| number = ML18192A991
| number = ML18192A991
| issue date = 12/31/2017
| issue date = 12/31/2017
| title = Oconee Nuclear Station, Units 1, 2 & 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 18, Appendix 18A, Tables
| title = Revision 27 to Updated Final Safety Analysis Report, Chapter 18, Appendix 18A, Tables
| author name =  
| author name =  
| author affiliation = Duke Energy Carolinas, LLC
| author affiliation = Duke Energy Carolinas, LLC
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:~ !"#$%%&'()%(*+(,'-%.+&'./.'!'~ !"~ ~$%&%"'%"'%"()))%*~ ()+)($%,,-$%)+."/0!()~(!
{{#Wiki_filter:Oconee Nuclear Station UFSAR Appendix 18A. Tables Appendix 18A. Tables
!,)~ $%,,!%*)()*#"$~$%,,(%*))*1
 
$+)$*,)1$%1
Oconee Nuclear Station                                      UFSAR Table 18-1 (Page 1 of 4)
*~~$*,((
Table 18-1. Summary Listing of the Programs, Activities and TLAA Topic                    Program/Activity or    UFSAR/ITS/SLC TLAA                Location Alloy 600 Aging Management Program            Program/Activity          18.3.1 Auxiliary Building Ventilation Inspection      Program/Activity        18.3.17.18 Battery Rack Inspections                      Program/Activity            ITS:
)"2344 5+)~~
SR 3.8.1.11, SR3.8.3.3, SR 3.10.1.10 18.3.26 Boric Acid Corrosion Control Program          Program/Activity          18.3.10 Cast Iron Selective Leaching Inspection        Program/Activity          18.2.1 Chemistry Control Program                      Program/Activity          18.3.2 ITS 5.5.14 ITS 3.10.1.8 Chilled Water Refrigeration Unit PM            Program/Activity        18.3.17.2 Coatings Program                              Program/Activity        3.8.1.1.1 6.2.1.6 18.3.17.1 18.3.17.5 Containment Inservice Inspection Plan          Program/Activity          18.3.3 ITS 3.6.1 B3.6.1 5.5.7 SLC 16.6.2 Containment Leak Rate Testing Program          Program/Activity        ITS 5.5.2 3.6.1 B3.6.1 SLC 16.6.1 Containment Liner Plate and Penetrations -          TLAA                3.8.1.5.3 Thermal Cycles Containment Post-Tensioning System -               TLAA                3.8.1.5.2 Prestress Loss                                                            16.6.2 18.3.3 Control Rod Drive Mechanism Nozzle and        Program/Activity          18.3.1.2 Other Vessel Closure Penetrations Inspection Program Control Room Pressurization & Filtration      Program/Activity        18.3.17.19 Inspection Control Room Ventilation System                Program/Activity        18.3.17.6 Examination (31 DEC 2014)
()"~~467
 
~ !8)"%
Oconee Nuclear Station                                    UFSAR Table 18-1 (Page 2 of 4)
9!
Topic                Program/Activity or    UFSAR/ITS/SLC TLAA                Location Crane Inspection Program                    Program/Activity          18.3.5 Cranes and Control of Heavy Loads                TLAA                  3.12 Duke Power Five-Year Underwater            Program/Activity          18.3.6 Inspection of Hydroelectric Dams and Appurtenances Elevated Water Storage Tank Inspection      Program/Activity          18.3.7 Environmental Qualification of Electrical        TLAA                  3.11 Equipment Federal Energy Regulatory Commission        Program/Activity          18.3.8 (FERC) Five Year Inspections Fire Protection Program                    Program/Activity          16.9.1, 16.9.2, 16.9.4, 16.9.5, 18.3.17.8 Flow Accelerated Corrosion Program          Program/Activity          18.3.9 Deleted Row per 2012 Update Galvanic Susceptibility Inspection          Program/Activity      18.2.2, 18.3.21 Generator Stator Water Cooler Inspection    Program/Activity        18.3.17.23 Heat Exchangers                            Program/Activity          18.3.11 18.3.17.3 18.3.17.4 18.3.17.7 18.3.17.9 18.3.17.11 18.317.12 18.3.17.13 18.3.17.15 Inservice Inspection Plan                  Program/Activity          18.3.12 5.2.3.12.4 SLC 16.9.18 Inspection Program for Civil Engineering    Program/Activity          18.3.13 Structures and Components Insulated Cables and Connections Aging      Program/Activity          18.3.14 Management Program Keowee Air and Gas Systems Inspection      Program/Activity      18.2.3, 18.3.21 Keowee Oil Sampling Program                Program/Activity          18.3.15 Keowee Turbine Generator Cooling Water      Program/Activity        18.3.17.10 Strainer PM (31 DEC 2014)
"~ !"#-%.+&'./.'!')~ ,))/:*~$*(2#;71<0;
 
~ /:2  ~9.%$~ !9=//9 9> $*79")
Oconee Nuclear Station                                    UFSAR Table 18-1 (Page 3 of 4)
?79")@7<~ ~78'8('
Topic                  Program/Activity or    UFSAR/ITS/SLC TLAA                Location Keowee Turbine Guide Bearing Oil Cooler      Program/Activity        18.3.17.22 Examination Keowee 230 kV Transmission Line              Program/Activity          18.3.24 Inspections Non-Class 1 Piping - Thermal Cycles              TLAA                3.2.2.2 Once Through Steam Generator Upper          Program/Activity          18.2.4 Lateral Support Inspection Penetration Room Ventilation System          Program/Activity        18.3.17.20 Inspection Penstock Inspection                          Program/Activity          18.3.16 Pressurizer Examinations and Inspections    Program/Activity          18.2.5 18.2.5.1 18.2.5.2 18.3.1.3 Preventive Maintenance Activities            Program/Activity          18.3.17 Program to Inspect High Pressure Injection  Program/Activity          18.3.18 Connections to the Reactor Coolant System Reactor Building Cooling System Inspection  Program/Activity        18.3.17.17 Reactor Building Purge System Inspection    Program/Activity        18.3.17.21 Reactor Building Spray System Inspection    Program/Activity          18.2.6 Reactor Coolant Pump Flywheel Inspection    Program/Activity        ITS 5.5.8 Program                                                              5.4.4.3.2 18.3.25 Reactor Coolant Pump Motor Oil Collection    Program/Activity          18.2.7 System Inspection Reactor Coolant System and Class 1                TLAA                5.2.1.4 Components (include leak-before-break)                                   18.4 (Oconee Thermal Fatigue Management Program)
8-'
Reactor Coolant System Operational          Program/Activity        ITS 3.4.13 Leakage Monitoring                                                  ITS 3.4.15 SLC 16.11.3 (31 DEC 2014)
8,'!7;)~82"; ((0 A% B~ (('(A%.)~ !(:9!
 
!-
Oconee Nuclear Station                                    UFSAR Table 18-1 (Page 4 of 4)
!!
Topic                Program/Activity or    UFSAR/ITS/SLC TLAA                Location Reactor Vessel Integrity Program                TLAA                5.2.3.3.2 Program/Activity        5.2.3.3.3 5.2.3.3.4 5.2.3.3.5 5.2.3.3.6 5.2.3.3.10 5.2.3.3.11 18.3.19 18.4 Reactor Vessel Internals                        TLAA                4.5.1.2 18.4 Reactor Vessel Internals Inspection        Program/Activity          18.3.20 Service Water Piping Corrosion Program      Program/Activity    18.3.21, 18.2.2, 18.2.3 Small Bore Piping Inspection                Program/Activity          18.2.8 Spent Fuel Rack Boraflex                        None                9.1.2.5 SSF - Diesel Fuel Oil Storage Tank          Program/Activity        18.3.17.14 Inspection Standby Shutdown Facility HVAC Inspection  Program/Activity        18.3.17.16 Steam Generator (SG) Program                Program/Activity        ITS 5.5.10 ITS 3.4.16 18.3.27 System Performance Testing Activities      Program/Activity          18.3.22 Tendon - Secondary Shield Wall -           Program/Activity          18.3.23 Surveillance Program                                                ITS 5.5.7 Treated Water Systems Stainless Steel      Program/Activity          18.2.9 Inspection (31 DEC 2014)}}
!8!!(!
!,~ (,((-%*)8~ /)9
%~) ~~)B~)
-C;A~%~~ ('(C;5% ,C;$BA).
%!
~ !"#-%.+&'./.'!'C;$BA5) 9!((C;(#$~*
~ ~(-31) 1$+)$*(((5$++%A0 
*%  ~ (-"%
~ !(#~ ~~49~ ~(,(,
(,(
~!~ :+~~D
)+")%")%~ !!"%~ !("% %~ (") 7+~
$%,,,--((,") 5)
%~ (!")%)
) ~?#1B/1B#@
?5$+7
@$*,(--")%5
*#$%-$%-,%*)  
~ !"#-%.+&'./.'!'"$*,((
,(
,(-
,(,
,(,(
,(8-"$*-,(-"~ (%. )('(('(% ~ (% 7"/38(,%%71275%$
~ !-%B%+;7:)~ !%A?%A@$%,,$%-(!%/$(($1%%+.1
%($%,,!$.%~%%
~ (8}}

Latest revision as of 21:39, 20 October 2019

Revision 27 to Updated Final Safety Analysis Report, Chapter 18, Appendix 18A, Tables
ML18192A991
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/31/2017
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18192A809 List:
References
ONS 2018-026
Download: ML18192A991 (5)


Text

Oconee Nuclear Station UFSAR Appendix 18A. Tables Appendix 18A. Tables

Oconee Nuclear Station UFSAR Table 18-1 (Page 1 of 4)

Table 18-1. Summary Listing of the Programs, Activities and TLAA Topic Program/Activity or UFSAR/ITS/SLC TLAA Location Alloy 600 Aging Management Program Program/Activity 18.3.1 Auxiliary Building Ventilation Inspection Program/Activity 18.3.17.18 Battery Rack Inspections Program/Activity ITS:

SR 3.8.1.11, SR3.8.3.3, SR 3.10.1.10 18.3.26 Boric Acid Corrosion Control Program Program/Activity 18.3.10 Cast Iron Selective Leaching Inspection Program/Activity 18.2.1 Chemistry Control Program Program/Activity 18.3.2 ITS 5.5.14 ITS 3.10.1.8 Chilled Water Refrigeration Unit PM Program/Activity 18.3.17.2 Coatings Program Program/Activity 3.8.1.1.1 6.2.1.6 18.3.17.1 18.3.17.5 Containment Inservice Inspection Plan Program/Activity 18.3.3 ITS 3.6.1 B3.6.1 5.5.7 SLC 16.6.2 Containment Leak Rate Testing Program Program/Activity ITS 5.5.2 3.6.1 B3.6.1 SLC 16.6.1 Containment Liner Plate and Penetrations - TLAA 3.8.1.5.3 Thermal Cycles Containment Post-Tensioning System - TLAA 3.8.1.5.2 Prestress Loss 16.6.2 18.3.3 Control Rod Drive Mechanism Nozzle and Program/Activity 18.3.1.2 Other Vessel Closure Penetrations Inspection Program Control Room Pressurization & Filtration Program/Activity 18.3.17.19 Inspection Control Room Ventilation System Program/Activity 18.3.17.6 Examination (31 DEC 2014)

Oconee Nuclear Station UFSAR Table 18-1 (Page 2 of 4)

Topic Program/Activity or UFSAR/ITS/SLC TLAA Location Crane Inspection Program Program/Activity 18.3.5 Cranes and Control of Heavy Loads TLAA 3.12 Duke Power Five-Year Underwater Program/Activity 18.3.6 Inspection of Hydroelectric Dams and Appurtenances Elevated Water Storage Tank Inspection Program/Activity 18.3.7 Environmental Qualification of Electrical TLAA 3.11 Equipment Federal Energy Regulatory Commission Program/Activity 18.3.8 (FERC) Five Year Inspections Fire Protection Program Program/Activity 16.9.1, 16.9.2, 16.9.4, 16.9.5, 18.3.17.8 Flow Accelerated Corrosion Program Program/Activity 18.3.9 Deleted Row per 2012 Update Galvanic Susceptibility Inspection Program/Activity 18.2.2, 18.3.21 Generator Stator Water Cooler Inspection Program/Activity 18.3.17.23 Heat Exchangers Program/Activity 18.3.11 18.3.17.3 18.3.17.4 18.3.17.7 18.3.17.9 18.3.17.11 18.317.12 18.3.17.13 18.3.17.15 Inservice Inspection Plan Program/Activity 18.3.12 5.2.3.12.4 SLC 16.9.18 Inspection Program for Civil Engineering Program/Activity 18.3.13 Structures and Components Insulated Cables and Connections Aging Program/Activity 18.3.14 Management Program Keowee Air and Gas Systems Inspection Program/Activity 18.2.3, 18.3.21 Keowee Oil Sampling Program Program/Activity 18.3.15 Keowee Turbine Generator Cooling Water Program/Activity 18.3.17.10 Strainer PM (31 DEC 2014)

Oconee Nuclear Station UFSAR Table 18-1 (Page 3 of 4)

Topic Program/Activity or UFSAR/ITS/SLC TLAA Location Keowee Turbine Guide Bearing Oil Cooler Program/Activity 18.3.17.22 Examination Keowee 230 kV Transmission Line Program/Activity 18.3.24 Inspections Non-Class 1 Piping - Thermal Cycles TLAA 3.2.2.2 Once Through Steam Generator Upper Program/Activity 18.2.4 Lateral Support Inspection Penetration Room Ventilation System Program/Activity 18.3.17.20 Inspection Penstock Inspection Program/Activity 18.3.16 Pressurizer Examinations and Inspections Program/Activity 18.2.5 18.2.5.1 18.2.5.2 18.3.1.3 Preventive Maintenance Activities Program/Activity 18.3.17 Program to Inspect High Pressure Injection Program/Activity 18.3.18 Connections to the Reactor Coolant System Reactor Building Cooling System Inspection Program/Activity 18.3.17.17 Reactor Building Purge System Inspection Program/Activity 18.3.17.21 Reactor Building Spray System Inspection Program/Activity 18.2.6 Reactor Coolant Pump Flywheel Inspection Program/Activity ITS 5.5.8 Program 5.4.4.3.2 18.3.25 Reactor Coolant Pump Motor Oil Collection Program/Activity 18.2.7 System Inspection Reactor Coolant System and Class 1 TLAA 5.2.1.4 Components (include leak-before-break) 18.4 (Oconee Thermal Fatigue Management Program)

Reactor Coolant System Operational Program/Activity ITS 3.4.13 Leakage Monitoring ITS 3.4.15 SLC 16.11.3 (31 DEC 2014)

Oconee Nuclear Station UFSAR Table 18-1 (Page 4 of 4)

Topic Program/Activity or UFSAR/ITS/SLC TLAA Location Reactor Vessel Integrity Program TLAA 5.2.3.3.2 Program/Activity 5.2.3.3.3 5.2.3.3.4 5.2.3.3.5 5.2.3.3.6 5.2.3.3.10 5.2.3.3.11 18.3.19 18.4 Reactor Vessel Internals TLAA 4.5.1.2 18.4 Reactor Vessel Internals Inspection Program/Activity 18.3.20 Service Water Piping Corrosion Program Program/Activity 18.3.21, 18.2.2, 18.2.3 Small Bore Piping Inspection Program/Activity 18.2.8 Spent Fuel Rack Boraflex None 9.1.2.5 SSF - Diesel Fuel Oil Storage Tank Program/Activity 18.3.17.14 Inspection Standby Shutdown Facility HVAC Inspection Program/Activity 18.3.17.16 Steam Generator (SG) Program Program/Activity ITS 5.5.10 ITS 3.4.16 18.3.27 System Performance Testing Activities Program/Activity 18.3.22 Tendon - Secondary Shield Wall - Program/Activity 18.3.23 Surveillance Program ITS 5.5.7 Treated Water Systems Stainless Steel Program/Activity 18.2.9 Inspection (31 DEC 2014)