|
|
(5 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17142A220 | | | number = ML17142A220 |
| | issue date = 05/19/2017 | | | issue date = 05/19/2017 |
| | title = Edwin I. Hatch Emergency Preparedness Inspection and Request for Information Dated: May 19, 2017 | | | title = Emergency Preparedness Inspection and Request for Information Dated: May 19, 2017 |
| | author name = Bonser B R | | | author name = Bonser B |
| | author affiliation = NRC/RGN-II/DRS/PSB1 | | | author affiliation = NRC/RGN-II/DRS/PSB1 |
| | addressee name = Vineyard D R | | | addressee name = Vineyard D |
| | addressee affiliation = Southern Nuclear Operating Co, Inc | | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | docket = 05000321, 05000366 | | | docket = 05000321, 05000366 |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 19, 2017 Mr. David R. Vineyard Vice President Southern Nuclear Operating Company, Inc. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 19, 2017 Mr. David R. Vineyard Vice President Southern Nuclear Operating Company, Inc. |
| Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513 | | Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| EDWIN I. HATCH NUCLEAR PLANT EMERGENCY PREPAREDNESS INSPECTION AND REQUEST FOR INFORMATION | | EDWIN I. HATCH NUCLEAR PLANT EMERGENCY PREPAREDNESS INSPECTION AND REQUEST FOR INFORMATION |
|
| |
|
| ==Dear Mr. Vineyard:== | | ==Dear Mr. Vineyard:== |
|
| |
|
| From October 16-20, 2017, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Emergency Preparedness exercise inspection at the Edwin I. Hatch Nuclear Plant. The inspection will evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection Procedures (IPs) 71114.01, Exercise Evaluation; 71114.04, Emergency Action Level and Emergency Plan Changes; and the Emergency Preparedness sections of 71151, Performance Indicator Verification. Prior to the onsite inspection period, inspectors will review the proposed exercise scenario using IP 71114.08, Exercise Evaluation - Scenario Review. | | From October 16-20, 2017, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Emergency Preparedness exercise inspection at the Edwin I. Hatch Nuclear Plant. |
| | The inspection will evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection Procedures (IPs) 71114.01, Exercise Evaluation; 71114.04, Emergency Action Level and Emergency Plan Changes; and the Emergency Preparedness sections of 71151, Performance Indicator Verification. Prior to the onsite inspection period, inspectors will review the proposed exercise scenario using IP 71114.08, Exercise Evaluation - Scenario Review. |
| Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. To minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. | | Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. To minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. |
| We have discussed the schedule for these inspection activities with your staff, and understand that our regulatory contact for this inspection will be Rhonda Outler, 912-366-2000, extension 2400 of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Steven Sanchez at 404-997-4418 (steven.sanchez@nrc.gov), or the Chief, Plant Support Branch 1, Brian Bonser at 404-997-4653. | | We have discussed the schedule for these inspection activities with your staff, and understand that our regulatory contact for this inspection will be Rhonda Outler, 912-366-2000, extension 2400 of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Steven Sanchez at 404-997-4418 (steven.sanchez@nrc.gov), or the Chief, Plant Support Branch 1, Brian Bonser at 404-997-4653. |
|
| |
|
| D. Vineyard 2 This letter and its enclosure will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." Sincerely, | | D. Vineyard 2 This letter and its enclosure will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. |
| | Sincerely, |
| | /RA/ |
| | Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-321 and 50-366 License Nos. DPR-57 AND NPF-5 |
|
| |
|
| /RA/
| | ==Enclosure:== |
| Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-321 and 50-366 License Nos. DPR-57 AND NPF-5
| |
|
| |
|
| ==Enclosure:==
| | Document Request List cc: Distribution via Listserv |
|
| |
|
| Document Request List cc: Distribution via Listserv
| | SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRS/PSB1 RII:DRS/PSB1 SIGNATURE JDH SPS BRB NAME J. Hickman S. Sanchez B. Bonser DATE 5/18/2017 5/19/2017 5/19/2017 E-MAIL COPY YES NO YES NO YES NO |
|
| |
|
| SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRS/PSB1 RII:DRS/PSB1 SIGNATURE JDH SPS BRB NAME J. Hickman S. Sanchez B. Bonser DATE 5/18/2017 5/19/2017 5/19/2017 E-MAIL COPY YES NO YES NO YES NO Enclosure Document Request List Inspection Dates: October 16-20, 2017 Inspection Procedures (IP's): IP 71114.01 Exercise Evaluation IP 71114.04 Emergency Action Level and Emergency Plan Changes IP 71114.08 Scenario Evaluation IP 71151 Performance Indicator Verification Note: This is a list of the documents to be provided to the inspectors upon arrival onsite. The current version of these documents is expected unless specified otherwise. The first seven italicized items under IP 71114.01 are requested as early as practical, but no later than 60 days prior to the exercise, to support the pre-exercise scenario review under IP 71114.08. However, this should not preclude submitting the scenario per 10 CFR 50.4. Electronic media is preferred, if readily available (the preferred file format is Word or searchable ".pdf" files on CDROM). [Note that the inspectors cannot accept data provided on USB or "flash" drives due to NRC IT security policies.] Please organize the information as it is arranged below (e.g., a folder labeled "Miscellaneous"). It is not the intent that large or burdensome data be scanned for this purpose (e.g., Performance Indicator documents). This data will be inspected using original documentation. Material can be provided prior to the inspection to the NRC Region II Office (ATTN: Steven Sanchez), 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector. 71114.01 Exercise Evaluation Current exercise package: scenario timeline, expected Drill and Exercise Performance (DEP) opportunities, exercise objectives, radiological assumptions, and scope of play and participation Completed IP 71114.08 Scenario Review Checklist, if performed Last graded and off-year exercise packages: scenario timelines, drill reports or assessments, and Final Federal Emergency Management Agency (FEMA) / Department of Homeland Security (DHS) exercise report All drill reports for the 2-year inspection period Current and immediately previous revisions of the Emergency Plan (E-Plan) Record of exercises conducted during each 8-year-cycle that documents the scenario elements demonstrated Drill, Exercise, and Emergency Facility Activation procedures Core damage assessment procedure Dose assessment procedure Special/emergency exposure procedure Potassium Iodide distribution procedure Assembly/accountability procedure Corrective Action Program (CAP) entries related to the exercises and drills for the 2-year inspection period (including those written by Corporate)
| | Document Request List Inspection Dates: October 16-20, 2017 Inspection Procedures (IPs): IP 71114.01 Exercise Evaluation IP 71114.04 Emergency Action Level and Emergency Plan Changes IP 71114.08 Scenario Evaluation IP 71151 Performance Indicator Verification Note: This is a list of the documents to be provided to the inspectors upon arrival onsite. The current version of these documents is expected unless specified otherwise. The first seven italicized items under IP 71114.01 are requested as early as practical, but no later than 60 days prior to the exercise, to support the pre-exercise scenario review under IP 71114.08. However, this should not preclude submitting the scenario per 10 CFR 50.4. Electronic media is preferred, if readily available (the preferred file format is Word or searchable .pdf files on CDROM). [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below (e.g., a folder labeled Miscellaneous). It is not the intent that large or burdensome data be scanned for this purpose (e.g., Performance Indicator documents). This data will be inspected using original documentation. Material can be provided prior to the inspection to the NRC Region II Office (ATTN: Steven Sanchez), 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector. |
| | 71114.01 Exercise Evaluation Current exercise package: scenario timeline, expected Drill and Exercise Performance (DEP) opportunities, exercise objectives, radiological assumptions, and scope of play and participation Completed IP 71114.08 Scenario Review Checklist, if performed Last graded and off-year exercise packages: scenario timelines, drill reports or assessments, and Final Federal Emergency Management Agency (FEMA) / Department of Homeland Security (DHS) exercise report All drill reports for the 2-year inspection period Current and immediately previous revisions of the Emergency Plan (E-Plan) |
| | Record of exercises conducted during each 8-year-cycle that documents the scenario elements demonstrated Drill, Exercise, and Emergency Facility Activation procedures Core damage assessment procedure Dose assessment procedure Special/emergency exposure procedure Potassium Iodide distribution procedure Assembly/accountability procedure Corrective Action Program (CAP) entries related to the exercises and drills for the 2-year inspection period (including those written by Corporate) |
| | Enclosure |
|
| |
|
| 2 71114.04 Emergency Action Level and Emergency Plan Changes Governing document for 10 CFR 50.54(q) evaluation process 10 CFR 50.54(q) evaluator training program and qualification records 10 CFR 50.54(q) evaluation/screening of changed Emergency Action Level (EAL), E-Plan, and Emergency Preparedness (EP) implementing procedures (including corporate procedures) Current and immediately previous revisions of EAL, E-Plan, and EP procedures (electronic version of current E-Plan requested about 3 weeks before inspection) CAP entries related to EAL and E-Plan changes since the last NRC EP inspection (including those written by Corporate) 71151 Performance Indicator Verification Governing document for the performance indicators (PIs) process DEP, Emergency Response Organization (ERO), and Alert and Notification System (ANS) PI data submitted since the last NRC EP inspection, documented in the report (hard copies can be provided upon arrival) DEP documentation and evaluations since the last NRC EP inspection CAP entries related to PIs, that is DEP, ERO training and participation, and ANS since the last NRC EP inspection (including those written by Corporate) Miscellaneous Procedures and Records CAP procedure Safety Evaluation Report approved E-Plan and EALs Corporate and Departmental processes or procedures for EP staff Lead Inspector Contact Information: Steven Sanchez 404-997-4418 steven.sanchez@nrc.gov LIST OF ACRONYMS ANS Alert and Notification System CAP Corrective Action Program DEP Drill and Exercise Performance DHS Department of Homeland Security EAL Emergency Action Level EP Emergency Preparedness E-Plan Emergency Plan ERO Emergency Response Organization FEMA Federal Emergency Management Agency IPs Inspection Procedures PIs Performance Indicators | | 2 71114.04 Emergency Action Level and Emergency Plan Changes Governing document for 10 CFR 50.54(q) evaluation process 10 CFR 50.54(q) evaluator training program and qualification records 10 CFR 50.54(q) evaluation/screening of changed Emergency Action Level (EAL), E-Plan, and Emergency Preparedness (EP) implementing procedures (including corporate procedures) |
| }} | | Current and immediately previous revisions of EAL, E-Plan, and EP procedures (electronic version of current E-Plan requested about 3 weeks before inspection) |
| | CAP entries related to EAL and E-Plan changes since the last NRC EP inspection (including those written by Corporate) 71151 Performance Indicator Verification Governing document for the performance indicators (PIs) process DEP, Emergency Response Organization (ERO), and Alert and Notification System (ANS) |
| | PI data submitted since the last NRC EP inspection, documented in the report (hard copies can be provided upon arrival) |
| | DEP documentation and evaluations since the last NRC EP inspection CAP entries related to PIs, that is DEP, ERO training and participation, and ANS since the last NRC EP inspection (including those written by Corporate) |
| | Miscellaneous Procedures and Records CAP procedure Safety Evaluation Report approved E-Plan and EALs Corporate and Departmental processes or procedures for EP staff Lead Inspector Contact Information: |
| | Steven Sanchez 404-997-4418 steven.sanchez@nrc.gov LIST OF ACRONYMS ANS Alert and Notification System CAP Corrective Action Program DEP Drill and Exercise Performance DHS Department of Homeland Security EAL Emergency Action Level EP Emergency Preparedness E-Plan Emergency Plan ERO Emergency Response Organization FEMA Federal Emergency Management Agency IPs Inspection Procedures PIs Performance Indicators}} |
Similar Documents at Hatch |
---|
Category:Inspection Plan
MONTHYEARIR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 IR 05000321/20230062024-02-28028 February 2024 Annual Assessment Letter Edwin I. Hatch Nuclear Plant Units 1 and 2 - Nrc Inspection Report 05000321/2023006 and 05000366/2023006 IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 ML23201A0292023-07-20020 July 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 IR 05000321/20220052022-08-23023 August 2022 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units and 2 Report 05000321/2022005 and 05000366/2022005 ML22073A0842022-03-21021 March 2022 an NRC Fire Protection Team Inspection (NRC Inspection Report Nos. 05000321/2022011 and 05000366/2022011) and Request for Information IR 05000321/20210062022-03-0202 March 2022 Annual Assessment Letter for Erwin I. Hatch Nuclear Plant, Units 1 and 2 (Report No. 05000321/2021006 and 05000366/2021006) ML22025A2142022-01-21021 January 2022 Plant Hatch 2022001 RP Baseline Inspection Information Request ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections IR 05000321/20210052021-08-23023 August 2021 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Report 05000321/2021005 and 05000366/2021005) ML21207A1072021-07-26026 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000321/2021010 and 05000366/2021010 IR 05000321/20200062021-03-0303 March 2021 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant - Report 05000321/2020006 and 05000366/2020006 ML21013A4112021-01-13013 January 2021 Notification of Edwin I. Hatch Nuclear Plant Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021010 and 05000366/2021010 ML20338A3472020-12-0202 December 2020 Notification of Inspection and Request for Information ML20239A7462020-08-25025 August 2020 Rif Letter to Plant Hatch Simulator Inspection 41502 ML20027B4162020-01-27027 January 2020 Notification of Inspection and Request for Information IR 05000321/20190052019-08-27027 August 2019 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant Reports 05000321/2019005 and 05000366/2019005 IR 05000321/20180062019-03-0404 March 2019 Annual Assessment Letter for Edwin I. Hatch - Report 05000321/2018006 and 05000366/2018006 ML19044A6002019-02-13013 February 2019 Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 0500021/2019011 and 05000366/2019011) IR 05000021/20190112019-02-13013 February 2019 Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 0500021/2019011 and 05000366/2019011) ML19016A3422019-01-10010 January 2019 U2 ISI 2019001 RFI - Bcc ML19008A2872018-12-20020 December 2018 RP Document Request ML18298A0982018-10-24024 October 2018 Emergency Preparedness Program Inspection Request for Information IR 05000321/20180052018-08-23023 August 2018 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant Units 1 and 2 - NRC Inspection Reports 05000321/2018005 and 05000366/2018005 ML18087A3592018-03-27027 March 2018 Eff & REMP Emailed Information and Doc Request ML18059A1402018-02-28028 February 2018 EOC Assessment Letter IR 05000321/20170052017-08-28028 August 2017 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Report 05000321/2017005 and 05000366/2017005 ML17142A2202017-05-19019 May 2017 Emergency Preparedness Inspection and Request for Information Dated: May 19, 2017 IR 05000321/20160062017-03-0101 March 2017 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Units 1 and 2 (Report 05000321/2016006 and 05000366/2016006) ML17021A0002017-01-20020 January 2017 Notification of Inspection and Request for Information IR 05000321/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Edwin I. Hatch Nuclear Plant Units 1 and 2 - NRC Inspection Report 05000321/2016005 and 05000366/2016005 ML16062A1842016-03-0202 March 2016 Annual Assessment Letter ML16014A7052016-01-14014 January 2016 Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos.0500321/2016007 and 05000366/2016007) ML16011A3542016-01-11011 January 2016 Notification of Inspection and Request for Information IR 05000321/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2015005 and 05000366/2015005) IR 05000321/20140012015-03-0404 March 2015 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2014001 and 05000366/2014001) ML14245A1692014-09-0202 September 2014 Mid-Cycle Letter IR 05000321/20130012014-03-0404 March 2014 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2013001 and 05000366/2013001) ML14009A2382014-01-0909 January 2014 Notification of Inspection and Request for Information ML13246A1152013-09-0303 September 2013 Mid Cycle Assessment Letter ML13175A3312013-06-24024 June 2013 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000321/20120012013-03-0404 March 2013 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2012001 and 366/2012001) IR 05000321/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan Edwin I. Hatch Nuclear Plant (IR 05000321-12-006, 05000366-12-006) ML12065A2302012-03-0505 March 2012 Report 22 ML1124403852011-09-0101 September 2011 Report 22 - Hatch ML1106302392011-03-0404 March 2011 Inspection/Activity Plan, 01/01/2011 - 06/30/2012, Report 22 ML1024406352010-09-0101 September 2010 09/01/2010 - 12/31/2011, Report 22 ML1024406322010-09-0101 September 2010 Mid Cycle Letter ML1006209002010-03-0303 March 2010 Enclosure - Hatch Inspection/Activity Plan Report 22, 2009 2024-04-25
[Table view] Category:Letter
MONTHYEARML24299A2222024-10-31031 October 2024 Audit Summary for License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components ML24292A1602024-10-22022 October 2024 Request for Withholding Information from Public Disclosure License Amendment Request to Revise Technical Specification Surveillance Requirements to Increase Safety/Relief Valve Setpoints ML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24303A4102024-10-17017 October 2024 Dir Results Letter to NRC - Hatch - Hurricane Helene IR 05000321/20244012024-10-10010 October 2024 Security Baseline Inspection Report 05000321-2024401 and 05000366-2024401 ML24256A0282024-09-12012 September 2024 2024 Hatch Requal Inspection Corporate Notification Letter NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc IR 05000321/20240912024-08-27027 August 2024 NRC Investigation Report 2-2023-003 and NOV - NRC Inspection Report 05000321/2024091 and 05000366/2024091 IR 05000321/20240052024-08-26026 August 2024 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Report 05000321/2024005 and 05000366/2024005 NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information IR 05000321/20240022024-08-0808 August 2024 Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002 NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24198A1252024-07-16016 July 2024 Edwin I Hatch Nuclear Plant Units 1 - 2 Notification of Conduct of Title 10 of the Code of Federal Regulations 50 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 05000321/LER-2024-003, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link 05000321/LER-2024-002-01, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 ML24163A0532024-06-14014 June 2024 Audit Plan - Alternative Seismic Method LAR ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations IR 05000321/20240902024-05-15015 May 2024 NRC Inspection Report 05000321-2024090 and 05000366-2024090, Investigation Report 2-2023-003; and Apparent Violation NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 05000321/LER-2024-002, Manual Reactor Trip Due to Loss of Feedwater2024-05-0909 May 2024 Manual Reactor Trip Due to Loss of Feedwater NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 IR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 05000366/LER-2024-002, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications2024-04-24024 April 2024 Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications IR 05000321/20240012024-04-22022 April 2024 Integrated Inspection Report 05000321/2024001 and 05000366/2024001 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint 05000321/LER-2024-001, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2024-04-0909 April 2024 Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission ML24069A0012024-03-0909 March 2024 – Correction of Amendment No. 266 Regarding License Amendment Request Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program (TSTF-425, Revision 3) ML24047A0362024-03-0404 March 2024 Response to Hatch and Vogtle FOF Dates Change Request (2025) NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 IR 05000321/20230062024-02-28028 February 2024 Annual Assessment Letter Edwin I. Hatch Nuclear Plant Units 1 and 2 - Nrc Inspection Report 05000321/2023006 and 05000366/2023006 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers 2024-09-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 19, 2017 Mr. David R. Vineyard Vice President Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT EMERGENCY PREPAREDNESS INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Vineyard:
From October 16-20, 2017, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Emergency Preparedness exercise inspection at the Edwin I. Hatch Nuclear Plant.
The inspection will evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection Procedures (IPs) 71114.01, Exercise Evaluation; 71114.04, Emergency Action Level and Emergency Plan Changes; and the Emergency Preparedness sections of 71151, Performance Indicator Verification. Prior to the onsite inspection period, inspectors will review the proposed exercise scenario using IP 71114.08, Exercise Evaluation - Scenario Review.
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. To minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation, and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff, and understand that our regulatory contact for this inspection will be Rhonda Outler, 912-366-2000, extension 2400 of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Steven Sanchez at 404-997-4418 (steven.sanchez@nrc.gov), or the Chief, Plant Support Branch 1, Brian Bonser at 404-997-4653.
D. Vineyard 2 This letter and its enclosure will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-321 and 50-366 License Nos. DPR-57 AND NPF-5
Enclosure:
Document Request List cc: Distribution via Listserv
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRS/PSB1 RII:DRS/PSB1 SIGNATURE JDH SPS BRB NAME J. Hickman S. Sanchez B. Bonser DATE 5/18/2017 5/19/2017 5/19/2017 E-MAIL COPY YES NO YES NO YES NO
Document Request List Inspection Dates: October 16-20, 2017 Inspection Procedures (IPs): IP 71114.01 Exercise Evaluation IP 71114.04 Emergency Action Level and Emergency Plan Changes IP 71114.08 Scenario Evaluation IP 71151 Performance Indicator Verification Note: This is a list of the documents to be provided to the inspectors upon arrival onsite. The current version of these documents is expected unless specified otherwise. The first seven italicized items under IP 71114.01 are requested as early as practical, but no later than 60 days prior to the exercise, to support the pre-exercise scenario review under IP 71114.08. However, this should not preclude submitting the scenario per 10 CFR 50.4. Electronic media is preferred, if readily available (the preferred file format is Word or searchable .pdf files on CDROM). [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below (e.g., a folder labeled Miscellaneous). It is not the intent that large or burdensome data be scanned for this purpose (e.g., Performance Indicator documents). This data will be inspected using original documentation. Material can be provided prior to the inspection to the NRC Region II Office (ATTN: Steven Sanchez), 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.
71114.01 Exercise Evaluation Current exercise package: scenario timeline, expected Drill and Exercise Performance (DEP) opportunities, exercise objectives, radiological assumptions, and scope of play and participation Completed IP 71114.08 Scenario Review Checklist, if performed Last graded and off-year exercise packages: scenario timelines, drill reports or assessments, and Final Federal Emergency Management Agency (FEMA) / Department of Homeland Security (DHS) exercise report All drill reports for the 2-year inspection period Current and immediately previous revisions of the Emergency Plan (E-Plan)
Record of exercises conducted during each 8-year-cycle that documents the scenario elements demonstrated Drill, Exercise, and Emergency Facility Activation procedures Core damage assessment procedure Dose assessment procedure Special/emergency exposure procedure Potassium Iodide distribution procedure Assembly/accountability procedure Corrective Action Program (CAP) entries related to the exercises and drills for the 2-year inspection period (including those written by Corporate)
Enclosure
2 71114.04 Emergency Action Level and Emergency Plan Changes Governing document for 10 CFR 50.54(q) evaluation process 10 CFR 50.54(q) evaluator training program and qualification records 10 CFR 50.54(q) evaluation/screening of changed Emergency Action Level (EAL), E-Plan, and Emergency Preparedness (EP) implementing procedures (including corporate procedures)
Current and immediately previous revisions of EAL, E-Plan, and EP procedures (electronic version of current E-Plan requested about 3 weeks before inspection)
CAP entries related to EAL and E-Plan changes since the last NRC EP inspection (including those written by Corporate) 71151 Performance Indicator Verification Governing document for the performance indicators (PIs) process DEP, Emergency Response Organization (ERO), and Alert and Notification System (ANS)
PI data submitted since the last NRC EP inspection, documented in the report (hard copies can be provided upon arrival)
DEP documentation and evaluations since the last NRC EP inspection CAP entries related to PIs, that is DEP, ERO training and participation, and ANS since the last NRC EP inspection (including those written by Corporate)
Miscellaneous Procedures and Records CAP procedure Safety Evaluation Report approved E-Plan and EALs Corporate and Departmental processes or procedures for EP staff Lead Inspector Contact Information:
Steven Sanchez 404-997-4418 steven.sanchez@nrc.gov LIST OF ACRONYMS ANS Alert and Notification System CAP Corrective Action Program DEP Drill and Exercise Performance DHS Department of Homeland Security EAL Emergency Action Level EP Emergency Preparedness E-Plan Emergency Plan ERO Emergency Response Organization FEMA Federal Emergency Management Agency IPs Inspection Procedures PIs Performance Indicators