| | title = Report for Analysis of a Concrete Sample from the Yankee Nuclear Power Station, Rowe, Massachusetts [Inspection No. 50-029/2004-002] [Rfta No. 05-001] | | | title = Report for Analysis of a Concrete Sample from the Yankee Nuclear Power Station, Rowe, Massachusetts (Inspection No. 50-029/2004-002) (Rfta No. 05-001) |
| | author name = Condra D | | | author name = Condra D |
| | author affiliation = Oak Ridge Institute for Science & Education | | | author affiliation = Oak Ridge Institute for Science & Education |
| | addressee name = Kottan J J | | | addressee name = Kottan J |
| | addressee affiliation = NRC/RGN-I | | | addressee affiliation = NRC/RGN-I |
| | docket = 05000029 | | | docket = 05000029 |
Line 19: |
Line 19: |
| =Text= | | =Text= |
| {{#Wiki_filter:ORISE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION- | | {{#Wiki_filter:ORISE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION- |
| ": CElVED 1 $ - ,.s ; q r-1 February 23,2005 Mr. Jim Kottan U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 | | ": CElVED 1 $ - ,.s ; q r-1 February 23,2005 Mr. Jim Kottan U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 SUBJECT: REPORT FOR ANALYSIS OF A CONCRETE SAMPLE FROM THE YANKEE NUCLEAR POWER STATION, ROWE, MASSACHUSETTS [INSPECTION NO. |
| | |
| SUBJECT: REPORT FOR ANALYSIS OF A CONCRETE SAMPLE FROM THE YANKEE NUCLEAR POWER STATION, ROWE, MASSACHUSETTS [INSPECTION NO. | |
|
| |
|
| 50-029/2004-0021 | | 50-029/2004-0021 |
Latest revision as of 02:28, 14 July 2019
|
---|
Category:Graphics incl Charts and Tables
MONTHYEARML18078A3012018-03-0505 March 2018 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML15240A3622015-09-28028 September 2015 Master Report - Tables 1 and 2 ML0629300912006-10-16016 October 2006 OOL-09, Attachment B - Data Quality Assessment Plots and Curves, List of Figures ML0629300932006-10-16016 October 2006 6279 Activity Forms, Portable Instrument Accountability Forms and Source Check Form ML0629700712006-10-0505 October 2006 Yankee Nuclear Power Station - Graphs and Charts, 6264 Activity ML0615304122006-01-25025 January 2006 Report for Analysis of Concrete Samples from the Yankee Nuclear Power Station, Rowe, Massachusetts (Inspection No. 50-029/2005-002) (Rfta No. 06-001) ML0513301302005-02-23023 February 2005 Report for Analysis of a Concrete Sample from the Yankee Nuclear Power Station, Rowe, Massachusetts (Inspection No. 50-029/2004-002) (Rfta No. 05-001) IR 05000029/20040022005-02-23023 February 2005 Report for Analysis of a Concrete Sample from the Yankee Nuclear Power Station, Rowe, Massachusetts (Inspection No. 50-029/2004-002) (Rfta No. 05-001) ML0704004002005-02-21021 February 2005 YNPS-FSS-TBN01-00, Final Status Survey Report, TBN-01-13, Frequency Plot FSS Data Through Calculation of ALARA Action Level ML0704003942005-02-21021 February 2005 YNPS-FSS-TBN01-00, Final Status Survey Report, Volume 3 (Attachment B Through Appendix D) ML0513600812005-02-16016 February 2005 Confirmatory Survey Results for Class 3 Open Land Areas Outside the RCA, Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 04-007) ML0426801492004-08-0505 August 2004 Calculation for Contaminated Concrete for the License Termination Plan (Ltp) ML0426801462004-08-0505 August 2004 Calculation for Contaminated Concrete for the License Termination Plan (Ltp) ML0426801512004-07-31031 July 2004 Calculation for Contaminated Concrete for the License Termination Plan (Ltp) ML0634804411996-12-0404 December 1996 Attachment B - Data Quality Assessment Plots and Curves 2018-03-05
[Table view] Category:Letter
MONTHYEARML23298A0532024-04-11011 April 2024 Exemption FA Cover Letter ML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML24085A2222024-03-11011 March 2024 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML24047A0552024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML24057A0212024-01-12012 January 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage IR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 ML23157A1012023-05-0404 May 2023 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML23130A1562023-04-24024 April 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4752023-02-24024 February 2023 Closeout Letter to Yankee Atomic Electric Company Regarding 2018 and 2021 Updated DFPs for Yankee Nuclear Power Station ISFSI ML23041A1132023-01-0505 January 2023 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests, and Experiments ML23041A1122023-01-0505 January 2023 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Changes, Tests, and Experiments Report ML22347A2802022-12-21021 December 2022 Yankee Atomic Electric Company - Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22136A1562022-04-28028 April 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2021 ML22119A2112022-04-18018 April 2022 Independent Spent Fuel Storage Installation - Yankee Atomic Electric Company Adoption of NAC-MPC System, Amendment 8 Certificate of Compliance and Canister Registration ML22089A1002022-03-14014 March 2022 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22011A1292022-01-31031 January 2022 Yankee Atomic Electric Company- Independent Spent Fuel Storage Installation Security Inspection Plan ML22038A2062022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML22038A1982022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21291A1602021-10-0404 October 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update of the Yaec Quality Assurance Program ML21287A0362021-10-0404 October 2021 Biennial Update to the Yankee Nuclear Power Station Final Safety Analysis Report ML21189A0502021-06-0101 June 2021 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML21062A2472021-04-0707 April 2021 Close-out Letter - Yankee Rowe ISFSI DFP ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML21077A1682021-03-0202 March 2021 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML21042A1452021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML21042A9812021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML21028A0632021-01-26026 January 2021 M210211: Welcome Letter to W. Norton 05000029/LER-2021-001, Compensatory Measure Not Established for a Momentary I/O Board Communication Loss2021-01-12012 January 2021 Compensatory Measure Not Established for a Momentary I/O Board Communication Loss ML20167A3032020-07-10010 July 2020 Letter - Ynps Exemption 190502, Rev 0 ML20167A3022020-07-0202 July 2020 FRN - Ynps Exemption 190502, Rev 0 ML20162A1282020-06-23023 June 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, for Yankee Rowe ISFSI (COVID-19) ML20160A0402020-05-20020 May 2020 BYR 2020-014 - Yaec Letter BYR 2020-014 Temporary Exemption - Annual Physical Requirement ML20087J6642020-03-16016 March 2020 Yankee Nuclear Power Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20054B6392020-02-0606 February 2020 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML20015A4942020-01-15015 January 2020 Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML20013F6882019-12-17017 December 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in Isfsj Manager ML19295E1062019-10-0202 October 2019 Biennial Update of the Yankee Atomic Electric Company Quality Assurance Program (Rev. 39) for the Yankee Rowe ISFSI ML19165A0262019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML19176A0752019-05-0202 May 2019 Independent Spent Fuel Storage Installation - Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML19121A4202019-04-23023 April 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2018 ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 2024-04-11
[Table view] |
Text
ORISE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION-
": CElVED 1 $ - ,.s ; q r-1 February 23,2005 Mr. Jim Kottan U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 SUBJECT: REPORT FOR ANALYSIS OF A CONCRETE SAMPLE FROM THE YANKEE NUCLEAR POWER STATION, ROWE, MASSACHUSETTS [INSPECTION NO.
50-029/2004-0021
[RFTA NO. 05-0011
Dear Mr. Kottan:
The Environmental Survey and Site Assessment Program (ESSAP)
of the Oak Ridge Institute for Science and Education (ORISE) received a concrete sample on November 4,2004 from the Yankee Nuclear Power Station in Rowe, Massachusetts that was collected on October 25,2004. The sample was analyzed as follows: by gamma spectroscopy (GS) (Procedure CPl , Revision 14), by alpha spectroscopy (AS) (Procedure APl 1 , Revision 2; Procedure CP2, Revision 12), by liquid scintillation analysis for tritium (H-3)
and carbon-14 (C-14) (Procedure AP6, Revision 14; Procedure CP4, Revision 3), by liquid scintillation analysis for nickel-63 (Ni-63), (Non-Routine Procedure AP12, Revision 3; Procedure CP4, Revision 3) and for strontium (Sr-90)
by gas-flow proportional counting (Procedure AP4, Revision1 2; Procedure CP3, Revision 2). The GS results are presented in Table 1. The AS results are presented in Table 2. The results for H-3, C-14, Ni-63, and Sr-90 have been combined and are presented in Table 3.
The request to analyze the sample for nickel-59 and iron-55 could not be met. ESSAP does not presently have procedures available for those two radionuclides in a concrete matrix.
ESSAP's Quality Control (QC) requirements were met for these analyses.
The QC files are available for your review upon request. P 0 BOX 1 17, OAK RIDGE, TENNESSEE 3783 1-01 17 Operated by Oak Ridge Associated Untversittes for the U S Department of Energy Please contact me at (865) 241-3242 or Wade Ivey at (865) 576-9184 should you 1iaL.e any q Lies t i on s . Distribution approval and concurrence
- Technical Management Team Member Quality Manager Si nc ere1 y, Initials I Dale Coiidra Laboratory Manager Envi ron m en t a1 Survey and Site Assessment Program RDC: WPI: ar Enc losu res cc: T. McLaughlin, NRC/NMSS/TWFN 7F27 E. Abelquist, ORISE/ESSAP E. Knox-Davin, NRC/NMSS/TWFN 8A23 .I. Hickman, NRC/DWMEP/TWFN 7F27 T. Vitkus, ORISE/ESSAP File/l62 1 ORISE TABLE 1 CONCENTRATIONS OF SELECTED GAMMA EMITTING RADIONUCLIDES IN A CONCRETE SAMPLE BY GAMMA SPECTROSCOPY CP1, REVISION 14 YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS ESSAP Sample ID Radionuclide
'The range of MDCs for the selected radionuclides is 0.01 pCi/g to 0.08 pCi/g. buncertainties represent the 95% confidence level, based on total propagated uncertainties.
'Zero values are due to rounding. Yankee Nuclear Power Station projects/l 621/2005-02-23 Data Tables ORISE TABLE 2 ESSAP Sample ID CONCENTRATIONS OF SELECTED ALPHA EMITTING RADIONUCLIDES IN A CONCRETE SAMPLE BY ALPHA SPECTROSCOPY PROCEDURES AP11, REVISION 2 AND CP2, REVISION 12 YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS NRC Region I Concentrationsa Radionuclide Sample ID (PCW 162 1 MOOO 1 162 1 MOOO 1 162 1 MOOO 1 STC-CB-01 Pu-2391240 o.ooc f 0.01 STC-CB-01 Am-241 0.00 f 0.02 STC-CB-01 Cm-244 0.00 f 0.02 %e range of MDCs for the selected radionuclides is 0.02 pCi/g to 0.04 pCi/g. buncertainties represent the 95% confidence level, based on total propagated uncertainties.
'Zero values are due to rounding. Yankee Nuclear Power Station projectdl62 1/2005-02-23 Data Tables ORISE TABLE 3 ESSAP Sample ID 162 1 MOO0 1 162 1 MOOOl CONCENTRATIONS OF SELECTED BETA EMITTING RADIONUCLIDES IN A CONCRETE SAMPLE YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS NRC Region I Concentrations and Radionuclide Sample ID MDCS' (pcvg) STC-CB-01 H-3b 28.9 f 4.2'(5.5)
STC-CB-01 C-14b 3.8 f 1.3 (2.0) 162 1 MOOOl 1621 MOOOl STC-CB-0 1 Ni-63d 0.80 f 0.93 (1.6) STC-CB-0 1 Sr-90e 0.19 f 0.45 (0.79) 'MDCs are in parenthesis.
bAnalyzed by Procedures AF'6, Revision 14 and CP4. Revision 3. 'Uncertainties represent the 95% confidence level, based on total propagated uncertainties.
dAnalyzed by Non-Routine Procedure AP12, Revision 3 and Procedure CP4, Revision 3. 'Analyzed by Procedures AP4. Revision 12 and CP3. Revision2.
Yankee Nuclear Power Station projectdl 62 I /2005-02-23 Data Tables