ML17207A733: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 14: Line 14:
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| page count = 14
| page count = 14
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:I TABLE  3.7-2            Continued SAFETY RELATED HYDRAULIC SNUBBERS*
FPL LOCATION    HARK      SYSTEM SNUBBER INSTALLED              ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFFICULT NO.      NO.      ON  LOCATION AND ELEVATION            INACCESSIBLE      ZONE**        TO REMOVE A  or I      Yes or No      Yes or No 033  HS  649-319  HS, Reactor Bldg., El ev.,                                  No            No 82'lev.
034  HS  548-5    HS, Reactor Bldg.,                            A              No            No I
82'lev.
036  HS  649-314  MS, Reactor Bldg.,                                          No            No 55'lev.
037  HS  649-314  HS, Reactor Bldg.,                            I              No 55'lev.
038  HS  649-310  MS, Reactor Bldg.,                            I              No            No 50'lev.
039  HS  649-304A HS, Reactor Bldg.,                            A              No            Yes 30'lev.
040  HS  548-9    HS, Reactor Bldg.,                            I              No            Yes 50'lev.
041  NS  548-9    HS, Reactor Bldg.,                            I              No            Yes 50'lev.
042  BF  549-7    BF, Reactor Bldg.,                            I                            No 40'lev.
043  BF  549-7    BF, Reactor Bldg.,                            I              No            No 40'lev.
044  BF  549-8    BF, Reactor Bldg.,                            I                            Yes 36' 40'lev.
047  BF  549-17  BF, Reactor Bldg.,                            A                            Yes CO C7
TABLE 3. 7-2      Continued SAFETY RELATED HYDRAULIC SNUBBERS*
FPL LOCATION    HARK      SYSTEM SNUBBER INSTALLED        ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFFICULT NO.      NO. ON  LOCATION AND ELEYATION      INACCESSIBLE      ZONE**        TO REMOVE A or I        Yes or No      Yes or No 052  BF  549-17  BF, Reactor Bldg., Elev. 36'53 No            No SI 968-210  SI, Reactor Bldg., Elev. 16'58 No SI 969-1216 SI, Reactor Bldg., Elev. 18'          A              No            No
'ql TABLE 3.7-2  Continued SAFETY RELATED HYDRAULIC SNUBBERS*
FPL LOCATION  MARK      SYSTEM SNUBBER INSTALLED      ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFFICULT NO.      NO. ON  LOCATION AND ELEVATION      INACCESSIBLE      ZONE**        TO REMOVE (A or I)      (Yes or  No    (Yes or No 081  SI 676-67  SI, RAB, Elev.                                        No            No 4'82 SI 676-67  SI, RAB, Elev.                        A              No            No Elev. 4' 4'83 SI 676-105 SI, RAB,                              A              No            No
      >> N Ir  .~
il
TABLE 3.7-2  Continued SAFETY RELATED HYDRAULIC SNUBBERS*
FPL LOCATION  MARK      SYSTEM SNUBBER INSTALLED      ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFFICULT NO.      NO.      ON  LOCATION AND    fLEYATION  INACCESSIBLE      ZONE**        TO REMOYE A or I        Yes or No      Yes or No 084  SI 676-105  SI, RAB, Elev.                                                      No Elev. 7' 4'12 SI 676-4505 SI, RAB,                              A              No tD CO C)
TABLE 3.7-2  Continued SAFETY RELATED HYDRAULIC SNUBBERS*
FPL LOCATION  HARK      SYSTEM SNUBBER INSTALLED  ACCESSIBLE OR -
HIGH RADIATION ESPECIALLY DIFFICULT NO.      NO. ON, LOCATION AND ELEVATION  INACCESSIBLE          ZONE**.        TO REMOYE A or I          Yes or No      Yes or No 102  HS-649-313 CC, RAB, Elev. 26'                                                  No
V V  n
SAFETY 'EVALUATION Re: St. Lucie Unit    1 Docket No. 50-335 Snubbers I. Introduction This evaluation supports        a  proposed change to Table 3.7-2 (SAFETY RELATED HYDRAULIC SNUBBERS).            Several snubbers on the    list  are deleted because  they are scheduled to          be  replaced by mechanical    snubbers  during the next refueling outage (Spring 1980).              Only smaller snubbers    of the  3 kip (3000 inch-pounds)        and 10  ki p size  will  be affected by the changeover    (see attached      list)-
II. Evaluation The snubbers    in question are designed        and installed for seismic considerations.        That  is, their    design function is to accommodate pipe movement caused      by slow thermal expansion,        but to "lock-up" to prevent potentially    damaging    transient    movement  duri ng a  postulated seismic event of  sufficie'nt magnitude.          The  Pacific Scientific    (PSA) mechanical snubbers which      we  propose    to  use operate on an    "acceleration limiting" basis. PSA  snubbers    permit thermal movement since the acceleration          .
associated    with thermal      movement    is very low, but they limit seismic induced acceleration to 0.02g.. Mechanical snubbers              would  actually allow less  movement than      hydraulic snubbers under seismic conditions because
  ~ g  ~
k
~  ~
~  ~ '
of hydraulic snubber lockup delays associated with achieving- the lockup velocity, activation of the lockup        mechanism,  and compression    of the hydraulic fluid. Therefore, based          on seismic  functional requirements, the planned replacement of hydraulic snubbers with mechanical                snubbers would be an improvement.
Pacific Scientific performed extensive testing in developing the                PSA 3 (3  kip)  and PSA 10 mechanical    sriubbers. The purpose  was  to evaluate their operability      under the adverse conditions expected in many applications,    such as high humidity, high temperature,          and  vibration.
The snubbers    operated favorably under      all test conditions.
PSA 3  and PSA 10 mechanical      snubbers  are currently in use at St. Lucie (see Amendment 31 to      Facility  Operating License DPR-67) and at        a  large number    of other reactor sites.      The use  of these snubbers    has been previously evaluated by the Commission          and found  to  be  acceptable.
III. Conclusions Based on    testing  and  operating experience, the use of        PSA  mechanical snubbers    should improve the operability of the seismic support system.
In conclusion, (1) the proposed change does not increase the probability or consequences      of accidents or malfunctions of equipment important to safety  and does not reduce    the margi n of safety    as  defined in the basis for  any  technical specification, therefore, the change          does not    involve a  significant  hazards consideration,      (2) there is reasonable      assurance that the health      and  safety of the public will not      be endangered    by
operation in the proposed manner,  and  (3) such activities will  be conducted in compliance with the Commission's regulations and the-issuance of  this amendment will  not be inimical to the  common defense and  security or to the health and  safety of the public.
    ~
r ~
Snubber Chan eout  PSL The folios(ing hydraulic snubbers are scheduled to      be replaced  by mechanical snubbers  during the Spring 1980 refueling outage:
V 3  Kip Size                                  10 Kip Size Tag No.            Hark No.                  Tag No.          Hark No.
035        HS-1076-3164                    101            CC-17-1 061        HS-549-11 (S I-970-1248)        103            CC-21-5 066        HS-549-11(S I-970-.1248)        104            CC-21-1 073  .      SI-972-6240                      105            CC-23-2 074        SI-973-240 076        SI-973-6224 077        SI-868-64 079        SI-868-163 080        SI-868-410 086        SI-676-129 087        SI-676-241(SI-676-250) 088        CC-1899-48 089        CC-1852-6241 090        SPS-27 091        SPS-417 092        SPS-467 093        SPS-777 096        CC-1865-9 106        CH-3-40 107        CH-3-75 110        SI-676-247(SI-676-2475) 111        S I-676-247 5A 114        SI>>972-6240
0 iP c 4 l
'I
              ~,t}}

Latest revision as of 01:31, 30 October 2019

Tech Specs Pages 3/4 7-33 Through 3/4 7-37,deleting 27 Entries from Table 3.7-2 Re Replacement of safety-related Hydraulic Snubbers
ML17207A733
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/09/1980
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17207A732 List:
References
NUDOCS 8001140450
Download: ML17207A733 (14)


Text

I TABLE 3.7-2 Continued SAFETY RELATED HYDRAULIC SNUBBERS*

FPL LOCATION HARK SYSTEM SNUBBER INSTALLED ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFFICULT NO. NO. ON LOCATION AND ELEVATION INACCESSIBLE ZONE** TO REMOVE A or I Yes or No Yes or No 033 HS 649-319 HS, Reactor Bldg., El ev., No No 82'lev.

034 HS 548-5 HS, Reactor Bldg., A No No I

82'lev.

036 HS 649-314 MS, Reactor Bldg., No No 55'lev.

037 HS 649-314 HS, Reactor Bldg., I No 55'lev.

038 HS 649-310 MS, Reactor Bldg., I No No 50'lev.

039 HS 649-304A HS, Reactor Bldg., A No Yes 30'lev.

040 HS 548-9 HS, Reactor Bldg., I No Yes 50'lev.

041 NS 548-9 HS, Reactor Bldg., I No Yes 50'lev.

042 BF 549-7 BF, Reactor Bldg., I No 40'lev.

043 BF 549-7 BF, Reactor Bldg., I No No 40'lev.

044 BF 549-8 BF, Reactor Bldg., I Yes 36' 40'lev.

047 BF 549-17 BF, Reactor Bldg., A Yes CO C7

TABLE 3. 7-2 Continued SAFETY RELATED HYDRAULIC SNUBBERS*

FPL LOCATION HARK SYSTEM SNUBBER INSTALLED ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFFICULT NO. NO. ON LOCATION AND ELEYATION INACCESSIBLE ZONE** TO REMOVE A or I Yes or No Yes or No 052 BF 549-17 BF, Reactor Bldg., Elev. 36'53 No No SI 968-210 SI, Reactor Bldg., Elev. 16'58 No SI 969-1216 SI, Reactor Bldg., Elev. 18' A No No

'ql TABLE 3.7-2 Continued SAFETY RELATED HYDRAULIC SNUBBERS*

FPL LOCATION MARK SYSTEM SNUBBER INSTALLED ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFFICULT NO. NO. ON LOCATION AND ELEVATION INACCESSIBLE ZONE** TO REMOVE (A or I) (Yes or No (Yes or No 081 SI 676-67 SI, RAB, Elev. No No 4'82 SI 676-67 SI, RAB, Elev. A No No Elev. 4' 4'83 SI 676-105 SI, RAB, A No No

>> N Ir .~

il

TABLE 3.7-2 Continued SAFETY RELATED HYDRAULIC SNUBBERS*

FPL LOCATION MARK SYSTEM SNUBBER INSTALLED ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFFICULT NO. NO. ON LOCATION AND fLEYATION INACCESSIBLE ZONE** TO REMOYE A or I Yes or No Yes or No 084 SI 676-105 SI, RAB, Elev. No Elev. 7' 4'12 SI 676-4505 SI, RAB, A No tD CO C)

TABLE 3.7-2 Continued SAFETY RELATED HYDRAULIC SNUBBERS*

FPL LOCATION HARK SYSTEM SNUBBER INSTALLED ACCESSIBLE OR -

HIGH RADIATION ESPECIALLY DIFFICULT NO. NO. ON, LOCATION AND ELEVATION INACCESSIBLE ZONE**. TO REMOYE A or I Yes or No Yes or No 102 HS-649-313 CC, RAB, Elev. 26' No

V V n

SAFETY 'EVALUATION Re: St. Lucie Unit 1 Docket No. 50-335 Snubbers I. Introduction This evaluation supports a proposed change to Table 3.7-2 (SAFETY RELATED HYDRAULIC SNUBBERS). Several snubbers on the list are deleted because they are scheduled to be replaced by mechanical snubbers during the next refueling outage (Spring 1980). Only smaller snubbers of the 3 kip (3000 inch-pounds) and 10 ki p size will be affected by the changeover (see attached list)-

II. Evaluation The snubbers in question are designed and installed for seismic considerations. That is, their design function is to accommodate pipe movement caused by slow thermal expansion, but to "lock-up" to prevent potentially damaging transient movement duri ng a postulated seismic event of sufficie'nt magnitude. The Pacific Scientific (PSA) mechanical snubbers which we propose to use operate on an "acceleration limiting" basis. PSA snubbers permit thermal movement since the acceleration .

associated with thermal movement is very low, but they limit seismic induced acceleration to 0.02g.. Mechanical snubbers would actually allow less movement than hydraulic snubbers under seismic conditions because

~ g ~

k

~ ~

~ ~ '

of hydraulic snubber lockup delays associated with achieving- the lockup velocity, activation of the lockup mechanism, and compression of the hydraulic fluid. Therefore, based on seismic functional requirements, the planned replacement of hydraulic snubbers with mechanical snubbers would be an improvement.

Pacific Scientific performed extensive testing in developing the PSA 3 (3 kip) and PSA 10 mechanical sriubbers. The purpose was to evaluate their operability under the adverse conditions expected in many applications, such as high humidity, high temperature, and vibration.

The snubbers operated favorably under all test conditions.

PSA 3 and PSA 10 mechanical snubbers are currently in use at St. Lucie (see Amendment 31 to Facility Operating License DPR-67) and at a large number of other reactor sites. The use of these snubbers has been previously evaluated by the Commission and found to be acceptable.

III. Conclusions Based on testing and operating experience, the use of PSA mechanical snubbers should improve the operability of the seismic support system.

In conclusion, (1) the proposed change does not increase the probability or consequences of accidents or malfunctions of equipment important to safety and does not reduce the margi n of safety as defined in the basis for any technical specification, therefore, the change does not involve a significant hazards consideration, (2) there is reasonable assurance that the health and safety of the public will not be endangered by

operation in the proposed manner, and (3) such activities will be conducted in compliance with the Commission's regulations and the-issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.

~

r ~

Snubber Chan eout PSL The folios(ing hydraulic snubbers are scheduled to be replaced by mechanical snubbers during the Spring 1980 refueling outage:

V 3 Kip Size 10 Kip Size Tag No. Hark No. Tag No. Hark No.

035 HS-1076-3164 101 CC-17-1 061 HS-549-11 (S I-970-1248) 103 CC-21-5 066 HS-549-11(S I-970-.1248) 104 CC-21-1 073 . SI-972-6240 105 CC-23-2 074 SI-973-240 076 SI-973-6224 077 SI-868-64 079 SI-868-163 080 SI-868-410 086 SI-676-129 087 SI-676-241(SI-676-250) 088 CC-1899-48 089 CC-1852-6241 090 SPS-27 091 SPS-417 092 SPS-467 093 SPS-777 096 CC-1865-9 106 CH-3-40 107 CH-3-75 110 SI-676-247(SI-676-2475) 111 S I-676-247 5A 114 SI>>972-6240

0 iP c 4 l

'I

~,t