#REDIRECT [[IR 05000263/2015007]]
{{Adams
| number = ML15355A533
| issue date = 12/21/2015
| title = Ltr 12/21/15 Monticello Nuclear Generating Plant Follow-Up to Disputed Violations of NRC Inspection Report 05000263/2015007 (Nja)
| author name = Lipa C
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Gardner P
| addressee affiliation = Northern States Power Co
| docket = 05000263
| license number = DPR-022
| contact person =
| case reference number = EA-15-206
| document report number = IR 2015007
| document type = Letter
| page count = 2
}}
See also: [[see also::IR 05000263/2015007]]
 
=Text=
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III 2443 WARRENVILLE RD. SUIT
E 210 LISLE, IL  60532
-4352 December 21, 2015
EA-15-2 06  Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN  55362
-9637 SUBJECT:  MONTICELLO
NUCLEAR GENERATING PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 050002
63/201500 7 Dear Mr. Gardner: This is a follow
-up letter to the U.S. Nuclear Regulatory Commission (NRC)
acknowledgement of disputed violation of NRC Inspection Report (IR) 05000263/2015007.  Specifically, on October 28, 2015, the NRC acknowledged your letter
sent to the NRC, dated October 2, 2015, that contested a Non
-Cited Violation (NCV) documented in our
IR issued on September 2, 2015.  The contested NCV is "Failure to Review for Suitability of Application Safety
-Related Relays Installed
Beyond their Service Life."
The NRC seeks to provide a
thorough response to disputed violations within 90 days of receipt of licensee's points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I.  However, the NRC review of this disputed violation is expected to take longer than 90 days because of ongoing activities related to the subject of th
is disputed violation. 
W e will inform you as soon as we complete our evaluation, which is expected to occur during the first quarter of calendar year 2016. In accordance with Title 10 of the Code of Federal Regulations
  (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,  /RA Benny Jose Acting for/
  Christine A. Lipa, Chief  Engineering
Branch 2 Division of Reactor Safety Docket No. 50
-263 License No. DPR
-22 cc:  Distribution via LISTSERV
 
December 21, 2015
EA-15-206  Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN  55362
-9637 SUBJECT:  MONTICELLO NUCLEAR GENERATING PLANT FOLLOW
-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
Dear Mr. Gardner:
This is a follow
-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed violation of NRC Inspection Report (IR) 05000263/2015007.  Specifically, on October 28, 2015, the NRC acknowledged your letter sent to the NRC, dated October 2, 2015, that contested a Non
-Cited Violation (NCV) documented in our IR issued on September
2, 2015.  The contested NCV is "Failure to Review for Suitability of Application Safety
-Related Relays Installed Beyond their Service Life."
The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt
of licensee's points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I.  However, the NRC review of this disputed violation is expected to take longer than 90 days because of ongoing activities related to the subject of this disputed violation.  We will inform you
as soon as we complete our evaluation, which is expected to occur during the first quarter of calendar year 2016.
In accordance with Title 10 of the Code of Federal Regulations
  (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of
this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA Benny Jose Acting for/
Christine A. Lipa, Chief
Engineering
Branch 2 Division of Reactor Safety
Docket No. 50
-263 License No. DPR
-22 cc:  Distribution via LISTSERV
DISTRIBUTION
: Janelle Jessie
RidsNrrDorlLpl3
-1 Resource
  RidsNrrPMMonticello
RidsNrrDirsIrib Resource
Cynthia Pederson
Darrell Roberts
Richard Skokowski
Allan Barker
Carole Ariano
Linda Linn
DRPIII DRSIII Jim Clay Carmen Olteanu
ADAMS Accession Number ML15355A533
  Publicly Available
  Non-Publicly Available
  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII  RIII  RIII  RIII  NAME BJose for NFeliz-Adorno:cl BJose for CLipa  DATE 12/21/15 12/21/15  OFFICIAL RECORD COPY
}}

Revision as of 12:47, 20 June 2019

Ltr 12/21/15 Monticello Nuclear Generating Plant Follow-Up to Disputed Violations of NRC Inspection Report 05000263/2015007 (Nja)
ML15355A533
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/21/2015
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Gardner P
Northern States Power Co
References
EA-15-206 IR 2015007
Download: ML15355A533 (2)


See also: IR 05000263/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III 2443 WARRENVILLE RD. SUIT

E 210 LISLE, IL 60532

-4352 December 21, 2015

EA-15-2 06 Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362

-9637 SUBJECT: MONTICELLO

NUCLEAR GENERATING PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 050002

63/201500 7 Dear Mr. Gardner: This is a follow

-up letter to the U.S. Nuclear Regulatory Commission (NRC)

acknowledgement of disputed violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on October 28, 2015, the NRC acknowledged your letter

sent to the NRC, dated October 2, 2015, that contested a Non

-Cited Violation (NCV) documented in our

IR issued on September 2, 2015. The contested NCV is "Failure to Review for Suitability of Application Safety

-Related Relays Installed

Beyond their Service Life."

The NRC seeks to provide a

thorough response to disputed violations within 90 days of receipt of licensee's points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days because of ongoing activities related to the subject of th

is disputed violation.

W e will inform you as soon as we complete our evaluation, which is expected to occur during the first quarter of calendar year 2016. In accordance with Title 10 of the Code of Federal Regulations

(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely, /RA Benny Jose Acting for/

Christine A. Lipa, Chief Engineering

Branch 2 Division of Reactor Safety Docket No. 50

-263 License No. DPR

-22 cc: Distribution via LISTSERV

December 21, 2015

EA-15-206 Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362

-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT FOLLOW

-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

Dear Mr. Gardner:

This is a follow

-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on October 28, 2015, the NRC acknowledged your letter sent to the NRC, dated October 2, 2015, that contested a Non

-Cited Violation (NCV) documented in our IR issued on September

2, 2015. The contested NCV is "Failure to Review for Suitability of Application Safety

-Related Relays Installed Beyond their Service Life."

The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt

of licensee's points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days because of ongoing activities related to the subject of this disputed violation. We will inform you

as soon as we complete our evaluation, which is expected to occur during the first quarter of calendar year 2016.

In accordance with Title 10 of the Code of Federal Regulations

(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of

this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely, /RA Benny Jose Acting for/

Christine A. Lipa, Chief

Engineering

Branch 2 Division of Reactor Safety

Docket No. 50

-263 License No. DPR

-22 cc: Distribution via LISTSERV

DISTRIBUTION

Janelle Jessie

RidsNrrDorlLpl3

-1 Resource

RidsNrrPMMonticello

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII DRSIII Jim Clay Carmen Olteanu

ADAMS Accession Number ML15355A533

Publicly Available

Non-Publicly Available

Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII NAME BJose for NFeliz-Adorno:cl BJose for CLipa DATE 12/21/15 12/21/15 OFFICIAL RECORD COPY