{{#Wiki_filter:~~ATTACHMENT 3 PROPOSED TECHNXCAL SPECXFXCATXONS Marked up Technical Specification Pages;3/4 0-3 S 3/4 0-6 ,'9404210202 940419 PDR"'ADOCK,05000250
{{#Wiki_filter:~ ~
.;;P.'~,...~, PDR P I APPLICABILITY SURVEILLANCE RE UIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.
ATTACHMENT 3 PROPOSED TECHNXCAL SPECXFXCATXONS Marked up Technical Specification Pages; 3/4 0-3 S 3/4 0-6
4.0.2 Each Surveillance Requirement shall be performed within the specified time interval with a maximum allowable extension not to exceed 25K of the survei)lance interval.4.0.3 Failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by Specification 4.0.2, shall constitute noncompliance with the OPERABILITY requirements for a Limiting Condition for Operation.
  ,'9404210202 940419 PDR "'ADOCK,05000250
The time limits of the ACTION requirements are applicable at the time it is identified that a Surveillance Requirement has not been performed.
.;;   P.'   ~,... ~, PDR
The ACTION requirements may be delayed for up to 24 hours to permit the completion of the surveillance when the allowable outage time limits of the ACTION requirements are less than 24 hours.Surveillance Requirements do not have to be performed on inoperable equipment.
 
4.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made unless the Surveillance Requirement(s) associated with a Limiting Condition for Operation has been performed within the stated surveillance interval or as otherwise specified.
P I
This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.
 
4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2, and 3 components shall be applicable as follows: Inservice inspection of ASME Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code nd a licable Addenda as re uired b 1 FR 50 Sec ion 50.55a f TURK:"Y POINT-UNITS 3 5 4 3/4 0-3 AMENDMENT NOS.137AND 1
APPLICABILITY SURVEILLANCE RE UIREMENTS 4.0. 1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.
J~~~W~OFMOIOE404~WWeAt~aAW~
: 4. 0. 2 Each Surveillance Requirement shall be performed within the specified time interval with a maximum allowable extension not to exceed 25K of the survei )lance interval.
\gtO&~~OV~
: 4. 0. 3 Failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by Specification 4.0.2, shall constitute noncompliance with the OPERABILITY requirements for a Limiting Condition for Operation. The time limits of the ACTION requirements are applicable at the time it is identified that a Surveillance Requirement has not been performed. The ACTION requirements may be delayed for up to 24 hours to permit the completion of the surveillance when the allowable outage time limits of the ACTION requirements are less than 24 hours. Surveillance Requirements do not have to be performed on inoperable equipment.
~PQIMSII%84NWPA AAekl Ol~l%0~W~f--
: 4. 0.4   Entry into an OPERATIONAL MODE or other specified condition shall not be made   unless the Surveillance Requirement(s) associated with a Limiting Condition for Operation has been performed within the stated surveillance interval or as otherwise specified. This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.
3/4.0 APP LI CAB I LITY BASES Surveillance Requirements do not have to be performed on inoperable equipment because the ACTION requirements define the remedial measures that apply.However, the Surveillance Requirements have to be met to demonstrate that inoperable equipment has been restored to OPERABLE status.S ecification 4.0.4 establishes the requirement that all applicable surve>lances must be met before entry into an OPERATIONAL MODE or other condition of operation specified in the Applicability statement.
4.0.5   Surveillance Requirements for inservice inspection and testing of ASME Code Class   1, 2, and 3 components shall be applicable as follows:
The purpose of this specification is to ensure that system and component OPERABILITY requirements or parameter limits are met before entry into a MODE or condition for which these systems and components ensure safe operation of the facility.This provision applies to changes in OPERATIONAL HODES or other specified conditions associated with plant shutdown as well as startup.Under the provisions of this specification, the applicable Surveillance Requirements must be performed within the specified surveillance interval to ensure that the Limiting Conditions for Operation are met during initial plant startup or following a plant outage.When a shutdown is required to comply with ACTION requirements, the provisions of Specification 4.0.4 do not apply because this would delay placing the facility in a lower MODE of operation.
Inservice inspection of ASME Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code nd a licable Addenda as re uired b 1   FR 50 Sec ion 50.55a                                       f TURK:"Y POINT   - UNITS 3 5 4         3/4 0-3       AMENDMENT NOS.137AND 1
S ecification 4.0.5 establishes the requirement that inservice inspection of ASHE Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with a periodically updated version of Section XI of the ASHE Boiler and Pressure essel Code and Addenda as required by 10 CFR 50.55a.YF-This specification includes a clarification of the frequencies for performing the inservice inspection and testing activities required by Section XI of the ASHE Boiler and Pressure Vessel Code and applicable Addenda.This clarification is provided to ensure consistency in surveillance intervals throughout the Technical Specifications and to remove any ambiguities relative to the frequencies for performing the required inshrvice inspection and testing activities.
 
Under the terms of this specification, the more restrictive requirements of the Technical Specifications take precedence over the ASME Boiler and Pressure Vessel Code and applicable Addenda.The requirements of Specification 4.0.4 to perform surveillance activities before entry into an OPERATIONAL MODE or other specified condition takes precedence over the ASHE Boiler and Pressure TURKEY POINT" UNITS 3&4 B 3/4 0-6 AMENDMENT NOS.137 AND 132 T))'ig r 4)
J
ATTACHMENT 4 PROPOSED TECHNICAL SPECIFICATIONS Corrected Technical Specification Pages;3/4 0-3 B 3/4 0-6
~
(~
~ ~
APPLICABILITY SURVEILLANCE RE UIREHENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.
W~OFMOIOE404~WWeAt~aAW~
4.0.2 Each Surveillance Requirement shall be performed within the specified time interval with a maximum allowable extension not to exceed 25K of the surveillance interval.4.0.3 Failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by Specification 4.0.2, shall constitute noncompliance with the OPERABILITY requirements for a Limiting Condition for Operation.
    \gtO&~~OV~~PQIMSII
The time limits of the ACTION requirements are applicable at the time it is identified that a Surveillance Requirement has not been performed.
                          %84NWPA AAeklOl~l%0
The ACTION requirements may be delayed for up to 24 hours to permit the completion of the surveillance when the allowable outage time limits of the ACTION requirements are less than 24 hours.Surveillance Requirements do not have to be performed on inoperable equipment.
                                  ~ W ~ f--
4.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made unless the Surveillance Requirement(s) associated with a Limiting Condition for Operation has been performed within the stated surveillance interval or as otherwise specified.
 
This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.
3/4. 0 APP LICAB I LITY BASES Surveillance Requirements do not have to be performed on inoperable equipment because the ACTION requirements define the remedial measures that apply.
4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2, and 3 components shall be applicable as follows: 'a~Inservice inspection of ASHE Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASHE Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a.TURKEY POINT-UNITS 3&4 3/4 0-3 AMENDMENT NOS.AND 3 4.0 APPLICABILITY BASES Surveillance Requirements do not have to be performed on inoperable equipment because the ACTION requirements define the remedial measures that apply.However, the Surveillance Requirements have to be met to demonstrate that inoperable equipment has been restored to OPERABLE status.S ecification 4.0.4 establishes the requirement that all applicable surveil-lances must be met before entry into an OPERATIONAL NODE or other condition of operation specified in the Applicability statement.
However, the Surveillance Requirements have to be met to demonstrate that inoperable equipment has been restored to OPERABLE status.
The purpose of this specification is to ensure that system and component OPERABILITY requirements or parameter limits are met before entry into a NODE or condition for which these systems and components ensure safe operation of the facility.This provision applies to changes in OPERATIONAL NODES or other specified conditions associated with plant shutdown as well as startup.Under the provisions of this specification, the applicable Surveillance Requirements must be performed within the specified surveillance interval to ensure that the Limiting Conditions for Operation are met during initial plant startup or following a plant outage.When a shutdown is required to comply with ACTION requirements, the provisions of Specification 4.0.4 do not apply because this would delay placing the facility in a lower NODE of operation.
S   ecification 4.0.4 establishes the requirement that all applicable surve> lances must be met before       entry into an OPERATIONAL MODE or other condition of operation specified in the Applicability statement. The purpose of this specification is to ensure that system and component OPERABILITY requirements or parameter limits are met before entry into a MODE or condition for which these systems and components ensure safe operation of the facility. This provision applies to changes in OPERATIONAL HODES or other specified conditions associated with plant shutdown as well as startup.
S ecification 4.0.5 establishes the requirement that inservice inspection of ASIDE Code Class I, 2, and 3 components and inservice testing of ASIDE Code Class I, 2, and 3 pumps and valves shall be performed in accordance with a periodically updated version of Section XI of the ASIDE Boiler and Pressure Vessel Code and Addenda as required by 10 CFR 50.55a.This specification includes a clarification of the frequencies for performing the inservice inspection and testing activities required by Section XI of the ASNE Boiler and Pressure Vessel Code and applicable Addenda.This clarifica-tion is provided to ensure consistency in surveillance intervals throughout the Technical Specifications and to remove any ambiguities relative to the frequencies for performing the required inservice inspection and testing activities.
Under the provisions of this specification, the applicable Surveillance Requirements must be performed within the specified surveillance interval to ensure that the Limiting Conditions for Operation are met during initial plant startup or following       a plant outage.
Under the terms of this specification, the more restrictive requirements of the Technical Specifications take precedence over the ASIDE Boiler and Pressure Vessel Code and applicable Addenda.The requirements of Specification 4.0.4 to perform surveillance activities before entry into an OPERATIONAL NODE or other specified condition takes precedence over the ASIDE Boiler and Pressure TURKEY POINT-UNITS 3 S.4 B 3/4 0-6 AMENDMENT NOS.AND}}
When a shutdown       is required to comply with ACTION requirements, the provisions of Specification 4.0.4 do not apply because this would delay placing the facility in a lower MODE of operation.
S ecification 4.0.5 establishes the requirement that inservice inspection of ASHE Code     Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and     3 pumps   and valves shall   be performed in accordance with a periodically updated version of Section XI of the           ASHE Boiler and Pressure essel Code and Addenda as required by 10         CFR 50.55a.
YF-This specification includes a clarification of the frequencies for performing the inservice inspection and testing activities required by Section XI of the ASHE Boiler and Pressure Vessel Code and applicable Addenda.           This clarification is provided to ensure consistency in surveillance intervals throughout the Technical Specifications and to remove any ambiguities relative to the frequencies for performing the required inshrvice inspection and testing activities.
Under the terms     of this specification, the more restrictive requirements of the Technical Specifications take precedence over the ASME Boiler and Pressure Vessel Code and applicable Addenda. The requirements of Specification 4.0.4 to perform surveillance activities before entry into an OPERATIONAL MODE or other specified condition takes precedence over the ASHE Boiler and Pressure TURKEY POINT     " UNITS   3 & 4         B 3/4 0-6       AMENDMENT NOS.137 AND 132
 
T
))     r
  'ig   4)
 
ATTACHMENT 4 PROPOSED TECHNICAL SPECIFICATIONS Corrected Technical Specification Pages; 3/4 0-3 B 3/4 0-6
 
( ~
APPLICABILITY SURVEILLANCE RE UIREHENTS 4.0.1       Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.
4.0.2       Each   Surveillance Requirement shall be performed within the specified time interval with       a maximum allowable extension not to exceed 25K of the surveillance interval.
4.0.3       Failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by Specification 4.0.2, shall constitute noncompliance with the OPERABILITY requirements for a Limiting Condition for Operation. The time limits of the ACTION requirements are applicable at the time it is identified that a Surveillance Requirement has not been performed.
The ACTION requirements may be delayed for up to 24 hours to permit the completion of the surveillance when the allowable outage time limits of the ACTION requirements are less than 24 hours.         Surveillance Requirements do not have to be performed on inoperable equipment.
4.0.4       Entry into an OPERATIONAL MODE or other specified condition shall not be made     unless the Surveillance Requirement(s) associated with a Limiting Condition for Operation has been performed within the stated surveillance interval or as otherwise specified. This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.
4.0.5       Surveillance Requirements for inservice inspection     and testing of ASME Code Class       1, 2, and 3 components shall be applicable as follows:
      'a ~     Inservice inspection of ASHE Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASHE Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a.
TURKEY POINT UNITS 3 & 4             3/4 0-3           AMENDMENT NOS. AND
 
3 4.0   APPLICABILITY BASES Surveillance Requirements do not have to be performed on inoperable equipment because the ACTION requirements define the remedial measures that apply.
However, the Surveillance Requirements have to be met to demonstrate that inoperable equipment has been restored to OPERABLE status.
S ecification 4.0.4 establishes the requirement that all applicable surveil-lances must be met before entry into an OPERATIONAL NODE or other condition of operation specified in the Applicability statement. The purpose of this specification is to ensure that system and component OPERABILITY requirements or parameter limits are met before entry into a NODE or condition for which these systems and components ensure safe operation of the facility. This provision applies to changes in OPERATIONAL NODES or other specified conditions associated with plant shutdown as well as startup.
Under the   provisions of this specification, the applicable Surveillance Requirements must be performed within the specified surveillance     interval to ensure that the Limiting Conditions for Operation are met during     initial plant startup or following a plant outage.
When a   shutdown is required to comply with ACTION requirements, the provisions of Specification 4.0.4 do not apply because this would delay placing the facility in a lower NODE of operation.
S ecification 4.0.5 establishes the requirement that inservice inspection of ASIDE Code Class I, 2, and 3 components and inservice testing of ASIDE Code Class   I, 2, and 3 pumps and valves shall be performed in accordance with a periodically   updated version of Section XI of the ASIDE Boiler and Pressure Vessel Code and Addenda as required by 10 CFR 50.55a.
This specification includes a clarification of the frequencies for performing the inservice inspection and testing activities required by Section XI of the ASNE Boiler and Pressure Vessel Code and applicable Addenda.       This clarifica-tion is provided to ensure consistency in surveillance intervals throughout the Technical Specifications and to remove any ambiguities relative to the frequencies for performing the required inservice inspection and testing activities.
Under the terms     of this specification, the more restrictive requirements of the Technical Specifications take precedence over the ASIDE Boiler and Pressure Vessel Code and applicable Addenda. The requirements of Specification 4.0.4 to perform surveillance activities before entry into an OPERATIONAL NODE or other specified condition takes precedence over the ASIDE Boiler and Pressure TURKEY POINT   - UNITS 3 S. 4       B 3/4 0-6               AMENDMENT NOS. AND}}

Latest revision as of 07:36, 22 October 2019

Proposed TS 4.0.5a Re ISI & Testing Programs
ML17352A547
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/19/1994
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17352A546 List:
References
NUDOCS 9404210202
Download: ML17352A547 (11)


Text

~ ~

ATTACHMENT 3 PROPOSED TECHNXCAL SPECXFXCATXONS Marked up Technical Specification Pages; 3/4 0-3 S 3/4 0-6

,'9404210202 940419 PDR "'ADOCK,05000250

.;; P.' ~,... ~, PDR

P I

APPLICABILITY SURVEILLANCE RE UIREMENTS 4.0. 1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.

4. 0. 2 Each Surveillance Requirement shall be performed within the specified time interval with a maximum allowable extension not to exceed 25K of the survei )lance interval.
4. 0. 3 Failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by Specification 4.0.2, shall constitute noncompliance with the OPERABILITY requirements for a Limiting Condition for Operation. The time limits of the ACTION requirements are applicable at the time it is identified that a Surveillance Requirement has not been performed. The ACTION requirements may be delayed for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of the surveillance when the allowable outage time limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Surveillance Requirements do not have to be performed on inoperable equipment.
4. 0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made unless the Surveillance Requirement(s) associated with a Limiting Condition for Operation has been performed within the stated surveillance interval or as otherwise specified. This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.

4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2, and 3 components shall be applicable as follows:

Inservice inspection of ASME Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code nd a licable Addenda as re uired b 1 FR 50 Sec ion 50.55a f TURK:"Y POINT - UNITS 3 5 4 3/4 0-3 AMENDMENT NOS.137AND 1

J

~

~ ~

W~OFMOIOE404~WWeAt~aAW~

\gtO&~~OV~~PQIMSII

%84NWPA AAeklOl~l%0

~ W ~ f--

3/4. 0 APP LICAB I LITY BASES Surveillance Requirements do not have to be performed on inoperable equipment because the ACTION requirements define the remedial measures that apply.

However, the Surveillance Requirements have to be met to demonstrate that inoperable equipment has been restored to OPERABLE status.

S ecification 4.0.4 establishes the requirement that all applicable surve> lances must be met before entry into an OPERATIONAL MODE or other condition of operation specified in the Applicability statement. The purpose of this specification is to ensure that system and component OPERABILITY requirements or parameter limits are met before entry into a MODE or condition for which these systems and components ensure safe operation of the facility. This provision applies to changes in OPERATIONAL HODES or other specified conditions associated with plant shutdown as well as startup.

Under the provisions of this specification, the applicable Surveillance Requirements must be performed within the specified surveillance interval to ensure that the Limiting Conditions for Operation are met during initial plant startup or following a plant outage.

When a shutdown is required to comply with ACTION requirements, the provisions of Specification 4.0.4 do not apply because this would delay placing the facility in a lower MODE of operation.

S ecification 4.0.5 establishes the requirement that inservice inspection of ASHE Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with a periodically updated version of Section XI of the ASHE Boiler and Pressure essel Code and Addenda as required by 10 CFR 50.55a.

YF-This specification includes a clarification of the frequencies for performing the inservice inspection and testing activities required by Section XI of the ASHE Boiler and Pressure Vessel Code and applicable Addenda. This clarification is provided to ensure consistency in surveillance intervals throughout the Technical Specifications and to remove any ambiguities relative to the frequencies for performing the required inshrvice inspection and testing activities.

Under the terms of this specification, the more restrictive requirements of the Technical Specifications take precedence over the ASME Boiler and Pressure Vessel Code and applicable Addenda. The requirements of Specification 4.0.4 to perform surveillance activities before entry into an OPERATIONAL MODE or other specified condition takes precedence over the ASHE Boiler and Pressure TURKEY POINT " UNITS 3 & 4 B 3/4 0-6 AMENDMENT NOS.137 AND 132

T

)) r

'ig 4)

ATTACHMENT 4 PROPOSED TECHNICAL SPECIFICATIONS Corrected Technical Specification Pages; 3/4 0-3 B 3/4 0-6

( ~

APPLICABILITY SURVEILLANCE RE UIREHENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.

4.0.2 Each Surveillance Requirement shall be performed within the specified time interval with a maximum allowable extension not to exceed 25K of the surveillance interval.

4.0.3 Failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by Specification 4.0.2, shall constitute noncompliance with the OPERABILITY requirements for a Limiting Condition for Operation. The time limits of the ACTION requirements are applicable at the time it is identified that a Surveillance Requirement has not been performed.

The ACTION requirements may be delayed for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of the surveillance when the allowable outage time limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Surveillance Requirements do not have to be performed on inoperable equipment.

4.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made unless the Surveillance Requirement(s) associated with a Limiting Condition for Operation has been performed within the stated surveillance interval or as otherwise specified. This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.

4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2, and 3 components shall be applicable as follows:

'a ~ Inservice inspection of ASHE Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASHE Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a.

TURKEY POINT UNITS 3 & 4 3/4 0-3 AMENDMENT NOS. AND

3 4.0 APPLICABILITY BASES Surveillance Requirements do not have to be performed on inoperable equipment because the ACTION requirements define the remedial measures that apply.

However, the Surveillance Requirements have to be met to demonstrate that inoperable equipment has been restored to OPERABLE status.

S ecification 4.0.4 establishes the requirement that all applicable surveil-lances must be met before entry into an OPERATIONAL NODE or other condition of operation specified in the Applicability statement. The purpose of this specification is to ensure that system and component OPERABILITY requirements or parameter limits are met before entry into a NODE or condition for which these systems and components ensure safe operation of the facility. This provision applies to changes in OPERATIONAL NODES or other specified conditions associated with plant shutdown as well as startup.

Under the provisions of this specification, the applicable Surveillance Requirements must be performed within the specified surveillance interval to ensure that the Limiting Conditions for Operation are met during initial plant startup or following a plant outage.

When a shutdown is required to comply with ACTION requirements, the provisions of Specification 4.0.4 do not apply because this would delay placing the facility in a lower NODE of operation.

S ecification 4.0.5 establishes the requirement that inservice inspection of ASIDE Code Class I, 2, and 3 components and inservice testing of ASIDE Code Class I, 2, and 3 pumps and valves shall be performed in accordance with a periodically updated version of Section XI of the ASIDE Boiler and Pressure Vessel Code and Addenda as required by 10 CFR 50.55a.

This specification includes a clarification of the frequencies for performing the inservice inspection and testing activities required by Section XI of the ASNE Boiler and Pressure Vessel Code and applicable Addenda. This clarifica-tion is provided to ensure consistency in surveillance intervals throughout the Technical Specifications and to remove any ambiguities relative to the frequencies for performing the required inservice inspection and testing activities.

Under the terms of this specification, the more restrictive requirements of the Technical Specifications take precedence over the ASIDE Boiler and Pressure Vessel Code and applicable Addenda. The requirements of Specification 4.0.4 to perform surveillance activities before entry into an OPERATIONAL NODE or other specified condition takes precedence over the ASIDE Boiler and Pressure TURKEY POINT - UNITS 3 S. 4 B 3/4 0-6 AMENDMENT NOS. AND