ML070610496: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 5: Line 5:
| author name = Vanwyen T
| author name = Vanwyen T
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
| addressee name = Fish T H
| addressee name = Fish T
| addressee affiliation = NRC/RGN-I/DRS/OB
| addressee affiliation = NRC/RGN-I/DRS/OB
| docket = 05000277, 05000278
| docket = 05000277, 05000278

Revision as of 04:23, 13 July 2019

Summary of Handouts to Applicants (Folder 3)
ML070610496
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/29/2007
From: Vanwyen T
Exelon Generation Co
To: Todd Fish
Operations Branch I
Sykes, Marvin D.
Shared Package
ML060800089 List:
References
Download: ML070610496 (1)


Text

To: T. Fish Fm: M. Kelly, PBAPS Exam Author Subj.: Handouts provided to applicants for the written exam We provided the following materials to the applicants for administration of the written exam: RO Exam 1. Full set of TRIPS with entry conditions blanked out: 0 T-1 00 "Scram" (1 sheet) 0 T-101 "RPV Control" (1 sheet) 0 T-102 "Primary Containment Control" (3 sheets) 0 T-103 "Secondary Containment Control" (1 sheet) T-104 "Radioactivity Release" (1 sheet) 0 T-1 1 1 "Level Restoration" (1 sheet) T-112 "Emergency Blowdown" (1 sheet) 0 T-116 "RPV Flooding" (2 sheets) T-117 "LeveVPower Control" (1 sheet) 2. Steam Tables 3, Print E-1 (sheet 1 of 4) Single Line Diagram - Station 4. Table 2 "Cause & Corrective Action Trouble Shooting" of SO 62.1 .A "Withdrawing/lnserting a Control Rod" SRO Exam 1. 2. 3. 4. 5. Full set of Technical Specifications (without bases), with S.R. 3.6.4.1.4 (SBGT flow rate c 10,500 cfm) sanitized.

Full set of Technical Requirements (without bases) SE-11 "Loss of Off-Site Power", Attachment C "Instrument List" Table PBAPS 3-1 : Emergency Action Level (EAL) Matrix of EP-AA-1007 "Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station", Rev. 13 OT-1 10, "Reactor High Level' Figure 1