Letter Sequence Other |
---|
|
|
MONTHYEARML14350A4662014-12-12012 December 2014 Flood Hazard Reevaluation Report Project stage: Other ML15177A1492015-07-0707 July 2015 Nuclear Regulatory Commission Plan for the Audit Arizona Public Service Company'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1 - Flooding for Palo Verde Nuclear Generating Station, Units Project stage: Other ML15266A2262015-09-22022 September 2015 Flood Hazard Reevaluation Report (FHRR) Project stage: Request ML15268A4132015-09-28028 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(F) Information Request - Flood-Causing Mechanism Reevaluation Project stage: Other ML15240A3622015-09-28028 September 2015 Master Report - Tables 1 and 2 Project stage: Other ML15280A0222015-10-0808 October 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluation Project stage: Other 2015-07-07
[Table View] |
|
---|
Category:Graphics incl Charts and Tables
MONTHYEARML18194A0772018-12-13013 December 2018 Log of Boring PV-53 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18194A0962018-08-0606 August 2018 Log of Boring PV-46 ML18194A0922018-08-0606 August 2018 Log of Boring PV-43C ML18194A0912018-08-0606 August 2018 Log of Boring PV-43B ML18194A0902018-08-0606 August 2018 Log of Boring PV-43A ML18194A0892018-08-0606 August 2018 Log of Boring PV-43 ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18194A0692018-07-13013 July 2018 Log of Boring PV-63 ML18194A1532018-07-13013 July 2018 Log of Boring PV-11 ML18194A1522018-07-13013 July 2018 Log of Boring PV-10 ML18194A1502018-07-13013 July 2018 Log of Boring PV-15 ML18194A1492018-07-13013 July 2018 Log of Boring PV-14 ML18194A1482018-07-13013 July 2018 Log of Boring PV-13 ML18194A1472018-07-13013 July 2018 Log of Boring PV-12 ML18194A1462018-07-13013 July 2018 Log of Boring PV-20 ML18194A1452018-07-13013 July 2018 Log of Boring PV-19 ML18194A1442018-07-13013 July 2018 Log of Boring PV-18 ML18194A1432018-07-13013 July 2018 Log of Boring PV-17 ML18194A1402018-07-13013 July 2018 Log of Boring PV-16 ML18194A1382018-07-13013 July 2018 Log of Boring PV-24 ML18194A0722018-07-13013 July 2018 Log of Boring PV-49 ML18194A0712018-07-13013 July 2018 Log of Boring PV-48 ML18194A3532018-07-13013 July 2018 Figure 2C-6, Geophysical Drill Hole Logs, GDDH-7, Gillespie Dam Alternate Siting Area ML18194A3522018-07-13013 July 2018 Figure 2C-5, Geophysical Drill Hole Logs, GDDH-6, Gillespie Dam Alternate Siting Area ML18194A3512018-07-13013 July 2018 Figure 2C-4, Geophysical Drill Hole Logs, GDDH-5, Gillespie Dam Alternate Siting Area ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A1592018-07-13013 July 2018 Log of Boring PV-6 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A0372018-07-13013 July 2018 Boring Projected Onto Line of Profile ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A1512018-07-13013 July 2018 Log of Boring PV-9 ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A1252018-07-13013 July 2018 Log of Boring PV-30. ML18194A1312018-07-13013 July 2018 Log of Boring PV-27. ML18194A1332018-07-13013 July 2018 Log of Boring PV-21. ML18194A1352018-07-13013 July 2018 Log of Boring PV-22. ML18194A1362018-07-13013 July 2018 Log of Boring PV-23. ML18194A0842018-07-13013 July 2018 Log of Boring PV-59 ML18194A0832018-07-13013 July 2018 Log of Boring PV-58 ML18194A0822018-07-13013 July 2018 Log of Boring PV-57 ML18194A0802018-07-13013 July 2018 Log of Boring PV-56 ML18194A0792018-07-13013 July 2018 Log of Boring PV-55 ML18194A0782018-07-13013 July 2018 Log of Boring PV-54 ML18194A0752018-07-13013 July 2018 Log of Boring PV-52 2018-08-06
[Table view] |
Text
Palo Verde - Units 1, 2, & 3 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Runup Hazard Elevation Local Intense Precipitation Unit 1 955.5 ft Minimal 955.5 ft FHRR Section 2.2.1 NGVD29 NGVD29 Unit 2 952.5 ft Minimal 952.5 ft FHRR Section 2.2.1 NGVD29 NGVD29 Unit 3 949.5 ft Minimal 949.5 ft FHRR Section 2.2.1 NGVD29 NGVD29 Streams and Rivers Winters Wash (at Cross Section 956.4 ft 5.6 ft 962.0 ft FHRR Section 2.2.2 AA) NGVD29 NGVD29 FHRR Table 2-2 East Wash (at Cross Section G2) 978.8 ft 4.0 ft 982.8 ft FHRR Section 2.2.2 NGVD29 NGVD29 FHRR Table 2-2 Gila River 776.0 ft Not 776.0 ft FHRR Section 2.2.2 NGVD29 applicable NGVD29 Centennial Wash 888.0 ft Not 888.0 ft FHRR Section 2.2.2 NGVD29 applicable NGVD29 Hassayampa River 942.0 ft Not 942.0 ft Email from Michael Dilorenzo, APS to NGVD29 applicable NGVD29 Juan Uribe, NRC,
Subject:
"Palo Verde Flood Hazard Reevaluation Report" (ADAMS Accession No. ML15266A226 Failure of Dams and Onsite Water Control/Storage Structures 900.0 ft Not 900.0 ft FHRR Section 2.2.3 NGVD29 applicable NGVD29
Palo Verde - Units 1, 2, & 3 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Runup Hazard Elevation Storm Surge No Impact No Impact No Impact FHRR Section 2.2.4 on the Site on the Site on the Site Identified Identified Identified Seiche 45-Acre Reservoir 951.0 ft Not 951.0 ft FHRR Section 2.2.6 NGVD29 applicable NGVD29 85-Acre Reservoir 951.0 ft Not 951.0 ft FHRR Section 2.2.6 NGVD29 applicable NGVD29 Evaporation Ponds 937.0 ft Not 937.0 ft FHRR Section 2.2.6 NGVD29 applicable NGVD29 Tsunami No Impact No Impact No Impact FHRR Section 2.2.4 on the Site on the Site on the Site Identified Identified Identified Ice-Induced Flooding No Impact No Impact No Impact FHRR Section 2.2.4 on the Site on the Site on the Site Identified Identified Identified Channel Migrations/Diversions No Impact No Impact No Impact FHRR Section 2.2.5 on the SIte on the Site on the Site Identified Identified Identified Note 1: Reported values are rounded to the nearest one-tenth of a foot.
Palo Verde - Units 1, 2, & 3 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Waves/ Reevaluated Reference Elevation Runup Hazard Elevation Local Intense Precipitation Unit 1 957.7 ft Minimal 957.7 ft Staff Assessment NGVD29 NGVD29 Unit 2 955.0 ft Minimal 955.0 ft Staff Assessment NGVD29 NGVD29 Unit 3 952.4 ft Minimal 952.4 ft Staff Assessment NGVD29 NGVD29 Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA consistent with the guidance. The NRC staff has reviewed information related to flood event duration parameters (including warning time and period of inundation).
Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table.
Note 3: Reported values are rounded to the nearest one-tenth of a foot.