| issue date = 08/12/2009
| issue date = 08/12/2009
| title = Response to RIS 2009-11, Preparation and Scheduling of Operator Licensing Examinations.
| title = Response to RIS 2009-11, Preparation and Scheduling of Operator Licensing Examinations.
| author name = Lynch J R
| author name = Lynch J
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::RIS 2009-11]]


=Text=
=Text=
{{#Wiki_filter:'" Entergy Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 August 12, 2009 U. S. Nuclear Regulatory  
{{#Wiki_filter:'" Entergy Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 August 12, 2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Commission
 
ATTN: Document Control Desk Washington, D.C. 20555-0001
==SUBJECT:==
SUBJECT: Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Response to RIS 2009-11 "Preparation  
Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Response to RIS 2009-11 "Preparation and Scheduling of Operator Licensing Examinations" LETTER NUMBER: 2.09.046  
and Scheduling  
 
of Operator Licensing  
==Dear Sir or Madam:==
Examinations" LETTER NUMBER: 2.09.046 Dear Sir or Madam: On July 16, 2009, the NRC issued Regulatory  
On July 16, 2009, the NRC issued Regulatory Issue Summary (RIS) 2009-11, "Preparation and Scheduling of Operator Licensing Examinations." This RIS requested information from licensees regarding proposed licensed operator examinations schedules and estimated number of applicants in order to assist the NRC in planning resources.
Issue Summary (RIS) 2009-11, "Preparation  
Accordingly, the requested information is provided in the enclosed NRC Form 536.There are no commitments contained in this letter.Please contact me at (508) 830-8403, if there are any questions regarding this subject.Sincerely, Joseph R. Lynch Manager, Licensing MJG/mg  
and Scheduling  
 
of Operator Licensing  
==Enclosure:==
Examinations." This RIS requested  
 
information  
Completed NRC Form 536 cc: Mr. Samuel J. Collins Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station woos"M Enclosure to ENO Letter 2.09.046 Completed NRC Form 536 (1 page)
from licensees  
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)
regarding  
Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations.
proposed licensed operator examinations  
Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EX(AMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
schedules  
FACILITY NRC REGION Entergy, Pilgrim Nuclear Power Station One A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 10 CY 11 Cy 12 Cy 13 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 10 CY 11 CY 12 Cy 13 NUMBER OF REACTOR 0 8 0 4 OPERATORS NUMBER OF SENIOR REACTOR 0 3 0 7 OPERATORS  
and estimated  
number of applicants  
in order to assist the NRC in planning resources.  
Accordingly, the requested  
information  
is provided in the enclosed NRC Form 536.There are no commitments  
contained  
in this letter.Please contact me at (508) 830-8403, if there are any questions  
regarding  
this subject.Sincerely, Joseph R. Lynch Manager, Licensing MJG/mg Enclosure:  
Completed  
NRC Form 536 cc: Mr. Samuel J. Collins Regional Administrator, Region I U.S. Nuclear Regulatory  
Commission
475 Allendale  
Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station woos"M  
Enclosure  
to ENO Letter 2.09.046 Completed  
NRC Form 536 (1 page)  
NRC FORM 536 U.S. NUCLEAR REGULATORY  
COMMISSION  
APPROVED BY OMB: NO. 3150-0131  
EXPIRES: 10/31/2011
(10-2008)  
Estimated  
burden per response to comply with this voluntary  
information
collection  
request: 1 hour. This information  
collection  
is used to plan budgets and resources  
for operator examinations.  
Send comments regarding  
burden OPERATOR LICENSING  
estimate to the Records and FOIA/Privacy  
Services Branch (T-5 F53), U.S.Nuclear Regulatory  
Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information
EX(AMINATION  
DATA and Regulatory  
Affairs, NEOB-10202, (3150-0131), Office of Management  
and Budget, Washington, DC 20503. If a means used to impose an information
collection  
does not display a currently  
valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information  
collection.
FACILITY NRC REGION Entergy, Pilgrim Nuclear Power Station One A. PROPOSED EXAMINATION  
PREPARATION  
SCHEDULE PROPOSED NUMBER CY 10 CY 11 Cy 12 Cy 13 ESTIMATED  
NUMBER OF LICENSEE-PREPARED  
0 1 0 1 EXAMINATIONS
ESTIMATED  
NUMBER OF NRC-PREPARED  
0 0 0 0 EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY 10 CY 11 CY 12 Cy 13 NUMBER OF REACTOR 0 8 0 4 OPERATORS NUMBER OF SENIOR REACTOR 0 3 0 7 OPERATORS  
-INSTANT NUMBER OF SENIOR REACTOR OPERATORS  
-INSTANT NUMBER OF SENIOR REACTOR OPERATORS  
-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS  
-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS  
-LIMITED PROPOSED DATES PRIMARY DATE 01/31/2011  
-LIMITED PROPOSED DATES PRIMARY DATE 01/31/2011 01/21/2013 ALTERNATE DATE 01/24/2011 01/28/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 11 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 11 0 0 0 11 CANDIDATES NRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPER}}
01/21/2013
ALTERNATE  
DATE 01/24/2011  
01/28/2013
C. PROPOSED GENERIC FUNDAMENTALS  
EXAMINATION (GFE) SCHEDULE CY 09 CY 11 PROPOSED NUMBER MARCH JUNE SEPTEMBER  
DECEMBER MARCH JUNE SEPTEMBER  
DECEMBER ESTIMATED NUMBER OF 0 0 0 11 0 0 0 11 CANDIDATES
NRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPER
}}

Revision as of 19:21, 11 July 2019

Response to RIS 2009-11, Preparation and Scheduling of Operator Licensing Examinations.
ML092310144
Person / Time
Site: Pilgrim
Issue date: 08/12/2009
From: Jeffery Lynch
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-09-011
Download: ML092310144 (3)


Text

'" Entergy Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 August 12, 2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Response to RIS 2009-11 "Preparation and Scheduling of Operator Licensing Examinations" LETTER NUMBER: 2.09.046

Dear Sir or Madam:

On July 16, 2009, the NRC issued Regulatory Issue Summary (RIS) 2009-11, "Preparation and Scheduling of Operator Licensing Examinations." This RIS requested information from licensees regarding proposed licensed operator examinations schedules and estimated number of applicants in order to assist the NRC in planning resources.

Accordingly, the requested information is provided in the enclosed NRC Form 536.There are no commitments contained in this letter.Please contact me at (508) 830-8403, if there are any questions regarding this subject.Sincerely, Joseph R. Lynch Manager, Licensing MJG/mg

Enclosure:

Completed NRC Form 536 cc: Mr. Samuel J. Collins Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station woos"M Enclosure to ENO Letter 2.09.046 Completed NRC Form 536 (1 page)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EX(AMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Entergy, Pilgrim Nuclear Power Station One A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 10 CY 11 Cy 12 Cy 13 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 10 CY 11 CY 12 Cy 13 NUMBER OF REACTOR 0 8 0 4 OPERATORS NUMBER OF SENIOR REACTOR 0 3 0 7 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR OPERATORS

-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS

-LIMITED PROPOSED DATES PRIMARY DATE 01/31/2011 01/21/2013 ALTERNATE DATE 01/24/2011 01/28/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 11 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 11 0 0 0 11 CANDIDATES NRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPER