| {{#Wiki_filter:}} | | {{#Wiki_filter:NRC FORM 699 U.S. NUCLEAR REGULATORY COMMISSION DATE OF SIGNATURE (03-2013) |
| | CONVERSATION RECORD 06/12/2019 NAME OF PERSON(S) CONTACTED OR IN CONTACT WITH YOU DATE OF CONTACT TYPE OF CONVERSATION E-MAIL Glenn Mathues 06/11/2019 TELEPHONE E-MAIL ADDRESS TELEPHONE NUMBER INCOMING glenn.mathues@orano.group (410) 910-6538 OUTGOING ORGANIZATION DOCKET NUMBER(S) |
| | TN Americas LLC 72-1042 LICENSE NUMBER(S) CONTROL NUMBER(S) |
| | CoC 1042 EOS Amendment #1 SUBJECT Clarification Call on RAI #1 response for CoC 1042 EOS Amendment #1. |
| | |
| | ==SUMMARY== |
| | |
| | Participants: |
| | TN: Philippe Pham, Don Shaw, Hoi Yee Tom, Laura Picard, Richard Migliore, Glenn Mathues NRC: Christian Jacobs, Veronica Wilson, Zhian Li, Travis Tate Continue on Page 2 ACTION REQUIRED (IF ANY) |
| | TN to provide supplemental information to RAI #1 on or before June 20, 2019, for the following RAIs as described below: |
| | From the May 1, 2019, clarification call (ML19123A113): RAIs 7-1, 8-2 (items 1 and 2), 8-6 (Part 1: items 2 and 5, Part 2: item 1), |
| | 8-7 (items 1, 2, 3, 4), 9-2 (item 1), 6-4, 6-5, 6-8, 6-11, 6-17, 6-18 From the May 22, 2019, clarification call (ML19144A296): RAI 4-6 From the June 11, 2019, clarification call: RAI 6-7 Continue on Page 3 NAME OF PERSON DOCUMENTING CONVERSATION Christian Jacobs SIGNATURE NRC FORM 699 (03-2013) |
| | Page 1 of 2 |
| | |
| | NRC FORM 699 U.S. NUCLEAR REGULATORY COMMISSION (03-2013) |
| | CONVERSATION RECORD (continued) |
| | |
| | ==SUMMARY== |
| | : (Continued from page 1) |
| | A clarification call requested by TN was held on June 11, 2019, with NRC staff regarding TN's revised approach (ML19161A052) to resolving RAI 6-7. Prior to the call, NRC staff provided six clarification questions (ML19158A370) to TN regarding their revised approach. |
| | Below are TN's responses to the six clarification questions on the revised approach as discussed during this call: |
| | : 1) Reference to the graded approach will not be included in the formal response. |
| | : 2) The TS FQT may be used with any fuel assembly design. Examples demonstrating use of the FQT are provided at the end of UFSAR Section 6.5.2. As shown in these examples, the burnup in GWd/FA is the burnup in GWd/MTU multiplied by the MTU of the individual fuel assembly. The GWd/FA is then used to obtain the cooling time from the table. The fuel assembly MTU may be either higher or lower than 0.492 MTU. |
| | : 3) The dose rate on the surface of EOS-TC125/135 is 80% from fuel in the peripheral region (20% from fuel in the interior region). |
| | The dose rate from the EOS-HSM or HSM-MX vents is 95% from fuel in the peripheral region (5% from fuel in the interior region). |
| | In addition, the calculation was based on the HLZC 4, which is bounding for all other configurations. This information will be included in the formal response. |
| | : 4) Instructions for loading LEOF are included in the draft TS Section 2.1. Chapter 9, Section 9.1.1, Step 1.a refers back to TS Section 2.1, so compliance with the TS is already included in Chapter 9. |
| | : 5) TS Table 7a is essentially the same as UFSAR Table 6-7, which was used to define the lower bound enrichments used in the analysis. TN agrees that rounding down will result in larger source terms, which is why enrichments are rounded down in the analysis. For instance, for a burnup of 62 GWd/MTU, the minimum enrichment is 62/16 = 3.875%, which is rounded down to 3.8%. |
| | This methodology is used to develop the heavy black line shown in UFSAR Table 6-61. This approach is acceptable and reflects UFSAR analysis. |
| | : 6) Table 3, "UFSAR FQT, HLZC 4 or 7 Peripheral Region Only" will be added to the TS. |
| | The applicant has agreed to provide supplemental information for RAI 6-7 as summarized above. |
| | Any correspondence or transmittal of supplemental information should include the following: |
| | CAC: 001028 Docket: 72-1042 EPID: L-2018-LLA-0043 NRC FORM 699 (03-2013) |
| | Page 2 of 2 |
| | |
| | NRC FORM 699 U.S. NUCLEAR REGULATORY COMMISSION (03-2013) |
| | CONVERSATION RECORD (continued) |
| | ACTION REQUIRED (Continued from page 1) |
| | NRC FORM 699 (03-2013) |
| | Page 3 of}} |
Revision as of 17:19, 19 October 2019
Letter Sequence RAI |
---|
EPID:L-2018-LLA-0043, Package: Acceptance Review of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1 to Nuhoms Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Supplemental Information (Approved, Closed) |
Results
Other: ML18144A087, ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML19177A014, ML20136A049, ML20136A050, ML20136A051
|
MONTHYEARML18134A1112018-05-15015 May 2018 Enclosure 1: Rsi (Non-Proprietary) (Letter to J. Bondre Acceptance Review of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1 to Nuhoms Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043 Project stage: Acceptance Review ML18134A1092018-05-15015 May 2018 Package: Acceptance Review of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1 to Nuhoms Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Supplemental Information Project stage: Request ML18134A1102018-05-15015 May 2018 Letter to J. Bondre Acceptance Review of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1 to Nuhoms Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Supplemental Informa Project stage: Acceptance Review ML18144A0872018-05-23023 May 2018 Conversation Record with D. Williford/Tn Americas LLC Clarification Call with Tn Americas LLC (Tn) on Request for Supplemental Information (Rsi) in Regard to Tn CoC 1042 Eos (Dkt No.: 72-1042, Conversation Held on May 23, 2018 Project stage: Other ML18213A0382018-08-0101 August 2018 Enclosursi (Letter to P. Narayanan Acceptance Review (Continued) of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1 to Nuhoms Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) Project stage: Acceptance Review ML18213A0362018-08-0101 August 2018 Package: Acceptance Review (Continued) of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1 to Nuhoms Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Supplemental Inform Project stage: Request ML18213A0372018-08-0101 August 2018 Letter to P. Narayanan Acceptance Review (Continued) of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1 to Nuhoms Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Suppl Project stage: Acceptance Review ML18255A0932018-08-27027 August 2018 Enclosure 1 - Affidavit Project stage: Other ML18255A0982018-08-30030 August 2018 Enclosure 6 - CoC 1042 Proposed Amendment 1, Revision 2, Technical Specifications Project stage: Other ML18255A0922018-08-30030 August 2018 Acceptance Review (Continued) of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1, to the Nuhoms Eos System, Revision 2 - Response to Second Request for Supplemental Information Project stage: Supplement ML18255A0942018-08-30030 August 2018 Enclosure 2 - Rsis and Responses Project stage: Other ML18255A0962018-08-30030 August 2018 Enclosure 4 - List of New CoC 1042 Amendment 1 Technical Specifications Changes and Justifications Project stage: Other ML18255A0972018-08-30030 August 2018 Enclosure 5 - List of Changed TS and UFSAR Pages Involved in CoC 1042 Amendment 1, Revision 2 Project stage: Other ML18255A1012018-08-30030 August 2018 Enclosure 8 - CoC 1042 Amendment 1, Revision 2, UFSAR Changed Pages Project stage: Other ML18255A1022018-08-30030 August 2018 Enclosure 9 - Additional Changes Not Associated with the Rsis Project stage: Other ML18261A1362018-09-17017 September 2018 Letter to P. Narayana Acceptance Review Completed for Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1, to Nuhoms Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) Project stage: Acceptance Review ML18355A8632018-12-21021 December 2018 Letter to P. Narayanan Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1, to Nuhoms Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Additional Information Project stage: RAI ML18355A8642018-12-21021 December 2018 Enclosure 1 - RAI (Non-Proprietary) (Letter to P. Narayanan Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1, to Nuhoms Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Project stage: RAI ML18355A8622018-12-21021 December 2018 Package: Letter to P. Narayanan Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1, to Nuhoms Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Additional Information Project stage: Request ML19015A1482019-01-14014 January 2019 Conversation Record with G. Mathues/Tn Americas LLC Clarification Call on RAI #1 (Part 1), for CoC 1042 Eos Amendment 1 Application, Docket No. 72-1042 Project stage: RAI ML19017A0192019-01-29029 January 2019 Enclosurai 6-7 (Letter to P. Narayanan Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1, to Nuhoms Eos System (Dkt No. 72-1042, CAC No. 001028, EPID: L--2018-LLA-0043)-Request for Additional Information Pa Project stage: RAI ML19017A0182019-01-29029 January 2019 Letter to P. Narayanan Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1, to Nuhoms Eos System (Dkt No. 72-1042, CAC No. 001028, EPID: L--2018-LLA-0043)-Request for Additional Information Part 2 Project stage: RAI ML19017A0172019-01-29029 January 2019 Package: Letter to P. Narayanan Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1, to Nuhoms Eos System (Dkt No. 72-1042, CAC No. 001028, EPID: L--2018-LLA-0043)-Request for Additional Information Part 2 Project stage: Request ML19123A1132019-05-0303 May 2019 Conversation Record with G. Mathues/Tn Americas LLC Clarification Call on RAI #1 Response for CoC 1042 Eos Amendment #1, Conversation Held on May 1, 2019 Project stage: RAI ML19144A2962019-05-23023 May 2019 Conversation Record with G. Mathues Et Al./Tn Americas LLC Clarification Call on RAI #1 Response for CoC 1042 Eos Amendment #1, Conversation Held on 05/22/2019 Project stage: RAI ML19158A3702019-06-0606 June 2019 Package: E-Mail with Attachment Feedback to Tn on Its Response to RAI 6-7.R1 Project stage: Request ML19164A0702019-06-12012 June 2019 Conversation Record with G. Mathues Et Al./Tn Americans LLC Clarification Call on RAI #1 Response for CoC 1042 Eos Amendment #1 Project stage: RAI ML19177A0142019-06-26026 June 2019 Letter to P. Narayanan Revised Schedule to Complete Review for Tn Americas LLC Application for Certificate If Compliance No. 1042, Amendment No. 1 to Nuhoms Eos System (Dkt No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) Project stage: Other ML20136A0522020-05-19019 May 2020 Final SER - Eos Amd 1 Project stage: Approval ML20136A0482020-05-19019 May 2020 CoC 1042 Eos A1 Issuance Package to Tn Project stage: Request ML20136A0512020-05-19019 May 2020 Final Tech Specs - Eos Amd 1 Project stage: Other ML20136A0502020-05-19019 May 2020 Final CoC - Eos Amd 1 Project stage: Other ML20136A0492020-05-19019 May 2020 Issuance Letter - CoC 1042 - for the NUHOMS Eos System Project stage: Other 2019-01-14
[Table View] |
|
---|
Category:Note to File incl Telcon Record
MONTHYEARML24144A2722024-05-22022 May 2024 NRC 699 - Tn Americas Clarification Call ML23215A1122023-08-0303 August 2023 Conversation Record Tn Code Alternative Request for Eos Amendments 1, 2 and 3 ML23138A1502023-05-16016 May 2023 Conversation Record CoC 1042 Amendment 4 - Clarification Call Regarding Tn'S Structural Rsi Responses ML22348A1192022-12-13013 December 2022 Conversation Record CoC 1042 Amendment 3- Clarification Call 3 Regarding Tn'S Revised Responses Submitted October 31, 2022 Regarding Observation 4-9 ML22264A3372022-09-15015 September 2022 NRC Form 699: Clarification Call 09-15-2022 ML22055A4672022-02-22022 February 2022 NRC Form 699 Clarification Call 02-22-2022 Re Draft Tn Supplemental Response to RAI for Coc No. 1042 Amendment 3 ML22035A0392022-02-0202 February 2022 NRC Form 699: Clarification Call 02-02-2022-signed ML21225A0372021-08-12012 August 2021 Conversation Record CoC 1042 Amendment 3 Responses to Observations 4-1, 4-4, 4-5, 4-8 and 4-11 ML21195A3702021-07-14014 July 2021 Conversation Record CoC 1042 Amendment 3 Responses to Rsi 4-1 and Observation 4-6 ML20352A0342020-12-16016 December 2020 Clarification Call Summary Regarding Eos Amendment 2 RAI 6-4 Response and Tn'S Proposed Additional Change 3 (Not Related to the Rais) ML20273A1232020-09-28028 September 2020 Clarification Call Summary Regarding Eos Amendment 2 RAI Responses ML19164A0702019-06-12012 June 2019 Conversation Record with G. Mathues Et Al./Tn Americans LLC Clarification Call on RAI #1 Response for CoC 1042 Eos Amendment #1 ML19144A2962019-05-23023 May 2019 Conversation Record with G. Mathues Et Al./Tn Americas LLC Clarification Call on RAI #1 Response for CoC 1042 Eos Amendment #1, Conversation Held on 05/22/2019 ML19123A1132019-05-0303 May 2019 Conversation Record with G. Mathues/Tn Americas LLC Clarification Call on RAI #1 Response for CoC 1042 Eos Amendment #1, Conversation Held on May 1, 2019 ML19015A1482019-01-14014 January 2019 Conversation Record with G. Mathues/Tn Americas LLC Clarification Call on RAI #1 (Part 1), for CoC 1042 Eos Amendment 1 Application, Docket No. 72-1042 ML18201A1042018-07-17017 July 2018 Conversation Record, C. Jacobs Et Al./Nrc D. Shaw Et Al./Tn Clarification Call with Tn Americas LLC on Response to Request for Supplemental Information in Regard to Tn CoC 1042 Eos Amendment I, Conversation Held on July 17, 2018 ML18144A0872018-05-23023 May 2018 Conversation Record with D. Williford/Tn Americas LLC Clarification Call with Tn Americas LLC (Tn) on Request for Supplemental Information (Rsi) in Regard to Tn CoC 1042 Eos (Dkt No.: 72-1042, Conversation Held on May 23, 2018 2024-05-22
[Table view] Category:Verbal Comm
MONTHYEARML24144A2722024-05-22022 May 2024 NRC 699 - Tn Americas Clarification Call ML23215A1122023-08-0303 August 2023 Conversation Record Tn Code Alternative Request for Eos Amendments 1, 2 and 3 ML23138A1502023-05-16016 May 2023 Conversation Record CoC 1042 Amendment 4 - Clarification Call Regarding Tn'S Structural Rsi Responses ML22348A1192022-12-13013 December 2022 Conversation Record CoC 1042 Amendment 3- Clarification Call 3 Regarding Tn'S Revised Responses Submitted October 31, 2022 Regarding Observation 4-9 ML22264A3372022-09-15015 September 2022 NRC Form 699: Clarification Call 09-15-2022 ML22055A4672022-02-22022 February 2022 NRC Form 699 Clarification Call 02-22-2022 Re Draft Tn Supplemental Response to RAI for Coc No. 1042 Amendment 3 ML22035A0392022-02-0202 February 2022 NRC Form 699: Clarification Call 02-02-2022-signed ML21225A0372021-08-12012 August 2021 Conversation Record CoC 1042 Amendment 3 Responses to Observations 4-1, 4-4, 4-5, 4-8 and 4-11 ML21195A3702021-07-14014 July 2021 Conversation Record CoC 1042 Amendment 3 Responses to Rsi 4-1 and Observation 4-6 ML20352A0342020-12-16016 December 2020 Clarification Call Summary Regarding Eos Amendment 2 RAI 6-4 Response and Tn'S Proposed Additional Change 3 (Not Related to the Rais) ML20273A1232020-09-28028 September 2020 Clarification Call Summary Regarding Eos Amendment 2 RAI Responses ML19164A0702019-06-12012 June 2019 Conversation Record with G. Mathues Et Al./Tn Americans LLC Clarification Call on RAI #1 Response for CoC 1042 Eos Amendment #1 ML19144A2962019-05-23023 May 2019 Conversation Record with G. Mathues Et Al./Tn Americas LLC Clarification Call on RAI #1 Response for CoC 1042 Eos Amendment #1, Conversation Held on 05/22/2019 ML19123A1132019-05-0303 May 2019 Conversation Record with G. Mathues/Tn Americas LLC Clarification Call on RAI #1 Response for CoC 1042 Eos Amendment #1, Conversation Held on May 1, 2019 ML19015A1482019-01-14014 January 2019 Conversation Record with G. Mathues/Tn Americas LLC Clarification Call on RAI #1 (Part 1), for CoC 1042 Eos Amendment 1 Application, Docket No. 72-1042 ML18201A1042018-07-17017 July 2018 Conversation Record, C. Jacobs Et Al./Nrc D. Shaw Et Al./Tn Clarification Call with Tn Americas LLC on Response to Request for Supplemental Information in Regard to Tn CoC 1042 Eos Amendment I, Conversation Held on July 17, 2018 ML18144A0872018-05-23023 May 2018 Conversation Record with D. Williford/Tn Americas LLC Clarification Call with Tn Americas LLC (Tn) on Request for Supplemental Information (Rsi) in Regard to Tn CoC 1042 Eos (Dkt No.: 72-1042, Conversation Held on May 23, 2018 2024-05-22
[Table view] |
Text
NRC FORM 699 U.S. NUCLEAR REGULATORY COMMISSION DATE OF SIGNATURE (03-2013)
CONVERSATION RECORD 06/12/2019 NAME OF PERSON(S) CONTACTED OR IN CONTACT WITH YOU DATE OF CONTACT TYPE OF CONVERSATION E-MAIL Glenn Mathues 06/11/2019 TELEPHONE E-MAIL ADDRESS TELEPHONE NUMBER INCOMING glenn.mathues@orano.group (410) 910-6538 OUTGOING ORGANIZATION DOCKET NUMBER(S)
TN Americas LLC 72-1042 LICENSE NUMBER(S) CONTROL NUMBER(S)
CoC 1042 EOS Amendment #1 SUBJECT Clarification Call on RAI #1 response for CoC 1042 EOS Amendment #1.
SUMMARY
Participants:
TN: Philippe Pham, Don Shaw, Hoi Yee Tom, Laura Picard, Richard Migliore, Glenn Mathues NRC: Christian Jacobs, Veronica Wilson, Zhian Li, Travis Tate Continue on Page 2 ACTION REQUIRED (IF ANY)
TN to provide supplemental information to RAI #1 on or before June 20, 2019, for the following RAIs as described below:
From the May 1, 2019, clarification call (ML19123A113): RAIs 7-1, 8-2 (items 1 and 2), 8-6 (Part 1: items 2 and 5, Part 2: item 1),
8-7 (items 1, 2, 3, 4), 9-2 (item 1), 6-4, 6-5, 6-8, 6-11, 6-17, 6-18 From the May 22, 2019, clarification call (ML19144A296): RAI 4-6 From the June 11, 2019, clarification call: RAI 6-7 Continue on Page 3 NAME OF PERSON DOCUMENTING CONVERSATION Christian Jacobs SIGNATURE NRC FORM 699 (03-2013)
Page 1 of 2
NRC FORM 699 U.S. NUCLEAR REGULATORY COMMISSION (03-2013)
CONVERSATION RECORD (continued)
SUMMARY
- (Continued from page 1)
A clarification call requested by TN was held on June 11, 2019, with NRC staff regarding TN's revised approach (ML19161A052) to resolving RAI 6-7. Prior to the call, NRC staff provided six clarification questions (ML19158A370) to TN regarding their revised approach.
Below are TN's responses to the six clarification questions on the revised approach as discussed during this call:
- 1) Reference to the graded approach will not be included in the formal response.
- 2) The TS FQT may be used with any fuel assembly design. Examples demonstrating use of the FQT are provided at the end of UFSAR Section 6.5.2. As shown in these examples, the burnup in GWd/FA is the burnup in GWd/MTU multiplied by the MTU of the individual fuel assembly. The GWd/FA is then used to obtain the cooling time from the table. The fuel assembly MTU may be either higher or lower than 0.492 MTU.
- 3) The dose rate on the surface of EOS-TC125/135 is 80% from fuel in the peripheral region (20% from fuel in the interior region).
The dose rate from the EOS-HSM or HSM-MX vents is 95% from fuel in the peripheral region (5% from fuel in the interior region).
In addition, the calculation was based on the HLZC 4, which is bounding for all other configurations. This information will be included in the formal response.
- 4) Instructions for loading LEOF are included in the draft TS Section 2.1. Chapter 9, Section 9.1.1, Step 1.a refers back to TS Section 2.1, so compliance with the TS is already included in Chapter 9.
- 5) TS Table 7a is essentially the same as UFSAR Table 6-7, which was used to define the lower bound enrichments used in the analysis. TN agrees that rounding down will result in larger source terms, which is why enrichments are rounded down in the analysis. For instance, for a burnup of 62 GWd/MTU, the minimum enrichment is 62/16 = 3.875%, which is rounded down to 3.8%.
This methodology is used to develop the heavy black line shown in UFSAR Table 6-61. This approach is acceptable and reflects UFSAR analysis.
- 6) Table 3, "UFSAR FQT, HLZC 4 or 7 Peripheral Region Only" will be added to the TS.
The applicant has agreed to provide supplemental information for RAI 6-7 as summarized above.
Any correspondence or transmittal of supplemental information should include the following:
CAC: 001028 Docket: 72-1042 EPID: L-2018-LLA-0043 NRC FORM 699 (03-2013)
Page 2 of 2
NRC FORM 699 U.S. NUCLEAR REGULATORY COMMISSION (03-2013)
CONVERSATION RECORD (continued)
ACTION REQUIRED (Continued from page 1)
NRC FORM 699 (03-2013)
Page 3 of