CODE PROJECT ENGINEERING DIRECTIVE BVftPJS AND ROE, INC.
iv V~'PPSS I"O'CLEAR PROJECT NO. 2 REASON FOR P. E, D.:
PROJECT ENGINEERING D I R ECTIVE 2
1
\\
2 DATE i'0 INF0 RMA'TION COP I~S 5
6
'18 I 8 IO PR IOR ITY I
SHEE T'1 OF 8
S 1011 1212 1415 This
?"=D is to allow the contractor to prepare for welding to be done by Dual.Shield FCAW Process.
REFERENCES SUBJECT Dual Shield FCAW ualifica LOCATION ENG. SYSTEM S/U S~S~s-I'UALITY C LASS on ORIGINATING DOCUMENTS Type of Filler 25 lb. spools (1500 lbs)
(Dia. 045)
Dual Shield (E-70T-1)
Metal Required manufacturer:
Chemetrom Welding Supply (206) 682-2880 Gas Argon CO2 98-2%
John Brosnann (415) 658-5010 DESCRIPTION OF WORK:
Contractor shall obtain machinery, welding wire and test materials to qualify a procedure and personnel, suitable to perform nec'essary capacity of welding to be done on the Sac. Wall.
Contractor shall coordinate all operations with Burns and Roe Welding Engineer in contractors establishment for qualifying procedures and personnel, to inable this program to be expedited.
The procedure and personnel shall be qualified in the horizontal position.
The test plate for qualifying the procedure and personnel shall be in accordance with AWS'l.l and Spec.
215-17D.
A 2'x 2'ock-up of the plate thickness (as close as possible),
and joint design shall be'welded by each welder prior to welding on the Sac. Wall.
Type of Machinery Required 12 Manufacturer: Airco Flux Core Welding Machines 1.
THIS PED REVISES DIRECTION PREVIOUSLY PROVIDED BY THE FOLLOWING PEDIsI:
2.
THIS PED VOIDS D IRECTION PREVIOUSLY PROVIDED BY THE FOLLOWING PEDIsI:
REVISE:
NONE DRAWINGS SPECIF ICATION APP ROVAL'S:
0Z 3.
THIS PED WORK SHOULD BE COORDINATED WITH KNOWN OTHER wORK UNDER THE FOLLOWINGPED'S'P' NGINEER LEAD DISCIPLINE ENGINEER DATE 4.
THIS PED DEPENDS ON THE PRIOR INSTALLATION0>>
THE FVLLOWINGPED'S S/U LIAISON ENGINEER DATE RESIDENT PROJECT ENGINEER DA E
I',EV i BR 803-2 800EDgS
I' k
4 II