ML15302A013: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML15302A013 | | number = ML15302A013 | ||
| issue date = 10/29/2015 | | issue date = 10/29/2015 | ||
| title = Ltr 10/29/15 Monticello Nuclear Generating Plant - Information Request for an NRC Triennial Permanent Modifications and 10 CFR 50.59 Baseline Inspection 05000263/2016008 ( | | title = Ltr 10/29/15 Monticello Nuclear Generating Plant - Information Request for an NRC Triennial Permanent Modifications and 10 CFR 50.59 Baseline Inspection 05000263/2016008 (Akd) | ||
| author name = Daley R | | author name = Daley R | ||
| author affiliation = NRC/RGN-III/DRS/EB3 | | author affiliation = NRC/RGN-III/DRS/EB3 | ||
| addressee name = Gardner P | | addressee name = Gardner P | ||
| addressee affiliation = Northern States Power Co | | addressee affiliation = Northern States Power Co | ||
| docket = 05000263 | | docket = 05000263 | ||
Line 14: | Line 14: | ||
| page count = 7 | | page count = 7 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000263/2016008]] | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION III 2443 WARRENVILLE RD. SUIT | |||
Mr. Peter Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637 | E 210 LISLE, IL 60532 | ||
-4352 October 29, 2015 | |||
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 BASELINE INSPECTION 05000263/2016008 | Mr. Peter A. Gardner | ||
Site Vice President Monticello Nuclear Generating Plant | |||
Northern States Power Company, Minnesota | |||
2807 West County Road 75 | |||
component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | Monticello, MN 55362 | ||
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT | |||
Sincerely,/RA/ | - INFORMATION REQUEST FOR AN NRC TRIENNIAL | ||
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-263 License No. DPR-22 | PERMANENT MODIFICATIONS AND 10 CFR 50.59 | ||
BASELINE INSPECTION 05000263/2016008 | |||
Dear Mr. Gardner: On February 29, 2016 , the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59 Baseline Inspection at the Monticello Nuclear Generating Plant. This inspection | |||
Modification and 50.59 Inspection Document Request cc w/encl: Distribution via LISTSERV Enclosure Inspection Report: 05000263/2016008 Inspection Dates: February 29 - March 4, 2016, and March 14 - 18, 2016 Inspection Procedure: Inspection Procedure 71111. | will be performed | ||
in accordance | |||
3 II. Information Requested to be Available Prior to Inspection. | with the NRC Baseline Inspection Procedure 71111.17T. The onsite portion of the inspection will take place on February 29 - March 4, 2016, and March 14 - 1 8 , 2016. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site , and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups. | ||
The first group of information is necessary to ensure that the inspection team is adequately | |||
4 III. Information Requested to be provided throughout the inspection (1) Copies of any corrective action documents generated as a result of the inspection team's questions or queries during this inspection. (2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide daily during the inspection to each inspection team member). If you have any questions regarding the information requested, please contact the inspection team leader. | prepared for the | ||
inspection. This information should be made available via compact disc and delivered to the regional | |||
office no later than December 17, 2015. The inspection team will review this information and, by January 15, 2016, will request | |||
specific items that should be provided for review in the regional office by February 12, 2016 | |||
. The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within Group II (i.e., Item [1]), will be requested for review in the regional office prior to the inspection by February 12 | |||
, 2016, as identified above. The remaining documents should be available by the first day of | |||
the onsite inspection, February | |||
29, 201 6. The third group lists information necessary to aid the inspection team in tracking issues identified as a result | |||
of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up | |||
-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. | |||
P. Gardner | |||
-2- The lead inspector for this inspection is Mr. Alan Dahbur. We | |||
understand that our regulatory contact for this inspection is | |||
Mr. Andy Kouba | |||
of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9810 , or via e-mail at Alan.Dahbur@nrc.gov | |||
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | |||
requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. In accordance with Title 10 of the Code of Federal Regulations | |||
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy | |||
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) | |||
component of the NRC's Agencywide | |||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html | |||
(the Public Electronic Reading Room). | |||
Sincerely, /RA/ | |||
Robert C. Daley, Chief | |||
Engineering Branch 3 | |||
Division of Reactor Safety | |||
Docket No. 50 | |||
-263 License No. DPR | |||
-22 Enclosure: | |||
Modification and 50.59 Inspection Document Request | |||
cc w/encl: Distribution via LISTSERV | |||
Enclosure Inspection Report | |||
: 05000263/2016008 | |||
Inspection Dates | |||
: February 29 - March 4, 2016 | |||
, and March 14 | |||
- 18, 2016 Inspection Procedure | |||
: Inspection | |||
Procedure 71111.17 T , "Evaluation | |||
s of Changes, Tests, and Experiments and Permanent Plant Modifications | |||
" Lead Inspector | |||
: Alan Dahbur | |||
(630) 829-9810 Alan.Dahbur@nrc.gov | |||
I. Information Requested for In | |||
-Office Preparation Week | |||
The following information is requested by | |||
December 17, 2015 , or sooner, to facilitate the selection of | |||
specific items that will be reviewed during the onsite inspection week. The inspection team will select | |||
specific items from the information requested below | |||
, and submit a list to your staff by | |||
January 15, 2016 | |||
. We will request that certain items | |||
be made available to the regional office prior to the inspection by | |||
February 1 | |||
2, 2016. We request that the remaining items selected from the lists be available and ready for review on the | |||
first day of inspection. All requested information should identify the associated system and cover the time frame from the receipt of information for the last MOD/50.59 inspection November 4, 2013 | |||
, to the present. The required information identified below should be provided on compact disc (CD). Please provide three copies of each CD submitted (i.e., one for each inspector). The preferred file format is a searchable "pdf" file. The CDs should be indexed | |||
and hyper-linked to facilitate ease of use, if possible. | |||
If you have any questions regarding this information, please call the inspection team leader as soon as possible. | |||
(1) List of "permanent plant modifications" to systems, structures or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency | |||
evaluations, suitability analyses, and commercial grade dedications.) | |||
The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification | |||
and a list of associated calculations and affected procedures. | |||
(2) List of all Title 10 , Code of Federal Regulations | |||
(CFR), Part 50.59 completed evaluations involving | |||
: (a) calculations | |||
; (b) procedure revisions | |||
; (c) changes to the facility (modifications); (d) non-routine operating configurations | |||
; or (e) departures in methods of analyses. This | |||
list should include 50.59 | |||
evaluations | |||
for the following: | |||
a. Changes that have been made under the provisions of 10 | |||
CFR 50.59 that have been updated in accordance with 10 | |||
CFR 50.71(e)(4) since the last MOD/50.59 inspection | |||
; | |||
2 b. Modifications that are field work complete; and | |||
c. Changes to calculations (or initiation of new calculations) that have been | |||
issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT i | |||
nclude any evaluations in which prior U.S. Nuclear Regulatory Commission | |||
approval was sought and obtained. (3) A list of all 10 | |||
CFR 50.59 changes that have been screened out as not requiring | |||
a full evaluation involving: (a) | |||
calculations; (b) | |||
procedure revisions; (c) changes to the facility (modifications); (d) | |||
non-routine operating configurations; or (e) departures in methods of analyses. | |||
The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). | |||
(4) A list of any modifications, procedure revisions, or Updated Final Safety Analysis | |||
Report (UFSAR) changes where it was determined that 10 | |||
CFR 50.59 did not apply. (5) A list of calculation changes that have been issued for use. | |||
(6) A list of corrective action documents (open and closed) that address permanent plant modifications or 10 CFR 50.59 issues, concerns, or processes. These documents should also inclu | |||
de the corrective action documents associated with the modification and the 50.59 change implementation. | |||
The list should contain the number, title and revision (or date) of each document, | |||
the affected system and corresponding documentation (if applicable), and should be sorted in order of significance. | |||
(7) Copies of procedures addressing the following: modifications, design changes, | |||
set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post | |||
-modification testing, 10 | |||
C FR 50.59 evaluation | |||
s and screenings, and UFSAR updates. | |||
(8) UFSAR updates submitted in accordance with 10 | |||
CFR 50.71(e)(4). Provide copies of the complete submittal. | |||
(9) Copy of the UFSAR change log or a synopsis of the changes. This should include all of the changes made to the UFSAR that were incorporated in the last | |||
10 CFR 50.71(e)(4) submittal. | |||
(10) Electronic copy of the UFSAR | |||
and Technical Specifications | |||
(TSs), if available. | |||
(11) Name(s) and phone number | |||
(s) for the regulatory and technical contacts. | |||
(12) Current management | |||
and engineering organizational chart. | |||
3 II. Information Requested to be Available Prior to Inspection | |||
. Request s will be M ade for Specific Item (1) Documents by | |||
January 15, 2016 | |||
, for Availability of | |||
Requested Item (1) Documents in Regional Office by | |||
February 12, 2016, and Items (2), (3) | |||
, and (4) Documents on | |||
First Day of Inspection (February 29, 2016) (1) Copies of all selected items from Section I. This includes copies of associated | |||
documents such as calculations, post | |||
-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents. | |||
(2) Copies of these documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them. | |||
a. UFSAR, if not previously provided | |||
; b. Original Final Safety Analysis Report (FSAR) | |||
Volumes; c. Original Safety Evaluation | |||
Reports and Supplements; | |||
d. FSAR Question and Answers; | |||
e. Quality Assurance | |||
(QA) Plan; f. TSs, if not previously provided | |||
; g. Latest Individual | |||
Plant Examination | |||
/Probabilistic | |||
Risk Assessment Report; h. Vendor Manuals; and | |||
i. The latest 10 CFR 50.59 | |||
UFSAR Update Submittal. | |||
(3) Please ensure that other supporting documents for the selected items have been | |||
located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting documents are: | |||
a. Drawings supporting the modifications; | |||
b. Procedures affected by the modifications; and | |||
c. UFSAR change papers generated due to a 10 CFR 50.59 | |||
evaluation. | |||
(4) Assessment and Corrective Actions: | |||
a. The most recent MOD/50.59 QA audit and/or self | |||
-assessment; and | |||
b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent MOD/50.59 QA audit and/or self | |||
-assessment. | |||
4 III. Information Requested to be provided throughout the inspection | |||
(1) Copies of any corrective action documents generated as a result of the | |||
inspection | |||
team's questions or queries during this inspection. | |||
(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide daily during the inspection to each inspection team member). | |||
If you have any questions regarding the information requested, please contact the inspection team leader. | |||
P. Gardner | |||
-2- The lead inspector for this inspection is Mr. Alan Dahbur. We | |||
understand that our regulatory contact for this inspection is | |||
Mr. Andy Kouba | |||
of your organization. If there are any questions about the inspection or the material | |||
requested, please contact the lead inspector at (630) 829-9810 , or via e-mail at Alan.Dahbur@nrc.gov | |||
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | |||
requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. In accordance with Title 10 of the Code of Federal Regulations | |||
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy | |||
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide | |||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html | |||
(the Public Electronic Reading Room). | |||
Sincerely, /RA/ | |||
Robert C. Daley, Chief | |||
Engineering Branch 3 | |||
Division of Reactor Safety | |||
Docket No. 50 | |||
-263 License No. DPR | |||
-22 Enclosure: | |||
Modification and 50.59 Inspection Document Request | |||
cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl | |||
: Janelle Jessie | |||
RidsNrrDorlLpl3 | |||
-1 Resource | |||
RidsNrrPMMonticello | |||
RidsNrrDirsIrib Resource | |||
Cynthia Pederson | |||
Darrell Roberts | |||
Richard Skokowski | |||
Allan Barker | |||
Carole Ariano | |||
Linda Linn | |||
DRPIII DRSIII Jim Clay Carmen Olteanu | |||
ADAMS Accession Number ML15302A013 | |||
Publicly Available | |||
Non-Publicly Available | |||
Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy | |||
OFFICE RIII RIII NAME ADahbur:cl RDaley DATE 10/29/15 10/29/15 OFFICIAL RECORD COPY | |||
}} | }} |
Revision as of 16:47, 20 June 2019
ML15302A013 | |
Person / Time | |
---|---|
Site: | Monticello |
Issue date: | 10/29/2015 |
From: | Robert Daley Engineering Branch 3 |
To: | Gardner P Northern States Power Co |
References | |
IR 2016008 | |
Download: ML15302A013 (7) | |
See also: IR 05000263/2016008
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III 2443 WARRENVILLE RD. SUIT
E 210 LISLE, IL 60532
-4352 October 29, 2015
Mr. Peter A. Gardner
Site Vice President Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
- INFORMATION REQUEST FOR AN NRC TRIENNIAL
PERMANENT MODIFICATIONS AND 10 CFR 50.59
BASELINE INSPECTION 05000263/2016008
Dear Mr. Gardner: On February 29, 2016 , the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59 Baseline Inspection at the Monticello Nuclear Generating Plant. This inspection
will be performed
in accordance
with the NRC Baseline Inspection Procedure 71111.17T. The onsite portion of the inspection will take place on February 29 - March 4, 2016, and March 14 - 1 8 , 2016. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site , and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups.
The first group of information is necessary to ensure that the inspection team is adequately
prepared for the
inspection. This information should be made available via compact disc and delivered to the regional
office no later than December 17, 2015. The inspection team will review this information and, by January 15, 2016, will request
specific items that should be provided for review in the regional office by February 12, 2016
. The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within Group II (i.e., Item [1]), will be requested for review in the regional office prior to the inspection by February 12
, 2016, as identified above. The remaining documents should be available by the first day of
the onsite inspection, February
29, 201 6. The third group lists information necessary to aid the inspection team in tracking issues identified as a result
of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up
-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
P. Gardner
-2- The lead inspector for this inspection is Mr. Alan Dahbur. We
understand that our regulatory contact for this inspection is
Mr. Andy Kouba
of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9810 , or via e-mail at Alan.Dahbur@nrc.gov
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. In accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket No. 50
-263 License No. DPR
-22 Enclosure:
Modification and 50.59 Inspection Document Request
cc w/encl: Distribution via LISTSERV
Enclosure Inspection Report : 05000263/2016008
Inspection Dates
- February 29 - March 4, 2016
, and March 14
- 18, 2016 Inspection Procedure
- Inspection
Procedure 71111.17 T , "Evaluation
s of Changes, Tests, and Experiments and Permanent Plant Modifications
" Lead Inspector
(630) 829-9810 Alan.Dahbur@nrc.gov
I. Information Requested for In
-Office Preparation Week
The following information is requested by
December 17, 2015 , or sooner, to facilitate the selection of
specific items that will be reviewed during the onsite inspection week. The inspection team will select
specific items from the information requested below
, and submit a list to your staff by
January 15, 2016
. We will request that certain items
be made available to the regional office prior to the inspection by
February 1
2, 2016. We request that the remaining items selected from the lists be available and ready for review on the
first day of inspection. All requested information should identify the associated system and cover the time frame from the receipt of information for the last MOD/50.59 inspection November 4, 2013
, to the present. The required information identified below should be provided on compact disc (CD). Please provide three copies of each CD submitted (i.e., one for each inspector). The preferred file format is a searchable "pdf" file. The CDs should be indexed
and hyper-linked to facilitate ease of use, if possible.
If you have any questions regarding this information, please call the inspection team leader as soon as possible.
(1) List of "permanent plant modifications" to systems, structures or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency
evaluations, suitability analyses, and commercial grade dedications.)
The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification
and a list of associated calculations and affected procedures.
(2) List of all Title 10 , Code of Federal Regulations
(CFR), Part 50.59 completed evaluations involving
- (a) calculations
- (b) procedure revisions
- (c) changes to the facility (modifications); (d) non-routine operating configurations
- or (e) departures in methods of analyses. This
list should include 50.59
evaluations
for the following:
a. Changes that have been made under the provisions of 10
CFR 50.59 that have been updated in accordance with 10
CFR 50.71(e)(4) since the last MOD/50.59 inspection
2 b. Modifications that are field work complete; and
c. Changes to calculations (or initiation of new calculations) that have been
issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT i
nclude any evaluations in which prior U.S. Nuclear Regulatory Commission
approval was sought and obtained. (3) A list of all 10
CFR 50.59 changes that have been screened out as not requiring
a full evaluation involving: (a)
calculations; (b)
procedure revisions; (c) changes to the facility (modifications); (d)
non-routine operating configurations; or (e) departures in methods of analyses.
The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
(4) A list of any modifications, procedure revisions, or Updated Final Safety Analysis
Report (UFSAR) changes where it was determined that 10
CFR 50.59 did not apply. (5) A list of calculation changes that have been issued for use.
(6) A list of corrective action documents (open and closed) that address permanent plant modifications or 10 CFR 50.59 issues, concerns, or processes. These documents should also inclu
de the corrective action documents associated with the modification and the 50.59 change implementation.
The list should contain the number, title and revision (or date) of each document,
the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.
(7) Copies of procedures addressing the following: modifications, design changes,
set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post
-modification testing, 10
C FR 50.59 evaluation
s and screenings, and UFSAR updates.
(8) UFSAR updates submitted in accordance with 10
CFR 50.71(e)(4). Provide copies of the complete submittal.
(9) Copy of the UFSAR change log or a synopsis of the changes. This should include all of the changes made to the UFSAR that were incorporated in the last
10 CFR 50.71(e)(4) submittal.
(10) Electronic copy of the UFSAR
and Technical Specifications
(TSs), if available.
(11) Name(s) and phone number
(s) for the regulatory and technical contacts.
(12) Current management
and engineering organizational chart.
3 II. Information Requested to be Available Prior to Inspection
. Request s will be M ade for Specific Item (1) Documents by
January 15, 2016
, for Availability of
Requested Item (1) Documents in Regional Office by
February 12, 2016, and Items (2), (3)
, and (4) Documents on
First Day of Inspection (February 29, 2016) (1) Copies of all selected items from Section I. This includes copies of associated
documents such as calculations, post
-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.
(2) Copies of these documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.
a. UFSAR, if not previously provided
- b. Original Final Safety Analysis Report (FSAR)
Volumes; c. Original Safety Evaluation
Reports and Supplements;
d. FSAR Question and Answers;
e. Quality Assurance
(QA) Plan; f. TSs, if not previously provided
- g. Latest Individual
Plant Examination
/Probabilistic
Risk Assessment Report; h. Vendor Manuals; and
i. The latest 10 CFR 50.59
UFSAR Update Submittal.
(3) Please ensure that other supporting documents for the selected items have been
located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting documents are:
a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10 CFR 50.59
evaluation.
(4) Assessment and Corrective Actions:
a. The most recent MOD/50.59 QA audit and/or self
-assessment; and
b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent MOD/50.59 QA audit and/or self
-assessment.
4 III. Information Requested to be provided throughout the inspection
(1) Copies of any corrective action documents generated as a result of the
inspection
team's questions or queries during this inspection.
(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide daily during the inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection team leader.
P. Gardner
-2- The lead inspector for this inspection is Mr. Alan Dahbur. We
understand that our regulatory contact for this inspection is
Mr. Andy Kouba
of your organization. If there are any questions about the inspection or the material
requested, please contact the lead inspector at (630) 829-9810 , or via e-mail at Alan.Dahbur@nrc.gov
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. In accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket No. 50
-263 License No. DPR
-22 Enclosure:
Modification and 50.59 Inspection Document Request
cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl
RidsNrrDorlLpl3
-1 Resource
RidsNrrPMMonticello
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII DRSIII Jim Clay Carmen Olteanu
ADAMS Accession Number ML15302A013
Publicly Available
Non-Publicly Available
Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII NAME ADahbur:cl RDaley DATE 10/29/15 10/29/15 OFFICIAL RECORD COPY