ML17272A908: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CODE PROJECT ENGINEERING DIRECTIVE BVftPJS AND ROE, INC.iv V~'PPSS I"O'CLEAR PROJECT NO.2 REASON FOR P.E, D.: PROJECT ENGINEERING D I R ECTIVE 2 1\2 DATE i'0 INF 0 RM A'T ION COP I~S 5 6'18 I 8 IO PR IOR ITY I SHEE T'1 OF 8 S 1011 1212 1415 This?"=D is to allow the contractor to prepare for welding to be done by Dual.Shield FCAW Process.REFERENCES SUBJECT Dual Shield FCAW ualifica LOCATION ENG.SYSTEM S/U S~S~s-I'UALITY C LASS on ORIGINATING DOCUMENTS Type of Filler 25 lb.spools (1500 lbs)(Dia.045)Dual Shield (E-70T-1)Metal Required manufacturer:
{{#Wiki_filter:CODE                 PROJECT ENGINEERING DIRECTIVE BVftPJS AND ROE, INC.                                             2        1 PROJECT iv V~'PPSS                         ENGINEERING                \      2              5  6    8  S  1011 1212 1415 I"O'CLEAR PROJECT D I R ECTIVE               DATE           i'0               I 8 IO    PR IOR ITY NO. 2
Chemetrom Welding Supply (206)682-2880 Gas-Argon-CO 2 98-2%John Brosnann (415)658-5010 DESCRIPTION OF WORK: Contractor shall obtain machinery, welding wire and test materials to qualify a procedure and personnel, suitable to perform nec'essary capacity of welding to be done on the Sac.Wall.Contractor shall coordinate all operations with Burns and Roe Welding Engineer in contractors establishment for qualifying procedures and personnel, to inable this program to be expedited.
                                                                                                  '18                    I INF 0 RM A'T ION                             SHEE T'1 OF REASON FOR P. E, D.:
The procedure and personnel shall be qualified in the horizontal position.The test plate for qualifying the procedure and personnel shall be in accordance with AWS'l.l and Spec.215-17D.A 2'x 2'ock-up of the plate thickness (as close as possible), and joint design shall be'welded by each welder prior to welding on the Sac.Wall.Type of Machinery Required 12 Manufacturer:
COP I~S This   ?"=D is to allow the contractor to prepare for welding to be done by Dual .Shield FCAW Process.
Airco Flux Core Welding Machines 1.THIS PED REVISES DIRECTION PREVIOUSLY PROVIDED BY THE FOLLOWING PEDIsI: 2.THIS PED VOIDS D IRECTION PREVIOUSLY PROVIDED BY THE FOLLOWING PEDIsI: REVISE: NONE DRAWINGS SPECIF ICATION APP ROVAL'S: 0 Z 3.THIS PED WORK SHOULD BE COORDINATED WITH KNOWN OTHER wORK UNDER THE FOLLOWING PED'S'P'NGINEER LEAD DISCIPLINE ENGINEER DATE 4.THIS PED DEPENDS ON THE PRIOR INSTALLATION 0>>THE FVLLOWING PED'S S/U LIAISON ENGINEER DATE RESIDENT PROJECT ENGINEER DA E I',EV i BR 803-2 800EDgS I'k 4 II}}
REFERENCES SUBJECT               Dual Shield       FCAW     ualifica   on LOCATION ENG. SYSTEM S/U   S~S~s-I'UALITY C LASS ORIGINATING DOCUMENTS DESCRIPTION OF WORK:
Contractor shall obtain machinery, welding wire and test materials to qualify a procedure and personnel,         suitable to perform nec'essary capacity of welding to be done on the Sac. Wall.
Contractor shall coordinate all operations with Burns and Roe Welding Engineer in contractors establishment for qualifying procedures and personnel, to inable this program to be expedited.
The procedure and personnel shall be qualified in the horizontal position. The test plate for qualifying the procedure and personnel shall be in accordance with AWS'l.l and Spec. 215-17D. A 2'x 2'ock-up of the plate thickness (as close as possible), and joint design shall be'welded by each welder prior to welding on the Sac. Wall.
Type of Machinery Required                      Type of Filler Metal Required 12                                             25 lb. spools                      manufacturer:
Manufacturer: Airco Flux                       (1500 lbs)                          Chemetrom Welding Supply Core Welding Machines                           (Dia. 045)                          (206) 682-2880 John Brosnann                                  Dual Shield                          Gas  Argon  CO (415) 658-5010                                  (E-70T-1)                                                    2 98-2%
: 1. THIS PED REVISES DIRECTION                       REVISE:
PREVIOUSLY PROVIDED BY THE FOLLOWING PEDIsI:                              NONE DRAWINGS
: 2. THIS PED VOIDS D IRECTION                         SPECIF ICATION PREVIOUSLY PROVIDED BY THE FOLLOWING PEDIsI:                           APP ROVAL'S:
0 PED'S'P'
: 3. THIS PED WORK SHOULD BE Z          COORDINATED WITH KNOWN                                                       NGINEER OTHER               wORK UNDER THE FOLLOWING                               LEAD DISCIPLINE ENGINEER                               DATE
: 4. THIS PED DEPENDS ON THE                           S/U LIAISON ENGINEER                                  DATE PRIOR INSTALLATION0>>
THE FVLLOWING PED'S                               RESIDENT PROJECT ENGINEER                             DA   E I',EV i BR 803-2 800EDgS
 
k I'
4 II}}

Latest revision as of 15:46, 29 October 2019

Project Engineering Directive Re Preparation for Welding by Dual Shield Fcaw Process
ML17272A908
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/14/1980
From:
BURNS & ROE CO.
To:
Shared Package
ML17272A904 List:
References
215-W-2749, NUDOCS 8004070374
Download: ML17272A908 (2)


Text

CODE PROJECT ENGINEERING DIRECTIVE BVftPJS AND ROE, INC. 2 1 PROJECT iv V~'PPSS ENGINEERING \ 2 5 6 8 S 1011 1212 1415 I"O'CLEAR PROJECT D I R ECTIVE DATE i'0 I 8 IO PR IOR ITY NO. 2

'18 I INF 0 RM A'T ION SHEE T'1 OF REASON FOR P. E, D.:

COP I~S This  ?"=D is to allow the contractor to prepare for welding to be done by Dual .Shield FCAW Process.

REFERENCES SUBJECT Dual Shield FCAW ualifica on LOCATION ENG. SYSTEM S/U S~S~s-I'UALITY C LASS ORIGINATING DOCUMENTS DESCRIPTION OF WORK:

Contractor shall obtain machinery, welding wire and test materials to qualify a procedure and personnel, suitable to perform nec'essary capacity of welding to be done on the Sac. Wall.

Contractor shall coordinate all operations with Burns and Roe Welding Engineer in contractors establishment for qualifying procedures and personnel, to inable this program to be expedited.

The procedure and personnel shall be qualified in the horizontal position. The test plate for qualifying the procedure and personnel shall be in accordance with AWS'l.l and Spec. 215-17D. A 2'x 2'ock-up of the plate thickness (as close as possible), and joint design shall be'welded by each welder prior to welding on the Sac. Wall.

Type of Machinery Required Type of Filler Metal Required 12 25 lb. spools manufacturer:

Manufacturer: Airco Flux (1500 lbs) Chemetrom Welding Supply Core Welding Machines (Dia. 045) (206) 682-2880 John Brosnann Dual Shield Gas Argon CO (415) 658-5010 (E-70T-1) 2 98-2%

1. THIS PED REVISES DIRECTION REVISE:

PREVIOUSLY PROVIDED BY THE FOLLOWING PEDIsI: NONE DRAWINGS

2. THIS PED VOIDS D IRECTION SPECIF ICATION PREVIOUSLY PROVIDED BY THE FOLLOWING PEDIsI: APP ROVAL'S:

0 PED'S'P'

3. THIS PED WORK SHOULD BE Z COORDINATED WITH KNOWN NGINEER OTHER wORK UNDER THE FOLLOWING LEAD DISCIPLINE ENGINEER DATE
4. THIS PED DEPENDS ON THE S/U LIAISON ENGINEER DATE PRIOR INSTALLATION0>>

THE FVLLOWING PED'S RESIDENT PROJECT ENGINEER DA E I',EV i BR 803-2 800EDgS

k I'

4 II