ML17265A684: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17265A684
| number = ML17265A684
| issue date = 06/21/1999
| issue date = 06/21/1999
| title = Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section Xi Require Exams for First 10-Yr Interval for Containment
| title = Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = VISSING G S
| addressee name = Vissing G
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000244
| docket = 05000244
Line 14: Line 14:
| page count = 6
| page count = 6
| project =  
| project =  
| stage = Other
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:glACCESSIONNBRFACIL:50-244AUTE.NAMEMECRgDY,R.C.RECIP.NAMEVISSING;G.S.REGULAYINFORMATIONDISTRIBUTIONYSTEM(RIDS)'I:9906290269DOC.DATE:99/06/2X"NOTARIZED:NODOCKET0.RobertEmmetGinnaNuclearPlant,Unit1,RochesterG05000244AUTHORAFFILIATIONRochesterGas8ElectricCorp.RECIPIENTAFFILIATION
{{#Wiki_filter:gl              REGULA      Y INFORMATION DISTRIBUTION            YSTEM (RIDS)
                                                                  'I ACCESSION NBR :9906290269          DOC.DATE: 99/06/2X" NOTARIZED: NO                    DOCKET 0 FACIL:50-244 .Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                    G  05000244 AUTE. NAME            AUTHOR AFFILIATION MECRgDY,R.C.          Rochester Gas 8 Electric Corp.
RECIP.NAME            RECIPIENT AFFILIATION VISSING; G. S.


==SUBJECT:==
==SUBJECT:==
InformsutilwishestoamendextentofalternateexamsprovidedforreliefrequestreISIprogramASMESectionXIrecpxireexamsforfirst10-Yrintervalforcontainment.DISTRIBUTIONCODE:A047DCOPIESRECEIVED:LTRENCLSIZE:TITLE:ORSubmittal:Inservice/Testing/RelieffromASMECode-GL-09-04NOTES:LicenseExp'dateinaccordancewith10CFR2,2.109(9/19/72).05000244ERECIPIENT,IDCODE/NAMELPD1-1LAVISSING,G.INTERNAL:cRXLECENTER01NUDOCS-ABSTRACTRES/DET/EIBEXTERNAL:LITCOANDERSONNRCPDRCOPIESLTTRENCL11111111111111RECIPIENTIDCODE/NAMELPD1-1PDNRR/DE/EMEBOGC/HDS3RES/DET/EMMEBNOACCOPIESLTTRENCL11111011110RDPEmR~Lt,~<g~'ENOTETOALL"RIDS"RECIPIENTS:PLEASEHELPUSTOREDUCEWASTE."TOHAVEYOURNAMEORORGANIZATIONREMOVEDFROMDISTRIBUTIONLISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION,CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION415-2083TOTALNUMBEROFCOPIESREQUIRED:LTTR12ENCL11 ANDROCHESTERGASANDELECl&#xc3;ICCORPORAVON~89EASTAYENUE,ROCHESrERN.YId6r19-0001AREACODE716&f6-2700ROBERTC.MECREDYVicePresidentNuclearOperationsJune21,1999U.S.NuclearRegulatoryCommissionDocumentControlDeskAttn:GuyS.VissingProjectDirectorateI-1Washington,D.C.20555
Informs util wishes to amend extent of alternate exams provided for relief request re ISI program ASME Section XI recpxire exams for first 10-Yr interval for containment.
DISTRIBUTION CODE: A047D          COPIES RECEIVED:LTR          ENCL        SIZE:
TITLE:   OR  Submittal: Inservice/Testing/Relief from              ASME Code  GL-09-04 NOTES:License Exp'date        in  accordance with 10CFR2,2.109(9/19/72).                 05000244 E RECIPIENT,           COPIES              RECIPIENT            COPIES ID  CODE/NAME        LTTR ENCL          ID CODE/NAME        LTTR ENCL                0 LPD1-1 LA                1      1      LPD1-1  PD              1    1 VISSING,G.               1      1                                                        R INTERNAL: cRXLE CENTER      01      1      1      NRR/DE/EMEB              1    1 NUDOCS-ABSTRACT          1      1      OGC/HDS3                  1    0 RES/DET/EIB              1      1      RES/DET/EMMEB            1    1 EXTERNAL: LITCO ANDERSON              1      1      NOAC                      1    1 NRC PDR                  1      1 D
PEmR~Lt,~<g~
                                                                                                    'E NOTE TO  ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE."TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR              12  ENCL      11
 
AND ROCHESTER GASANDELECl&#xc3;ICCORPORAVON ~ 89EASTAYENUE, ROCHESrER N. Y Id6r19-0001    AREA CODE716 &f6-2700 ROBERT C. MECREDY Vice President Nuclear Operations June 21, 1999 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, D.C. 20555


==Subject:==
==Subject:==
InserviceInspectionProgramASMESectionXIRequiredExaminationsforFirst10-YearIntervalforContainment(IWEandIWL)RequestforReliefNo.40R.E.GinnaNuclearPowerPlantDocketNo.50/244
Inservice Inspection Program ASME Section XI Required Examinations for First 10-Year Interval for Containment (IWE and IWL)
Request for Relief No. 40 R.E. Ginna Nuclear Power Plant Docket No. 50/244
 
==Dear Mr. Vissing:==
 
RG&E provided the NRC with the subject relief request on January 11, 1999. As a result of a telecon with NRC staff on June 16, 1999, RG&E wishes to amend the extent of the alternate examinations provided for in that relief request.
In addition to the testing to be conducted in accordance with 10CFR 50 Appendix J, RGB E will perform an IWE detailed visual examination of the repaired or replaced area (VT-1). A replacement page of the attachment to our January 11, 1999 relief request is provided.
Very truly yours, Robert C. Mecredy 9906290269 990b2'i POR        ADQCK 0500024%i
 
xc: Mr. Guy S. Vissing (Mail Stop 8C2)
Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475  Allendale Road King of Prussia, PA  19406 U.S. NRC Ginna Senior Resident Inspector
 
r T
I h
 
Collection systems, as required during the conduct of a system pressure test. In addition, personnel performing VT-2 examinations are required to be qualified in accordance with Subarticle IWA-2300 of ASME Section XI.
For repairs, replacements or modifications that are performed under ASME Section XI Code, applicable Construction Code (or Installation Code) non-destructive examinations (NDE) are performed and must meet the acceptance criteria of the Construction /
Installation Code. In addition to the Construction Code NDE, applicable ASME Section XI NDE pre-service NDE are also performed. These Construction Code and Section XI pre-service NDE requirements provide additional assurances that the repairs, replacements or modifications are sound and leak-tight.
Table IWE-2500-1, Examination Category E-P, identifies the examination method of 10 CFR 50, Appendix J and does not specifically identify a VT-2 visual examination. 10 CFR 50, Appendix J provides requirements for testing as well as acceptable leakage criteria. These tests are performed by Appendix J "Test" personnel and utilize calibrated equipment to determine acceptability. Additionally, 10 CFR 50.55a (b) (2) (x) (E) requires a general visual examination of the containment each period that would identify any structural degradation that may contribute to leakage. A "VT-2"visual examination willnot provide additional assurance of safety beyond that of current Appendix J practices.
Relief is requested in accordance with 10 CFR 50.55a (a) (3) (I). The proposed alternative (pressure testing in accordance with 10 CFR 50, Appendix J) willprovide and acceptable level of quality and safety.
The reference to paragraph IWA-5240 has been removed in the 1997 Addenda of ASME Section XI. This addenda has been approved by the ASME Main Committee and should be published in 1998.
Alternate Examinations:
Testing shall be conducted in accordance with 10 CFR 50, Appendix J, in lieu of Paragraph IWE-5240 of ASME Section XI, as well as performing an IWE detailed visual examination of the repaired or replaced area (VT-l).
Request for Relief No. 40                                          Attachment Page 2  of 3


==DearMr.Vissing:==
4 rr od}}
RG&EprovidedtheNRCwiththesubjectreliefrequestonJanuary11,1999.AsaresultofateleconwithNRCstaffonJune16,1999,RG&Ewishestoamendtheextentofthealternateexaminationsprovidedforinthatreliefrequest.Inadditiontothetestingtobeconductedinaccordancewith10CFR50AppendixJ,RGBEwillperformanIWEdetailedvisualexaminationoftherepairedorreplacedarea(VT-1).AreplacementpageoftheattachmenttoourJanuary11,1999reliefrequestisprovided.Verytrulyyours,RobertC.Mecredy9906290269990b2'iPORADQCK0500024%i xc:Mr.GuyS.Vissing(MailStop8C2)ProjectDirectorateI-1DivisionofReactorProjects-I/IIOfficeofNuclearReactorRegulationU.S.NuclearRegulatoryCommissionWashington,D.C.20555RegionalAdministrator,RegionIU.S.NuclearRegulatoryCommission475AllendaleRoadKingofPrussia,PA19406U.S.NRCGinnaSeniorResidentInspector rITh Collectionsystems,asrequiredduringtheconductofasystempressuretest.Inaddition,personnelperformingVT-2examinationsarerequiredtobequalifiedinaccordancewithSubarticleIWA-2300ofASMESectionXI.Forrepairs,replacementsormodificationsthatareperformedunderASMESectionXICode,applicableConstructionCode(orInstallationCode)non-destructiveexaminations(NDE)areperformedandmustmeettheacceptancecriteriaoftheConstruction/InstallationCode.InadditiontotheConstructionCodeNDE,applicableASMESectionXINDEpre-serviceNDEarealsoperformed.TheseConstructionCodeandSectionXIpre-serviceNDErequirementsprovideadditionalassurancesthattherepairs,replacementsormodificationsaresoundandleak-tight.TableIWE-2500-1,ExaminationCategoryE-P,identifiestheexaminationmethodof10CFR50,AppendixJanddoesnotspecificallyidentifyaVT-2visualexamination.10CFR50,AppendixJprovidesrequirementsfortestingaswellasacceptableleakagecriteria.ThesetestsareperformedbyAppendixJ"Test"personnelandutilizecalibratedequipmenttodetermineacceptability.Additionally,10CFR50.55a(b)(2)(x)(E)requiresageneralvisualexaminationofthecontainmenteachperiodthatwouldidentifyanystructuraldegradationthatmaycontributetoleakage.A"VT-2"visualexaminationwillnotprovideadditionalassuranceofsafetybeyondthatofcurrentAppendixJpractices.Reliefisrequestedinaccordancewith10CFR50.55a(a)(3)(I).Theproposedalternative(pressuretestinginaccordancewith10CFR50,AppendixJ)willprovideandacceptablelevelofqualityandsafety.ThereferencetoparagraphIWA-5240hasbeenremovedinthe1997AddendaofASMESectionXI.ThisaddendahasbeenapprovedbytheASMEMainCommitteeandshouldbepublishedin1998.AlternateExaminations:Testingshallbeconductedinaccordancewith10CFR50,AppendixJ,inlieuofParagraphIWE-5240ofASMESectionXI,aswellasperforminganIWEdetailedvisualexaminationoftherepairedorreplacedarea(VT-l).RequestforReliefNo.40AttachmentPage2of3 od4rr}}

Latest revision as of 16:45, 29 October 2019

Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment
ML17265A684
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/21/1999
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9906290269
Download: ML17265A684 (6)


Text

gl REGULA Y INFORMATION DISTRIBUTION YSTEM (RIDS)

'I ACCESSION NBR :9906290269 DOC.DATE: 99/06/2X" NOTARIZED: NO DOCKET 0 FACIL:50-244 .Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTE. NAME AUTHOR AFFILIATION MECRgDY,R.C. Rochester Gas 8 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSING; G. S.

SUBJECT:

Informs util wishes to amend extent of alternate exams provided for relief request re ISI program ASME Section XI recpxire exams for first 10-Yr interval for containment.

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code GL-09-04 NOTES:License Exp'date in accordance with 10CFR2,2.109(9/19/72). 05000244 E RECIPIENT, COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 LPD1-1 LA 1 1 LPD1-1 PD 1 1 VISSING,G. 1 1 R INTERNAL: cRXLE CENTER 01 1 1 NRR/DE/EMEB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 RES/DET/EIB 1 1 RES/DET/EMMEB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 D

PEmR~Lt,~<g~

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE."TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 11

AND ROCHESTER GASANDELEClÃICCORPORAVON ~ 89EASTAYENUE, ROCHESrER N. Y Id6r19-0001 AREA CODE716 &f6-2700 ROBERT C. MECREDY Vice President Nuclear Operations June 21, 1999 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, D.C. 20555

Subject:

Inservice Inspection Program ASME Section XI Required Examinations for First 10-Year Interval for Containment (IWE and IWL)

Request for Relief No. 40 R.E. Ginna Nuclear Power Plant Docket No. 50/244

Dear Mr. Vissing:

RG&E provided the NRC with the subject relief request on January 11, 1999. As a result of a telecon with NRC staff on June 16, 1999, RG&E wishes to amend the extent of the alternate examinations provided for in that relief request.

In addition to the testing to be conducted in accordance with 10CFR 50 Appendix J, RGB E will perform an IWE detailed visual examination of the repaired or replaced area (VT-1). A replacement page of the attachment to our January 11, 1999 relief request is provided.

Very truly yours, Robert C. Mecredy 9906290269 990b2'i POR ADQCK 0500024%i

xc: Mr. Guy S. Vissing (Mail Stop 8C2)

Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector

r T

I h

Collection systems, as required during the conduct of a system pressure test. In addition, personnel performing VT-2 examinations are required to be qualified in accordance with Subarticle IWA-2300 of ASME Section XI.

For repairs, replacements or modifications that are performed under ASME Section XI Code, applicable Construction Code (or Installation Code) non-destructive examinations (NDE) are performed and must meet the acceptance criteria of the Construction /

Installation Code. In addition to the Construction Code NDE, applicable ASME Section XI NDE pre-service NDE are also performed. These Construction Code and Section XI pre-service NDE requirements provide additional assurances that the repairs, replacements or modifications are sound and leak-tight.

Table IWE-2500-1, Examination Category E-P, identifies the examination method of 10 CFR 50, Appendix J and does not specifically identify a VT-2 visual examination. 10 CFR 50, Appendix J provides requirements for testing as well as acceptable leakage criteria. These tests are performed by Appendix J "Test" personnel and utilize calibrated equipment to determine acceptability. Additionally, 10 CFR 50.55a (b) (2) (x) (E) requires a general visual examination of the containment each period that would identify any structural degradation that may contribute to leakage. A "VT-2"visual examination willnot provide additional assurance of safety beyond that of current Appendix J practices.

Relief is requested in accordance with 10 CFR 50.55a (a) (3) (I). The proposed alternative (pressure testing in accordance with 10 CFR 50, Appendix J) willprovide and acceptable level of quality and safety.

The reference to paragraph IWA-5240 has been removed in the 1997 Addenda of ASME Section XI. This addenda has been approved by the ASME Main Committee and should be published in 1998.

Alternate Examinations:

Testing shall be conducted in accordance with 10 CFR 50, Appendix J, in lieu of Paragraph IWE-5240 of ASME Section XI, as well as performing an IWE detailed visual examination of the repaired or replaced area (VT-l).

Request for Relief No. 40 Attachment Page 2 of 3

4 rr od