
DATE            4/13/17      4/13/17
                                       
                                      Request for Information
                  Evaluations of Changes, Tests, and Experiments Inspection
                            Diablo Canyon Power Plant, Units 1 and 2
Inspection Report:              05000275/2017002 and 05000323/2017002
Inspection Dates:              June 19-23, 2017
Inspection Procedure:          IP 71111.17T, Evaluations of Changes, Tests, and Experiments
Lead Inspector:                Gerond A. George, Senior Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by June 12, 2017, to the attention of Gerond A. George. We request that you
categorize the documents in your response with the numbered list below. If only hard copies of
the requested documents are available or if the electronic format is too large, please inform the
lead inspector and provide the documents on the first day of the on-site inspection. Also, the
inspectors will select specific items from the information requested below and request from your
staff additional documents needed during the on-site inspection weeks. We ask that the specific
items requested be available and ready for review on the first day of inspection. If you have any
questions regarding this information request, please contact the lead inspector as soon as
possible.
    1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
    2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully
        implemented changes, tests, and experiments performed since the last triennial
        modification inspection that did not result in an evaluation.
    3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,
        tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that
        did not result in an application for a license amendment.
    4. A list with descriptions of all temporary plant modifications implemented since the last
        triennial 10 CFR 50.59 inspection.
    5. A list with descriptions of all compensatory actions for degraded or non-conforming
        conditions implemented since the last triennial 10 CFR 50.59 inspection.
    6. A list with descriptions of all corrective action documents related to 10 CFR 50.59
        screenings and evaluations since the last triennial 10 CFR 50.59 inspection.
    7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
        including qualification dates.
    8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
        evaluations, including qualification dates.
    9. Current revisions of the Technical Specifications and Bases and the Updated Final
        Safety Analysis Report.
                                                                                  Enclosure
    10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59
        programs.
    11. A copy of the most recent submittal of the report containing a brief description of any
        changes, tests, and experiments, including a summary of the evaluation of each,
        required by 10 CFR 50.59(d)(2).
    12. A list of systems and system designators and a set of one-line (i.e., simplified) system
        diagrams.
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Inspector Contact Information:
Gerond A. George                  Shiattin Makor                      Chad Stott
Senior Reactor Inspector          Reactor Inspector                    Reactor Inspector
817-200-1562                      817-200-1507                        817-200-1526
Gerond.George@nrc.gov              Shiattin.Makor@nrc.gov              Chad.Stott@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Gerond A. George
1600 East Lamar Blvd.
Arlington, TX 76011-4125
                                            2
}}
}}

Latest revision as of 04:38, 30 October 2019

Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000275/2017002 and 05000323/2017002) and Request for Information
ML17103A639
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/13/2017
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Halpin E
Pacific Gas & Electric Co
References
IR 2017002
Download: ML17103A639 (5)


See also: IR 05000275/2017002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

April 13, 2017

Mr. Edward D. Halpin, Senior Vice President,

Generation and Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF

EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS INSPECTION

(05000275/2017002 AND 05000323/2017002) AND REQUEST FOR

INFORMATION

Dear Mr. Halpin:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff

will conduct the baseline inspection of evaluations of changes, tests, and experiments at your

Diablo Canyon Power Plant, Units 1 and 2, from June 19-23, 2017. The inspection will consist

of three reactor inspectors from the NRCs Region IV office for one week. The inspection will be

conducted in accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes,

Tests, and Experiments.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. In order to minimize the impact to your on-site resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by June 12, 2017. Upon review

of these documents, the inspectors will select additional documentation for review upon arrival.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and the on-site portions of the

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be David Madsen of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, Gerond A. George, by telephone at 817-200-1562 or by e-mail at

Gerond.George@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

E. Halpin 2

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-275 and 50-323

License Nos. DPR-80 and DPR-82

Enclosure:

Evaluations of Changes, Tests,

and Experiments Inspection

Request for Information

Electronic Distribution for Diablo Canyon

Power Plant

ML17103A639

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: TFarnholtz Yes No Publicly Available Sensitive NRC-002

OFFICE SRI:EB1 C:EB1

NAME GGeorge TFarnholtz

SIGNATURE /RA/ /RA/

DATE 4/13/17 4/13/17

Request for Information

Evaluations of Changes, Tests, and Experiments Inspection

Diablo Canyon Power Plant, Units 1 and 2

Inspection Report: 05000275/2017002 and 05000323/2017002

Inspection Dates: June 19-23, 2017

Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments

Lead Inspector: Gerond A. George, Senior Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (preferred) by June 12, 2017, to the attention of Gerond A. George. We request that you

categorize the documents in your response with the numbered list below. If only hard copies of

the requested documents are available or if the electronic format is too large, please inform the

lead inspector and provide the documents on the first day of the on-site inspection. Also, the

inspectors will select specific items from the information requested below and request from your

staff additional documents needed during the on-site inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any

questions regarding this information request, please contact the lead inspector as soon as

possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully

implemented changes, tests, and experiments performed since the last triennial

modification inspection that did not result in an evaluation.

3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,

tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that

did not result in an application for a license amendment.

4. A list with descriptions of all temporary plant modifications implemented since the last

triennial 10 CFR 50.59 inspection.

5. A list with descriptions of all compensatory actions for degraded or non-conforming

conditions implemented since the last triennial 10 CFR 50.59 inspection.

6. A list with descriptions of all corrective action documents related to 10 CFR 50.59

screenings and evaluations since the last triennial 10 CFR 50.59 inspection.

7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,

including qualification dates.

8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or

evaluations, including qualification dates.

9. Current revisions of the Technical Specifications and Bases and the Updated Final

Safety Analysis Report.

Enclosure

10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59

programs.

11. A copy of the most recent submittal of the report containing a brief description of any

changes, tests, and experiments, including a summary of the evaluation of each,

required by 10 CFR 50.59(d)(2).

12. A list of systems and system designators and a set of one-line (i.e., simplified) system

diagrams.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Inspector Contact Information:

Gerond A. George Shiattin Makor Chad Stott

Senior Reactor Inspector Reactor Inspector Reactor Inspector

817-200-1562 817-200-1507 817-200-1526

Gerond.George@nrc.gov Shiattin.Makor@nrc.gov Chad.Stott@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Gerond A. George

1600 East Lamar Blvd.

Arlington, TX 76011-4125

2