{{#Wiki_filter:~TABLE 3.3-3 (Continued)
{{#Wiki_filter:~
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUHENTATION 0'13%QQ&#xc3;O M&UI UO DO Cl<RM ON UIA OO ON QOB t!UIM Xhl N (m C)m m Cs m'X 4(c)C.Automatic Actuation Logic VII.AUXILIARY FEEDWATER (SG"2)(AFAS-2)
TABLE 3.3-3 (Continued)
A.Sensor/Trip Units 1.Steam Generator 02 Level-Low CHANNELS TO TRIP 2(d)2(d)1 B.2.SLeam Generator d Pressure-SGl>SG2 ESFA System Logic 1.Matrix Logic 2.Initiation Logic 6 4(c)2(d)4(c)3.Hanual AFAS 2(d)1 C.Automatic Actuation Logic 2 VIII.LOSS OF POWER (LOV)A.4.16 kV Emergency Bus Under-voltage (Loss of Voltage)B.4.16 kV Emergency Bus Under-voltage (Degraded Voltage)IX.CONTROL ROOM ESSENTIAL FILTRATION 4/Bu gg)'.2/Bus 4/Bu (g.): 2/Bus 2 1 TOTAL NO.ESFA SYSTEM FUNCTIONAL UNIT OF CHANNELS VI.AUXILIARY FEEDWATER (SG-l)(AFAS-1)(Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUHENTATION m
B.ESt A System Logic l.Matrix Logic 6 2.Initiation Logic 4(c)3.Manual AFAS MINIMUM CHANNELS OPERABLE 3/Bus 3/Bus APPLICABLE MODES 1 2 3 1 2 3 1 2 3 1, 2, 3, 4 1 2 1, 2, 3, 4 3, 4 1, 2, 3 1, 2, 3 All Modes 1 2 3 1, 2, 3, 4 1,2,-3,4 ,.1,2,3,4 ACTION 17 0 12 15 D3 16 Q f I III 0 13", l 4" O A 13*, 14" 17 12 15 16 13", 14" 13k 14k JI)4!18" 1
(                                               TOTAL NO.      CHANNELS MINIMUM CHANNELS  APPLICABLE C) ESFA SYSTEM FUNCTIONAL UNIT                  OF CHANNELS    TO TRIP  OPERABLE    MODES      ACTION m
GR INFGRMATIGN GNi TABLE 3.3" 3 Continued)
VI. AUXILIARY FEEDWATER (SG-l)(AFAS-1) (Continued)
TABLE NOTATIONS (a)In MODES 3-4, the value may be decreased manually, to a minimum of 100 psia, as pressurizer pressure is reduced, provided the margin between the pressurizer pressure and this value is maintained at less than or equal to 400 psi;the setpoint shall be increased automatically as pressurizer pressure is increased until the trip setpoint is reached.Trip may be manually bypassed below 400 psia;bypass shall be automatically removed whenever pressurizer pressure is greater than or equal to 500 psia.(b)In MODES 3-4, the value may be decreased manually as steam generator pressure is reduced, provided the margin between the steam generator pressure and this value is maintained at less than or equal to 200 psi;the setpoint shall be increased automatically as steam generator pressure is increased until the trip setpoint is reached.(c)Four channels provided, arranged in a selective two-out-of-four configuration (i.e., one-out-of-two taken twice).(d)The proper two-out-of-four combination.
B. ESt A System  Logic
: l. Matrix Logic                  6                                    1  2  3    17
: 2. Initiation Logic              4(c) 0 2(d)                1, 2, 3,  4 12
: 3. Manual AFAS                    4(c)            2(d)                1,2,-3,4    15              D3 Automatic Actuation Logic                           1                  ,.1,2,3,4      16 Q
C.                                                                                                        f I
VII. AUXILIARY FEEDWATER (SG"2)(AFAS-2)                                                                         III 0'13%
QQ A. Sensor/Trip Units                                                                                       0
  &#xc3;O              1. Steam Generator 02 Level-M
  &UI                  Low                                                                 1  2   3    13", l 4"      O UO              2. SLeam Generator d A
DO Cl<
RM                    Pressure - SGl > SG2                                               1  2  3    13*, 14" ON          B. ESFA System Logic UIA OO              1. Matrix Logic                     6                                    1  2  3    17 ON t!QOB UIM              2. Initiation Logic                 4(c)           2(d)               1, 2, 3,    4 12 Xhl N
: 3. Hanual AFAS                   4(c)            2(d)                 1 2  3,  4 15 C. Automatic Actuation Logic           2               1                    1, 2, 3,  4 16 m  VIII. LOSS OF POWER   (LOV)
Cs m      A. 4. 16 kV Emergency Bus Under-
      'X          voltage (Loss of Voltage)           4/Bu  gg)  '. 2/Bus      3/Bus    1, 2,  3    13", 14" B. 4. 16 kV Emergency Bus Under-13k  14k  JI) 4 voltage (Degraded Voltage)         4/Bu (g.)   : 2/Bus     3/Bus     1, 2,   3 FILTRATION                    1                   All   Modes   18" IX. CONTROL ROOM ESSENTIAL                  2                                                                   !
 
1 GR       INFGRMATIGN GNi TABLE 3. 3" 3 Continued)
TABLE NOTATIONS (a) In MODES 3-4, the value may be decreased manually, to a minimum of 100 psia, as pressurizer pressure is reduced, provided the margin between the pressurizer pressure and this value is maintained at less than or equal to 400 psi; the setpoint shall be increased automatically as pressurizer pressure is increased until the trip setpoint is reached. Trip may be manually bypassed below 400 psia; bypass shall be automatically removed whenever pressurizer pressure is greater than or equal to 500 psia.
(b) In MODES 3-4, the value may be decreased manually as steam generator pressure is reduced, provided the margin between the steam generator pressure and this value is maintained at less than or equal to 200 psi; the setpoint shall be increased automatically as steam generator pressure is increased until the trip setpoint is reached.
(c) Four channels provided, arranged in a selective two-out-of-four configuration (i.e., one-out-of-two taken twice).
(d) The proper two-out-of-four combination.
The provisions of Specification 3.0.4 are not applicable.
The provisions of Specification 3.0.4 are not applicable.
ACTION 12-ACTION 13-ACTION STATEMENTS Mith the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOMN within the following 30 hours.Mith the number of channels OPERABLE one less than the Total Number of Channels, STARTUP and/or POMER OPERATION may continue provided the inoperable channel is placed in the bypassed or tripped condition within 1 hour.If the inoperable channel is bypassed, the desirability of maintaining this channel in the bypassed condition shall be reviewed in accordance with Specification 6.5.1.6.g.The channel shall be returned to OPERABLE status no later than during the next COLD SHUTDOMN.Mith,a channel.process measurement circuit that" affects.multiple functional units inoperable or im test, bypass or trip all associated functional units as listed below.Process Measurement Circuit 1.Steam Generator Pressur e-Low Steam Generator Pressure-Low Steam Generator Leve1 1-Low (ESF)Steam Generator Level 2-Low (ESF)2.Steam Generator Level (Mide Range)Steam Generator Level-Low (RPS)Steam Generator Level 1-Low (ESF)Steam Generator Level 2-Low (ESF)'ALO'VERDE-'UNIT'3/4'3-23 AMENOMENT NO.37  
ACTION STATEMENTS ACTION  12-     Mith the number of OPERABLE   channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOMN within the following 30 hours.
ACTION  13-      Mith the number of channels OPERABLE one less than the Total Number of Channels, STARTUP and/or POMER OPERATION may continue provided the inoperable channel is placed in the bypassed or tripped condition within 1 hour. If the inoperable channel is bypassed, the desirability of maintaining this channel in the bypassed condition shall be reviewed in accordance with Specification 6.5. 1.6.g. The channel shall be returned to OPERABLE status no later than during the next COLD SHUTDOMN.
Mith,a channel. process measurement circuit that" affects. multiple functional units inoperable or im test, bypass or trip all associated functional units as listed below.
Process Measurement   Circuit
: 1. Steam Generator Pressur e-     Steam Generator Pressure - Low Low                              Steam Generator Leve1 1-Low (ESF)
Steam Generator Level 2-Low (ESF)
: 2. Steam Generator Level           Steam Generator Level - Low (RPS)
(Mide Range)                    Steam Generator Level 1-Low (ESF)
Steam Generator Level 2-Low (ESF)
'ALO 'VERDE 'UNIT'                     3/4'3-23                     AMENOMENT NO. 37
 
yCQ~~ilTROLLED QOCUMgj37 TABLE  3.3-3 (Continued)
ACTION STATEMENTS    (Continued)
ACTION 14-        With the number of channels        OPERABLE one  less than the Minimum Channels OPERABLE, STARTUP and/or        POWER OPERATION may      continue provided the following conditions are satisfied:
: a. Verify that one of the inoperable channels has been bypassed and place the other inoperable channel in thee tri        ripped            ed condition within 1 hour.
                . b. All functional units affected by the bypassed/tripped channel shall also be placed in the bypassed/tripped condition    as listed below:
Process Measurement Circuit                Functional Unit    Bypassed/Tripp ed
: 1. Steam Generator Pressure -          Steam Generator    Pressure - Low Steam Generator    Level 1                "  Low (ESF Steam Generator    Level 2                -  Low (ESF
: 2. Steam Generator    Level  -  Low    Steam Generator Lev e l " Low (RPS)
( Widee Range)
Ran e                        Steam Generator Level 1 - Low (ESF Steam Generator Level 2 " Low and/or POWER OPERATION may continue until the performance (ESF'TARTUP of the next required CHANNEL FUNCTIONAL TEST. Subsequent STARTUP and/or POWER OPERATION may continue          if one channel is restored to OPERABLE status and the provisions of ACTION 13 are                        a satisfied.
ACTION 15-        With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within
                  -6 hours and in HOT SHUTDOWN within, the following 6 ho.i~s.
ACTION 16-        With the number of OPERABLE channels one less than the Total Number of Channels,.be in at least HOT STANDBY within 6 hours and in at least HOT SHUTDOWN within the following 6 hours; however, one channel may be bypassed for up to 1 hour for surveillance testing provided the other channel is OPERABLE ACTION 17  "      With. the number of OPERABLE channels one less than        an th e M~nimum Number of Channels, restore the inoperable, channel to OPERABLE status within 48 hours or be in at least HOT STANDBY 6 hours and in COLD SHUTDOWN within the following 3O hours
                                                                                      'th'ext ACTION 18-        With the number of OPERABLE channels one less than th e > nimum of Channels, operation may continue for up      u  t o 6 hhours. M'umber After 6 hours operation may continue provided aat l eas t 1 train of o  essential    filtration is in    operation, otherwise,      be            in    HOT STANDBY  within the next    6  hours and in    COLD SHUTDOWN    within the            t following 30 hours.
PALO VERDE  - UNIT 1                      3/4 3-24                    AMENDMENT NO. 27
 
gyy~yp le-A'cdc~n uc l 4    muv e        thun o~w      ~    4e  we  uc<e4 Jepadzd ow      ~c      d'e~uy voglap r r.'a ed,
                                      ~g    ger r~sdo~a Sert A~ c&g c'rroprcrg racfad'/PJ@Q f~ag'5      ~CZk4 $    howVg    n1- hm
.
c'n  at'ersd              bod'yz~~dAg      ~(y'Az~ f4      neph'o
      ~@i            ~+a ('n cong sou limn mzzAin ggpo M(wj gO )ace r g


ACTION 14-ACTION 15-ACTION 16-ACTION 17" ACTION 18-yCQ~~ilTROLLED QOCUMgj37 TABLE 3.3-3 (Continued)
TABLE 3. 3-3 (Continued)
ACTION STATEMENTS (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION HINIHUM TOTAL NO.      CHANNELS  CHANNELS  APPLICABLE, ESFA SYSTEM FUNCTIONAL UNIT                     Of CHANNELS    TO TRIP    OPERABLE      MODES        ACTION VI. AUXILIARY FEEDWATER (SG-1)(AFAS-1) (Continued)
With the number of channels OPERABLE one less than the Minimum Channels OPERABLE, STARTUP and/or POWER OPERATION may continue provided the following conditions are satisfied:
B. ESFA System   Logic
a.Verify that one of the inoperable channels has been bypassed and place the other inoperable channel in the tri ed condition within 1 hour.in e ripped.b.All functional units affected by the bypassed/tripped channel shall also be placed in the bypassed/tripped condition as listed below: Process Measurement Circuit Functional Unit Bypassed/Tripp 1.Steam Generator Pressure-Steam Generator Pressure-Low ed Steam Generator Level 1" Low (ESF Steam Generator Level 2-Low (ESF Wide Ran e 2.Steam Generator Level-Low Steam Generator Lev l" L (RPS)e" ow (e Range)Steam Generator Level 1-Low (ESF Steam Generator Level 2" Low (ESF'TARTUP and/or POWER OPERATION may continue until the performance of the next required CHANNEL FUNCTIONAL TEST.Subsequent STARTUP and/or POWER OPERATION may continue if one channel is restored to OPERABLE status and the provisions of ACTION 13 a satisfied.
: l. Matrix Logic                   6                                      1  2  3        17
are With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within-6 hours and in HOT SHUTDOWN within, the following 6 ho.i~s.With the number of OPERABLE channels one less than the Total Number of Channels,.be in at least HOT STANDBY within 6 hours and in at least HOT SHUTDOWN within the following 6 hours;however, one channel may be bypassed for up to 1 hour for surveillance testing provided the other channel is OPERABLE an e~nimum With.the number of OPERABLE channels one less than th M Number of Channels, restore the inoperable, channel to OPERABLE status within 48 hours or be in at least HOT STANDBY'th'ext 6 hours and in COLD SHUTDOWN within the following 3O hours With the number of OPERABLE channels one less than th M'umber of Channels, operation may continue for u t 6 h e>nimum up o hours.of After 6 hours operation may continue provided at l t 1 a eas train o essential filtration is in operation, otherwise, be in HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within t following 30 hours.within the PALO VERDE-UNIT 1 3/4 3-24 AMENDMENT NO.27 gyy~yp A'cdc~n le-uc l 4 muv e thun o~w~4e we uc<e4 Jepadzd voglap r~g ger Sert c'rroprcrg o w~c d'e~uy r.'a ed, r~sdo~a A~c&g racfad'/PJ@Q f~ag'5~CZk4$howVg n1-hm.c'n at'ersd bod'yz~~dAg
: 2. Initiation Logic               4(c)           2(d)                 1, 2, 3,   4   12
~(y'Az~f4 neph'o~@i~+a ('n cong sou limn mzzAin ggpo M(wj gO)ace r g TABLE 3.3-3 (Continued)
: 3. Manual AFAS                     4(c)            2(d)      4          1, 2, 3, 4    15 C~   Automatic Actuation Logic                           1          2          1, 2, 3,  4  16 VI'I. AUXILIARY FEEDWATER (SG-2)(AFAS-2)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION ESFA SYSTEM FUNCTIONAL UNIT VI.AUXILIARY FEEDWATER (SG-1)(AFAS-1)
A. Sensor/Trip Units P
B.ESFA System Logic l.Matrix Logic 2.Initiation Logic TOTAL NO.Of CHANNELS (Continued) 6 4(c)CHANNELS TO TRIP 2(d)HINIHUM CHANNELS APPLICABLE, OPERABLE MODES 1 2 3 1, 2, 3, 4 ACTION 17 12 3.Manual AFAS C~Automatic Actuation Logic VI'I.AUXILIARY FEEDWATER (SG-2)(AFAS-2)
: l. Steam Generator   82 Level-Low                                                                   1, 2, 3        13'4 14*
A.Sensor/Trip Units P l.Steam Generator 82 Level-Low 2.Steam Generator h Pressure-SGl)SG2 B.ESFA System Logic 1.Hatrix Logic 2.Initiation Logic 3.Hanual AFAS C.Automatic Actuation Logic VI I I.LOSS'F POWER (LOV)A.4.16 kV Emergency Bus Under-voltage (Loss of Voltage)B.4.16 kV Emergency Bus Under-voltage (Degraded Voltage)IX.CONTROL ROOM ESSENTIAL FILTRATION 4(c)4(c)4(c)2 4/Ou (e)4/Ou (e)2 2(d)1-2(d)2(d)1 2/Bus 2/Bus 4 2 3/Bus 3/Bus 1, 2, 3, 4 1, 2, 3, 4 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3, 4 1, 2, 3, 4 1, 2, 3, 4 1,2,3 1, 2, 3 All Modes 15 16 13'4 14*13*, 14*17 12 15 16~13+, 14*13", 14")18" I~n GR INFGRiViATIGN GM TABLE 3.3-3 (Continued)
: 2. Steam Generator h Pressure - SGl ) SG2                                                   1, 2, 3        13*, 14*
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION i/9" ((o e~@3'ABLE'OTATIONS (a)In MODES 3-4, the value may be decreased manually, to a minimum of 100 psia, as pressurizer pressure is reduced, provided the margin between the pressurizer pressure and this value is maintained at less than or equal to.400 psi;the setpoint shall be increased automatically as pressurizer.pressure is increased until the trip setpoint is reached.Trip may be manually bypassed below 400 psia;bypass shall be automatically removed whenever pressurizer pressure is greater than or equal to 500 psia.(b)In MODES 3-4, the value may be decreased manually as steam generator pressure is reduced, provided the margin between the steam generator pressure and this value is maintained at less than or equal to 200 psi;the setpoint shall be increased automatically as steam generator pressure is increased until the trip setpoint is reached.(c)Four channels provided, arranged in a selective two-out-of-four configuration (i.e., one-out-of-two taken twice).d)The proper two-out-of-four combination.
B. ESFA System Logic
: 1. Hatrix Logic                                                           1, 2, 3        17
: 2. Initiation Logic               4(c)          - 2(d)                  1, 2, 3,  4  12
: 3. Hanual AFAS                     4(c)            2(d)                  1, 2, 3, 4    15 C. Automatic Actuation Logic           2              1                      1, 2, 3, 4    16 VI I I. LOSS'F POWER (LOV)
A. 4. 16 kV Emergency Bus Under-voltage (Loss of Voltage)           4/Ou  (e)      2/Bus      3/Bus      1,2,3        ~ 13+, 14*
B. 4. 16 kV Emergency Bus Under-voltage (Degraded Voltage)           4/Ou (e)       2/Bus     3/Bus       1, 2, 3       13", 14"
                                                                                                                )
IX. CONTROL ROOM ESSENTIAL FILTRATION        2                                      All  Modes    18"
 
I ~
n
 
GR       INFGRiViATIGNGM TABLE 3.3-3 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (a)   In MODES     3-4, the value may be decreased manually, to a minimum of 100 psia, as pressurizer pressure is reduced, provided the margin between the pressurizer pressure and this value is maintained at less than or equal
@3'ABLE'OTATIONS to .400 psi; the setpoint shall be increased automatically as pressurizer
        .pressure is increased until the       trip setpoint is reached. Trip may be manually bypassed below 400 psia; bypass shall be automatically removed whenever pressurizer pressure is greater than or equal to 500 psia.
(b) In MODES 3-4, the value may be decreased manually as steam generator pressure is reduced, provided the margin between the steam generator pressure and this value is maintained at less than or equal to 200 psi; the setpoint shall be increased automatically as steam generator pressure is increased until the trip setpoint is reached.
(c) Four channels provided, arranged in a selective two-out-of-four configuration (i.e., one-out-of-two taken twice).
d) The proper two-out-of-four combination.
The provisions of Specification 3.0.4 are not applicable.
The provisions of Specification 3.0.4 are not applicable.
ACTION STATEMENTS ACTION 12-With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.ACTION 13-With the number of channels OPERABLE one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may continue provided the inoperable channel is placed in the bypassed or tripped condition within 1 hour.If the inoperable channel is bypassed, the desirability of maintaining this channel in the bypassed condition shall be reviewed in accordance with Specification 6.5.1.6.g.The channel shall be returned to.OPERABLE:status.
ACTION STATEMENTS ACTION 12   -       With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
no later than during the"next.COLD SHUTOOWN.With a channel process measurement circuit that affects multiple functional units inoperable or in test, bypass or trip all associated functional units as listed below.Process Measurement Circuit 1.Steam Generator Pressure-Low Steam Generator Pressure-Low Steam Generator Level 1-Low (ESF)Steam Generator Level 2-Low (ESF)2.Steam Generator Level (Wide Range)Steam Generator Level-Low (RPS)Steam Generator Level 1-Low (ESF)Steam Generator Level 2-Low (ESF)PALO VERDE" UNIT 2 3/4 3"23 y~ONTRQLL:-D QQCUIVlil i TABLE 3.3-3 (Continued)'NGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION ACTION STATEMENTS ACTION 14-ACTION 15" ACTION 16-AC.fION 17-ACTION 18-Mith the number of channels OPERABLE one less than the Minimum.Channels OPERABLE, STARTUP and/or POWER OPERATION may continue provided the following conditions are satisfied:
ACTION 13   -       With the number of channels OPERABLE one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may continue provided the inoperable channel is placed in the bypassed or tripped condition within 1 hour.     If the inoperable channel is bypassed, the desirability of maintaining this channel in the i/9"          bypassed condition shall be reviewed in accordance with Specification 6.5. 1.6.g. The channel shall be returned to
a.Verify that one of the inoperable channels has been bypassed and place the other inoperable channel in the tripped condition within 1 hour.b.All functional units affected by the bypassed/tripped channel shall also be placed in the bypassed/tripped condition as listed below: Process Heasurement Circuit 1.Steam.Generator Pressure-Low 4 Functional Unit Bypassed/Tripped Steam, Generator Pressure-Low Steam Generator Level 1-Low (ESF: Steam Generator Level 2-Low (ESF: 2.Steam Generator Level-Low (Wide Range)at>o s~szr.Steam Generator Level-Low (RPS)Steam Generator Level 1-Low (ESF', Steam Generator Level 2-Low (ESF;STARTUP and/or POWER OPERATION may continue until the performance of the next required CHANNEL FUNCTIONAL TEST.Subsequent STARTUP and/or POWER OPERATION may continue if one channel is restored to OPERABLE status and the provisions of ACTION.13 are satisfied.
((o              . OPERABLE:status. no later than during the"next .COLD SHUTOOWN.
With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in ai least HOT STANDBY within 6 hours and in HOT SHUTDOMN within the following 6 hours.Mi,th the number of OPERABLE channels one less than the Total Number of Channels, be in at leas~HOT STANDBY within 6 hours and in at least HOT SHUTDOWN within the following 6 hours;however, one channel may be bypassed for up to 1 hour for surveillance testing provided.the other channel is OPERABLE..
With a channel process measurement circuit that affects multiple e                      functional units inoperable or in test, bypass or       trip all associated   functional units as listed below.
With the'number of OPERABLE channels one less than the Minimum Number of Channels;restore the inoperable channel to OPERABLE.status within 48 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.With the number of OPERABLE channels one less than the Minimum Number of Channels, operation may continue for up to 6 hours.After 6 hours operation may continue provided at least 1 tt ain'f essential filtration is in operation, otherwise, be in HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.PALO VERDE-UNIT 2 3/4 3-24  
Process   Measurement Circuit
/cd'run I 7-~u t'e/hue o~w~><~e u<'v z 4 Jegy added vo/tape r+s f'<r 4 vs c nope'rsA os nod':a~~gi'red, restore the&egret>d'IV'+
: 1. Steam Generator   Pressure-     Steam Generator   Pressure - Low Low                              Steam Generator   Level 1-Low (ESF)
'r~Gl~p~c Zh<4$ho&rg c>v oI~ersl.hot y4ndAg~izy'ken fA pep C 6/lo~rs~nA r n'Cagl yh~l&o~n os Wr'7$0)outs.
Steam Generator   Level 2-Low (ESF)
: 2. Steam Generator   Level         Steam Generator   Level - Low (RPS)
(Wide Range)                    Steam Generator   Level 1-Low (ESF)
Steam Generator   Level 2-Low (ESF)
PALO VERDE   " UNIT 2                     3/4 3"23
 
y~ONTRQLL:-D QQCUIVlili TABLE 3. 3-3 (Continued)'NGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION ACTION STATEMENTS ACTION 14-     Mith the number of channels                         OPERABLE one   less than the Minimum
              . Channels OPERABLE, STARTUP and/or                           POWER OPERATION   may continue provided the following conditions are satisfied:
: a. Verify that one of the inoperable channels has been bypassed and place the other inoperable channel in the tripped condition within 1 hour.
: b. All functional units affected by the bypassed/tripped channel shall also be placed in the bypassed/tripped condition as listed below:
Process Heasurement Circuit                                 Functional Unit Bypassed/Tripped
: 1. Steam. Generator Pressure-                           Steam, Generator Pressure - Low Low                                                  Steam Generator Level 1 - Low (ESF:
4 Steam Generator Level 2 - Low (ESF:
: 2.     Steam Generator   Level                   -   Low   Steam Generator Level - Low (RPS)
(Wide Range)                                          Steam Generator Level 1 - Low (ESF',
Steam Generator Level 2 - Low (ESF; STARTUP     and/or POWER OPERATION may continue until the performance of the next required       CHANNEL FUNCTIONAL TEST.                       Subsequent STARTUP and/or POWER OPERATION may continue restored to OPERABLE status and the provisions of ACTION .13 are if one channel is satisfied.
ACTION 15  "    With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in ai least HOT STANDBY within 6 hours and in HOT SHUTDOMN within the following 6 hours.
ACTION  16-      Mi,th the number of OPERABLE channels one less than the Total Number of Channels, be in at leas~ HOT STANDBY within 6 hours and in at least HOT SHUTDOWN within the following 6 hours; however, one channel may be bypassed for up to 1 hour for surveillance testing provided. the other channel is OPERABLE..
AC.fION 17-      With the 'number of OPERABLE channels one less than the Minimum Number of Channels; restore the inoperable channel to OPERABLE
              . status within 48 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
ACTION  18-      With the number of OPERABLE channels one less than the Minimum
              'fNumber of Channels, operation may continue for up to 6 hours.
After 6 hours operation may continue provided at least 1 tt ain essential STANDBY filtration is in within the next   6   hours and in operation, otherwise, COLD SHUTDOWN be  in HOT within the following 30 hours.
at>o      s~szr    .
PALO VERDE - UNIT 2                     3/4 3-24
 
/cd'run I 7-
          ~u t'e /hue   o~w     ~   >< ~e u <'v z 4 Jegy added os vo/tape r nod':a~~gi'red,
                          +srestore f'<r 4 vs the c nope'rsA
                        ~c Zh< 4 $
                                              &egret>d'IV'+
            'r~Gl~p                 ho &rg                 c> v oI ~ersl . hot y4ndAg ~izy'ken         fA                 pep C 6
  /lo ~rs ~nA r n'Cagl yh~l&o~n os Wr'7       $0   )outs   .
 
TABLE 3.3-3 (Continued)
TABLE 3.3-3 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TOTAL NO.ESFA SYSTEM FUNCTIONAL UNIT OF CHANNELS VI.AUXILIARY FEEOWATER (SG-l)(AFAS-1)(Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION HINIHUH TOTAL NO.     CHANNELS  CHANNELS  APPLICABLE ESFA SYSTEM FUNCTIONAL UNIT                       OF CHANNELS   TO TRIP  OPERABLE    MODES      ACTION VI. AUXILIARY FEEOWATER (SG-l)(AFAS-1) (Continued)
B.ESFA System l.ogic 1.Matrix Logic 2.Initiation Logic HINIHUH CHANNELS CHANNELS TO TRIP OPERABLE 2(d)APPLICABLE MODES 1 2 3 1, 2, 3, 4 ACTION 12 3.l1anual AFAS C.Automatic Actuation Logic VII.AUXILIARY FCEOWATER (SG-2)(AFAS-2)
B. ESFA   System l.ogic
~A.Sensor/Trip Units l.Steam Generator N2 Level-Low 2.Steam Generator 6 Pressure-SGl>SG2 B.ESFA System Logic 1.Matrix Logic 2.Initiation Logic 4(c)6~(c)2(d)1 2(d)1, 2, 3, 4 1, 2, 3, 4 1 2 3 1 2 3 1 2 3 1, 2, 3, 4 15 16 13", 14*13*, 14" 12 3.Manual AFAS C.Automatic Actuation Logic VIII.LOSS OF POWER (LOV)A.4.I6 kV Emergency Bus Under-voltage (Loss of Voltage)'.4.16 kV Emergency Bus Under-*voltage (Degraded Voltage)IX.CONTR01 ROOM ESSENTIAL FILTRATION Q, 4(c)2(d)1 4/Bu 9)2/Bus 4/Bu (6)2/Bus 2 3/Bus 3/Bus~1, 2, 3, 4 1, 2, 3, 4 1, 2, 3 1, 2, 3 All Modes 15 16 13", 14" 13", 14*l9 18" gGR iNFGRiVIATIGN GN'ABLE 3.3-3 Continued ENGINEERED SAFETY FEATURES ACTUATION SYSTEH INSTRUHENTATION TABLE NOTATIONS (a)In HOOFS 3-4, the value may be decreased manually, to a minimum of 100 psia, as pressurizer pressure is reduced, provided the margin between the pressurizer pressure and this value is maintained at less than or equal to 400 psi;the setpoint shall be increased automatically as pressurizer pressure is increased until the trip setpoint is reached.Trip may be manually bypassed below 400 psia;bypass shall be automatically removed whenever pressurizer pressure is greater than or equal to 500 psia.(b)In HODES 3-4, the value may be decreased manually as steam generator pressure is reduced, provided the margin between the steam generator pressure and this value is maintained at less than or equal to 200 psi;the setpoint shall be increased automatically as steam generator pressure is increased until the trip setpoint is reached.(c)Four channels provided, arranged in a selective two-out-of-four configuration (i.e., one-out-of-two taken twice).(d)The proper two-out-of-four combination.
: 1. Matrix Logic                                                       1  2  3
: 2. Initiation   Logic                             2(d)                 1, 2, 3,   4 12
: 3. l1anual AFAS                     4(c)          2(d)                1, 2, 3,  4 15 C. Automatic Actuation Logic                           1                    1, 2, 3,  4 16 VII. AUXILIARY FCEOWATER (SG-2)(AFAS-2)
      ~
A. Sensor/Trip Units
: l. Steam Generator N2   Level-13", 14*
Low                                                               1  2  3
: 2. Steam Generator 6 Pressure - SGl > SG2                                               1  2  3      13*, 14" B. ESFA System   Logic
: 1. Matrix Logic                     6                                  1  2  3
: 2. Initiation Logic               ~(c)         2(d)                 1, 2, 3, 4   12
: 3. Manual AFAS                      4(c)          2(d)              ~
1, 2, 3, 4   15 C. Automatic Actuation Logic                          1                   1, 2, 3, 4   16 VIII.       LOSS OF POWER   (LOV)
A. 4. I6 kV Emergency Bus Under-voltage (Loss of Voltage)             4/Bu          2/Bus    3/Bus      1, 2,  3    13", 14" 9)
    '.
    *
: 4. 16 kV Emergency Bus Under-voltage (Degraded Voltage)           4/Bu (6)     2/Bus     3/Bus     1, 2, 3     13", 14* l9 All  Modes  18" IX. CONTR01    ROOM  ESSENTIAL FILTRATION      2 Q,
 
gGR       iNFGRiVIATIGN GN'ABLE
: 3. 3-3   Continued ENGINEERED SAFETY FEATURES ACTUATION SYSTEH INSTRUHENTATION TABLE NOTATIONS (a) In HOOFS     3-4, the value may be decreased manually, to a minimum of 100 psia, as pressurizer pressure is reduced, provided the margin between the pressurizer pressure and this value is maintained at less than or equal to 400 psi; the setpoint shall be increased automatically as pressurizer pressure is increased until the trip setpoint is reached. Trip may be manually bypassed below 400 psia; bypass shall be automatically removed whenever pressurizer pressure is greater than or equal to 500 psia.
(b) In HODES 3-4, the value may be decreased manually as steam generator pressure is reduced, provided the margin between the steam generator pressure and this value is maintained at less than or equal to 200 psi; the setpoint shall be increased automatically as steam generator pressure is increased until the trip setpoint is reached.
(c) Four channels provided, arranged in a selective two-out-of-four configuration (i.e., one-out-of-two taken twice).
(d) The proper two-out-of-four combination.
The provisions of Specification 3.0.4 are not applicable.
The provisions of Specification 3.0.4 are not applicable.
ACTION STATEHENTS ACTION 12-With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the fo'llowing 30 hours.ACTION 13-With the number of channels OPERABLE one less than the Total~Number of Channels, STARTUP and/or POWER OPERATION may continue provided the inoperable channel is placed in the bypassed or tripped condition within 1 hour.If the inoperable channel is bypassed, the desirability of maintaining this channel in the bypassed condition shall be reviewed in accordance with Speci-fication 6.5.1.6.g.The channel shall, be returned to+Chp...OPERABLE.status:no later than.during the next COLD SHUTDOWN.With a channel process measurement circuit that affects multiple functional units inoperable or in test, bypass or trip all associated functional units as listed below.Process Heasur ement Circuit 1.Steam Generator Pressure-Steam Generator Pressure-Low Low Steam Generator Level 1-Low (ESF)Steam Generator Level 2-Low (ESF)2.Steam Generator Level (Wide Range)Steam Generator Level-Low (RPS)Steam Generator Level 1-Low (ESF)Steam Generator Level 2-Low (ESF)PALO VERDE" UNIT 3 3/4 3-23 TABLE 3.3-3 (Continued)
ACTION STATEHENTS ACTION 12 -       With the number of     OPERABLE   channels one less than the Total Number of Channels,     restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the fo'llowing 30 hours.
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION ACTION STATEMENTS ACTION 14-ACTION 15-ACTION 16-ACTION 17-ACTION 18-With the number of channels OPERABLE one less than the Minimum Channels OPERABLE, STARTUP and/or POWER OPERATION may continue provided the following conditions are satisfied:
ACTION 13 -       With the number of channels OPERABLE one less than the Total
a.Verify that one of the inoperable channels has been bypassed and place the other inoperable channel in the tripped condition within 1 hour.b.All functional units affected by the bypassed/tripped channel shall also be placed in the bypassed/tripped condition as listed below: Process Measurement Circuit 1.Steam Generator Pressure-Low Functional Unit Bypassed/Tripped Steam Generator Pressure-Low Steam Generator Level 1-Low (ESF)Steam Generator Level 2-Low (ESF)2.Steam Generator Level-Low (Wide Range)With the number of OPERABLE channels one less than the Minimum Number of Channels, operation.
                ~
may continue for up to 6 hours.After 6 hours operation may continue provided at least 1 train of essential filtration is in operation, otherwise, be in HOT STANDBY within the next 6 hours and in COLO SHUTDOWN within the following 30 hours.Steam Generator Level" Low (RPS)Steam Generator Level 1-Low (ESF)Steam Generator Level 2-Low (ESF)STARTUP and/or POWER OPERATION may continue until the performance of the next required CHANNEL FUNCTIONAL TEST.Subsequent STARTUP and/or POWER OPERATION may continue if one channel is restored to OPERABLE status and the provisions of ACTION 13 are satisfied.
Number of Channels, STARTUP and/or POWER OPERATION may continue provided the inoperable channel is placed in the bypassed or tripped condition within 1 hour. If the inoperable channel is bypassed, the desirability of maintaining this channel in the bypassed condition shall be reviewed in accordance with Speci-fication 6.5. 1.6. g. The channel shall, be returned to
With'the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within 6 hours and in HOT SHUTDOWN within the following 6 hours.With the number of OPERABLE channels one less than the Total Number of Channels, be in at least HOT STANDBY within 6 hours and in at least HOT SHUTDOWN within the following 6 hours;however, one channel'ay be bypassed for up to 1 hour for surveillance testing provided the other channel is OPERABLE.With the number of OPERABLE channels one less than the Minimum Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.ADD gASZr PALO VERDE-UNIT 3 3/4 3-24  
  +Chp       .
                ..OPERABLE.status:no later than. during the next COLD SHUTDOWN.
With a channel process measurement circuit that affects multiple functional units inoperable or in test, bypass or trip all associated functional units as listed below.
Process   Heasur ement Circuit
: 1. Steam Generator     Pressure -         Steam Generator Pressure - Low Low                                     Steam Generator Level 1-Low (ESF)
Steam Generator Level 2-Low (ESF)
: 2. Steam Generator     Level               Steam Generator Level - Low (RPS)
(Wide Range)                            Steam Generator Level 1-Low (ESF)
Steam Generator Level 2-Low (ESF)
PALO VERDE   " UNIT   3                   3/4 3-23
 
TABLE 3.3-3 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION ACTION STATEMENTS ACTION 14-     With the number of channels       OPERABLE one less than the Minimum Channels OPERABLE, STARTUP and/or       POWER OPERATION   may continue provided the following conditions are satisfied:
: a. Verify that one of the inoperable channels has been bypassed and place the other inoperable channel in the tripped condition within 1 hour.
: b. All functional units affected by the bypassed/tripped channel shall also be placed in the bypassed/tripped condition as listed below:
Process   Measurement Circuit             Functional Unit Bypassed/Tripped
: 1. Steam Generator Pressure-           Steam Generator Pressure - Low Low                                Steam Generator Level 1 - Low (ESF)
Steam Generator Level 2 - Low (ESF)
: 2. Steam Generator   Level - Low   Steam Generator Level " Low (RPS)
(Wide Range)                        Steam Generator Level 1 - Low (ESF)
Steam Generator Level 2 - Low (ESF)
STARTUP and/or POWER OPERATION may continue until the performance of the next required CHANNEL FUNCTIONAL TEST. Subsequent STARTUP and/or POWER OPERATION may continue         if one channel is restored to OPERABLE status and the provisions of ACTION 13 are satisfied.
ACTION 15-      With'the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within 6 hours and in HOT SHUTDOWN within the following 6 hours.
ACTION 16-      With the number of OPERABLE channels one less than the Total Number of Channels, be in at least HOT STANDBY within 6 hours and in at least HOT SHUTDOWN within the following 6 hours; however, one channel'ay be bypassed for up to 1 hour for surveillance testing provided the other channel is OPERABLE.
ACTION 17-      With the number of OPERABLE channels one less than the Minimum Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
ACTION 18-      With the number of    OPERABLE    channels one less than the Minimum Number of Channels,    operation. may continue for up to 6 hours.
After 6 hours operation may continue provided at least 1 train of essential filtration is in operation, otherwise, be in HOT STANDBY within the next 6 hours and in COLO SHUTDOWN within the following  30 hours.
ADD     gASZr PALO VERDE - UNIT 3                   3/4 3-24


PcdCon lW-8hwn oww g~~~e uLv<4 degraded v'oZ<agc r+s p<<~vs c~oper~M or~od'n<<gr red, reslare Ae.a'egraCkd'/OJIoIQ Y~ap'p~cZ/c,~'AG u'rg o r<'~al'msl holy@'~dIg
PcdCon lW-8hwn oww     g   ~~ ~e uLv < 4 degraded   v'oZ<agc   r+s     p<<   ~vs             c~oper~M or   ~od'n<<gr     red, reslare       Ae.
~gyle~fA nupC d ho~rs~~A (n'cong SAul&~~~miami~gPa Wr<g$0)ourg.}}
u'rg o r a'egraCkd'/OJIoIQ
                                '
Y~ap'p     ~cZ/c,~     AG
  <'~ al'msl     holy@'~dIg ~gyle~ fA nupC                   d ho~rs ~~A ( n'cong SAul&~~~ miami~
gPa Wr<g $ 0 )ourg .}}

Revision as of 09:24, 29 October 2019

Proposed Tech Specs Amend to Add One Action Statement to Table 3.3-3,entry 8
ML17310B451
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/12/1994
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17310B450 List:
References
NUDOCS 9407250073
Download: ML17310B451 (16)


Text

~

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUHENTATION m

( TOTAL NO. CHANNELS MINIMUM CHANNELS APPLICABLE C) ESFA SYSTEM FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION m

VI. AUXILIARY FEEDWATER (SG-l)(AFAS-1) (Continued)

B. ESt A System Logic

l. Matrix Logic 6 1 2 3 17
2. Initiation Logic 4(c) 0 2(d) 1, 2, 3, 4 12
3. Manual AFAS 4(c) 2(d) 1,2,-3,4 15 D3 Automatic Actuation Logic 1 ,.1,2,3,4 16 Q

C. f I

VII. AUXILIARY FEEDWATER (SG"2)(AFAS-2) III 0'13%

QQ A. Sensor/Trip Units 0

ÃO 1. Steam Generator 02 Level-M

&UI Low 1 2 3 13", l 4" O UO 2. SLeam Generator d A

DO Cl<

RM Pressure - SGl > SG2 1 2 3 13*, 14" ON B. ESFA System Logic UIA OO 1. Matrix Logic 6 1 2 3 17 ON t!QOB UIM 2. Initiation Logic 4(c) 2(d) 1, 2, 3, 4 12 Xhl N

3. Hanual AFAS 4(c) 2(d) 1 2 3, 4 15 C. Automatic Actuation Logic 2 1 1, 2, 3, 4 16 m VIII. LOSS OF POWER (LOV)

Cs m A. 4. 16 kV Emergency Bus Under-

'X voltage (Loss of Voltage) 4/Bu gg) '. 2/Bus 3/Bus 1, 2, 3 13", 14" B. 4. 16 kV Emergency Bus Under-13k 14k JI) 4 voltage (Degraded Voltage) 4/Bu (g.)  : 2/Bus 3/Bus 1, 2, 3 FILTRATION 1 All Modes 18" IX. CONTROL ROOM ESSENTIAL 2  !

1 GR INFGRMATIGN GNi TABLE 3. 3" 3 Continued)

TABLE NOTATIONS (a) In MODES 3-4, the value may be decreased manually, to a minimum of 100 psia, as pressurizer pressure is reduced, provided the margin between the pressurizer pressure and this value is maintained at less than or equal to 400 psi; the setpoint shall be increased automatically as pressurizer pressure is increased until the trip setpoint is reached. Trip may be manually bypassed below 400 psia; bypass shall be automatically removed whenever pressurizer pressure is greater than or equal to 500 psia.

(b) In MODES 3-4, the value may be decreased manually as steam generator pressure is reduced, provided the margin between the steam generator pressure and this value is maintained at less than or equal to 200 psi; the setpoint shall be increased automatically as steam generator pressure is increased until the trip setpoint is reached.

(c) Four channels provided, arranged in a selective two-out-of-four configuration (i.e., one-out-of-two taken twice).

(d) The proper two-out-of-four combination.

The provisions of Specification 3.0.4 are not applicable.

ACTION STATEMENTS ACTION 12- Mith the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOMN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

ACTION 13- Mith the number of channels OPERABLE one less than the Total Number of Channels, STARTUP and/or POMER OPERATION may continue provided the inoperable channel is placed in the bypassed or tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. If the inoperable channel is bypassed, the desirability of maintaining this channel in the bypassed condition shall be reviewed in accordance with Specification 6.5. 1.6.g. The channel shall be returned to OPERABLE status no later than during the next COLD SHUTDOMN.

Mith,a channel. process measurement circuit that" affects. multiple functional units inoperable or im test, bypass or trip all associated functional units as listed below.

Process Measurement Circuit

1. Steam Generator Pressur e- Steam Generator Pressure - Low Low Steam Generator Leve1 1-Low (ESF)

Steam Generator Level 2-Low (ESF)

2. Steam Generator Level Steam Generator Level - Low (RPS)

(Mide Range) Steam Generator Level 1-Low (ESF)

Steam Generator Level 2-Low (ESF)

'ALO 'VERDE 'UNIT' 3/4'3-23 AMENOMENT NO. 37

yCQ~~ilTROLLED QOCUMgj37 TABLE 3.3-3 (Continued)

ACTION STATEMENTS (Continued)

ACTION 14- With the number of channels OPERABLE one less than the Minimum Channels OPERABLE, STARTUP and/or POWER OPERATION may continue provided the following conditions are satisfied:

a. Verify that one of the inoperable channels has been bypassed and place the other inoperable channel in thee tri ripped ed condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

. b. All functional units affected by the bypassed/tripped channel shall also be placed in the bypassed/tripped condition as listed below:

Process Measurement Circuit Functional Unit Bypassed/Tripp ed

1. Steam Generator Pressure - Steam Generator Pressure - Low Steam Generator Level 1 " Low (ESF Steam Generator Level 2 - Low (ESF
2. Steam Generator Level - Low Steam Generator Lev e l " Low (RPS)

( Widee Range)

Ran e Steam Generator Level 1 - Low (ESF Steam Generator Level 2 " Low and/or POWER OPERATION may continue until the performance (ESF'TARTUP of the next required CHANNEL FUNCTIONAL TEST. Subsequent STARTUP and/or POWER OPERATION may continue if one channel is restored to OPERABLE status and the provisions of ACTION 13 are a satisfied.

ACTION 15- With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within

-6 hours and in HOT SHUTDOWN within, the following 6 ho.i~s.

ACTION 16- With the number of OPERABLE channels one less than the Total Number of Channels,.be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for surveillance testing provided the other channel is OPERABLE ACTION 17 " With. the number of OPERABLE channels one less than an th e M~nimum Number of Channels, restore the inoperable, channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 3O hours

'th'ext ACTION 18- With the number of OPERABLE channels one less than th e > nimum of Channels, operation may continue for up u t o 6 hhours. M'umber After 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> operation may continue provided aat l eas t 1 train of o essential filtration is in operation, otherwise, be in HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the t following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

PALO VERDE - UNIT 1 3/4 3-24 AMENDMENT NO. 27

gyy~yp le-A'cdc~n uc l 4 muv e thun o~w ~ 4e we uc<e4 Jepadzd ow ~c d'e~uy voglap r r.'a ed,

~g ger r~sdo~a Sert A~ c&g c'rroprcrg racfad'/PJ@Q f~ag'5 ~CZk4 $ howVg n1- hm

.

c'n at'ersd bod'yz~~dAg ~(y'Az~ f4 neph'o

~@i ~+a ('n cong sou limn mzzAin ggpo M(wj gO )ace r g

TABLE 3. 3-3 (Continued)

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION HINIHUM TOTAL NO. CHANNELS CHANNELS APPLICABLE, ESFA SYSTEM FUNCTIONAL UNIT Of CHANNELS TO TRIP OPERABLE MODES ACTION VI. AUXILIARY FEEDWATER (SG-1)(AFAS-1) (Continued)

B. ESFA System Logic

l. Matrix Logic 6 1 2 3 17
2. Initiation Logic 4(c) 2(d) 1, 2, 3, 4 12
3. Manual AFAS 4(c) 2(d) 4 1, 2, 3, 4 15 C~ Automatic Actuation Logic 1 2 1, 2, 3, 4 16 VI'I. AUXILIARY FEEDWATER (SG-2)(AFAS-2)

A. Sensor/Trip Units P

l. Steam Generator 82 Level-Low 1, 2, 3 13'4 14*
2. Steam Generator h Pressure - SGl ) SG2 1, 2, 3 13*, 14*

B. ESFA System Logic

1. Hatrix Logic 1, 2, 3 17
2. Initiation Logic 4(c) - 2(d) 1, 2, 3, 4 12
3. Hanual AFAS 4(c) 2(d) 1, 2, 3, 4 15 C. Automatic Actuation Logic 2 1 1, 2, 3, 4 16 VI I I. LOSS'F POWER (LOV)

A. 4. 16 kV Emergency Bus Under-voltage (Loss of Voltage) 4/Ou (e) 2/Bus 3/Bus 1,2,3 ~ 13+, 14*

B. 4. 16 kV Emergency Bus Under-voltage (Degraded Voltage) 4/Ou (e) 2/Bus 3/Bus 1, 2, 3 13", 14"

)

IX. CONTROL ROOM ESSENTIAL FILTRATION 2 All Modes 18"

I ~

n

GR INFGRiViATIGNGM TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (a) In MODES 3-4, the value may be decreased manually, to a minimum of 100 psia, as pressurizer pressure is reduced, provided the margin between the pressurizer pressure and this value is maintained at less than or equal

@3'ABLE'OTATIONS to .400 psi; the setpoint shall be increased automatically as pressurizer

.pressure is increased until the trip setpoint is reached. Trip may be manually bypassed below 400 psia; bypass shall be automatically removed whenever pressurizer pressure is greater than or equal to 500 psia.

(b) In MODES 3-4, the value may be decreased manually as steam generator pressure is reduced, provided the margin between the steam generator pressure and this value is maintained at less than or equal to 200 psi; the setpoint shall be increased automatically as steam generator pressure is increased until the trip setpoint is reached.

(c) Four channels provided, arranged in a selective two-out-of-four configuration (i.e., one-out-of-two taken twice).

d) The proper two-out-of-four combination.

The provisions of Specification 3.0.4 are not applicable.

ACTION STATEMENTS ACTION 12 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

ACTION 13 - With the number of channels OPERABLE one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may continue provided the inoperable channel is placed in the bypassed or tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. If the inoperable channel is bypassed, the desirability of maintaining this channel in the i/9" bypassed condition shall be reviewed in accordance with Specification 6.5. 1.6.g. The channel shall be returned to

((o . OPERABLE:status. no later than during the"next .COLD SHUTOOWN.

With a channel process measurement circuit that affects multiple e functional units inoperable or in test, bypass or trip all associated functional units as listed below.

Process Measurement Circuit

1. Steam Generator Pressure- Steam Generator Pressure - Low Low Steam Generator Level 1-Low (ESF)

Steam Generator Level 2-Low (ESF)

2. Steam Generator Level Steam Generator Level - Low (RPS)

(Wide Range) Steam Generator Level 1-Low (ESF)

Steam Generator Level 2-Low (ESF)

PALO VERDE " UNIT 2 3/4 3"23

y~ONTRQLL:-D QQCUIVlili TABLE 3. 3-3 (Continued)'NGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION ACTION STATEMENTS ACTION 14- Mith the number of channels OPERABLE one less than the Minimum

. Channels OPERABLE, STARTUP and/or POWER OPERATION may continue provided the following conditions are satisfied:

a. Verify that one of the inoperable channels has been bypassed and place the other inoperable channel in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
b. All functional units affected by the bypassed/tripped channel shall also be placed in the bypassed/tripped condition as listed below:

Process Heasurement Circuit Functional Unit Bypassed/Tripped

1. Steam. Generator Pressure- Steam, Generator Pressure - Low Low Steam Generator Level 1 - Low (ESF:

4 Steam Generator Level 2 - Low (ESF:

2. Steam Generator Level - Low Steam Generator Level - Low (RPS)

(Wide Range) Steam Generator Level 1 - Low (ESF',

Steam Generator Level 2 - Low (ESF; STARTUP and/or POWER OPERATION may continue until the performance of the next required CHANNEL FUNCTIONAL TEST. Subsequent STARTUP and/or POWER OPERATION may continue restored to OPERABLE status and the provisions of ACTION .13 are if one channel is satisfied.

ACTION 15 " With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in ai least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOMN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

ACTION 16- Mi,th the number of OPERABLE channels one less than the Total Number of Channels, be in at leas~ HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for surveillance testing provided. the other channel is OPERABLE..

AC.fION 17- With the 'number of OPERABLE channels one less than the Minimum Number of Channels; restore the inoperable channel to OPERABLE

. status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

ACTION 18- With the number of OPERABLE channels one less than the Minimum

'fNumber of Channels, operation may continue for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

After 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> operation may continue provided at least 1 tt ain essential STANDBY filtration is in within the next 6 hours and in operation, otherwise, COLD SHUTDOWN be in HOT within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

at>o s~szr .

PALO VERDE - UNIT 2 3/4 3-24

/cd'run I 7-

~u t'e /hue o~w ~ >< ~e u <'v z 4 Jegy added os vo/tape r nod':a~~gi'red,

+srestore f'<r 4 vs the c nope'rsA

~c Zh< 4 $

&egret>d'IV'+

'r~Gl~p ho &rg c> v oI ~ersl . hot y4ndAg ~izy'ken fA pep C 6

/lo ~rs ~nA r n'Cagl yh~l&o~n os Wr'7 $0 )outs .

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION HINIHUH TOTAL NO. CHANNELS CHANNELS APPLICABLE ESFA SYSTEM FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION VI. AUXILIARY FEEOWATER (SG-l)(AFAS-1) (Continued)

B. ESFA System l.ogic

1. Matrix Logic 1 2 3
2. Initiation Logic 2(d) 1, 2, 3, 4 12
3. l1anual AFAS 4(c) 2(d) 1, 2, 3, 4 15 C. Automatic Actuation Logic 1 1, 2, 3, 4 16 VII. AUXILIARY FCEOWATER (SG-2)(AFAS-2)

~

A. Sensor/Trip Units

l. Steam Generator N2 Level-13", 14*

Low 1 2 3

2. Steam Generator 6 Pressure - SGl > SG2 1 2 3 13*, 14" B. ESFA System Logic
1. Matrix Logic 6 1 2 3
2. Initiation Logic ~(c) 2(d) 1, 2, 3, 4 12
3. Manual AFAS 4(c) 2(d) ~

1, 2, 3, 4 15 C. Automatic Actuation Logic 1 1, 2, 3, 4 16 VIII. LOSS OF POWER (LOV)

A. 4. I6 kV Emergency Bus Under-voltage (Loss of Voltage) 4/Bu 2/Bus 3/Bus 1, 2, 3 13", 14" 9)

'.

4. 16 kV Emergency Bus Under-voltage (Degraded Voltage) 4/Bu (6) 2/Bus 3/Bus 1, 2, 3 13", 14* l9 All Modes 18" IX. CONTR01 ROOM ESSENTIAL FILTRATION 2 Q,

gGR iNFGRiVIATIGN GN'ABLE

3. 3-3 Continued ENGINEERED SAFETY FEATURES ACTUATION SYSTEH INSTRUHENTATION TABLE NOTATIONS (a) In HOOFS 3-4, the value may be decreased manually, to a minimum of 100 psia, as pressurizer pressure is reduced, provided the margin between the pressurizer pressure and this value is maintained at less than or equal to 400 psi; the setpoint shall be increased automatically as pressurizer pressure is increased until the trip setpoint is reached. Trip may be manually bypassed below 400 psia; bypass shall be automatically removed whenever pressurizer pressure is greater than or equal to 500 psia.

(b) In HODES 3-4, the value may be decreased manually as steam generator pressure is reduced, provided the margin between the steam generator pressure and this value is maintained at less than or equal to 200 psi; the setpoint shall be increased automatically as steam generator pressure is increased until the trip setpoint is reached.

(c) Four channels provided, arranged in a selective two-out-of-four configuration (i.e., one-out-of-two taken twice).

(d) The proper two-out-of-four combination.

The provisions of Specification 3.0.4 are not applicable.

ACTION STATEHENTS ACTION 12 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the fo'llowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

ACTION 13 - With the number of channels OPERABLE one less than the Total

~

Number of Channels, STARTUP and/or POWER OPERATION may continue provided the inoperable channel is placed in the bypassed or tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. If the inoperable channel is bypassed, the desirability of maintaining this channel in the bypassed condition shall be reviewed in accordance with Speci-fication 6.5. 1.6. g. The channel shall, be returned to

+Chp .

..OPERABLE.status:no later than. during the next COLD SHUTDOWN.

With a channel process measurement circuit that affects multiple functional units inoperable or in test, bypass or trip all associated functional units as listed below.

Process Heasur ement Circuit

1. Steam Generator Pressure - Steam Generator Pressure - Low Low Steam Generator Level 1-Low (ESF)

Steam Generator Level 2-Low (ESF)

2. Steam Generator Level Steam Generator Level - Low (RPS)

(Wide Range) Steam Generator Level 1-Low (ESF)

Steam Generator Level 2-Low (ESF)

PALO VERDE " UNIT 3 3/4 3-23

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION ACTION STATEMENTS ACTION 14- With the number of channels OPERABLE one less than the Minimum Channels OPERABLE, STARTUP and/or POWER OPERATION may continue provided the following conditions are satisfied:

a. Verify that one of the inoperable channels has been bypassed and place the other inoperable channel in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
b. All functional units affected by the bypassed/tripped channel shall also be placed in the bypassed/tripped condition as listed below:

Process Measurement Circuit Functional Unit Bypassed/Tripped

1. Steam Generator Pressure- Steam Generator Pressure - Low Low Steam Generator Level 1 - Low (ESF)

Steam Generator Level 2 - Low (ESF)

2. Steam Generator Level - Low Steam Generator Level " Low (RPS)

(Wide Range) Steam Generator Level 1 - Low (ESF)

Steam Generator Level 2 - Low (ESF)

STARTUP and/or POWER OPERATION may continue until the performance of the next required CHANNEL FUNCTIONAL TEST. Subsequent STARTUP and/or POWER OPERATION may continue if one channel is restored to OPERABLE status and the provisions of ACTION 13 are satisfied.

ACTION 15- With'the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

ACTION 16- With the number of OPERABLE channels one less than the Total Number of Channels, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel'ay be bypassed for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for surveillance testing provided the other channel is OPERABLE.

ACTION 17- With the number of OPERABLE channels one less than the Minimum Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

ACTION 18- With the number of OPERABLE channels one less than the Minimum Number of Channels, operation. may continue for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

After 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> operation may continue provided at least 1 train of essential filtration is in operation, otherwise, be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLO SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

ADD gASZr PALO VERDE - UNIT 3 3/4 3-24

PcdCon lW-8hwn oww g ~~ ~e uLv < 4 degraded v'oZ<agc r+s p<< ~vs c~oper~M or ~od'n<<gr red, reslare Ae.

u'rg o r a'egraCkd'/OJIoIQ

'

Y~ap'p ~cZ/c,~ AG

<'~ al'msl holy@'~dIg ~gyle~ fA nupC d ho~rs ~~A ( n'cong SAul&~~~ miami~

gPa Wr<g $ 0 )ourg .