ML18142B033: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:NRC Approved TSTFs Not Incorporated into the ISTS NUREGs Date of NRC NRC Approval Approval NUREGs Traveler # Date Letter Affected Short Title TSTF-426-A, Rev. 5 5/30/2013 5/30/2013 CE Revise or Add Actions to Preclude Entry into LCO 3.0.3 - RITSTF Initiatives 6b & 6c TSTF-432-A, Rev. 1 5/11/2012 5/11/2012 W Change in Technical Specifications End States (WCAP-16294) | ||
TSTF-490-A, Rev. 0 3/15/2007 3/15/2007 PWROG Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec TSTF-505-A, Rev. 1 3/15/2012 3/15/2012 B&W Provide Risk-Informed Extended Completion W Times - RITSTF Initiative 4b CE BWR4 BWR6 TSTF-510-A, Rev. 2 10/27/2011 10/27/2011 PWROG Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection TSTF-522-A, Rev. 0 9/20/2012 9/20/2012 B&W Revise Ventilation System Surveillance W Requirements to Operate for 10 hours per Month CE BWR4 BWR6 TSTF-523-A, Rev. 2 1/15/2014 1/15/2014 B&W Generic Letter 2008-01, Managing Gas W Accumulation CE BWR4 BWR6 TSTF-529-A, Rev. 4 4/21/2016 4/21/2016 B&W Clarify Use and Application Rules W | |||
CE BWR4 BWR6 TSTF-535-A, Rev. 0 2/26/2013 2/26/2013 BWROG Revise Shutdown Margin Definition to Address Advanced Fuel Designs TSTF-542-A, Rev. 2 12/20/2016 12/20/2016 BWROG Reactor Pressure Vessel Water Inventory Control TSTF-545-A, Rev. 3 12/11/2015 12/11/2015 B&W TS Inservice Testing Program Removal & Clarify W SR Usage Rule Application to Section 5.5 Testing CE BWR4 BWR6 TSTF-546-A, Rev. 0 8/31/2017 8/31/2017 BWROG Revise APRM Channel Adjustment Surveillance Requirement TSTF-547-A, Rev. 1 3/4/2016 3/4/2016 W Clarification of Rod Position Requirements Page 1 of 2 18-May-18 Copyright(C) 2018, EXCEL Services Corporation. Use by EXCEL Services associates, utility clients, and the U.S. Nuclear Regulatory Commission is granted. All other use without written permission is prohibited. | |||
NRC Approved TSTFs Not Incorporated into the ISTS NUREGs Date of NRC NRC Approval Approval NUREGs Traveler # Date Letter Affected Short Title TSTF-551-A, Rev. 3 9/21/2017 9/21/2017 BWROG Revise Secondary Containment Surveillance Requirements Total Number of Approved TSTFs: 14 Page 2 of 2 18-May-18 Copyright(C) 2018, EXCEL Services Corporation. Use by EXCEL Services associates, utility clients, and the U.S. Nuclear Regulatory Commission is granted. All other use without written permission is prohibited.}} |
Latest revision as of 01:25, 21 October 2019
ML18142B033 | |
Person / Time | |
---|---|
Site: | Technical Specifications Task Force |
Issue date: | 05/17/2018 |
From: | Technical Specifications Task Force |
To: | Office of Nuclear Reactor Regulation |
Honcharik M | |
Shared Package | |
ML18142B058 | List: |
References | |
Download: ML18142B033 (2) | |
Text
NRC Approved TSTFs Not Incorporated into the ISTS NUREGs Date of NRC NRC Approval Approval NUREGs Traveler # Date Letter Affected Short Title TSTF-426-A, Rev. 5 5/30/2013 5/30/2013 CE Revise or Add Actions to Preclude Entry into LCO 3.0.3 - RITSTF Initiatives 6b & 6c TSTF-432-A, Rev. 1 5/11/2012 5/11/2012 W Change in Technical Specifications End States (WCAP-16294)
TSTF-490-A, Rev. 0 3/15/2007 3/15/2007 PWROG Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec TSTF-505-A, Rev. 1 3/15/2012 3/15/2012 B&W Provide Risk-Informed Extended Completion W Times - RITSTF Initiative 4b CE BWR4 BWR6 TSTF-510-A, Rev. 2 10/27/2011 10/27/2011 PWROG Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection TSTF-522-A, Rev. 0 9/20/2012 9/20/2012 B&W Revise Ventilation System Surveillance W Requirements to Operate for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> per Month CE BWR4 BWR6 TSTF-523-A, Rev. 2 1/15/2014 1/15/2014 B&W Generic Letter 2008-01, Managing Gas W Accumulation CE BWR4 BWR6 TSTF-529-A, Rev. 4 4/21/2016 4/21/2016 B&W Clarify Use and Application Rules W
CE BWR4 BWR6 TSTF-535-A, Rev. 0 2/26/2013 2/26/2013 BWROG Revise Shutdown Margin Definition to Address Advanced Fuel Designs TSTF-542-A, Rev. 2 12/20/2016 12/20/2016 BWROG Reactor Pressure Vessel Water Inventory Control TSTF-545-A, Rev. 3 12/11/2015 12/11/2015 B&W TS Inservice Testing Program Removal & Clarify W SR Usage Rule Application to Section 5.5 Testing CE BWR4 BWR6 TSTF-546-A, Rev. 0 8/31/2017 8/31/2017 BWROG Revise APRM Channel Adjustment Surveillance Requirement TSTF-547-A, Rev. 1 3/4/2016 3/4/2016 W Clarification of Rod Position Requirements Page 1 of 2 18-May-18 Copyright(C) 2018, EXCEL Services Corporation. Use by EXCEL Services associates, utility clients, and the U.S. Nuclear Regulatory Commission is granted. All other use without written permission is prohibited.
NRC Approved TSTFs Not Incorporated into the ISTS NUREGs Date of NRC NRC Approval Approval NUREGs Traveler # Date Letter Affected Short Title TSTF-551-A, Rev. 3 9/21/2017 9/21/2017 BWROG Revise Secondary Containment Surveillance Requirements Total Number of Approved TSTFs: 14 Page 2 of 2 18-May-18 Copyright(C) 2018, EXCEL Services Corporation. Use by EXCEL Services associates, utility clients, and the U.S. Nuclear Regulatory Commission is granted. All other use without written permission is prohibited.